CN205990904U - Waste heat recovery product well system for coal underground gasifying technology - Google Patents

Waste heat recovery product well system for coal underground gasifying technology Download PDF

Info

Publication number
CN205990904U
CN205990904U CN201620929802.5U CN201620929802U CN205990904U CN 205990904 U CN205990904 U CN 205990904U CN 201620929802 U CN201620929802 U CN 201620929802U CN 205990904 U CN205990904 U CN 205990904U
Authority
CN
China
Prior art keywords
product
pipe
well
cooling tube
pipeline section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620929802.5U
Other languages
Chinese (zh)
Inventor
闵振华
汪原理
卡斯珀·扬·亨德利克·伯格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China (shanghai) Energy Technology Co Ltd
Original Assignee
China (shanghai) Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China (shanghai) Energy Technology Co Ltd filed Critical China (shanghai) Energy Technology Co Ltd
Priority to CN201620929802.5U priority Critical patent/CN205990904U/en
Application granted granted Critical
Publication of CN205990904U publication Critical patent/CN205990904U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides a kind of waste heat recovery product well system for coal underground gasifying technology, and this waste heat recovery product well system includes:Product pipe, jacket pipe, water cooling tube, measuring instrument system, product casing, High Temperature High Pressure wellhead equipment and ground waste-heat recovery device etc., in this product well system, all parts all easily reclaim, reuse, and the heat that down-hole high pressure high temperature vapor is carried out can be used for surface production technique, steam turbine power generation, boiler generate electricity, other ground public utilities or plant area's life are personal etc..The effective monitoring to product well not only can be realized, control and protection by this utility model; and reliable and effective recovery and comprehensive utilization has been carried out to the waste heat of high-temperature crude synthesis gas; significantly decrease cooling water amount and reduce the requirement that waste water downstream is processed; it is truly realized coal comprehensive high-efficiency to utilize, reduce whole coal underground gasifying technology(ISC)Energy consumption, finally solve existing coal underground gasifying technology(ISC)The technical barrier facing.

Description

Waste heat recovery product well system for coal underground gasifying technology
Technical field
This utility model is related to a kind of residual neat recovering system, more particularly to a kind of for coal underground gasifying technology Waste heat recovery product well system.
Background technology
Underground coal gasification(UCG)(ISC)It is a kind of by the controlled burning to subterranean coal(Imperfect combustion)And gasified reverse Should, coal is converted into the technical process of gas products.Product gas are commonly known as synthesis gas, can as fuel production, The raw material of the downstream processes such as Chemical Manufacture, generating.This technical process set shaft building completion, underground coal mining and coal gasifying process skill Art, have the advantages that safety is good, the little, high efficiency of investment, pollution few.
Coal seam is led directly to by ground drilling, the injection of oxygen supply agent and product gas output provide effective passage.One is used for The drilling well of oxidant injection is referred to as " injection well ", and the drilling well that another one is used for producing product gas is referred to as " product well ".Directional Drilling Well and vertical drilling all can be used as injection well or product wells.
When having injection well, product well and horizontal channel to couple together the two in coal seam, this construction is referred to as a coal Charcoal underground gasification(ISC)Unit or well pair.ISC unit includes combustion zone, gasification zone and pyrolysis zone.Given birth to by underground coal gasification(UCG) The product gas becoming(Crude synthesis gas)Usually contain synthesis gas(CO、CO2、 H2、 CH4Deng)And other impurities composition(Solid Grain, water, coal tar, H2S、NH4, COS etc.).Its complicated component degree depends on many aspects, including:The coal ground therapeutic method to keep the adverse QI flowing downwards Change used oxidant(Air or other oxidants such as oxygen, oxygen-enriched air or vapour mixture), underground coal gasification(UCG) work The operating parameter of skill(As temperature, pressure, flow etc.), the inherent water in coal seam or surrounding formations penetrate into water in coal seam, ature of coal Deng.
One of Main Bottleneck of coal underground gasification technology is that the effective discharge of product well in running limits and produces The damage of product well.The main cause of these problems includes the wrong type selecting of product well, and happen suddenly high-temperature condition, and heat dissipation design considers not Foot, corrosion protection design considers not enough and stopping state etc..According to existing patent documentation, the concrete technical problems facing at present Including:
(1)Because high heat load acts directly on its absolute high temperature causing on product well(May be up to 700oC).When this temperature Degree exceedes the yield stress invalid temperature of product casing material, ultimately causes the damage of product well.
(2)Due to thermal expansion limited by well cementing of cement sleeve pipe(Thermal stretching)The sleeve pipe causing and/or the damage of cementing position Bad.
(3)Due to not considering the free suspension of product pipe in vertical or confined goods well(Deadweight)Thermal stretching and the product that causes QC flexural deformation.
(4)Because web rot corrosion synthesis gas causes deterioration and the damage of product well integrity.Including granule with a high speed Gas pickling, hydrogen embrittlement or hydrogen induced cracking (HIC), chloride ion spot corrosion, sulfide(H2S)Stress corrosion cracking, CO2Corrosion, dissimilar metal Couple corrosion and other corrosion mechanisms.
(5)In ignition process, because product well temperature is relatively low, the volatile matters of coal and thermal decomposition product heavy constituent(Tar, Colophonium Deng)Easily condense in product well and mix with solid particle and coal ash, ultimately cause the partially or completely blocking of product well.Class As, when underground gasification load down runs, because the reduction of product well temperature and air-flow are carried solid, liquid body impurity secretly and not exclusively made The product well plugging becoming.
(6)Product well underground monitoring device system is not enough, causes cannot detect in advance and process product well plugging and/or damage Bad problem.
(7)Product well does not have enough security system devices and processing method, to tackle high-temperature product well and to damage, gas is dirty The problems such as design of dye thing leakage and system exception ruuning situation and the not enough strata pressure causing of configuration are too high.
(8)The product well equipment easily not reclaiming and can re-using.
(9)Waste heat in crude synthesis gas under suitable process recovery well is not had to reduce whole underground coal gasification(UCG) (ISC)The energy consumption of technique.
Utility model content
One of the purpose of this utility model is to solve the deficiencies in the prior art, provides one kind to be used for underground coal gasification(UCG) work The waste heat recovery product well system of skill.
This utility model solves its technical problem and be employed technical scheme comprise that:
A kind of waste heat recovery product well system for coal underground gasifying technology, based on underground coal gasification(UCG) unit (ISC)Vertical waste heat recovery product well, described waste heat recovery product well system includes following assembly:
Well mouth hanger, is fixed at product well well head, for hanging the associated component of waste heat recovery product well system;
Product pipe, in product well, is freely suspended from well mouth hanger, the end section of product pipe is set using perforate Meter, is provided with some pores, forms perforate product pipe pipeline section, and remainder is complete product pipe pipeline section, perforate product pipe pipeline section side Just crude synthesis gas enter product stream by pore and earthward export;
Jacket pipe, is freely suspended from well mouth hanger, positioned at product pipe outside and with product pipe concentric setting, jacket pipe Form circular passage and product pipe between, jacket pipe end caliber is progressively decreased to be in close contact with product pipe outer wall, contact site Position forms a metal to metal seal structure(Product pipe is contacted by ring surface with jacket pipe, more closely pastes between contact site Close, reach the effect of sealing);When continuous cooling water is injected in circular passage, carry out heat exchange type with high-temperature crude synthesis gas Become high pressure high temperature vapor, steam flows to ground by circular passage, carries out waste heat recovery;
Water cooling tube, by eccentric well mouth hanger inner ring, parallel be freely suspended from by product pipe, and be located at jacket pipe Interior, for injection cooling water, unsaturated steam and/or anticorrosion good antiscale property toward in the circular passage between jacket pipe and product pipe Medium, described water cooling tube extends to the bottom of circular passage between jacket pipe and product pipe, and water-cooled tube end is provided with nozzle, water-cooled It is provided with check-valves, check-valves are used for maintaining in water cooling tube water-column and prevent reverse steam from entering water cooling tube in pipe;Cooling water Injection rate is controlled by the crude synthesis gas temperature that product pipe top measures it is ensured that crude synthesis gas temperature is less than design temperature (300-350℃);
Measuring instrument system, including distributed temperature sensor, pressure transducer and sonic sensor, described measuring instrument System is fixed at product pipe periphery, and is in the position contour with water cooling tube nozzle, and described distributed temperature sensor is used for By monitoring product well downhole temperature and then controlling cooling water flow in water cooling tube, distributed pressure sensor is used for monitoring product Well down-hole and chuck overpressure, distributed acoustic wave sensor is used for monitoring product well down-hole emergency case, such as sleeve pipe or product QC damages(Cracking, bending etc.), solid particle or liquid bolt enter product pipe and product blockage etc.;
Product casing, is fixed in the stratum of product well periphery by high-temperature cement set, described product casing conduct Product pipe, the shell of jacket pipe, water cooling tube and measuring instrument system, start to extend to coal seam near top from product well well head, Remaining vertical coal bed drilling is not provided with sleeve pipe, and the annular channels between product casing and jacket pipe are as system exception running Standby pressure release passage;Specifically, product casing passes through high temperature resistant box cupling and screw thread by some sections of product casing bodies It is formed by connecting.
The wellhead equipment of high temperature high voltage resistant(Wherein pressure sets rated range and is defined by meeting lithostatic pressure, and temperature meets 180-350 DEG C of operating temperature range), comprise at least one instrument pressed joint port, for connecting measuring instrument system;Also Including at least four groups of circulation passage ports and valves, the effect of described four groups of circulation passage ports and valve is as follows:One stream is all As crude synthesis gas outlet, a circulation passage port and the valve in product pipe when road port and valve normally run for system As the outlet of circular passage between product casing and jacket pipe when running for system exception, a circulation passage port and valve As the outlet of circular passage between jacket pipe and product pipe when door normally runs for system, steam for the high pressure in circular passage Steam flow goes out, and a circulation passage port connects the medium inlet of water cooling tube with valve, for toward injected media in water cooling tube, described Wellhead equipment is additionally provided with thermometer and pressure gauge, for directly displaying the temperature and pressure numerical value of each passage of well head, and data Transmitting device, for monitoring the situation of synthesis gas, high steam and cooling water distribution channel, and the data that each sensor is obtained Signal feeds back to control system and is stored in data base;
Ground waste-heat recovery device, annular channel outlet and water cooling tube inlet between connection product pipe and jacket pipe, will The waste heat that High Temperature High Pressure saturated vapor in circular passage between product pipe and jacket pipe is carried out is used for surface production technique, (As air separation unit, air compressor, synthesic gas compressor, downstream purification or synthesis technique etc.), steam turbine power generation or directly replace Use by oneself for Motor drive pump, boiler generating, other ground public utility or plant area's life etc..
It is as follows that this utility model solves another technical scheme that its technical problem adopted:
For the waste heat recovery product well system of coal underground gasifying technology, more than the orientation based on underground coal gasification(UCG) unit Recuperation of heat product well, described product well includes vertical section, segmental arc and horizontal segment, described waste heat recovery product well system include as Lower assembly:
Well mouth hanger, is fixed at product well well head, for hanging the associated component of waste heat recovery product well system;
Product pipe, in product well, the end section of product pipe adopts perforate to design, and is provided with some pores, formation is opened Hole product pipe pipeline section, remainder is complete product pipe pipeline section, facilitates crude synthesis gas to enter product stream earthward by pore Outlet;
Jacket pipe, positioned at product pipe is outside and the concentric setting with product pipe, forms annular between jacket pipe and product pipe Passage, jacket pipe end caliber is progressively decreased to be in close contact with product pipe outer wall, and contact site forms a metal to metal seal Structure;When continuous cooling water is injected in circular passage, carries out heat exchange with high-temperature crude synthesis gas and form high pressure high temperature vapor, Steam flows to ground by circular passage, carries out waste heat recovery;
Water cooling tube, by the parallel pipe located at product, and is located in jacket pipe, for toward the annular between jacket pipe and product pipe Injection cooling water, unsaturated steam and/or anticorrosion good antiscale property medium in passage, described water cooling tube extends to jacket pipe and product Circular passage bottom between pipe, water-cooled tube end is provided with nozzle, is provided with check-valves inside water cooling tube, for maintaining water in water cooling tube Pillar height degree and prevent reverse steam from entering water cooling tube;The crude synthesis gas temperature that cooling water injection rate is measured by product pipe top Lai Control it is ensured that crude synthesis gas temperature is less than design temperature(300-350℃);
Measuring instrument system, including distributed temperature sensor, pressure transducer and sonic sensor, described measuring instrument System is fixed at product pipe periphery, and is in the position contour with water cooling tube nozzle, and described distributed temperature sensor is used for Control cooling water flow in water cooling tube by monitoring product well downhole temperature, distributed pressure sensor is used for monitoring product Jing Jing Descend and chuck overpressure, distributed acoustic wave sensor is used for monitoring product well down-hole emergency case, such as sleeve pipe or product pipe Damage(Cracking, bending etc.), solid particle or liquid bolt enter product pipe and product blockage etc.;
Product casing, is fixed in the stratum of product well periphery by high-temperature cement set, described product casing conduct Product pipe, the shell of jacket pipe, water cooling tube and measuring instrument system, start to extend to inside coal seam from product well well head, product Annular channels between casing and jacket pipe are as the standby pressure release passage of system exception running;
The wellhead equipment of high temperature high voltage resistant(Wherein pressure setting rated range meets lithostatic pressure and is defined, and temperature meets 180-350 DEG C of operating temperature range), comprise at least one measuring instrument splice port, for connecting measuring instrument system;Also Including at least four groups of circulation passage ports and valves, wherein:Make when one circulation passage port and valve normally run for system Export for the crude synthesis gas in product pipe, a circulation passage port and valve are used for when system exception runs as product casing When the outlet of circular passage and jacket pipe between, a circulation passage port and valve normally run for system as jacket pipe and The outlet of circular passage between product pipe, flows out for the high steam in circular passage, a circulation passage port connects with valve The medium inlet of water cooling tube, for toward injected media in water cooling tube, described wellhead equipment is additionally provided with thermometer and pressure gauge, uses In the temperature and pressure numerical value directly displaying each passage of well head, and data transmission device, for monitoring synthesis gas, high steam With the situation of cooling water distribution channel, and by each sensor obtain data signal feed back to control system;
Ground waste-heat recovery device, annular channel outlet and water cooling tube inlet between connection product pipe and jacket pipe, will The waste heat that High Temperature High Pressure saturated vapor in circular passage between product pipe and jacket pipe is carried out is used for surface production technique; (As air separation unit, air compressor, synthesic gas compressor, downstream purification or synthesis technique etc.), steam turbine power generation or directly replace Use by oneself for Motor drive pump, boiler generating, other ground public utility or plant area's life etc.;
In the technical program, described product pipe, jacket pipe, water cooling tube and product casing all with orientation waste heat recovery product The shape of well is consistent, namely all includes vertical section, segmental arc and horizontal segment, and the vertical section of product pipe, jacket pipe and water cooling tube is equal By well mouth hanger free suspension, bending section passes through product casing bending section and supports, and horizontal component passes through product casing Horizontal component supports;
The vertical section of product casing and segmental arc are fixed in the stratum of product well periphery by high-temperature cement set, described Perforate product pipe pipeline section self-produced QC segmental arc end starts, and extends to the directional well top in no sleeve pipe coal bed drilling, and with Injection well horizontal bore internal lining pipe intersects.
Preferably, described perforate product pipe length of pipe section is that 1-3 pipeline section is long(I.e. 6-18 rice), the aperture of perforate is 5- 35mm, perforate accounts for the 5-35% of tube wall area with interval mode layout of interlocking, the perforate gross area.
Preferably, in described vertical product well complete product pipe pipeline section and perforate product pipe pipeline section all using corrosion-resistant nickelic Chromium alloy material(As section alloy 600 like this, Meng Naier alloy 400 and with first-class)Process, under maximum heat stretches situation, open The distance between the end of hole product pipe pipeline section and product bottom are more than zero.
Preferably, in described confined goods well complete product pipe pipeline section and perforate product pipe pipeline section all using corrosion-resistant nickelic Chromium alloy material(As section alloy 600 like this, Meng Naier alloy 400 and with first-class)Process, horizontal bore internal lining pipe is in coal Can progressively consume in charcoal underground gasification process, material selection carbon steel pipe.
Preferably, described perforate product pipe pipeline section diameter is less than complete product pipe pipeline section diameter, in order in Completion Operations Perforate product pipe pipeline section and complete product pipe pipeline section connecting portion box cupling pass through jacket pipe caliber and reduce part;Or it is located at folder Sleeve pipe caliber reduces the complete product pipe pipeline section of part from the size bigger than product pipe other parts pipeline section diameter.
Preferably, under the maximum axial elongated distance situation that thermal expansion and free suspension deadweight cause, metal-metal is close The position of seal structure is still located at complete product pipe pipeline section.
Preferably, described check-valves(4)1-3 above perforate product pipe pipeline section with complete product pipe pipeline section joint The low temperature zone position of pipeline section length, the length of each pipeline section length is 6m, check-valves(4)It is provided with several, realize multiple protection functions, Maintain water column suitable height and prevent high pressure high temperature vapor from revealing.
Preferably, there is appropriate gap structure between the contact portion of metal to metal seal structure and product pipe(Product pipe Contacted by ring surface with jacket pipe, more closely fit between contact site, reach the effect of sealing, but due to being all rigidity , there is a little gap, i.e. gap structure in face), cooling water after water cooling tube is injected between product pipe and jacket pipe, a small amount of water High-temperature crude synthesis gas stream is leaked into, to play part shock chilling function fall at gap structure by metal to metal seal joint The temperature of low crude synthesis gas.
The beneficial effects of the utility model:In this product well system, all parts all easily reclaim, reuse, and down-hole is high The heat that warm high compressed steam is carried out can be used for surface production technique, steam turbine power generation, boiler generates electricity, other ground are public sets Apply or plant area's life is personal etc.;The effective monitoring to product well not only can be realized, control and protection by this utility model, and And the waste heat of high-temperature crude synthesis gas carried out reliable and effective reclaim and comprehensively utilize, significantly decrease cooling water amount and Reduce the requirement that waste water downstream is processed, be truly realized coal comprehensive high-efficiency and utilize, reduce whole underground coal gasification(UCG) work Skill(ISC)Energy consumption, finally solve existing coal underground gasifying technology(ISC)The technical barrier facing.
Brief description
Fig. 1 is the structural representation of the first implementation of the present utility model;
Fig. 2 is the structural representation of second implementation of the present utility model.
In figure:1st, product pipe, 1a, perforate product pipe pipeline section, 1b, complete product pipe pipeline section, 2, water cooling tube, 3, check-valves, 4th, nozzle, 5, jacket pipe, 6, metal to metal seal structure, 7, product casing, 8, high-temperature cement set, 9, measuring instrument system, 10th, measuring instrument splice port, 11, crude synthesis gas outlet, the outlet of circular passage between 12, product casing and jacket pipe, 13rd, the outlet of High Temperature High Pressure saturated vapor, 14, medium inlet, 15, ground waste-heat recovery device, 16, surface production technique, 17th, horizontal bore internal lining pipe.
Specific embodiment
Below by specific embodiment, and combine accompanying drawing, the technical solution of the utility model is made further specifically Bright.
System of the present utility model specifically describes the building block including can buying in different suppliers, and specific sets Meter and the part manufacturing.Innovation of the present utility model, the different qualities according to single part and special part and function, sieve Select most suitable part and integrate out a set of exclusive device systems.
Embodiment 1:
As shown in Figure 1, a kind of waste heat recovery product well system for coal underground gasifying technology, based on coal underground Gasification unit(ISC)Vertical waste heat recovery product well, described waste heat recovery product well system includes following assembly:
One well mouth hanger, is fixed at product well well head, for hanging the relevant group of waste heat recovery product well system Part;
One product pipe 1, in product well, is freely suspended from well mouth hanger, and the end section of product pipe 1 is using opening Hole is designed, and is provided with some pores, facilitates crude synthesis gas to enter product stream by pore and earthward exports;
One jacket pipe 5, is freely suspended from well mouth hanger, outside and concentric with product pipe 1 set positioned at product pipe 1 Put, form circular passage between jacket pipe 5 and product pipe 1, jacket pipe 5 end caliber is progressively decreased to tight with product pipe 1 outer wall Contiguity is touched, and contact site forms a metal to metal seal structure 6;When continuous cooling water is injected in circular passage, with high temperature Crude synthesis gas carry out heat exchange and form high pressure high temperature vapor, and steam flows to ground by circular passage, carries out waste heat recovery;
Water cooling tube 2, by eccentric well mouth hanger inner ring, parallel be freely suspended from by product pipe 1, and be located at jacket pipe In 5, prevent for injection cooling water, unsaturated steam and/or anticorrosion toward in the circular passage between jacket pipe 5 and product pipe 1 Fouling medium, described water cooling tube 2 extends to circular passage bottom between jacket pipe 5 and product pipe 1, and water cooling tube 2 end is provided with spray Mouth 4, is provided with check-valves 3 in water cooling tube 2, for maintaining in water cooling tube 2 water-column and preventing reverse steam from entering water cooling tube 2; Cooling water injection rate is controlled by the crude synthesis gas temperature that product pipe 1 top measures it is ensured that crude synthesis gas temperature is less than setting Temperature(300-350℃);
Measuring instrument system 9, including distributed temperature sensor, pressure transducer and sonic sensor, described monitor Table system 9 is fixed at product pipe 1 periphery, and is in the position contour with the nozzle 4 of water cooling tube 2, and described distributed temperature passes Sensor is used for by monitoring product well downhole temperature and then controlling cooling water flow in water cooling tube 2, and distributed pressure sensor is used Pressure in monitoring product well down-hole and jacket pipe 5, distributed acoustic wave sensor is used for monitoring product well down-hole emergency case, example As sleeve pipe or product pipe damage(Cracking, bending etc.), solid particle or liquid bolt enter product pipe and product blockage etc.;
Product casing 7, is formed with threadeding by high temperature resistant box cupling by some sections of product casing bodies, and passes through High-temperature cement set 8 is fixed in the stratum of product well periphery, and described product casing 7 is as product pipe 1, jacket pipe 5, water cooling tube 2 and the shell of measuring instrument system 9, start to extend to coal seam near top from product well well head, remaining vertical coal bed drilling is not Setting sleeve pipe, the annular channels between product casing 7 and jacket pipe 5 are as the standby pressure release passage of system exception running;
The wellhead equipment of high temperature high voltage resistant(Wherein pressure setting rated range meets lithostatic pressure and is defined, and temperature meets 180-350 DEG C of operating temperature range), comprise at least one instrument pressed joint port 10, for connecting measuring instrument system 9;Also include at least four groups circulation passage ports and valve, the effect of described four groups of circulation passage ports and valve is as follows:First-class As the crude synthesis gas outlet 11 in product pipe, a circulation passage port when circulation passage port and valve normally run for system With valve is used for the outlet 12 as circular passage between product casing and jacket pipe, a circulation passage when system exception runs As the outlet 13 of circular passage between jacket pipe 5 and product pipe 1 when port and valve normally run for system, logical for annular High steam in road flows out, and a circulation passage port connects the medium inlet 14 of water cooling tube with valve, for toward water cooling tube Interior injected media, described wellhead equipment is additionally provided with thermometer and pressure gauge, for directly displaying the temperature of each passage of well head And pressure value, and data transmission device, for monitoring the situation of synthesis gas, high steam and cooling water distribution channel;
Ground waste-heat recovery device 15, connects wellhead equipment and supplies the circulation passage port of high steam outflow and for medium note The circulation passage port entering, the waste heat that the High Temperature High Pressure saturated vapor in jacket pipe 5 is carried out is used for surface production technique 16(As air separation unit, air compressor, synthesic gas compressor, downstream purification or synthesis technique etc.), steam turbine power generation or directly Replacement Motor drive pump, boiler generating, other ground public utility or plant area live personal etc..
In this utility model, functioning primarily as of product pipe 1 cools down the main circulation that crude synthesis gas are transported to ground Passage, high-temperature crude synthesis gas are cooled to the temperature of setting, the metal to metal seal of jacket pipe 5 and product pipe 1 through two ways The leakage prevention structure leak of structure 6 is quenched the conduction of heat/exchange process in process and product pipe 1.By product pipe 1 with full of cooling The jacket pipe 5 of water or steam can protect product casing 7, it is to avoid TRANSIENT HIGH TEMPERATURE changes, and is that product casing 7 provides slowly Heating and the protection to web rot corrosion sour gas.The type selecting of product pipe 1 in product well and choice requirement are as follows:
(a)Product bore is determined according to the maximum productivity of each ISC unit(ID)Size.To meet synthesis gas The maximum water leakage of the leakage prevention structure of big flow, maximum temperature and jacket pipe and product pipe metal to metal seal structure 6 will Ask.
(b)According to design pressure in design pressure in free suspension weight, maximum product pipe and maximum jacket pipe(Saturation is steamed Air pressure)Determine product pipe external diameter(OD)Size and wall thickness.Meet multiple underground work requirement simultaneously.
(c)Determine the maximum axial elongated distance that thermal expansion and free suspension deadweight cause.Guarantee that product pipe 1 has enough Degree of freedom, prevents product pipe 1 from bending and perforate product pipe 1a enters in jacket pipe 5.
(d)According to the minimum load down operation production capacity of each ISC unit determine minimum synthesis gas range of flow and Minimum oxidant injects range of flow.Synthesis gas velocity needs to carry liquid therein and solid impurity enough secretly to ground.
(e)The selection aspect of product pipe 1, inwall needs to meet high temperature web rot corrosion sour gas job requirements, and outer wall needs Meet high temperature and high pressure steam job requirements.Material antiseptic mainly considers high temperature hydrogen burn into stress corrosion cracking(As hydrogen embrittlement or hydrogen Cause cracking, sulfide-stress cracking, chloride stress cracking corrosion cracking etc.), sour gas corrosion is (as CO2, H2S, H2SO4, HCl, etc.), dew point corrosion, ammonium chloride and ammonium hydro sulfide burn into sulfidation corrosion, graphitic corrosion, dissimilar metal electrification rotten Erosion etc..
(f)Perforate product pipe pipeline section 1a length is that 1-3 pipeline section is long(I.e. 6-18 rice), the aperture of perforate is 5-35mm, opens Hole accounts for the 5-35% of tube wall area with interval mode layout of interlocking, the perforate gross area.
In embodiment 1, system is based on vertical product well, and the top of product pipe 1 needs to install a part of height corrosion-resistant material The perforate product pipe of material(Namely foregoing product pipe 1 is by complete product pipe pipeline section 1b and perforate product pipe pipeline section 1a group Become).In order to prevent the bending of product pipe 1 in gasification, after considering that its maximum heat is stretched, the end of perforate product pipe 1a can not Contact with product bottom(Namely distance is more than zero).Perforate product pipe size is more smaller than complete product pipe, is easy to completion mistake In journey, the box cupling of perforate product pipe pipeline section 1a and complete product pipe pipeline section 1b connecting portion passes through the portion that jacket pipe 5 caliber reduces Point.
This structure division such as can reduce the complete product pipe pipe of part using other replacement schemes in jacket pipe 5 caliber Section 1b(With respect to perforate product pipeline section 1a, this section is no perforate design)From than product pipe 1 other parts pipeline section(Same sample ruler Very little)Bigger size.
In this utility model, complete product pipe pipeline section 1b(I.e. non-perforate pipeline section)Corrosion resistance material from higher level Material, gasification terminates rear recyclable and reuses;Box cupling positioned at metal to metal seal structure 6 position(Non- tube having holes Section)Can be reused after sanding and polishing.
In this utility model, jacket pipe 5 is arranged in product casing 7.Its type selecting and choice requirement are as follows:
(a)The internal diameter (ID) of jacket pipe 5 is sufficiently large, can load product pipe 1, water cooling tube 2 and measuring instrument system 9.Chuck Circular passage size between pipe 5 and these pipelines can produce enough steam, meets needed for the waste-heat recovery device of ground Big steam requires.
(b)According to design pressure in free suspension weight, underground work requirement, maximum jacket pipe 5(Saturated vapour pressure)With Maximum ISC unit operating pressure determines product pipe 1 external diameter(OD)Size and wall thickness.
(c)Jacket pipe 5 caliber reduces part and product pipe 1 is fitted close, and forms a metal to metal seal structure 6.Folder The pipeline section inwall that sleeve pipe 5 caliber reduces part needs sanding and polishing to form a smooth surface so that product pipe 1 is more easy to enter well Descend and improve the sealing of metal to metal seal structure 6.
(d)Determine the maximum axial elongated distance that thermal expansion and free suspension deadweight cause, to ensure metal to metal seal Structure 6 is always on complete product pipe 1b(Non- perforate designs part), prevent perforate product pipe 1a from entering in jacket pipe 5.
(e)The selection aspect of jacket pipe 5 meets high temperature and high pressure steam job requirements, and can provide good metal -- Au Belong to the material of sealing property.
In this utility model, water cooling tube 2 is made up of following part:
The size of water cooling tube 2 meets its flow and the requirement of corresponding construction integrity(It is applied to water under high pressure and High Temperature High Pressure Steam working environment).Material aspect selects the material of rustless steel or higher level, and gasification reclaims after terminating and repeats to make With.Water cooling tube 2 is located in jacket pipe 5, by well mouth hanger bias inner ring, parallel is freely suspended from by product pipe 1.Water cooling tube 2 tops will extend to jacket pipe 5 and reduce section bottom.
One check-valves 3 being provided with Opening pressure is arranged on water cooling tube 2.When ground cooling water injected system goes wrong Water-column in pipe can be maintained, prevent reverse steam from entering water cooling tube.Simultaneously can be to folder when in water cooling tube 2, steam pressure is too high Sleeve pipe 5 direction pressure release.In order to ensure the integrity of check-valves 3, check-valves 3 are arranged on the relatively low region of temperature(It is located at gold Genus-shape metallic leak-proof structure 7 more than 1 pipeline section in top is long).Meanwhile, preferably, multiple check-valves 3 can be installed, Simultaneously using realizing standby functions.
Nozzle 4 device of water cooling tube 2 end can spray or spray enough cooling waters between product pipe 1 and jacket pipe 5 Circular passage in.Circulating condensing water after cooling water, waste heat recovery, unsaturated steam and additive/inhibitor(Anticorrosion is prevented Fouling)Jacket pipe 5 is injected into by this pipe and is used as circulating coolant.
Cooling water(Steam)Cyclic process is as follows:Cooling water is injected into from product well wellhead equipment and passes through gold with product pipe 1 In the jacket pipe 5 that genus-metal sealing engages.Leakage prevention structure at metal to metal seal structure 6 for a small amount of water leaks into high temperature Raw synthesis gas stream, the temperature that can slightly reduce crude synthesis gas plays part shock chilling function.In jacket pipe 5, injection water is changing For forming the water column of certain altitude before steam.Steam after conversion enters ground waste-heat recovery device 15 by wellhead equipment, uses In surface production technique 16(As steam turbine/boiler generating, steam heat-exchanger, other surface technology steamturbines etc.)Carry out heat Can recycle.Finally, the condensed water after waste heat recovery is injected in jacket pipe 5 by wellhead equipment circulation.
In the present embodiment, the material of higher level selected by water cooling tube 2, and gasification terminates rear recyclable and reuses.
In this utility model, measuring instrument system 9 is fixed on complete product pipe pipeline section 1b(Non- perforate designs part)Top End, the top of perforate product pipe 1a.The sensor of measuring instrument system 9 enters underground work after being placed in a protection sleeve pipe Area, gasification terminates rear recyclable and reuses.Measuring instrument system 9 includes following functions:
The temperature on temperature sensor monitors product pipe 1 top, for controlling and adjusting the injection flow of cooling water, finally really Protect and control the temperature of this position to be less than 300-350 DEG C of design temperature.The temperature of this position is simultaneously used for the safety system of whole technique System, can cut off oxidant injection when this temperature exceedes security settings temperature at once.This utility model specifically adopts distributed Temperature sensor, a distributed temperature sensor is arranged on product pipe 1 and is used for measuring the Temperature Distribution of whole product pipe, with When can indicate cooling water liquid level in jacket pipe 5.
Pressure transducer is used for monitoring the down-hole pressure situation of product well using distributed sensor.Simultaneously it can be found that by The extruding of the instrument system sheath causing in vapour pressure or operating pressure or damage.
Sonic sensor adopts distributed sensor.Can be used for monitoring and find product well down-hole emergency case, for example Sleeve pipe or product pipe 1 damage(As cracking, bending etc.), solid particle or liquid bolt enter product pipe 1 and product pipe 1 blocking etc.. Cooling boiling water in jacket pipe 5 can be monitored simultaneously(Bubbling)Position range, can determine that the height of cooling water level in jacket pipe 5 Degree.
In this utility model, product casing 7 includes following equipment and cementing method:
(a)Product casing 7 size need sufficiently large to dispose product pipe 1, jacket pipe 5, water cooling tube 2 and measuring instrument system System 9(Such as 4.5 inches of product pipe, 8.625 inches of jacket pipe, 2 inches of water cooling tube, 0.75 inch of measuring instrument system, sleeve pipe 10.75 inches).Simultaneously need to being determined in outer ring product according to situations such as the concrete feature such as water-bearing layer on stratum, unconsolidated formation The quantity of casing 7 and size(Such as conduit 16-36 inch, surface pipe 13.375-20 inch, protective casing 9.625- 13.375 inch etc.).
(b)The selection of product casing 7 wall thickness will meet drilling and well completion job requirements, and requirement simultaneously can be born more than quiet The pressure of rock pressure.
(c)Product casing 7 box cupling, screw thread and cementing concrete set 8 select to meet the requirement of high temperature well working environment.Product Casing 7 selection mainly for inner tubal wall as the annular channels of abnormal operation current path therefore, to assure that the whole production cycle The integrity of interior well.This cycle includes the parking of ISC unit, equipment Removal and shut-in well disused well.
For the present embodiment based on vertical product well, product casing 78 is fixed to coal seam always by high-temperature cement set Near top.For confined goods well, it is attached that product casing 7 is fixed to horizontal level in coal seam always by high-temperature cement set 8 Closely(The coal seam being directed to inclination angle is then fixed near the position parallel with seat earth).
In this utility model, product well wellhead equipment will meet following functions and requirement:
(a)Wellhead equipment is suitable for high temperature well working environment, and in the case of maximum operating pressure, its operation temperature is up to 180- 350℃ .
(b)Wellhead equipment selection aspect, the exit region contacting with down-hole product considers solid/particle collision High Temperature High Pressure Steam and the Working Environments of high temperature web rot corrosion sour gas.
Wellhead equipment comprises one or more measuring instrument ports and the down-hole such as corresponding synthesis gas, cooling water, steam The import and export of product.
Wellhead equipment installs temperature, pressure gauge and the data transmission device that can directly display numerical value, even if to guarantee it When his all systems are in fault or off-line state, also can direct situation in monitoring well.Temperature and pressure signal transmitting apparatus can Data signal is fed back to control system simultaneously and be stored in data base.Wellhead temperature signal provides synthesis gas in product pipe 1 The temperature of steam in temperature and jacket pipe 5.When wellhead temperature reaches 280-350 DEG C of setting, system will automatically cut off oxidation The injection of agent.Meanwhile, wellhead temperature also can as the serials control of cooling water flow to increase cooling water injection flow it is ensured that Wellhead temperature is less than design temperature.Because well head pressure is consistently lower than down-hole pressure, therefore well head pressure signal data can be made Instruction for down-hole product pipe 1 and jacket pipe 5 annular interval pressure.
Wellhead equipment removable renovation, reuse after shut-in well disused well.
In this utility model, ground waste-heat recovery device 15 connects the outlet of wellhead equipment high temperature and high pressure steam and cooling water note Entrance.The heat that High Temperature High Pressure saturated vapor in jacket pipe 5 can be carried out by this ground waste-heat recovery device 15 is used for ground Look unfamiliar production. art 16(As air separation unit, air compressor, synthesic gas compressor, downstream purification or synthesis technique etc.), steam turbine Generating or directly replacement Motor drive pump, boiler generating, other ground public utilities or plant area live personal etc.(As steam heat Exchanger, heating etc.).
As shown in figure 1, the working method of embodiment 1 is as follows:
High-temperature crude synthesis gas enter the boring of injection well horizontal seam and injection well horizontal bore internal lining pipe from ISC gasification zone 17, flow to the vertical coal bed drilling of product well.Afterwards, high-temperature crude synthesis gas enter perforate product pipe 1a and complete product pipe 1b, with The cooling water by the injection of wellhead equipment cooling water inlet of its outer wall carries out heat exchange cooling.Cooling water is injected into water cooling tube 2, Through check-valves 3 and nozzle 4, it is sprayed onto in the circular passage of jacket pipe 5 surrounding product pipe.In the end of jacket pipe 5, reduce The diameter of jacket pipe 5 makes itself and product pipe 1 fluid-tight engagement form a metal to metal seal structure 6.So in jacket pipe 5 Enough cooling waters can be stored in portion circular passage and form the water column of certain altitude.Cooling water absorbs product pipe 1 and thick conjunction Become the heat of gas, the crude synthesis gas in cooling product pipe 1.The water absorbing enough heats is converted into high temperature and high pressure steam by well head Equipment steam (vapor) outlet enters into ground waste-heat recovery device 15, for steam turbine power generation, surface production technique or other public set Apply.Condensed water after waste heat recovery passes through the circulation of wellhead equipment cooling water inlet and is injected into down-hole.The injection stream of cooling water Amount is by the temperature sensor control being arranged on product pipe 1 it is ensured that the temperature of product pipe 1 is less than default temperature 300-350 DEG C .Check-valves 3 are provided with an Opening pressure, can guarantee that the water-column in water cooling tube 2 in well head cooling water inlet no flow. It is provided with leakage prevention structure at metal to metal seal mechanism 6, a small amount of cooling water leakage is had by leakage prevention structure and slightly closes to high temperature Become gas and injection well horizontal bore internal lining pipe 17, can slightly reduce the temperature of crude synthesis gas.Product pipe 1, water cooling tube 2 and monitor Table system 9 is arranged on inside jacket pipe 5.Jacket pipe 5 is in inside the concentric circular of product casing 7.This product casing 7 passes through High-temperature cement set 8 is fixing in the earth formation, extends to coal seam near top from ground.Between product casing 7 and jacket pipe 5 Annular channels as system exception running standby pressure release passage, synthesis gas pass through wellhead equipment on synthesis gas ring shape lead to Way outlet flows out.
Embodiment 2
As shown in Fig. 2 a kind of waste heat recovery product well system for coal underground gasifying technology, based on the coal ground therapeutic method to keep the adverse QI flowing downwards Change the orientation waste heat recovery product well of unit, including vertical section, segmental arc and horizontal segment, described waste heat recovery product Jing Xitongbao Include the assembly of assembly and technical requirements substantially with embodiment 1, difference is as follows:
(a)Described product pipe 1, jacket pipe 5, water cooling tube 2 and product casing 7 shape all with orientation waste heat recovery product well Shape is consistent, namely all includes vertical section, segmental arc and horizontal segment, and the vertical section of product pipe 1, jacket pipe 5 and water cooling tube 2 all passes through Well mouth hanger free suspension, bending section passes through product casing 7 bending section and supports, and horizontal component passes through product casing 7 water Flat part supports;
(b)Measuring instrument system 9 is fixed on complete product pipe 1b(Non- perforate)Top, the rear of perforate product pipe 1a (The present embodiment is based on confined goods well).
(c)High-temperature cement set 8 terminates from segmental arc tail end, and described perforate product pipe pipeline section 1a covers 8 ends from high-temperature cement Start, extend to the directional well top in the coal bed drilling of no high-temperature cement set 8, and horizontally disposed with injection well there is perforate The horizontal bore internal lining pipe 17 of design intersects.Specifically, the present embodiment is based on confined goods well, and perforate product pipe 1a is from high temperature Cement sheath 8 end(Jacket pipe 5 and product pipe 1 metal to metal seal structure 6 position rear)Start, extend through and no cover Pipe coal bed drilling is intersected until the horizontal bore internal lining pipe 17 with injection well with perforate design.Perforate in coal bed drilling Product pipe(Also referred to as product well water is opened flat in the hole bushing pipe 17)Major function be to prevent in gasification coal bed drilling avalanche to block up Plug gasification tunnel.This horizontal bore internal lining pipe 17 is consumed with the process of coal underground gasifying technology simultaneously.Due in coal It is consumed in underground gasification process, the selection of the horizontal bore internal lining pipe 17 in coal bed drilling is unimportant, general employing Carbon steel pipe can meet requirement.Perforate product pipe pipeline section 1a in jacket pipe 5 needs to select high corrosion resistance material Keep the integrity of product well.
As shown in Fig. 2 the working method of embodiment 2 is as follows:
The pipeline section that jacket pipe 5 caliber reduces is located in the flat no cement sleeve pipe of product well water.High-temperature crude synthesis gas gasify from ISC Area is opened flat in the hole bushing pipe 17 by product well water and the boring of product well water level coal flows to product pipe 1 until ground.Product pipe 1 leads to Cross a jacket pipe 5 containing water cooling tube 2 to cool down.In jacket pipe 5, cooling water absorbs the heat of product pipe 1 and crude synthesis gas It is converted into high temperature and high pressure steam.Steam enters into ground waste-heat recovery device 15 by jacket pipe 5 circular passage afterwards, for vapour Turbine generating, surface production technique 16 or other public utilities etc..For confined goods well, its product casing 7 passes through high temperature Cement sheath 8 is fixing in the earth formation, extends to the position parallel to seat earth for the product casing 7 from ground.
Correlation properties that mentioned above " embodiment " inclusion describes in embodiments, structure, feature All related to wherein at least one embodiment of the present utility model.Therefore, the above repeatedly refers to " an embodiment In " place not all refer in particular to same embodiment.Additionally, the correlation properties describing in embodiments, structure, feature can With one or more combinations in any suitable manner.

Claims (9)

1. it is used for the waste heat recovery product well system of coal underground gasifying technology, the vertical waste heat based on underground coal gasification(UCG) unit Reclaim product well it is characterised in that:Described waste heat recovery product well system includes following assembly:
Well mouth hanger, is fixed at product well well head, for hanging the associated component of waste heat recovery product well system;
Product pipe(1), in product well, it is freely suspended from well mouth hanger, product pipe(1)End section set using perforate Meter, is provided with some pores, forms perforate product pipe pipeline section(1a), remainder is complete product pipe pipeline section(1b);
Jacket pipe(5), it is freely suspended from well mouth hanger, positioned at product pipe(1)Outside and with product pipe(1)Concentric setting, Jacket pipe(5)With product pipe(1)Between formed circular passage, jacket pipe(5)End caliber is progressively decreased to and product pipe(1)Outward Wall is in close contact, and contact site forms a metal to metal seal structure(6);
Water cooling tube(2), by eccentric well mouth hanger inner ring, parallel it is freely suspended from product pipe(1)Side, and it is located at jacket pipe (5)Interior, for toward jacket pipe(5)With product pipe(1)Between circular passage in injection cooling water, unsaturated steam and/or anti- Corrosion good antiscale property medium, described water cooling tube(2)Extend to jacket pipe(5)With product pipe(1)Between circular passage bottom, water-cooled Pipe(2)End is provided with nozzle(4), water cooling tube(2)Inside it is provided with check-valves(3), check-valves(3)For maintaining water cooling tube(2)Interior water Pillar height degree and prevent reverse steam from entering water cooling tube(2);
Measuring instrument system(9), including distributed temperature sensor, pressure transducer and sonic sensor, described measuring instrument System(9)It is fixed at product pipe(1)Periphery, and be in and water cooling tube(2)Nozzle(4)Contour position, described distributed Temperature sensor is used for controlling water cooling tube by monitoring product well downhole temperature(2)Interior cooling water flow, distributed pressure senses Device is used for monitoring product well down-hole and jacket pipe(5)Interior pressure, distributed acoustic wave sensor is used for monitoring the burst of product well down-hole Situation;
Product casing(7), by high-temperature cement set(8)It is fixed in the stratum of product well periphery, product casing(7)As Product pipe(1), jacket pipe(5), water cooling tube(2)With measuring instrument system(9)Shell, start to extend to coal from product well well head Layer top, product casing(7)With jacket pipe(5)Between annular channels as misoperation process standby pressure release passage;
The wellhead equipment of high temperature high voltage resistant, comprises at least one measuring instrument splice port(10), for connecting measuring instrument system System(9);Also include at least four groups circulation passage ports and valve, wherein:One circulation passage port and valve are normal for system Export as the crude synthesis gas in product pipe during operation(11), a circulation passage port and valve are used for making when system exception runs Outlet for circular passage between product casing and jacket pipe(12), a circulation passage port and valve are normally transported for system As the outlet of High Temperature High Pressure saturated vapor in circular passage between jacket pipe and product pipe during row(13), a circulation passage port Connect the medium inlet of water cooling tube with valve(14), described wellhead equipment is additionally provided with thermometer and pressure gauge, for directly showing Show the temperature and pressure numerical value of each passage of well head, and data transmission device, for monitoring synthesis gas, high steam and cooling water The situation of distribution channel, and the data signal of each sensor acquisition is fed back to control system and is stored in data base;
Ground waste-heat recovery device(15), connect product pipe(1)And jacket pipe(5)Between annular channel outlet and water cooling tube(2) Inlet, by product pipe(1)And jacket pipe(5)Between the waste heat that is carried out of High Temperature High Pressure saturated vapor in circular passage use In surface production technique(16).
2. it is used for the waste heat recovery product well system of coal underground gasifying technology, the orientation waste heat based on underground coal gasification(UCG) unit Reclaim product well, described orientation waste heat recovery product well include vertical section, segmental arc and horizontal segment it is characterised in that:Described remaining Recuperation of heat product well system includes following assembly:
Well mouth hanger, is fixed at product well well head, for hanging the associated component of waste heat recovery product well system;
Product pipe(1), in product well, product pipe(1)End section adopt perforate design, be provided with some pores, formed Perforate product pipe pipeline section(1a), remainder is complete product pipe pipeline section(1b);
Jacket pipe(5), positioned at product pipe(1)Outside and with product pipe(1)Concentric setting, jacket pipe(5)With product pipe(1)It Between formed circular passage, jacket pipe(5)End caliber is progressively decreased to and product pipe(1)Outer wall is in close contact, contact site shape Become a metal to metal seal structure(6);
Water cooling tube(2), parallel located at product pipe(1)Side, and it is located at jacket pipe(5)Interior, for toward jacket pipe(5)With product pipe (1)Between circular passage in injection cooling water, unsaturated steam and/or anticorrosion good antiscale property medium, described water cooling tube(2)Prolong Extend jacket pipe(5)With product pipe(1)Between circular passage bottom, water cooling tube(2)End is provided with nozzle(3), water cooling tube(2) Inside is provided with check-valves(4), check-valves(4)For maintaining water cooling tube(2)Interior water-column and prevent reverse steam from entering water-cooled Pipe(2);
Measuring instrument system(9), including distributed temperature sensor, pressure transducer and sonic sensor, described measuring instrument System(9)It is fixed at product pipe(1)Periphery, and be in and water cooling tube(2)Nozzle(3)Contour position, described distributed Temperature sensor is used for controlling water cooling tube by monitoring product well downhole temperature(2)Interior cooling water flow, distributed pressure senses Device is used for monitoring product well down-hole and jacket pipe(5)Interior pressure, distributed acoustic wave sensor is used for monitoring the burst of product well down-hole Situation;
Product casing(7), by high-temperature cement set(8)It is fixed in the stratum of product well periphery, described product casing(7) As product pipe(1), jacket pipe(5), water cooling tube(2)With measuring instrument system(9)Shell, from product well well head start extend To coal seam, product casing(7)With jacket pipe(5)Between annular channels as system exception running standby pressure release Passage;
The wellhead equipment of high temperature high voltage resistant, comprises at least one measuring instrument splice port(10), for connecting measuring instrument system System(9);Also include at least four groups circulation passage ports and valve, wherein:One circulation passage port and valve are normal for system Export as the crude synthesis gas in product pipe during operation(11), a circulation passage port and valve are used for making when system exception runs Outlet for circular passage between product casing and jacket pipe(12), a circulation passage port and valve are normally transported for system As the outlet of High Temperature High Pressure saturated vapor in circular passage between jacket pipe and product pipe during row(13), a circulation passage port Connect the medium inlet of water cooling tube with valve(14), described wellhead equipment is additionally provided with thermometer and pressure gauge, for directly showing Show the temperature and pressure numerical value of each passage of well head, and data transmission device, for monitoring synthesis gas, high steam and cooling water The situation of distribution channel, and the data signal that each sensor is obtained feeds back to control system;
Ground waste-heat recovery device(15), connect product pipe(1)And jacket pipe(5)Between annular channel outlet and water cooling tube(2) Inlet, by product pipe(1)And jacket pipe(5)Between High Temperature High Pressure saturated vapor is carried out in circular passage waste heat be used for Surface production technique(16);
Described product pipe(1), jacket pipe(5), water cooling tube(2)With product casing(7)All with orientation waste heat recovery product well Shape is consistent, all includes vertical section, segmental arc and horizontal segment, product pipe(1), jacket pipe(5)And water cooling tube(2)Vertical section equal By well mouth hanger free suspension, bending section passes through product casing(7)Bending section supports, and horizontal component passes through product well set Pipe(7)Horizontal component supports;
Product casing(7)Vertical section and segmental arc pass through high-temperature cement set(8)It is fixed in the stratum of product well periphery, institute State the self-produced QC of perforate product pipe pipeline section(1)Segmental arc end starts, and extends to the directional well top in no sleeve pipe coal bed drilling, And with injection well horizontal bore internal lining pipe(17)Intersecting.
3. the waste heat recovery product well system for coal underground gasifying technology according to claim 1 and 2, its feature exists In:Described perforate product pipe pipeline section(1a)Length is that 1-3 pipeline section is long, and the length of each pipeline section length is 6m, and the aperture of perforate is 5-35mm, perforate accounts for the 5-35% of tube wall area with interval mode layout of interlocking, the perforate gross area.
4. the waste heat recovery product well system for coal underground gasifying technology according to claim 1 it is characterised in that: Described complete product pipe pipeline section(1b)With perforate product pipe pipeline section(1a)All processed using corrosion-resistant nickelic chromium alloy material, Under maximum heat stretches situation, perforate product pipe pipeline section(1a)The distance between end and product bottom be more than zero.
5. the waste heat recovery product well system for coal underground gasifying technology according to claim 2 it is characterised in that: Described complete product pipe pipeline section(1b)With perforate product pipe pipeline section(1a)All processed using corrosion-resistant nickelic chromium alloy material, Horizontal bore internal lining pipe(17)Underground Coal Gasification Process can progressively consume, material selection carbon steel pipe.
6. the waste heat recovery product well system for coal underground gasifying technology according to claim 1 and 2, its feature exists In:Described perforate product pipe pipeline section(1a)Diameter is less than complete product pipe pipeline section(1b)Diameter, in order to perforate in Completion Operations Product pipe pipeline section(1a)With complete product pipe pipeline section(1b)Connecting portion box cupling passes through jacket pipe(5)Caliber reduces part;Or Person is located at jacket pipe(5)Caliber reduces the complete product pipe pipeline section of part(1b)From ratio product pipe(1)Other parts pipeline section is straight The big size in footpath.
7. the waste heat recovery product well system for coal underground gasifying technology according to claim 1 and 2, its feature exists In:Under the maximum axial elongated distance situation that thermal expansion and free suspension deadweight cause, metal to metal seal structure(6)'s Position is still located at complete product pipe pipeline section(1b).
8. the waste heat recovery product well system for coal underground gasifying technology according to claim 1 and 2, its feature exists In:Described check-valves(4)The low temperature of 1-3 pipeline section length above perforate product pipe pipeline section with complete product pipe pipeline section joint Zone position, the length of each pipeline section length is 6m, check-valves(4)It is provided with several, realizes multiple protection functions, maintain water column suitable Height and prevent high pressure high temperature vapor reveal.
9. the waste heat recovery product well system for coal underground gasifying technology according to claim 7 it is characterised in that: Metal to metal seal structure(6)With product pipe(1)Contact portion between there is suitable gap structure, cooling water is from water-cooled Pipe(2)It is injected into product pipe(1)With jacket pipe(5)Between after, a small amount of water passes through metal to metal seal structure(6)The seam at place High-temperature crude synthesis gas stream is leaked into, to play the temperature that part shock chilling function reduces crude synthesis gas at gap structure.
CN201620929802.5U 2016-08-24 2016-08-24 Waste heat recovery product well system for coal underground gasifying technology Withdrawn - After Issue CN205990904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620929802.5U CN205990904U (en) 2016-08-24 2016-08-24 Waste heat recovery product well system for coal underground gasifying technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620929802.5U CN205990904U (en) 2016-08-24 2016-08-24 Waste heat recovery product well system for coal underground gasifying technology

Publications (1)

Publication Number Publication Date
CN205990904U true CN205990904U (en) 2017-03-01

Family

ID=58107113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620929802.5U Withdrawn - After Issue CN205990904U (en) 2016-08-24 2016-08-24 Waste heat recovery product well system for coal underground gasifying technology

Country Status (1)

Country Link
CN (1) CN205990904U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121617A (en) * 2016-08-24 2016-11-16 中为(上海)能源技术有限公司 Waste heat recovery product well system and operational approach for coal underground gasifying technology
CN109740203A (en) * 2018-12-18 2019-05-10 新疆贝肯能源工程股份有限公司 Orientation trajectory design method for underground heat well development
CN111022026A (en) * 2020-01-03 2020-04-17 中国矿业大学 Waste heat power generation device and method used in underground coal gasification process
CN113452880A (en) * 2021-06-08 2021-09-28 常州大学 Underground video detection device suitable for high-temperature geothermal well and control method thereof
CN114592813A (en) * 2022-04-18 2022-06-07 大庆长垣能源科技有限公司 Well washing device for screen pipe well completion
WO2023124897A1 (en) * 2021-12-27 2023-07-06 中国石油天然气集团有限公司 Annulus water injection distributed spray cooling method for high-temperature underground gas

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121617A (en) * 2016-08-24 2016-11-16 中为(上海)能源技术有限公司 Waste heat recovery product well system and operational approach for coal underground gasifying technology
CN109740203A (en) * 2018-12-18 2019-05-10 新疆贝肯能源工程股份有限公司 Orientation trajectory design method for underground heat well development
CN111022026A (en) * 2020-01-03 2020-04-17 中国矿业大学 Waste heat power generation device and method used in underground coal gasification process
CN113452880A (en) * 2021-06-08 2021-09-28 常州大学 Underground video detection device suitable for high-temperature geothermal well and control method thereof
WO2023124897A1 (en) * 2021-12-27 2023-07-06 中国石油天然气集团有限公司 Annulus water injection distributed spray cooling method for high-temperature underground gas
CN114592813A (en) * 2022-04-18 2022-06-07 大庆长垣能源科技有限公司 Well washing device for screen pipe well completion
CN114592813B (en) * 2022-04-18 2023-11-21 大庆长垣能源科技有限公司 Well flushing device for screen pipe well completion

Similar Documents

Publication Publication Date Title
CN106121617B (en) Waste heat for coal underground gasifying technology recycles product well system and operating method
CN205990904U (en) Waste heat recovery product well system for coal underground gasifying technology
Mocek et al. Pilot-scale underground coal gasification (UCG) experiment in an operating Mine “Wieczorek” in Poland
US4067390A (en) Apparatus and method for the recovery of fuel products from subterranean deposits of carbonaceous matter using a plasma arc
CN106089179B (en) For the withdrawal well equipment of Underground Coal Gasification Process and its application
CN103670357B (en) The crack of the carbon containing humatite reservoir in underground is linked up, passageway machining and underground gasification method
AU2016420451B2 (en) Production well apparatus for underground coal gasification and use thereof
US20160123128A1 (en) Gas injection apparatus with controllable gas injection point, gas injection process, and gasification method
US9228426B2 (en) Underground coal gasification well liner
CN113279807A (en) Anti-backfire system and method for reinjection of carbon dioxide for underground coal gasification
RU2706498C1 (en) Equipment for oxidizer injection during underground gasification of coal and its use
CN103410487B (en) Thickened oil thermal recovery decompression method
CN102434143A (en) Vent-hole bi-sleeve heat exchanger for underground coal gasification and heat exchange protecting method
CN107605454A (en) Go out gas drilling hole and go out the method for gas drilling hole conveying coal gas
CN112431582B (en) Underground coal gasification system and method capable of realizing parallel transportation of multiple media
AU2013101616A4 (en) Oxidant injection method
CN206053928U (en) For the withdrawal well equipment of Underground Coal Gasification Process
WO2021179684A1 (en) Underground gasifier pre-control structure, gasifier, and gasification method
CN105178935B (en) A kind of central water tube formula gasification coal mining device
CN206053927U (en) For the oxidant injection device of Underground Coal Gasification Process
CN211623393U (en) Chilling water device for underground coal gasification process
CN205990906U (en) Dock gasification furnace for coal underground gasifying technology
CN215408574U (en) Heat exchange device for coal underground gasification process
CN211598595U (en) Well cementation system for coal underground gasification process
CN211860586U (en) Oil field is electromagnetic heating device in pit

Legal Events

Date Code Title Description
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170301

Effective date of abandoning: 20190108