CN206015055U - A kind of galvanization production line - Google Patents
A kind of galvanization production line Download PDFInfo
- Publication number
- CN206015055U CN206015055U CN201620979067.9U CN201620979067U CN206015055U CN 206015055 U CN206015055 U CN 206015055U CN 201620979067 U CN201620979067 U CN 201620979067U CN 206015055 U CN206015055 U CN 206015055U
- Authority
- CN
- China
- Prior art keywords
- water
- aqueous vapor
- production line
- workpiece
- high pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Coating With Molten Metal (AREA)
Abstract
The utility model discloses a kind of galvanization production line, comprise the pretreatment washing equipment sequentially connecting, pickler, washing equipment, help plating pond, drying baker, hot dip pond, cooling bay, wherein workpiece is sling by loop wheel machine, entering successively and in corresponding production equipment, complete galvanizing operation. pretreatment and washing step in above-mentioned production line unite two into one, by pressure-air through tube connector to air nozzle, running water through tube connector to water injection nozzle, workpiece is through the cleaning of water spout, reach the effect of high pressure water cleaning, carry out high pressure and dry up again the effect of cleaning through air nozzle, effectively remove surface oxide layer and greasy dirt, guarantee the raising of product quality and save production cost, saving water resource reduces pollutant emission, pickler adopts two step pickling comprehensive treatment techniques, can remove fast at normal temperatures stainless steel surfaces thick oxide layer and clean spent acid etc.
Description
Technical field
The utility model relates to Hot Galvanizing Technology field, particularly a kind of galvanization production line.
Background technology
Zinc-plated referring at metal, plated surface one deck zinc of alloy or other material is attractive in appearance to rise, the antirust table that waits effect face treatment technology. the method that the plating zinc on surface of steel plate mainly adopts is now galvanizing, galvanizing resistance to corrosion far away higher than electrogalvanizing, galvanizing can not be got rusty in several years, electrogalvanizing will get rusty in half a year. and galvanizing and hot dipping are also named in galvanizing zinc-plated, it is a kind of effectively anti-corrosion of metal mode, be mainly used on the metal structure facility of every profession and trade. in various protection steel matrix coating method in, galvanizing is very good one. it is to be under the state of liquid at zinc, pass through quite complicated thing reason, after chemical action, on iron and steel, not only plate thicker pure zinc layer, but also generate a kind of zinc-iron alloy layer. this plant plating method, not only possesses the corrosion-resistant characteristic of electrogalvanizing, and owing to thering is zinc-iron alloy layer, also having electrogalvanizing institute cannot think the strong corrosion resistance of analogy. therefore this plating method is specially adapted to various strong acid, in the strong corrosive environments such as alkali fog. galvanizing is produced product are lengthened the life to the corrosion inhibitor of iron and steel, energy-saving material-saving plays irreplaceable effect, with high voltage power transmission, traffic, communication career is sent out rapidly exhibition, more and more higher to steel and iron parts requirement of shelter, galvanizing demand also constantly increases.
The production line automation degree of existing galvanizing is low, as operation under pretreated water needs artificial or distributes first Carry out the pretreatment of oxide layer, and wash the impurity such as greasy dirt etc., caused the raising of labor cost; Existing acid dip pickle Under the room temperature at 20-25 DEG C, the hydrochloric acid solution of workpiece to be plated being put into 18-20% carries out pickling, to remove workpiece to be plated The oxide of the iron such as surface iron rust, in the time that workpiece to be plated is put into hydrochloric acid solution, first tilts workpiece to be plated 15 °, puts into be plated One end of workpiece, then put into the other end, the immersion time is 5-15 minute; But this pickling process is time-consuming, and the workpiece that need to overturn, Increase labour intensity.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, and a kind of galvanization production line is provided, and it is high that this production line has automaticity, reduced labor cost.
The technical solution of the utility model is achieved in that a kind of galvanization production line, the pretreatment that comprises sequentially connection is washed equipment, pickler, washing equipment, is helped plating pond, drying baker, hot dip pond, cooling bay, wherein workpiece is sling by loop wheel machine, enters successively and in corresponding production equipment, completes galvanizing operation.
As preferably, described pretreatment washing equipment comprises on Workpiece fixing plate, and Workpiece fixing plate is provided with aqueous vapor stationary magazine creel, aqueous vapor stationary magazine creel is provided with aqueous vapor and enters plate, aqueous vapor is entered plate and is provided with water spout and air nozzle, wherein pressure-air through tube connector to air nozzle, running water through tube connector to water injection nozzle.
As another preferred, described pickler comprises the heat water-spraying chamber, the first water under high pressure spray chamber, the first pickling chamber, the second water under high pressure spray chamber, the second pickling chamber, the third high setting-out spray chamber that connect successively.
Preferably described washing equipment comprises on Workpiece fixing plate as another, and Workpiece fixing plate is provided with aqueous vapor stationary magazine creel, aqueous vapor stationary magazine creel is provided with aqueous vapor and enters plate, aqueous vapor is entered plate and is provided with water spout and air nozzle, wherein pressure-air through tube connector to air nozzle, running water through tube connector to water injection nozzle.
Pretreatment and washing step in above-mentioned production line unite two into one, extremely jet through tube connector by pressure-air mouth, running water through tube connector to water injection nozzle, workpiece is through the cleaning of water spout, reach the effect of high pressure water cleaning, pass through again jet mouth carries out high pressure and dries up the effect of cleaning, effectively remove surface oxide layer and greasy dirt, guarantee raising the saving of product quality production cost, saving water resource reduces pollutant emission, pickler adopts two step pickling comprehensive treatment techniques, at normal temperatures can remove fast stainless steel surfaces thick oxide layer and clean spent acid etc.
Compared with prior art, advantage of the present utility model is as follows: it is high that this production line has automaticity, reduced labor cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Detailed description of the invention of the present utility model is as follows:
Embodiment 1: as shown in Figure 1: a kind of galvanization production line, comprise the pretreatment washing equipment 1 sequentially connecting, pickling equipment 2, washing equipment 3, help plating pond 4, drying baker 5, hot dip pond 6, cooling bay 7, wherein workpiece is sling by loop wheel machine, enter successively in corresponding production equipment, completing galvanizing operation. described pretreatment washing equipment comprises on Workpiece fixing plate 1.1, workpiece is fixed plate is provided with aqueous vapor stationary magazine creel 1.2, aqueous vapor stationary magazine creel is provided with aqueous vapor and enters plate 1.3, aqueous vapor enter plate be provided with water spout 1.4 and air nozzle 1.5, wherein pressure-air through tube connector to air nozzle, running water through tube connector to water injection nozzle. described pickler bag draw together the heat water-spraying chamber 2.1 connecting successively, the first water under high pressure spray chamber 2.2, the first pickling chamber 2.3, the second water under high pressure spray chamber 2.4, the second pickling chamber 2.5, described in third high setting-out spray chamber 2.6., washing equipment comprises on Workpiece fixing plate 3.1, workpiece is solid determine plate and be provided with aqueous vapor stationary magazine creel 3.2, aqueous vapor stationary magazine creel is provided with aqueous vapor and enters plate 3.3, aqueous vapor enter plate be provided with water spout 3.4 with and air nozzle 3.5, wherein pressure-air through tube connector to air nozzle, running water through tube connector to water injection nozzle.
Pretreatment and washing step in above-mentioned production line unite two into one, extremely jet through tube connector by pressure-air mouth, running water through tube connector to water injection nozzle, workpiece is through the cleaning of water spout, reach the effect of high pressure water cleaning, pass through again jet mouth carries out high pressure and dries up the effect of cleaning, effectively remove surface oxide layer and greasy dirt, guarantee raising the saving of product quality production cost, saving water resource reduces pollutant emission, pickler adopts two step pickling comprehensive treatment techniques, at normal temperatures can remove fast stainless steel surfaces thick oxide layer and clean spent acid etc.
Finally, should be understood that, above embodiment is only the more representational example of the utility model. obviously, this practicality is new The technical scheme of type is not limited to above-described embodiment, can also have many deformations.One of ordinary skill in the art can be from this reality The all deformations that is directly derived with new disclosure or associated, are considered as protection domain of the present utility model.
Claims (4)
1. a kind of galvanization production line, it is characterised in that including sequentially connect pretreatment washing equipment, pickler, washing
Equipment, plating pond, drying baker, hot dip pond, cooling bay is helped, wherein workpiece sling by loop wheel machine, sequentially enters corresponding production equipment
In complete galvanizing operation.
2. galvanization production line according to claim 1, it is characterised in that the pretreatment washing equipment includes that workpiece is solid
In fixed board, Workpiece fixing plate is provided with aqueous vapor fixed cylinder, and aqueous vapor fixed cylinder is provided with aqueous vapor and enters plate, and aqueous vapor is entered plate and is provided with water spray
, through connecting tube to air nozzle, running water is through connecting tube to water injection nozzle for mouth and air nozzle, wherein pressure-air.
3. galvanization production line according to claim 1, it is characterised in that the pickler includes the heat being sequentially connected
Water spray room, the first water under high pressure spray chamber, the first pickling room, the second water under high pressure spray chamber, the second pickling room, the 3rd high pressure water jets
Drench room.
4. galvanization production line according to claim 1, it is characterised in that the washing equipment includes Workpiece fixing plate
On, Workpiece fixing plate is provided with aqueous vapor fixed cylinder, and aqueous vapor fixed cylinder is provided with aqueous vapor and enters plate, aqueous vapor enter plate be provided with water spout with
And air nozzle, wherein, through connecting tube to air nozzle, running water is through connecting tube to water injection nozzle for pressure-air.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620979067.9U CN206015055U (en) | 2016-08-29 | 2016-08-29 | A kind of galvanization production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620979067.9U CN206015055U (en) | 2016-08-29 | 2016-08-29 | A kind of galvanization production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206015055U true CN206015055U (en) | 2017-03-15 |
Family
ID=58253462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620979067.9U Expired - Fee Related CN206015055U (en) | 2016-08-29 | 2016-08-29 | A kind of galvanization production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206015055U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106222594A (en) * | 2016-08-29 | 2016-12-14 | 桐乡市铁盛线路器材有限公司 | A kind of galvanization production line |
-
2016
- 2016-08-29 CN CN201620979067.9U patent/CN206015055U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106222594A (en) * | 2016-08-29 | 2016-12-14 | 桐乡市铁盛线路器材有限公司 | A kind of galvanization production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105603349A (en) | Hot galvanizing process | |
CN102965675B (en) | Pickling passivation method of stainless steel | |
CN109881133A (en) | A kind of electric power tower component hot dip galvanizing process | |
CN102051605B (en) | Method for anti-corrosive surface treatment of aluminum or aluminum alloy product | |
CN103938142B (en) | A kind of thinning ammonium-salt-free plating assistant agent of solvent technique heat galvanizing coating | |
CN102994926A (en) | Hot dip galvanizing process method | |
CN107513681B (en) | Hot-dip galvanizing process | |
CN106222594A (en) | A kind of galvanization production line | |
CN104152836A (en) | Hot-dip galvanizing process | |
CN102644082A (en) | Frame coating technology combining silane pretreatment and cathode electrophoresis | |
CN206015055U (en) | A kind of galvanization production line | |
CN106947962A (en) | A kind of salt-free acid pickling and rust removing method for bonderizing of hot rolling wire rod | |
CN101275254B (en) | High efficiency chromium electroplating method for low and middle continuous processing line | |
CN104178718A (en) | Production method of prestressed hot-galvanized steel wire for bridge | |
CN104419940A (en) | Steel wire surface treatment method | |
CN105618413A (en) | Cleaning technique for surface of metal-cased cell | |
CN103966645A (en) | Stepping electrophoresis line production technology | |
CN108546896B (en) | High-reliability environment-friendly electric power fitting galvanizing process | |
CN101956189B (en) | Method for treating inner surface of steel drum | |
CN111118580A (en) | Electrophoresis process of automobile parts | |
CN103469252B (en) | The aluminium electrolysis cathode rod iron of anti-carburizi ng | |
CN105195405A (en) | Metal surface anti-corrosion treatment method | |
CN104060208A (en) | Bolt galvanized line production equipment | |
CN103805978A (en) | Energy-saving black metal processing method | |
CN111058022B (en) | Anticorrosion and antibacterial treatment method for iron handrails |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170315 Termination date: 20200829 |