CN205976571U - Building is faced limit combination formula and is prevented guardrail bar - Google Patents

Building is faced limit combination formula and is prevented guardrail bar Download PDF

Info

Publication number
CN205976571U
CN205976571U CN201620546226.6U CN201620546226U CN205976571U CN 205976571 U CN205976571 U CN 205976571U CN 201620546226 U CN201620546226 U CN 201620546226U CN 205976571 U CN205976571 U CN 205976571U
Authority
CN
China
Prior art keywords
joint
pipe
tube
joint casing
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620546226.6U
Other languages
Chinese (zh)
Inventor
周家明
向鹏
赵战军
李洪
胡鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group Co Ltd
Original Assignee
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group Co Ltd filed Critical Chongqing Construction Engineering Group Co Ltd
Priority to CN201620546226.6U priority Critical patent/CN205976571U/en
Application granted granted Critical
Publication of CN205976571U publication Critical patent/CN205976571U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a building is faced limit combination formula and is prevented guardrail bar, including horizontal frame pipe, vertical pipe, be used for that building corner transversely puts up tub, the guardrail bar that prevents of vertical union coupling changes corner connector, is used for the guardrail bar T -shaped that prevents of two horizontal frame pipes, a vertical union coupling to connect, be used for two horizontal frame pipes, two vertical union couplings to prevent guardrail bar cross joints and be used for the guardrail bar that prevents that a pipe and building wall connection are fixed to lean on the wall list to connect. The utility model discloses simple structure, convenient and practical.

Description

Building faces side modular guard railing
Technical field
The utility model is related to a kind of safety protection facility of construction site use and in particular to a kind of building faces side combination Formula guard rail.
Background technology
With the expansion of construction scope, security incident is also to take place frequently, and causes very to the personal property of China builder Major injury, the raising of awareness of safety is very urgent.Require according to country is relevant, excavation of foundation pit, project under construction face side hole all Need to carry out security protection, typically we carry out scene protection using guard rail.
Guard rail is that a kind of common tubing connects product, how to build temporarily, is easy to play provisional protection Effect, improves the security of job site.Present guard rail is typically made up of tubing and joint, wherein tubing include crossbeam and Cylindrical vertical tube, in order to preferably increase stability, the structure of guard rail is made using metal material entirely.Wherein, many water The upper and lower arranged for interval of flat crossbeam, many vertical tubes are plugged in the middle of crossbeam along vertical direction interval, are connected formation one with crossbeam Individual overall guard rail.For good connecting cross beam and vertical tube, how to be assembled using T-shaped type joint, abbreviation T font or Three-way connection, usually crossbeam run through the horizontal opening of T-shaped type joint, and vertical tube is fixed on the vertical openings of T-shaped type joint.And T-shaped joint is applied to horizontal basal plane, and for the place upstairs having angle of inclination, T font joint cannot be carried out connecting and fixing.
For this reason, now many connected using the pipeline that special-shaped T-shaped type joint carries out angle of inclination, special-shaped T-shaped type joint by T-shaped type joint, horizontal tube and bend pipe composition, wherein horizontal tube and bend pipe are separately mounted at the horizontal opening of T-shaped type joint, Then pass through the installing hole on horizontal tube and bend pipe surface with bolt, so that it is fixed using frictional force.So there is problems with:1st, build Build and be disposed in the outdoor the guard rail on building site more, because long wind and weather and guard rail are made up of metal material, different Connection within shape T-shaped type joint and tubing and joint, all get rusty easily, and the guard rail after getting rusty is in dismounting Very inconvenient;2nd, the fixation of joint and tubing and the fixation within joint, is all carried out by the way of bolt insertion installing hole Fixing, bolt, under wind and weather, gets rusty easily, and dismounting is inconvenient.
In addition, existing corner coupling head, including the first connector, the second connector and joint among three members, three companies It is integrated making between joint and is mutually perpendicular between any two, but corner coupling head is used in building corner by builder During connecting two sections of guard rails, it is frequently encountered orientation problem:Need to fix corner coupling head one end with one section of guard rail, Then the corner coupling head other end and another section of guard rail are fixed, and are frequently necessary in this process corner coupling head is carried out repeatedly Angle adjustment, builder generally uses brute-force or hard thing impact corner coupling head, not only have impact on construction speed, and easily Cause the damage of corner coupling head, increased cost.
Utility model content
The utility model aims to provide a kind of building and faces side modular guard railing, shortens the engineering time.
Base case:Building in this programme faces side modular guard railing, including transverse strands pipe, vertical frame pipe, is used for Guard rail corner coupling head that transverse strands pipe at corners of building, vertical frame pipe connect, for two transverse strands pipes, one vertical Guard rail T-shaped type joint that frame pipe connects, cross for two transverse strands pipes, two vertical frame pipe connection guard rails Joint and the guard rail being connected with building masonry wall for frame pipe lean on wall list joint, wherein guard rail corner coupling head Including the first connector, the second connector and joint among three members, it is vertical setting between the wherein first connector and the second connector Put, guard rail T-shaped type joint includes tee T joint body, and described tee T joint body is along horizontal direction one end Be cased with horizontal tube, the other end of tee T joint body is cased with bend pipe, the first described connector include the first inserted joint casing and Fixing first pivot fitting vertical with the first inserted joint casing, the second described connector includes the second inserted joint casing and with second The second fixing pivot fitting of inserted joint casing, the first described pivot fitting forms pivot joint with the second described pivot fitting;The It is hinged with screw-button between in the middle part of one inserted joint casing and in the middle part of the second inserted joint casing;Joint among three members includes and the first pivot fitting Connecting tube and threeth inserted joint casing fixing with connecting tube that end is detachably connected;Described elbow internal wall is provided with cushion; Described horizontal tube is divided into outer tube and inner tube, outer tube and inner tube with axis and interference fit, and the end sidewalls of said inner tube open up Jagged, the surfaces externally and internally of inner tube is cased with interior elastic layer and outer elastic layer respectively, and interior elastic layer, outer elastic layer and cushion are along axle To all offering cut-off rule.
Compared to prior art, the utility model has the advantage of:It is pivot joint between first connector and the second connector , the angle that operative employee adjusts between the first connector and the second connector according to actual conditions then can be facilitated right to realize The connection of two section guards or assembling are very convenient quick.Wherein first inserted joint casing, the 3rd inserted joint casing and a section guard Rod member is connected, and then turn screw-button is adjusted angle with the rod member of an other section guard, is aligned and goes forward side by side to the second inserted joint casing Row is connected;Whole process is convenient and swift, thus realizing quick adjustment, installing and fixing, greatly reduces the engineering time.
Additionally, compared with existing bolt connection, adopting elastic connection, horizontal tube and bend pipe all with squeezing in the utility model The mode of compression elasticity material, is changed to the contact surface between horizontal tube, bend pipe and tubing, special-shaped T-shaped type joint itself Assembling and special-shaped T-shaped type joint are convenient with the connection of tubing, good fixing effect, and it is more convenient to dismount link.With When, using elastic connection way, and it is interference fit, firm effect is more preferable.Horizontal tube is divided into outer tube and inner tube, and the side of inner tube Wall end is provided with breach, can be knocked out inner tube, outer tube and tee T using first being exerted a force to indentation, there with instrument in outer tube Reserve space between joint body, tubing, can easily outer tube be taken off very much, such dismounting mode, will not be because of The baptism of rainwater and dismantle and waste time and energy, detaching structure is ingenious, and dismantle easily save time.Due to being externally provided with interior elasticity in inner tube Layer and outer elastic layer, in unloading process, will not produce to the surface of inner tube, tubing and outer tube and scratch, be easy to reuse, Economize on resources.Cut-off rule is all offered above interior elastic layer, outer elastic layer and cushion, convenient disassembly, and reusable. It is elastic connection that the utility model mainly changes contact surface, and more preferably, do not got rusty by tubing etc. is affected firm effect, and to pipe The damage of material and joint is less, reusable;Meanwhile, structure and the dismounting mode of horizontal tube are changed, dismounting is time saving and energy saving.
The security protection facing side and hole be applied to Building Construction for the utility model, has structure letter Singly, build dismounting fast and convenient, have enough to meet the need convenient transportation, the repeatable advantage being used in turn.
Prioritization scheme one, the optimization further based on base case:The axle center in the described pivot joint face of the first pivot fitting Line direction is provided with cylindrical boss, and cylindrical boss upper end is provided with the clamping edge of a wing;The pivot joint face of the second described pivot fitting Direction of axis line be provided with can with described cylindrical boss grafting and enable rotate cylindrical tube, connecting tube and cylinder Shape boss lower end is threaded and connecting tube is with diameter greater than cylindrical tube;By the cooperation between cylindrical boss and cylindrical tube Thus forming stable pivot joint relation between the first connector and the second connector, it is simultaneously located at the clamping edge of a wing, connecting tube straight Footpath is more than cylindrical tube it is also possible to prevent the second connector and the first connector from departing from, connecting tube and with cylindrical boss lower end Screw thread, facilitates installing/dismounting.
Prioritization scheme two, the optimization further based on base case or prioritization scheme one:First inserted joint casing, the second grafting Sleeve pipe and the 3rd inserted joint casing structure are identical, and the first inserted joint casing circumference has dilatation joint, and the first inserted joint casing outer wall is along axle To in enlarging shape, in the middle part of the first inserted joint casing, it is threaded with threaded cap, threaded cap outer end can be with the first inserted joint casing outer wall work Offset as end;The working end that the setting of dilatation joint can be easy to the first inserted joint casing is shunk or is expanded, thus adapting to different rule The connection of the guard rail of lattice, simultaneously the first inserted joint casing outer wall in enlarging shape be working end be in enlarging shape, and the first grafting set It is threaded with threaded cap, threaded cap outer end can be offseted with the first inserted joint casing outer wall working end, operative employee's turn spiral shell in the middle part of pipe Line lid can achieve the contraction to dilatation joint or unclamps, thus realizing the fixation of inserted joint casing and guard rail.
Prioritization scheme three, the optimization further based on prioritization scheme two:The first described inserted joint casing is cylindrical sleeve, The first described inserted joint casing is integrally formed with the first described pivot fitting;The second described inserted joint casing is cylindrical shroud Cylinder, the second described inserted joint casing is integrally formed with the second described pivot fitting;Convenient processing ensures structural strength simultaneously.
Prioritization scheme four, the optimization further based on prioritization scheme three:Described cylindrical boss and the first described pivot Adapter is integrally formed;Described cylindrical tube is integrally formed with the second described pivot fitting;Convenient processing ensures knot simultaneously Structure intensity.
Prioritization scheme five, the optimization further based on base case one:The end sidewalls of described horizontal tube are provided with outside clamping Pipe and the condom of inner tube, condom takes the shape of the letter U structure, and described breach is located inside condom;Open up above described interior elastic layer There is chute, the inwall of inner tube is provided with the draw runner matching with chute;Breach is located inside condom, on the one hand to outer tube and inner tube It is attached, increase the firm effect of inner and outer tubes;On the other hand, breach is blocked in condom, it is to avoid other people are by mistake Tear open it is ensured that the integrality of horizontal tube and security, and the setting of chute and draw runner is easy to when dismantling inner tube, by inner tube from outer tube Inside knock out, dismounting is laborsaving.
Prioritization scheme six, the optimization further based on prioritization scheme five:Described cushion has been routed over anti-skid bulge;Increase Plus the connection of bend pipe and joint and tubing, firm effect is more preferable.
Prioritization scheme seven, the optimization further based on prioritization scheme five or six:The cross section of described breach is trapezoidal;It is easy to Extracting tool is inserted into indentation, there and is exerted a force.
Brief description
Fig. 1 is the schematic diagram in the utility model embodiment one;
Fig. 2 is the schematic diagram in the utility model embodiment one;
Fig. 3 is the schematic diagram in the utility model embodiment two;
Fig. 4 is the enlarged drawing of part A in Fig. 3;
Fig. 5 is the structural representation of the utility model embodiment three;
Fig. 6 is the structural representation of coning sleeve in Fig. 5;
Fig. 7 is the structural representation of rubber sleeve in Fig. 5;
Fig. 8 is the structural representation of the utility model example IV;
Fig. 9 be in Fig. 8 jump ring schematic diagram.
Specific embodiment
Below by specific embodiment, the utility model is described in further detail:
Embodiment one:
Reference in Figure of description includes:Tee T joint body 1, transverse pipe 101, vertical duct 102, horizontal tube 2, bend pipe 3, cushion 4, anti-skid bulge 5, outer tube 6, inner tube 7, interior elastic layer 8, outer elastic layer 9, cut-off rule 10, chute 11, lack Mouth 12, condom 13, the first connector 110, threaded cap 111, dilatation joint 112, the second connector 120, screw-button 121, clamping The edge of a wing 122.
As shown in Figure 1 and Figure 2:The building in this programme in this programme faces side modular guard railing, including transverse strands Pipe, vertical frame pipe, the guard rail corner coupling head connecting for transverse strands pipe, vertical frame pipe at corners of building, it is used for two Guard rail T-shaped type joint that transverse strands pipe, vertical frame pipe connect, it is used for two transverse strands pipes, two vertical frame Guan Lian Take over control guard rail rod cross type joint and the guard rail that is connected with building masonry wall for frame pipe leans on wall list joint, wherein Guard rail corner coupling head includes the first connector, the second connector and joint among three members, and the wherein first connector and second is even It is vertically disposed between joint, the first connector includes the first of the first inserted joint casing and fixation vertical with the first inserted joint casing Pivot fitting, the second described connector includes the second inserted joint casing and second pivot fitting fixing with the second inserted joint casing, First pivot fitting forms pivot joint with the second described pivot fitting;In the middle part of first inserted joint casing with the second inserted joint casing in the middle part of it Between be hinged with screw-button;Joint among three members includes connecting tube and and the connecting tube being detachably connected with the first pivot fitting end The 3rd fixing inserted joint casing.
Guard rail cross type joint in the present embodiment be in crosswise, be two horizontal steel pipes respectively with a vertical steel Pipe vertical welding forms;Guard rail leans on wall list joint T-shaped, is formed with a steel pipe vertical welding by a base, wherein base Circumference has four through holes for being connected with building masonry wall.
It is pivot joint between first connector 110 and the second connector 120, then can facilitate operative employee according to actual feelings Condition adjusts angle between the first connector 110 and the second connector 120 to realize the connection to two section guards or assembling, non- Often convenient and swift.Wherein first inserted joint casing, the 3rd inserted joint casing are connected with the rod member of a section guard, then turn screw-button 121 to the second inserted joint casings are adjusted angle, are aligned and be connected with the rod member of an other section guard;Whole process side Just quick, thus realizing quick adjustment, installing and fixing, greatly reduce the engineering time.
The direction of axis line in the pivot joint face of the first pivot fitting is provided with cylindrical boss, and cylindrical boss upper end is provided with card The tight edge of a wing 122;The direction of axis line in the described pivot joint face of the second pivot fitting is provided with can be inserted with described cylindrical boss Connect and enable the cylindrical tube rotating, connecting tube is threadeded with cylindrical boss lower end and connecting tube is with diameter greater than cylinder Cylinder;By the cooperation between cylindrical boss and cylindrical tube thus being formed between the first connector 110 and the second connector 120 Stable pivot joint relation, is simultaneously located at the clamping edge of a wing 122, connecting tube with diameter greater than cylindrical tube it is also possible to prevent second even Joint 120 is departed from the first connector 110, connecting tube with cylindrical boss lower end screw thread, facilitate installing/dismounting.
First inserted joint casing, the second inserted joint casing and the 3rd inserted joint casing structure are identical, taking the first inserted joint casing as a example Illustrate, the first inserted joint casing circumference has dilatation joint 112, the first inserted joint casing outer wall is in enlarging shape vertically, and first inserts It is threaded with threaded cap 111, threaded cap 111 outer end can be offseted with the first inserted joint casing outer wall working end in the middle part of female connector pipe;Swollen The working end that the setting of expansion joint (E.J.) 112 can be easy to the first inserted joint casing is shunk or is expanded, thus adapting to the protection of different size The connection of railing, simultaneously the first inserted joint casing outer wall in enlarging shape be working end be in spiral shell in the middle part of enlarging shape, and the first inserted joint casing Line is connected with threaded cap 111, and threaded cap 111 outer end can be offseted with the first inserted joint casing outer wall working end, operative employee's turn screw thread Lid 111 can achieve the contraction to dilatation joint 112 or unclamps, thus realizing the fixation of inserted joint casing and guard rail.
First inserted joint casing is cylindrical sleeve, and the first described inserted joint casing is become with the first described pivot fitting one Type;The second described inserted joint casing is cylindrical sleeve, and the second described inserted joint casing is with the second described pivot fitting integrally Shaping;Convenient processing ensures structural strength simultaneously.
Cylindrical boss is integrally formed with the first described pivot fitting;Described cylindrical tube and the described second pivot Joint is integrally formed;Convenient processing ensures structural strength simultaneously.
Guard rail T-shaped type joint includes tee T joint body 1, and tee T joint body 1 includes transverse pipe 101, horizontal Tubing all can be connected to the two ends of pipe 101, the centre of transverse pipe 101 is vertically welded with vertical duct 102, the bottom of vertical duct 102 Tubing can be connected.One end of transverse pipe 101 is cased with horizontal tube 2, and the other end of transverse pipe 101 is cased with bend pipe 3, bend pipe 3 with laterally It is provided with cushion 4 between the end of pipe 101, cushion 4 is uniformly laid with anti-skid bulge 5 above, be easy to increase bend pipe 3 and pipe Material, the frictional force of transverse pipe 101, fixed effect is more preferable.Horizontal tube 2 is divided into outer tube 6 and inner tube 7, outer tube 6 and the same axis of inner tube 7 Line and interference fit, the surfaces externally and internally of inner tube 7 is cased with interior elastic layer 8 and outer elastic layer 9, interior elastic layer 8, outer elastic layer 9 respectively All offer cut-off rule 10 vertically with cushion 4, be easy to it is dismantled.Interior elastic layer 8 offers chute 11 above, interior The inwall of pipe 7 is provided with the draw runner matching with chute 11.The end sidewalls of inner tube 7 open up jagged 12, and breach 12 is covered with above Resilient sleeve, the cross section of breach 12 is trapezoidal.The end sidewalls of horizontal tube 2 are provided with the condom 13 of clamping outer tube 6 and inner tube 7, Condom 13 takes the shape of the letter U structure, and breach 12 is located inside condom 13, is easy to breach 12 is protected, it is to avoid other people are internal Pipe 7 and outer tube 6 are dismantled.
The course of work:Workmen, in excavation of foundation pit, builds guard rail near interim hole, is wherein connect using various Crossbeam and vertical tube are fixed by head.At the place that goes upstairs having angle of inclination, first water is put to one end of tee T joint body 1 Flat pipe 2, the other end puts bend pipe 3, then inserts tubing in the free end of horizontal tube 2, bend pipe 3 and tee T joint body 1. When disassembly is desired, available extracting tool top insertion breach 12 at, then apply external force, make inner tube 7 slowly from outer tube 6 Interior slip comes, and now, outer tube 6 has being enclosed within above tubing of gap, along cut-off rule 10 by interior elastic layer 8, outer elastic layer 9 groups Open, tubing and tee T joint body 1 will be separated with horizontal tube 2, finally can easily outer tube 6 and inner tube 7 be taken off.And for At bend pipe 3, the junction of swing bend pipe 3 and tee T joint body 1, and exert a force upwards, can be by bend pipe 3 and T-shaped type joint Body 1 is taken apart.
Embodiment two:
Reference in Figure of description includes:Cross joint body 1, horizontal tube 2, bend pipe 3, resilient sleeve 4, fixing Pipe 5, rotates pipe 6, ball seat 7, bulb 8, groove 9, installing hole 10, latch 11, spring 12, limited block 13, fixing chain 14.
Difference with embodiment one is:As shown in Figure 3, Figure 4, the guard rail cross type joint in the present embodiment includes Cross joint body 1, cross joint body 1 includes vertical duct, and the two ends of vertical duct all can be inserted into tubing, in vertical duct Between level be welded with two transverse pipe, and two transverse pipe are located at same level.One end of transverse pipe is cased with horizontal tube 2, horizontal It is cased with bend pipe 3 to the other end of pipe, be wherein arranged with resilient sleeve 4 inside the both ends of horizontal tube 2, the cross section of resilient sleeve 4 is Trapezoidal, to stop to rainwater, it is to avoid rainwater enters horizontal tube 2 and tubing, the junction of cross joint body 1, fall The low probability that it gets rusty, when so that guard rail is dismounted, rapid and convenient.Wherein bend pipe 3 includes fixing pipe 5 and rotates pipe 6, fixing pipe 5 One end insertion transverse pipe in, the other end of fixing pipe 5 is welded with ball seat 7, rotates pipe 6 and is provided with ball near the end of fixing pipe 5 8, bulb 8 is used cooperatively with ball seat 7, and the end rotating pipe 6 away from fixing pipe 5 can be inserted into tubing.Bulb 8 offers four above Individual groove 9, offers installing hole 10 above ball seat 7 side wall, and installing hole 10 includes approach section and adjusts section, and the diameter of approach section is little In the diameter adjusting section, the part that latch 11 stretches into regulation section is arranged with spring 12, is additionally provided with latch 11 above ball seat 7 side wall, Latch 11 is stretched in installing hole 10 and is offseted with groove 9, and latch 11 is located at and is provided with limited block 13 below spring 12, so can make to insert Pin 11 moves up and down in installing hole 10, and will not depart from installing hole 10, and spring 12 can ensure that latch 11 resets.Wherein, Latch 11 is provided with fixing chain 14 away from the end of ball seat 7, and latch 11 is passed through fixing chain 14 and is connected with fixing pipe 5.
The course of work of the present utility model:Workmen, in excavation of foundation pit, builds guard rail near interim hole, its Middle using various terminal, crossbeam and vertical tube are fixed.At the place that goes upstairs having angle of inclination, first to cross joint body One end put horizontal tube, the other end puts bend pipe, and bend pipe is carried out with angular adjustment, and one hand of workmen will expose ball seat part The latch dividing lifts, the spring-compressed above latch, and latch moves out and depart from groove, and workmen's another holds and turns Dynamic pipe, is rotated clockwise, adjusts and stop operating to required angle.Then, unclamp the end of latch, the bullet above latch Spring restores to the original state, and latch under the action of the spring, is offseted with the groove above bulb again, and fixing pipe and rotation pipe are fixed. Finally insert tubing in the free end of horizontal tube, bend pipe and cross joint body, provisional protection hurdle is built and finished.
Embodiment three:
Reference in Figure of description includes:Vertical tube set 10, right interface 11, left transverse tube 12, projection 13, left pipe box 20th, right pipe box 30, taper ring 40, groove 41, snap ring 42, rubber sleeve 50, bolt 60, tubing 70.
Difference with embodiment one is:As shown in Fig. 5, Fig. 6, Fig. 7, guard rail geneva cross, including vertical tube set 10th, left pipe box 20,30, four taper rings 40 of right pipe box and four rubber sleeves 50.Vertical tube covers 10 hollows, and the middle part of vertical tube set 10 is left Side is provided with left transverse tube 12, and left pipe box 20 is slidably connected with left transverse tube 12, and left pipe box 20 is provided with the steady pin of fixing left pipe box 20.Perpendicular It is provided with right interface 11 on the right side of the middle part of pipe box 10, in right interface 11, is provided with internal thread, the left part of right pipe box 30 is provided with external screw thread, Right pipe box 30 is threadeded with right interface 11.The upper and lower end of vertical tube set 10 is provided with circular hole close to port, and right pipe box 30 is close to left Port and right pipe box 30 are equipped with circular hole at ports having.
Rubber sleeve 50 is made up of elastic caoutchouc in truncated cone-shaped, and four rubber sleeves 50 are provided with internal thread hole, four rubber sleeves 50 May be contained within four circular holes, its bigger diameter end is towards inside port.Taper ring 40 is the open loop structure in circular platform type, taper ring 40 by Elastic caoutchouc is made, and internal welding is provided with snap ring 42, and snap ring 42 is arranged concentrically with taper ring 40, is directed at taper at the opening of snap ring 42 The opening of ring 40.It is provided with groove 41, vertical tube set 10 upper and lower port outside and left and right pipe box 30 inside the bigger diameter end of taper ring 40 Port outside be equipped with the projection 13 engaging with groove 41.
When assembling guard rail, some positions in the middle part of guard rail, need geneva cross to be attached.Cross connects Head connects during tubing 70 it would be desirable to the vertical tubing 70 placed passes through in the vertical tube set 10 of this joint, adjusts the position of this joint Put, at rubber sleeve 50, this joint is fixed on tubing 70 using bolt 60.Then two taper rings 40 are reused, by vertical tube The upper and lower port of set 10 is individually fixed on tubing 70, is substantially prevented from tubing 70 and slides in vertical tube set 10.In 20 sets of left pipe box Enter tubing 70, adjust the suitable length of left pipe box 20 institute of tubing 70, at rubber sleeve 50, left pipe box 20 is solid using bolt 60 On tubing 70.It is inserted in corresponding tubing 70 in right pipe box 30, at circular hole, tubing 70 is fixing using bolt 60, then It is placed on the port of left pipe box 20 and right pipe box 30 using taper ring 40.
When needing to dismantle guard rail, first the taper ring 40 of this joint all takes off, then by left pipe box 20 and right pipe box 30 Bolt 60 in upper rubber sleeve 50 takes off, and then takes off the tubing 70 being placed in left pipe box 20 and right pipe box 30.By vertical tube The bolt 60 of the upper and lower port of set 10 takes off, and the tubing 70 being placed in vertical tube set 10 is taken off, you can complete tearing open of guard rail Unload.If needing three-way connection during use, right pipe box 30 can be taken off from right interface 11, this joint can achieve threeway The function of joint.
Example IV:
Reference in Figure of description includes:Base 1, connecting seat 2, sleeve pipe 3, pressure ring 4, jump ring 5, screw rod 6, positioning Pin 7, anti-slop serrations 51.
Difference with embodiment one is:As shown in figure 8, guard rail includes base 1 and sleeve pipe 3, bottom by wall list joint Seat 1 is square, and base 1 is provided with four connecting holes, and connecting hole is separately positioned on the corner of base 1.Base 1 company of being provided with Joint chair 2, connecting seat 2 is rotated with base 1 and is connected;Connecting seat 2 is a multidiameter, and base 1 is provided with a blind hole, the big end of multidiameter In insertion blind hole, and an end cap is connected by screw on base 1, the end face of this end cap is coordinated with the shaft shoulder of connecting seat 2, from And by spacing for connecting seat 2 on base 1, and connecting seat 2 can be made to rotate with respect to base 1.One end of sleeve pipe 3 and connecting seat 2 Small end is hinged;Sleeve pipe 3 other end is provided with retaining mechanism, and retaining mechanism includes pressure ring 4 and jump ring 5, and pressure ring 4 is set in outside sleeve pipe 3, And pressure ring 4 threadeded with sleeve pipe 3, pressure ring 4 is provided with an annular ridge, jump ring 5 be arranged on annular ridge and sleeve pipe 3 end face it Between, sleeve pipe 3 end face and annular ridge are coordinated with the both ends of the surface wedge surface of jump ring 5 respectively.
During installation, first base 1 is fixed on body of wall;During firm banking 1, connecting hole is passed through by bolt, and by bolt Hammer into body of wall, then can complete the fixation of base 1.After completing base 1 and the fixation of body of wall, by one end plug-in-sleeve 3 of tubing, Then screw pressure ring 4, when the gap of annular ridge and sleeve pipe 3 end face reduces, then annular ridge and sleeve pipe 3 end face will oppress card Spring 5, because sleeve pipe 3 end face and annular ridge are coordinated with the both ends of the surface wedge surface of jump ring 5 respectively, will receive therefore when jump ring 5 is forced to Contracting, thus complete the fixation of tubing and sleeve pipe 3.Then so that sleeve pipe 3 is rotated along its jointed shaft, then can change the angle of tubing and body of wall Degree;So that connecting seat 2 respect thereto 1 is rotated, then can change the direction of tubing.
For the ease of turning pressure ring 4, the periphery of pressure ring 4 is set to regular hexagon;Such that it is able to pressure ring 4 is turned by spanner, And pressure ring 4 is turned by spanner, bigger oppressive force can be provided to jump ring 5.Jump ring 5 madial wall is provided with anti-slop serrations 51, with Improve the fitness of jump ring 5 and tubing, and then the steadiness of enhancing tubing, and prevent tubing from sliding with respect to jump ring 5, prevent card Spring 5 Fast Wearing.
All it is rotatably connected to alignment pin 7, the two ends of alignment pin 7 all offer connecting hole in the middle part of connecting seat 2 and sleeve pipe 3, and It is provided with screw rod 6 and passes through connecting hole, screw rod 6 is provided with four nuts, alignment pin 7 is located between two nuts respectively;Will with this nut After alignment pin 7 is stuck, screw rod 6, connecting seat 2 and sleeve pipe 3 will form stable triangular structure, improve the intensity of guard rail;Separately The two ends of outside fix pin 7 are set to flat so that nut is contacted in face with alignment pin 7, therefore can strengthen nut to alignment pin 7 Pressure, and then improve threaded pretightning force, prevent nut loosening.
Above-described is only embodiment of the present utility model, the general knowledge here such as known concrete structure and characteristic in scheme Excessively describe.It should be pointed out that for a person skilled in the art, in the premise without departing from the utility model structure Under, some deformation can also be made and improve, these also should be considered as protection domain of the present utility model, and these are all without impact Effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim It is defined, specific embodiment in specification etc. records the content that can be used for explaining claim.

Claims (8)

1. building face side modular guard railing, include transverse strands pipe, vertical frame pipe, be used for corners of building at transverse strands pipe, The guard rail corner coupling head of vertical frame pipe connection, the guard rail fourth connecting for two transverse strands pipes, a vertical frame pipe Font joint, connect guard rail cross type joints and for frame Guan Yujian for two transverse strands pipes, two vertical frame pipes Build the fixing guard rail of thing wall connecting and lean on wall list joint, wherein guard rail corner coupling head include the first connector, second Connector and joint among three members, are vertically disposed between the wherein first connector and the second connector, guard rail tee T Joint includes tee T joint body, and described tee T joint body is cased with horizontal tube along horizontal direction one end, and tee T connects The other end of head body is cased with bend pipe it is characterised in that the first described connector includes the first inserted joint casing and inserts with first The first vertically fixing pivot fitting of female connector pipe, the second described connector include the second inserted joint casing and with the second inserted joint casing The second fixing pivot fitting, the first described pivot fitting forms pivot joint with the second described pivot fitting;First grafting set It is hinged with screw-button between in the middle part of pipe and in the middle part of the second inserted joint casing;Joint among three members includes removable with the first pivot fitting end Unload the connecting tube of connection and threeth inserted joint casing fixing with connecting tube;Described elbow internal wall is provided with cushion;Described level Pipe is divided into outer tube and inner tube, outer tube and inner tube with axis and interference fit, the end sidewalls of said inner tube open up jagged, interior The surfaces externally and internally of pipe is cased with interior elastic layer and outer elastic layer respectively, and interior elastic layer, outer elastic layer and cushion all open up vertically There is cut-off rule.
2. building according to claim 1 faces side modular guard railing it is characterised in that described the first pivot fitting The direction of axis line in pivot joint face be provided with cylindrical boss, cylindrical boss upper end is provided with the clamping edge of a wing;The second described pivot The direction of axis line in the pivot joint face of adapter is provided with and with described cylindrical boss grafting and can enable the cylinder rotating Cylinder, connecting tube is threadeded with cylindrical boss lower end and connecting tube is with diameter greater than cylindrical tube.
3. building according to claim 1 and 2 face side modular guard railing it is characterised in that the first inserted joint casing, Two inserted joint casings and the 3rd inserted joint casing structure are identical, and the first inserted joint casing circumference has dilatation joint, outside the first inserted joint casing Wall is in enlarging shape vertically, is threaded with threaded cap, threaded cap outer end can be with the first inserted joint casing in the middle part of the first inserted joint casing Outer wall working end offsets.
4. building according to claim 3 faces side modular guard railing it is characterised in that described the first inserted joint casing For cylindrical sleeve, the first described inserted joint casing is integrally formed with the first described pivot fitting;The second described grafting set Manage as cylindrical sleeve, the second described inserted joint casing is integrally formed with the second described pivot fitting.
5. building according to claim 4 face side modular guard railing it is characterised in that described cylindrical boss with The first described pivot fitting is integrally formed;Described cylindrical tube is integrally formed with the second described pivot fitting.
6. building according to claim 1 faces side modular guard railing it is characterised in that the end side of described horizontal tube Wall is provided with the condom of clamping outer tube and inner tube, and condom takes the shape of the letter U structure, and described breach is located inside condom;Described interior bullet Chute is offered, the inwall of inner tube is provided with the draw runner matching with chute above property layer.
7. building according to claim 6 faces side modular guard railing it is characterised in that described cushion is routed over There is anti-skid bulge.
8. the building according to claim 6 or 7 face side modular guard railing it is characterised in that described breach transversal Face is trapezoidal.
CN201620546226.6U 2016-06-07 2016-06-07 Building is faced limit combination formula and is prevented guardrail bar Active CN205976571U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620546226.6U CN205976571U (en) 2016-06-07 2016-06-07 Building is faced limit combination formula and is prevented guardrail bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620546226.6U CN205976571U (en) 2016-06-07 2016-06-07 Building is faced limit combination formula and is prevented guardrail bar

Publications (1)

Publication Number Publication Date
CN205976571U true CN205976571U (en) 2017-02-22

Family

ID=58020977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620546226.6U Active CN205976571U (en) 2016-06-07 2016-06-07 Building is faced limit combination formula and is prevented guardrail bar

Country Status (1)

Country Link
CN (1) CN205976571U (en)

Similar Documents

Publication Publication Date Title
CN207005565U (en) A kind of non-excavation rehabilitation caves in the collapsible steel loop of pipeline
CN202266753U (en) Device for quickly connecting jacking pipe joints
CN205976571U (en) Building is faced limit combination formula and is prevented guardrail bar
CN211129199U (en) Gardens are with convenient to detach's trees support frame
CN210263070U (en) A reinforcement bar for foundation ditch shaped steel supports system of strutting
CN209976009U (en) Steel structure connecting piece for building
CN218543389U (en) Installation device is assisted to infrastructure for building engineering
CN207003968U (en) A kind of dismountable scaffold of architectural engineering
CN110629787A (en) Core mold for pipe gallery pouring and construction method
CN203755314U (en) Circular foundation pit splicing support structure
CN206801072U (en) A kind of foundation ditch temporary guard rail
CN212983875U (en) Building construction is with building foundation ditch bearing structure convenient to installation demolishs
CN216616849U (en) Adjustable support jacking for concrete inclined structure
CN205224596U (en) A reserve sleeve pipe for floor reservation hole
CN206128110U (en) Anchor cage ring type basis of removable crab -bolt
CN213391181U (en) Fastener type steel pipe formwork support
CN204645696U (en) Building faces frontier defense protection unit
CN211974292U (en) Scaffold bridging connecting fastener
CN206128108U (en) Prestressing force bucket foundation of removable crab -bolt
CN207080169U (en) A kind of wall attaching parts for bridge construction safety climbing ladder
CN112942817A (en) Adjustable support jacking for concrete inclined structure and using method
CN206158214U (en) Prevent that guardrail bar T -shaped connects
CN214090922U (en) Scaffold steel pipe vertical butt joint auxiliary device
CN101942835A (en) Heavy-load composite function anchoring device for scaffold
CN205677271U (en) The cross joint of guard rail