CN205997720U - A kind of front defrosting air pipe and the assembling structure of instrument board - Google Patents

A kind of front defrosting air pipe and the assembling structure of instrument board Download PDF

Info

Publication number
CN205997720U
CN205997720U CN201620861210.4U CN201620861210U CN205997720U CN 205997720 U CN205997720 U CN 205997720U CN 201620861210 U CN201620861210 U CN 201620861210U CN 205997720 U CN205997720 U CN 205997720U
Authority
CN
China
Prior art keywords
air pipe
instrument board
defrosting air
front defrosting
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620861210.4U
Other languages
Chinese (zh)
Inventor
李会英
梁庆钦
李艳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAIC GM Wuling Automobile Co Ltd
Original Assignee
SAIC GM Wuling Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAIC GM Wuling Automobile Co Ltd filed Critical SAIC GM Wuling Automobile Co Ltd
Priority to CN201620861210.4U priority Critical patent/CN205997720U/en
Application granted granted Critical
Publication of CN205997720U publication Critical patent/CN205997720U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air-Flow Control Members (AREA)

Abstract

This utility model provides the assembling structure of a kind of front defrosting air pipe and instrument board, including before defrosting air pipe and instrument board, the top edge of described front defrosting air pipe is provided with positioning and guiding pin, the lower limb of described front defrosting air pipe is provided with flange, the upper end of described instrument board is provided with the positioning guide hole matching with described positioning and guiding pin, described positioning and guiding pin is arranged on described positioning and guiding in the hole, and the lower end of described instrument board is provided with limit ribs.The beneficial effects of the utility model are:On the one hand, before fastening is installed, positioning and guiding pin can be first passed through and carry out guide-localization, can quickly, precisely front defrosting air pipe be assembled in place;On the other hand, can be matched with flange by draw-in groove, reach spacing purpose, can prevent front defrosting air pipe oral area from occurring from empty, problem of misalignment with the defroster grill oral area of instrument board because own form shrinks, reduce wind loss, reduce abnormal sound source, lift defrosting-defogging performance.

Description

A kind of front defrosting air pipe and the assembling structure of instrument board
Technical field
This utility model is related to the assembling structure of instrument board, the assembling knot of more particularly, to a kind of front defrosting air pipe and instrument board Structure.
Background technology
Traditional front defrosting air pipe is fixed on instrument board by 3 self threading pins, and front defrosting air pipe border is turned over by airduct Side is coordinated with instrument board;This respective outer side edges mode has following defect:
A. no guide assembling structure, be unfavorable for the assembling of front defrosting air pipe;
B. the airduct flange between screw mount point and instrument board infinite place mechanism, easily produces airduct oral area because from figure Shape shrinks and produces from empty and problem of misalignment with instrument board defroster grill, and wind loss is serious, has noise, simultaneously defrosting-defogging performance Decline.
Content of the invention
In order to solve the problems of the prior art, this utility model provides the assembling of a kind of front defrosting air pipe and instrument board Structure.
This utility model provides the assembling structure of a kind of front defrosting air pipe and instrument board, including before defrosting air pipe and instrument Plate, the top edge of described front defrosting air pipe is provided with positioning and guiding pin, and the lower limb of described front defrosting air pipe is provided with flange, described instrument The upper end of dash board is provided with the positioning guide hole matching with described positioning and guiding pin, and described positioning and guiding pin is arranged on described positioning Guiding in the hole, the lower end of described instrument board is provided with limit ribs, and described limit ribs are provided with the card matching with described flange Groove, described flange is arranged in described draw-in groove.
As further improvement of the utility model, described flange is wrapped with the first sponge, described first sponge sandwiched Between described flange, draw-in groove.
As further improvement of the utility model, the top edge of described front defrosting air pipe is enclosed with the second sponge, described Second sponge holder is located between described front defrosting air pipe, instrument board.
As further improvement of the utility model, the upper end of described instrument board is provided with guide and limit boss, described guiding Positive stop lug boss is fitted with the top edge of described front defrosting air pipe.
As further improvement of the utility model, the top edge of described front defrosting air pipe passes through tapping screw and described instrument The upper end of dash board connects.
As further improvement of the utility model, described positioning and guiding pin has four.
The beneficial effects of the utility model are:By such scheme, on the one hand, before installing fastening, it is fixed to first pass through Position guide finger carries out guide-localization, can quickly, be precisely assembled in place front defrosting air pipe;On the other hand, draw-in groove can be passed through and turn over While matching, reaching spacing purpose, the defrosting with instrument board because own form shrinks of front defrosting air pipe oral area can be prevented Grid oral area occurs from empty, problem of misalignment, reduces wind loss, reduces abnormal sound source, lifts defrosting-defogging performance.
Brief description
Fig. 1 is the schematic diagram of a kind of front defrosting air pipe of this utility model and the assembling structure of instrument board.
Fig. 2 is the profile A-A of Fig. 1.
Specific embodiment
Explanation and specific embodiment further illustrate to this utility model below in conjunction with the accompanying drawings.
Drawing reference numeral in Fig. 1 to Fig. 2 is:Front defrosting air pipe 1;Instrument board 2;Tapping screw 3;Limit ribs 4;Second sea Continuous 5;Guide and limit boss 6;Draw-in groove 7;First sponge 8.
As shown in Figure 1 to Figure 2, the assembling structure of a kind of front defrosting air pipe and instrument board, including before defrosting air pipe 1 and instrument Plate 2, the top edge of described front defrosting air pipe 1 is provided with positioning and guiding pin, and the lower limb of described front defrosting air pipe 1 is provided with flange, institute The upper end stating instrument board 2 is provided with the positioning guide hole matching with described positioning and guiding pin, and described positioning and guiding pin is arranged on institute State positioning and guiding in the hole, the lower end of described instrument board 2 is provided with limit ribs 4, and described limit ribs 4 are provided with and described flange phase The draw-in groove 7 of cooperation, described flange is arranged in described draw-in groove 7.
As shown in Figure 1 to Figure 2, described flange is wrapped with the first sponge 8, described first sponge 8 be located in described flange, Between draw-in groove 7.
As shown in Figure 1 to Figure 2, the top edge of described front defrosting air pipe 1 is enclosed with the second sponge 5, and described second sponge 5 is pressed from both sides Located between described front defrosting air pipe 1, instrument board 2.
As shown in Figure 1 to Figure 2, the upper end of described instrument board 2 is provided with guide and limit boss 6, described guide and limit boss 6 with The top edge of described front defrosting air pipe 1 fits.
As shown in Figure 1 to Figure 2, the top edge of described front defrosting air pipe 1 passes through the upper of tapping screw 3 and described instrument board 2 End connects.
As shown in Figure 1 to Figure 2, described positioning and guiding pin has four.
A kind of front defrosting air pipe that this utility model provides is had the characteristics that with the assembling structure of instrument board:
A. in addition to 3 tapping screws 3 of arrangement, top edge also has 4 positioning and guiding pins to front defrosting air pipe 1, spacing Simultaneously work as guiding the effect of assembling, can quickly, precisely airduct be assembled in place.
B. front defrosting air pipe 1 lower limb is snapped in by flange in the draw-in groove 7 of limit ribs 4 of instrument board 2, plays spacing Effect, can prevent front defrosting air pipe 1 oral area because own form shrinks with the defroster grill oral area of instrument board 2 from empty, dislocation Problem occurs, and reduces wind loss, reduces abnormal sound source, lifts defrosting-defogging performance.
A kind of front defrosting air pipe that this utility model provides is as follows with the advantage of the assembling structure of instrument board:
A. fast accurate assembling airduct, improve production efficiency.
B. reduce noise, lift perceived quality.
C. reduce noise source, more conducively abnormal sound source is searched.
D. reduce wind loss, improve warm-air drier air-out utilization rate.
E. reduce wind loss, lift car load defrosting-defogging performance.
Above content be with reference to specific preferred implementation further detailed description of the utility model it is impossible to Identification is of the present utility model to be embodied as being confined to these explanations.Ordinary skill for this utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, all should regard For belonging to protection domain of the present utility model.

Claims (6)

1. a kind of front defrosting air pipe and instrument board assembling structure it is characterised in that:Including before defrosting air pipe and instrument board, described The top edge of front defrosting air pipe is provided with positioning and guiding pin, and the lower limb of described front defrosting air pipe is provided with flange, described instrument board Upper end is provided with the positioning guide hole matching with described positioning and guiding pin, and described positioning and guiding pin is arranged on described positioning guide hole Interior, the lower end of described instrument board is provided with limit ribs, and described limit ribs are provided with the draw-in groove matching with described flange, described Flange is arranged in described draw-in groove.
2. front defrosting air pipe according to claim 1 and instrument board assembling structure it is characterised in that:Described flange outsourcing It is wrapped with the first sponge, described first sponge holder is located between described flange, draw-in groove.
3. front defrosting air pipe according to claim 1 and instrument board assembling structure it is characterised in that:Described front defrosting wind The top edge of pipe is enclosed with the second sponge, and described second sponge holder is located between described front defrosting air pipe, instrument board.
4. front defrosting air pipe according to claim 1 and instrument board assembling structure it is characterised in that:Described instrument board Upper end is provided with guide and limit boss, and described guide and limit boss is fitted with the top edge of described front defrosting air pipe.
5. front defrosting air pipe according to claim 1 and instrument board assembling structure it is characterised in that:Described front defrosting wind The top edge of pipe is connected with the upper end of described instrument board by tapping screw.
6. front defrosting air pipe according to claim 1 and instrument board assembling structure it is characterised in that:Described positioning and guiding Pin has four.
CN201620861210.4U 2016-08-10 2016-08-10 A kind of front defrosting air pipe and the assembling structure of instrument board Expired - Fee Related CN205997720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620861210.4U CN205997720U (en) 2016-08-10 2016-08-10 A kind of front defrosting air pipe and the assembling structure of instrument board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620861210.4U CN205997720U (en) 2016-08-10 2016-08-10 A kind of front defrosting air pipe and the assembling structure of instrument board

Publications (1)

Publication Number Publication Date
CN205997720U true CN205997720U (en) 2017-03-08

Family

ID=58198305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620861210.4U Expired - Fee Related CN205997720U (en) 2016-08-10 2016-08-10 A kind of front defrosting air pipe and the assembling structure of instrument board

Country Status (1)

Country Link
CN (1) CN205997720U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106042934A (en) * 2016-08-10 2016-10-26 上汽通用五菱汽车股份有限公司 Assembling structure of front defrosting air pipe and instrument board

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106042934A (en) * 2016-08-10 2016-10-26 上汽通用五菱汽车股份有限公司 Assembling structure of front defrosting air pipe and instrument board

Similar Documents

Publication Publication Date Title
CN205997720U (en) A kind of front defrosting air pipe and the assembling structure of instrument board
CN204177018U (en) Refrigerator
CN203771862U (en) Refrigerator
CN106042934A (en) Assembling structure of front defrosting air pipe and instrument board
CN205005382U (en) Hanging electric cabinet of air conditioner
CN202849748U (en) Position regulating device of edge tensioning halter
CN203964317U (en) Air-cooled ducted air conditioner and screen pack fixed structure thereof
CN203553801U (en) Built-in cable arrangement frame
CN204929443U (en) Machine cabinet
CN204632506U (en) A kind of dry-type transformer replacing blower fan apparatus that do not have a power failure
CN204349361U (en) A kind of cable bridge rack side board structure of good heat dissipation effect
CN204948608U (en) For the electrical control cabinet of UV equipment
CN204151515U (en) The limit yarn feeding device of flat filament warping machines
CN209643243U (en) A kind of electrical cabinet with PLC auxiliary heat dissipation box
CN204678653U (en) A kind of panel beating of plastic front board strengthens structure
CN204382783U (en) A kind of printing machine with radiator structure
CN203940325U (en) A kind of ingot position signal lamp of rotor spinning machine
CN202948713U (en) Novel bass device of accordion
CN203722984U (en) A compressor and a compressor set
CN202141990U (en) Server computer case provided with combination type front window
CN208299242U (en) A kind of High-Voltage Electrical Appliances cabinet being easily installed
CN203233639U (en) Guiding type support device of fans
CN202867586U (en) Bracket for rotating shaft
CN209281810U (en) LED display cabinet waterproof construction
CN202746295U (en) Fan volute

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308