CN205975531U CN201620972658.3U CN201620972658U CN205975531U CN 205975531 U CN205975531 U CN 205975531U CN 201620972658 U CN201620972658 U CN 201620972658U CN 205975531 U CN205975531 U CN 205975531U
Authority
CN
China
Prior art keywords
gate
hole
door hole
draft tube
floodgate door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620972658.3U
Other languages
Chinese (zh)
Inventor
江礼为
后开祥
曾树元
王操
王坤
龚朝蜀
冀道文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201620972658.3U priority Critical patent/CN205975531U/en
Application granted granted Critical
Publication of CN205975531U publication Critical patent/CN205975531U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model discloses a power station tail lock placer. Including gate pier (1), gate pier (1) top surface is draft tube deck (2), and draft tube deck (2) surface is located below the design flood position, just is higher than all units and completely sends out the tailwater level with gate (3) height, being equipped with on draft tube deck (2) and opening and close framed bent (4) and floodgate door hole (5), floodgate door hole (5) are the rectangular hole, and the length direction of floodgate door hole (5) is perpendicular with water flow direction, the degree of depth of floodgate door hole (5) is greater than gate (3) height, and the drill way of floodgate door hole (5) is equipped with locking roof beam (6) of a pair of symmetry, and locking roof beam (6) is perpendicular with floodgate door hole's (5) length direction, locking roof beam (6) bottom is equipped with the hoist of being connected with gate (3). The utility model discloses a place the gate in floodgate door hole, avoided flood period the flood or the stone sediment produce great influence to the gate, reduced the risk that the gate became invalid, provide the guarantee for the safe operation in power station.

Description

A kind of hydropower station tail water gate apparatus for placing
Technical field
This utility model is related to a kind of hydropower station tail water gate apparatus for placing, belongs to Hydraulic and Hydro-Power Engineering technical field.
Background technology
For the higher power station of tail water design flood level, check flood level, if the setting of draft tube deck elevation is higher than tail Water check flood level, will increase larger civilwork engineering quantity and investment, in order to reduce civilwork engineering quantity and investment, typically by tail Horizontal stand elevation is set lower than tail water design flood level, that is, be equivalent to tail water design flood level, the relatively low power station of check flood level Central tail lock inspection platform.It is usually that tail lock is placed on draft tube deck, gate bottom is stamped on locking beam, Top, side are fixed using certain way, and this gate modes of emplacement affects when flood is less less, but when meet with great flood or During person's over-level flood, taken due to flood and wrap up in rock ballast collision gate and turbulent water, lead to gate damaged, or even cannot normally open Close or gate is flushed away, have a strong impact on the safe operation in power station.
Content of the invention
The purpose of this utility model is, provides a kind of hydropower station tail water gate apparatus for placing.Avoid breaking due to gate Damage or the normal safe losing efficacy and affecting power station run.
The technical solution of the utility model:
A kind of hydropower station tail water gate apparatus for placing, including gate pier, is provided with draft tube deck, draft tube deck table in gate pier top surface Face is located at below design flood level, and completely sends out tailwater level higher than all units and add gate height;Draft tube deck is provided with keying row Frame and gate hole, gate hole is rectangular opening, and the length direction of gate hole is vertical with water (flow) direction;The depth of gate hole is more than gate Highly, the aperture of gate hole is provided with a pair symmetrical locking beam, and locking beam is vertical with the length direction of gate hole;Locking beam bottom It is provided with the suspender being connected with gate.
Compared with prior art, this utility model is by being placed on gate in the hole by gate, it is to avoid flood period flood or Person's rock ballast produces large effect to gate, reduces the risk of gate inefficacy, is that the safe operation in power station provides guarantee.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1.
In figure is labeled as:1- gate pier, 2- draft tube deck, 3- gate, 4- open and close framed bent, 5- gate hole, 6- locking beam.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples, but not as new to this practicality Any restriction of type.
Embodiment
A kind of hydropower station tail water gate apparatus for placing, as shown in Figure 1:Including gate pier 1, gate pier 1 top surface is draft tube deck 2, Draft tube deck 2 surface is located at below design flood level, and completely sends out tailwater level higher than all units and add gate 3 highly;Draft tube deck 2 It is provided with keying framed bent 4 and gate hole 5, gate hole 5 is rectangular opening, the length direction of gate hole 5 is vertical with water (flow) direction;Gate The depth in hole 5 is more than gate 3 height, and the aperture of gate hole 5 is provided with a pair symmetrical locking beam 6, locking beam 6 and gate hole 5 Length direction is vertical;Locking beam 6 bottom is provided with the suspender being connected with gate 3.
The technical scheme of this example includes:
1st, tail water gate pier structure is designed to structure as shown in Figure 1, gate hole 5 is set in gate pier 1;
2nd, after should ensure that gate 3 is placed in gate hole 5, gate 3 Bottom Altitude is higher than tail when all units are completely sent out Water level elevation, that is, draft tube deck 2 elevation should be greater than all units and completely send out tailwater level+gate height;
3rd, using locking beam 6, gate 3 is hung in gate hole 5, locking beam 6 is fixed on draft tube deck 2;
4th, during gate 3 maintenance, using headstock gear, gate 3 lifting is placed on draft tube deck 2.
Points for attention:(1)Locking is placed on the gate Bottom Altitude of gate in the hole when completely must send out higher than whole units Tailwater level, it is to avoid the disturbance to gate for the generating tail water;(2)The fixed form of locking beam will guarantee reliability.

Claims (1)

1. a kind of hydropower station tail water gate apparatus for placing, including gate pier(1)It is characterised in that:In gate pier(1)Top surface is provided with tail water Platform(2), draft tube deck(2)Surface is located at below design flood level, and completely sends out tailwater level higher than all units and add gate(3)High Degree;Draft tube deck(2)It is provided with keying framed bent(4)And gate hole(5), gate hole(5)For rectangular opening, gate hole(5)Length Direction is vertical with water (flow) direction;Gate hole(5)Depth be more than gate(3)Highly, gate hole(5)Aperture be provided with a pair symmetrical Locking beam(6), lock beam(6)With gate hole(5)Length direction vertical;Locking beam(6)Bottom is provided with and gate(3)Connect Suspender.
CN201620972658.3U 2016-08-30 2016-08-30 Power station tail lock placer Active CN205975531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620972658.3U CN205975531U (en) 2016-08-30 2016-08-30 Power station tail lock placer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620972658.3U CN205975531U (en) 2016-08-30 2016-08-30 Power station tail lock placer

Publications (1)

Publication Number Publication Date
CN205975531U true CN205975531U (en) 2017-02-22

Family

ID=58037057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620972658.3U Active CN205975531U (en) 2016-08-30 2016-08-30 Power station tail lock placer

Country Status (1)

Country Link
CN (1) CN205975531U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975017A (en) * 2017-12-30 2018-05-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of locking means and structure of tailrace tunnel bulkhead gate
CN109356130A (en) * 2018-12-10 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 A kind of locking means and device of tailrace tunnel bulkhead gate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975017A (en) * 2017-12-30 2018-05-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of locking means and structure of tailrace tunnel bulkhead gate
CN107975017B (en) * 2017-12-30 2023-01-24 中国电建集团贵阳勘测设计研究院有限公司 Locking method and structure of tailrace water tunnel maintenance gate
CN109356130A (en) * 2018-12-10 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 A kind of locking means and device of tailrace tunnel bulkhead gate
CN109356130B (en) * 2018-12-10 2023-11-14 中国电建集团贵阳勘测设计研究院有限公司 Locking method and device for tail water tunnel overhaul gate

Similar Documents

Publication Publication Date Title
CN205975531U (en) Power station tail lock placer
CN106438177A (en) Floating pendulum type ocean manual downwelling device utilizing wave energy and control method
CN106697189A (en) Installation method for float-dragging method offshore type ocean booster station
CN106638530A (en) Process for lifting offshore booster station jacket in shallow water
CN102923261A (en) Sit-on-bottom type offshore wind turbine installation barge
CN203238654U (en) Self-lifting tidal current energy generating base structure
CN107975017B (en) Locking method and structure of tailrace water tunnel maintenance gate
CN209873694U (en) Device for collecting fish in tail water of hydropower station
CN209652930U (en) A kind of steady stake assistance platform device for blower stake
CN103381881A (en) Floating-type offshore power generation platform adopting reinforced concrete structure
CN203270531U (en) Steel trash blocking device of hydropower station reservoir area
CN202987472U (en) Truss type offshore wind turbine mounting barge capable of sitting on bottom
CN202966598U (en) Novel bottom-supported marine wind turbine mounting barge
CN203096774U (en) Anti-floating structure of open-cut tunnel
CN210621637U (en) Prevent gushing damp dew top formula plane gate
CN203238655U (en) Offshore wind power single pile foundation-based tidal current energy power generation foundation structure
CN207739235U (en) A kind of locking structure of tailrace tunnel bulkhead gate
CN203924089U (en) For the pile foundation of offshore wind farm facility
CN206428667U (en) A kind of dam using river weight and momentum
CN106480860B (en) It is a kind of using river water weight and the dam of momentum
CN208026255U (en) A kind of pile foundation inclination warning reminding equipment
CN207295671U (en) One kind suspension floatation type sewage blocking device
CN207582480U (en) Marine brace foundation
CN105804111A (en) Unequal-length-leg offshore wind power jacket foundation and construction method thereof
CN205329647U (en) Prevent accumulational tail lock of silt