CN206015664U - A kind of built-in inserted-link type activity hangs muscle - Google Patents

A kind of built-in inserted-link type activity hangs muscle Download PDF

Info

Publication number
CN206015664U
CN206015664U CN201620593349.5U CN201620593349U CN206015664U CN 206015664 U CN206015664 U CN 206015664U CN 201620593349 U CN201620593349 U CN 201620593349U CN 206015664 U CN206015664 U CN 206015664U
Authority
CN
China
Prior art keywords
inserted link
shaped card
suspension rod
card plate
upper swing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620593349.5U
Other languages
Chinese (zh)
Inventor
茹少凡
刘建顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201620593349.5U priority Critical patent/CN206015664U/en
Application granted granted Critical
Publication of CN206015664U publication Critical patent/CN206015664U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of built-in inserted-link type activity hangs muscle, belongs to building, Bridge Pile Foundation Construction aid technical field, including upper swing pipe, lower suspension rod, sleeve pipe, U-shaped card plate and inserted link, the upper end of upper swing pipe is welded with suspension ring;The inside of the upper swing pipe is stretched on the top of lower suspension rod, and lower suspension rod bar to the length direction of upper swing pipe on be provided with corresponding pin-and-hole, be provided with lock pin I in corresponding pin-and-hole by lower suspension rod and upper swing pipe connection locking;Described U-shaped card plate is fixed in the lower end of lower suspension rod, and the opening of U-shaped card plate is provided with corresponding through hole on the upper plate of U-shaped card plate and lower plate towards side;Sleeve pipe is fixed on the sidepiece of the upper swing pipe, is provided with a step in the middle part of inserted link, and the top of inserted link is stretched in sleeve pipe, and in the through hole of bottom insertion U-shaped card plate, the stirrup of strengthening at the top of steel reinforcement cage is stuck in the closing space that U-shaped card plate is constituted with inserted link.This utility model can be reused, and reduce and waste, and save construction cost, easy to operate.

Description

A kind of built-in inserted-link type activity hangs muscle
Technical field
This utility model is related to building, Bridge Pile Foundation Construction aid technical field.
Background technology
Carry out in concreting process in pile foundation, when steel reinforcement cage is positioned after hanging, horizontal direction adopts limited block by steel Muscle cage is fixed on middle position in stake holes, and vertical direction meets design requirement for ensureing steel reinforcement cage top mark height, at the top of steel reinforcement cage Welding hangs muscle, reaches the high purpose of control steel reinforcement cage top mark by the length for adjusting hangs muscle.In prior art the lower end of hangs muscle with Steel reinforcement cage is directly welded, and during casting concrete, hangs muscle is not reclaimed, and on the one hand this way causes hangs muscle to make, weld time-consuming expense Power, hangs muscle is not recyclable to cause waste of material, another reverse side, and rising of steel cage or sinking during casting concrete effectively cannot be controlled System, so that affect the quality of pile foundation engineering steel reinforcement cage.
Utility model content
The technical problems to be solved in the utility model, is to provide a kind of built-in inserted-link type activity hangs muscle, and which can repeat to make With, reduce and waste, saving construction cost, and floating or the sinking of steel reinforcement cage can be effectively controlled, and can adapt to different level Steel reinforcement cage, easy to operate.
For solving above-mentioned technical problem, technical solution adopted in the utility model is:
A kind of built-in inserted-link type activity hangs muscle, including upper swing pipe, lower suspension rod, sleeve pipe, U-shaped card plate and inserted link, described hangs oneself The upper end of pipe is welded with suspension ring;The inside of the upper swing pipe is stretched on the top of the lower suspension rod, and lower suspension rod bar to on The length direction of swing pipe is provided with corresponding pin-and-hole, is provided with lock pin I by lower suspension rod and upper swing pipe connection locking in corresponding pin-and-hole; Described U-shaped card plate is fixed in the lower end of the lower suspension rod, and the opening of U-shaped card plate is towards side, U-shaped card plate upper plate and under Plate is provided with corresponding through hole;Described sleeve pipe is fixed on the sidepiece of the upper swing pipe, and the inserted link includes the inserted link being parallel to each other Top and inserted link bottom, are connected by step between the inserted link top and inserted link bottom, and inserted link top is stretched in sleeve pipe, inserted link In the through hole of bottom insertion U-shaped card plate, the stirrup of strengthening at the top of steel reinforcement cage is stuck in the closing space that U-shaped card plate is constituted with inserted link Interior.
Preferably, being provided with the lock pin II that can be fixed on inserted link on sleeve pipe between described sleeve pipe and the inserted link.
Preferably, the U-shaped card plate is welded to connect with the lower end of the lower suspension rod.
It is using the beneficial effect produced by above-mentioned technical proposal:In prior art, the lower end of hangs muscle is direct with steel reinforcement cage Welding, during casting concrete, hangs muscle is not reclaimed, and on the one hand this way causes hangs muscle to make, welding is wasted time and energy, and hangs muscle can not Recovery causes waste of material, another reverse side, and rising of steel cage or sinking during casting concrete cannot get effective control, so that affecting The quality of pile foundation engineering steel reinforcement cage.This utility model adopts dismountable structure, after the completion of pile foundation construction, by the lower end of inserted link Extract the through hole of U-shaped card plate out, hangs muscle integrally can be departed from steel reinforcement cage, realize that hangs muscle is separated with steel reinforcement cage dismounting so that hangs muscle is whole Body can be reused, and reduce and waste, and save construction cost, and can effectively control floating or the sinking of steel reinforcement cage, thereby increases and it is possible to The enough length by adjustment hangs muscle, adapts to the steel reinforcement cage of different level, easy to operate.
Description of the drawings
Structural representations of the Fig. 1 for this utility model one embodiment;
Each figure number is entitled:1 suspension ring, swing pipe on 2,3 lock pins I, 4 times suspension rods, 5 U-shaped card plates, on 5-1 Plate, 5-2 lower plates, 6 strengthen stirrup, 7 inserted links, 8 sleeve pipes, 9 pin-and-holes, 10 lock pins II.
Specific embodiment
Below in conjunction with the accompanying drawings and one embodiment is described in further detail to this utility model.
As shown in figure 1, this utility model includes swing pipe 2, lower suspension rod 4, sleeve pipe 8, U-shaped card plate 5 and inserted link 7, described on The upper end of swing pipe 2 is welded with suspension ring 1;Stretch into the inside of the upper swing pipe 2, and the bar in lower suspension rod 4 in the top of the lower suspension rod 4 Corresponding pin-and-hole 9 is provided with to the length direction of upper swing pipe 2, lock pin I 3 is provided with corresponding pin-and-hole 9 by lower suspension rod 4 and is hung oneself Pipe 2 connects locking;Described U-shaped card plate 5 is fixed in the lower end of the lower suspension rod 4, and the opening of U-shaped card plate 5 is towards side, in U The upper plate 5-1 of type clamp 5 and lower plate 5-2 are provided with corresponding through hole;Described sleeve pipe 8 is fixed on the sidepiece of the upper swing pipe 2, institute Inserted link 7 is stated in fold-line-shaped, middle part is provided with a bending, and inserted link 7 includes the inserted link top being parallel to each other and inserted link bottom, described slotting Pass through step between bar top and inserted link bottom(That is bending)Connection, inserted link top are built in sleeve pipe 8, can be relative to sleeve pipe 8 move up and down, in the through hole of inserted link bottom insertion U-shaped card plate 5, the reinforcement stirrup 6 at the top of steel reinforcement cage be stuck in U-shaped card plate 5 with In the closing space of the inserted link bottom composition of inserted link 7.
The use process of said structure is:First, according to swing pipe 2 and lower suspension rod 4 on the high Reasonable adjustment of the top mark of steel reinforcement cage Relative position, the two is fixed by lock pin I 3;The inserted link top of inserted link 7 is inserted in sleeve pipe 8;Then, by the top of steel reinforcement cage Stirrup 6 of strengthening stretch in the U-type groove of described U-shaped card plate 5;Then, the inserted link bottom of inserted link 7 is inserted into U-shaped card plate 5 On upper plate 5-1 and lower plate 5-2 in corresponding through hole, stirrup 6 will be strengthened and be enclosed in the closing space that U-shaped card plate 5 is constituted with inserted link 7 Interior.After the completion of pile foundation is poured, you can extract inserted link 7 from the through hole of upper plate 5-1 and lower plate 5-2 out, such that it is able to hangs muscle is whole Body takes out.
The beneficial effect of said structure is:After the completion of pile foundation construction, can separate with steel reinforcement cage dismounting, can repeat to make With, reduce and waste, saving construction cost, and floating or the sinking of steel reinforcement cage can be effectively controlled, and can adapt to different level Steel reinforcement cage, easy to operate, more practical.
Further, the lock pin II that inserted link 7 can be fixed on sleeve pipe 8 is provided between described sleeve pipe 8 and the inserted link 7 10.Inserted link 7 can be relatively fixed by said structure design with sleeve pipe 8, and during preventing from pouring pile foundation, inserted link 7 is moved upwards Dynamic, it is further ensured that the stirrup 6 of strengthening at the top of steel reinforcement cage is reliably stuck in U-shaped card plate 5 with the inserted link bottom composition of inserted link 7 In closing space.
Further, the U-shaped card plate 5 is welded to connect with the lower end of the lower suspension rod 4.Connection is more solid, reliable.
Further, the quantity of the suspension ring 1 is at least 2, and suspension ring 1 are located on the extended line of 2 length direction of upper swing pipe, It is welded to connect between suspension ring 1.Steel reinforcement cage of the said structure design also for adaptation different level, with lower suspension rod 4 and upper swing pipe 2 Collapsible structure design effect identical, between suspension rod 4 and upper swing pipe 2, the adjustment of relative position can not meet steel reinforcement cage instantly During the requirement of absolute altitude, the adjustment for selecting the suspension ring 1 of differing heights be aided in can be passed through, the suitability is higher.
Specific case used herein is set forth to principle of the present utility model and embodiment, above example Explanation be only intended to help and understand method of the present utility model and its core concept.It should be pointed out that for the art For those of ordinary skill, on the premise of without departing from this utility model principle, some changing can also be carried out to this utility model Enter and modify, these improvement and modification are also fallen in this utility model scope of the claims.

Claims (3)

1. a kind of built-in inserted-link type activity hangs muscle, it is characterised in that:Including upper swing pipe(2), lower suspension rod(4), sleeve pipe(8), U-shaped card Plate(5)And inserted link(7), the upper swing pipe(2)Upper end be welded with suspension ring(1);The lower suspension rod(4)Top stretch on described Swing pipe(2)Inside, and in lower suspension rod(4)Bar to upper swing pipe(2)Length direction be provided with corresponding pin-and-hole(9), right The pin-and-hole that answers(9)In be provided with lock pin I(3)By lower suspension rod(4)With upper swing pipe(2)Connection locking;The lower suspension rod(4)Lower end solid Fixed described U-shaped card plate(5), and U-shaped card plate(5)Opening towards side, in U-shaped card plate(5)Upper plate(5-1)And lower plate (5-2)It is provided with corresponding through hole;Described sleeve pipe(8)It is fixed on the upper swing pipe(2)Sidepiece, the inserted link(7)Including phase Mutually parallel inserted link top and inserted link bottom, are connected by step between the inserted link top and inserted link bottom, and inserted link top is stretched Enter sleeve pipe(8)Interior, U-shaped card plate is inserted in inserted link bottom(5)Through hole in, reinforcement stirrup at the top of steel reinforcement cage(6)It is stuck in the U Type clamp(5)In the closing space constituted with the inserted link bottom of the inserted link (7).
2. a kind of built-in inserted-link type activity hangs muscle according to claim 1, it is characterised in that:Described sleeve pipe(8)With described Inserted link(7)Between be provided with can be by inserted link(7)It is fixed on sleeve pipe(8)On lock pin II(10).
3. a kind of built-in inserted-link type activity hangs muscle according to claim 1, it is characterised in that:The U-shaped card plate(5)With institute State lower suspension rod(4)Lower end be welded to connect.
CN201620593349.5U 2016-06-17 2016-06-17 A kind of built-in inserted-link type activity hangs muscle Expired - Fee Related CN206015664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620593349.5U CN206015664U (en) 2016-06-17 2016-06-17 A kind of built-in inserted-link type activity hangs muscle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620593349.5U CN206015664U (en) 2016-06-17 2016-06-17 A kind of built-in inserted-link type activity hangs muscle

Publications (1)

Publication Number Publication Date
CN206015664U true CN206015664U (en) 2017-03-15

Family

ID=58242647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620593349.5U Expired - Fee Related CN206015664U (en) 2016-06-17 2016-06-17 A kind of built-in inserted-link type activity hangs muscle

Country Status (1)

Country Link
CN (1) CN206015664U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670582A (en) * 2019-09-26 2020-01-10 广东省建筑工程机械施工有限公司 Device for cast-in-place pile construction and cast-in-place pile construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670582A (en) * 2019-09-26 2020-01-10 广东省建筑工程机械施工有限公司 Device for cast-in-place pile construction and cast-in-place pile construction method
CN110670582B (en) * 2019-09-26 2024-02-09 广东省建筑工程机械施工有限公司 Device for construction of cast-in-place pile and cast-in-place pile construction method

Similar Documents

Publication Publication Date Title
CN201649072U (en) Pile foundation reinforcement cage hoisting device
CN206957257U (en) Spigot-and-socket edge protection column
CN208701729U (en) A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap
CN107100069A (en) A kind of concrete cylindrical pier capping beam and binder inverted construction method
CN204266193U (en) Pile foundation steel bar cage locator
CN206737118U (en) A kind of prefabricated regeneration concrete bean column node of reinforcement
CN206034444U (en) Movable hanging steel bar for steel reinforcement cage of pile foundation
CN205653782U (en) Mould is repaired to bored concrete pile pile head
CN207061644U (en) A kind of borehole filling pile cage of reinforcement lowering equipment
CN206015664U (en) A kind of built-in inserted-link type activity hangs muscle
CN203625889U (en) Hanging cage structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN108005114A (en) A kind of piping lane pours mould
CN209066594U (en) The connection structure of contrary sequence method foundation pit construction central sill and steel core concrete column
CN205676782U (en) Cross moving track system before step-less adjustment ball-and-socket hinge style many supporting racks bridge machine
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN207775925U (en) A kind of piping lane pours mold
CN206693470U (en) A kind of cast-in-place secondary beam T-shaped floor
CN206267358U (en) A kind of built-in girder steel shear wall
CN205636493U (en) A device that is used for high mound of hollow thin wall of bridge to bind
CN212866086U (en) Lattice column direction control device
CN209277089U (en) The cast-in-place beam template hanging supporting device of long piled wharf and support system
CN108999287B (en) A kind of assembled square steel tube concrete beam Column border node connection type
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN206052692U (en) A kind of bored concrete pile suspension rod
CN206052691U (en) A kind of removable bored concrete pile suspension rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20210617