CN205979832U CN201620786092.5U CN201620786092U CN205979832U CN 205979832 U CN205979832 U CN 205979832U CN 201620786092 U CN201620786092 U CN 201620786092U CN 205979832 U CN205979832 U CN 205979832U
Authority
CN
China
Prior art keywords
box door
smoke box
smoke
installation cavity
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620786092.5U
Other languages
Chinese (zh)
Inventor
李正斌
汪亚平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING TAIHU BOILER Co Ltd
Original Assignee
CHONGQING TAIHU BOILER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING TAIHU BOILER Co Ltd filed Critical CHONGQING TAIHU BOILER Co Ltd
Priority to CN201620786092.5U priority Critical patent/CN205979832U/en
Application granted granted Critical
Publication of CN205979832U publication Critical patent/CN205979832U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Special Wing (AREA)
  • Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)

Abstract

The utility model discloses a low temperature panel boiler uptake door, including boiler body (1) and smoke box door (2), the inner chamber of boiler body (1) divide into smoke box door installation cavity (3) and high temperature smoke -box (4), be provided with between smoke box door installation cavity (3) and high temperature smoke -box (4) step interface (5), install in smoke box door installation cavity (3) smoke box door (2), the panel (2a) of smoke box door (2) separates through a non -metallic gasket (6) with the front panel (1a) of boiler body (1), the inner panel (2c) and the curb plate (2b) of smoke box door (2) separate through the 2nd non -metallic gasket (7), inner panel (2c) and step interface (5) of smoke box door (2) separate through the 3rd non -metallic gasket (8), before the lateral wall metal extension board of smoke box door installation cavity (3) divide into, two sections backs separate through fourth non -metallic gasket (9). The heat that the messenger transmitted on the smoke box shop front board significantly reduces, is showing the panel temperature that has reduced the smoke box door.

Description

Cryogenic panels boiler smoke chamber door
Technical field
The utility model belongs to boiler parts technical field and in particular to a kind of smoke box door of boiler.
Background technology
In conjunction with shown in Fig. 3, Fig. 4, boiler body 1 is divided into smoke box door to install equipped with smoke box door 2, the inner chamber of boiler body 1 Chamber 3 and high temperature smoke-box 4, are provided with step interface 5 between smoke box door installation cavity 3 and high temperature smoke-box 4, smoke box door 2 is arranged on cigarette In chamber door installation cavity 3, the panel 2a of the smoke box door 2 and front panel 1a of boiler body 1 is separated by the first non-metallic gasket 6.
The high-temperature flue gas of high temperature smoke-box 4 are directly contacted with the inner panel 2c of smoke box door 2, and the heat of inner panel 2c passes through smoke box door 2 Side plate 2b be delivered to panel 2a, cause smoke box door panel temperature too high;In addition, part high-temperature flue gas pass through boiler body 1 with Gap between smoke box door 2 channels to the temperature having increased smoke box door face board in smoke box door installation cavity 3 further.
Utility model content
The utility model aims to solve the problem that the too high problem of boiler uptake shop front plate temperature.
For this reason, the technical scheme that the utility model is adopted is:A kind of cryogenic panels boiler smoke chamber door, including boiler body And smoke box door, the inner chamber of described boiler body is divided into smoke box door installation cavity and high temperature smoke-box, smoke box door installation cavity and high temperature smoke-box Between be provided with step interface, described smoke box door is arranged in smoke box door installation cavity, the panel of described smoke box door and boiler this The front panel of body is separated by the first non-metallic gasket, the inner panel of described smoke box door and side plate pass through the second non-metallic gasket every Open, the inner panel of smoke box door is separated by the 3rd non-metallic gasket with step interface, the side-wall metallic support plate of smoke box door installation cavity It is divided into forward and backward two sections and separated by the 4th non-metallic gasket.
Preferred as such scheme, the side plate of described smoke box door is provided with the first bending part, institute near the side of inner panel The cross section stating the second non-metallic gasket is mated with the first bending part, to increase the heat-insulated area of the second non-metallic gasket.
Further, forward and backward two sections of described smoke box door installation cavity are correspondingly arranged on the second bending part, and the described 4th is nonmetallic The cross section of packing ring is mated with the second bending part, to increase the heat-insulated area of the 4th non-metallic gasket.
The beneficial effects of the utility model:By setting up the second non-metallic gasket, the inner panel of smoke box door and side plate are separated, Set up the 3rd non-metallic gasket to separate the inner panel of smoke box door with step interface, set up the 4th non-metallic gasket and smoke box door is pacified Forward and backward two sections of the side-wall metallic support plate behaveing affectedly separate, and so that the heat being delivered on smoke box door face board is greatly reduced, significantly reduce The panel temperature of smoke box door.
Brief description
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A portion enlarged drawing of Fig. 1.
Fig. 3 is the structural representation before improving.
Fig. 4 is the B portion enlarged drawing of Fig. 3.
Specific embodiment
Below by embodiment and combine accompanying drawing, the utility model is described in further detail:
In conjunction with shown in Fig. 1, Fig. 2, a kind of cryogenic panels boiler smoke chamber door, main include boiler body 1 and smoke box door 2 two Point.
The inner chamber of boiler body 1 is divided into smoke box door installation cavity 3 and high temperature smoke-box 4, smoke box door installation cavity 3 and high temperature smoke-box 4 Between be provided with step interface 5, smoke box door 2 is arranged in smoke box door installation cavity 3, the panel 2a of smoke box door 2 and boiler body 1 Front panel 1a separated by the first non-metallic gasket 6, the above is identical with existing structure, will not be described here.
Difference is:The inner panel 2c and side plate 2b of smoke box door 2 is separated by the second non-metallic gasket 7, the inner panel of smoke box door 2 2c is separated by the 3rd non-metallic gasket 8 with step interface 5, and the side-wall metallic support plate of smoke box door installation cavity 3 is divided into forward and backward two Section is simultaneously separated by the 4th non-metallic gasket 9.
Preferably, the side plate 2b of smoke box door 2 is provided with the first bending part, the second non-metallic gasket near the side of inner panel 2c 7 cross section is mated with the first bending part.
In addition, forward and backward two sections of smoke box door installation cavity 3 are correspondingly arranged on the second bending part, the horizontal stroke of the 4th non-metallic gasket 9 Section is mated with the second bending part.

Claims (3)

1. a kind of cryogenic panels boiler smoke chamber door, including boiler body (1) and smoke box door (2), the inner chamber of described boiler body (1) It is divided into smoke box door installation cavity (3) and high temperature smoke-box (4), be provided with step between smoke box door installation cavity (3) and high temperature smoke-box (4) and divide Interface (5), described smoke box door (2) is arranged in smoke box door installation cavity (3), and the panel (2a) of described smoke box door (2) is with boiler originally The front panel (1a) of body (1) separated by the first non-metallic gasket (6) it is characterised in that:The inner panel (2c) of described smoke box door (2) Separated by the second non-metallic gasket (7) with side plate (2b), the inner panel (2c) of smoke box door (2) and step interface (5) pass through the Three non-metallic gaskets (8) separate, and the side-wall metallic support plate of smoke box door installation cavity (3) is divided into forward and backward two sections and passes through the 4th non-gold Belong to packing ring (9) to separate.
2. according to the cryogenic panels boiler smoke chamber door described in claim 1 it is characterised in that:The side plate of described smoke box door (2) (2b) side near inner panel (2c) is provided with the first bending part, the cross section of described second non-metallic gasket (7) and the first folding Turn of bilge mates.
3. according to the cryogenic panels boiler smoke chamber door described in claim 1 it is characterised in that:Described smoke box door installation cavity (3) Forward and backward two sections are correspondingly arranged on the second bending part, and the cross section of described 4th non-metallic gasket (9) is mated with the second bending part.
CN201620786092.5U 2016-07-25 2016-07-25 Low temperature panel boiler uptake door Active CN205979832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620786092.5U CN205979832U (en) 2016-07-25 2016-07-25 Low temperature panel boiler uptake door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620786092.5U CN205979832U (en) 2016-07-25 2016-07-25 Low temperature panel boiler uptake door

Publications (1)

Publication Number Publication Date
CN205979832U true CN205979832U (en) 2017-02-22

Family

ID=58026396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620786092.5U Active CN205979832U (en) 2016-07-25 2016-07-25 Low temperature panel boiler uptake door

Country Status (1)

Country Link
CN (1) CN205979832U (en)

Similar Documents

Publication Publication Date Title
CN205979832U (en) Low temperature panel boiler uptake door
CN205101201U (en) Structure of making an uproar falls in compressor valve
CN104266363A (en) Low-noise boiler with air preheating
CN204665383U (en) Burner and there is the gas-cooker of this burner
CN204629460U (en) Tertiary air staged combustion device
CN204041189U (en) A kind of smoke-ejecting pipe with rainproof groove
CN204022754U (en) For the ammoniacal liquor system of tamping coke oven dust
CN207112863U (en) Air mixing tube with fastening structure
CN204267345U (en) A kind of split type wheel cap structure and compressor
CN204127543U (en) Connect the aluminum alloy suction tude connection set of gas stove valve body
CN205371099U (en) High temperature fan inclined plane pulls out fork portion with inflation
CN201155581Y (en) Gas valve
CN206207414U (en) Die-casting type furnace end and combustor thereof
CN204944187U (en) A kind of magnetic core sintering furnace gas extraction system
CN205991513U (en) The boiler combustion machine interface of above plate temperature can be reduced
CN204115237U (en) A kind of low noise boiler with air preheat
CN202612918U (en) Flange with lug boss
CN203309940U (en) Energy-saving fireplace
CN203718823U (en) Gas safety protection system for gas-fired boiler
CN201425337Y (en) Waterproof structure applicable to detachable dual-purpose furnace
CN204629593U (en) Novel energy conserving furnace
CN102767843A (en) Connection structure of stove core and firewood feed port of firewood-saving stove
CN207064755U (en) A kind of gasket base gas valve self-closing structure integrated with push rod
CN202901388U (en) Electromagnetic air valve for plasma cutting machine
CN203154667U (en) Marsh gas flame arrester

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant