CN205975511U - Stride highway debris flow gully row and lead structure - Google Patents

Stride highway debris flow gully row and lead structure Download PDF

Info

Publication number
CN205975511U
CN205975511U CN201620665133.5U CN201620665133U CN205975511U CN 205975511 U CN205975511 U CN 205975511U CN 201620665133 U CN201620665133 U CN 201620665133U CN 205975511 U CN205975511 U CN 205975511U
Authority
CN
China
Prior art keywords
culvert
highway
barricade
debris flow
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620665133.5U
Other languages
Chinese (zh)
Inventor
张岗平
黄熠辉
王登银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Power Construction Group Aviation Port Construction Co Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201620665133.5U priority Critical patent/CN205975511U/en
Application granted granted Critical
Publication of CN205975511U publication Critical patent/CN205975511U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a stride highway debris flow gully row and lead structure. The utility model discloses an aim at enlarging the mud -rock flow and excrete the space, reduce the resistance let out under the mud -rock flow. The utility model provides a: a stride highway debris flow gully row and lead structure, this drainage guide structural arrangement of is in the middle of original valley, and this original valley's downstream side violently has a highway, and build the highway bottom has the culvert, backfills the stone sediment between culvert top and the road surface, and the barricade has been built in the stone sediment outside, corresponding to the barricade below, be equipped with retaining wall in the culvert bottom, build the open channel and link up mutually with the culvert in original valley, the culvert use into the entrance to a cave as the starting point along the hole axis to both sides respectively the outer angle Q that expands be the loudspeaker form, the vertical sloping i of culvert edge hole axis is greater than vertical mean inclination of open channel section, the exit end of culvert and barricade binding site are with 1: N's slope upwards extends to when the wall outside. The utility model is suitable for a similar engineerings such as the mud -rock flow row of highway and debris flow gully joint part position leads.

Description

Guide structure arranged by a kind of across Debris Flow along Highways ditches
Technical field
This utility model is related to a kind of across Debris Flow along Highways ditches and arranges guide structure, is primarily adapted for use in highway and joins with debris flow gully The debris flow drainage at position such as leads at the similar engineering.
Background technology
Highway in China prolongs continuous tens thousand of kilometer, in highway construction process, often runs into natural cheuch, if cheuch relatively deep or Larger, possess the condition building bridge, then crossed over bridge;If cheuch is shallower or less, culvert and highway phase can only be passed through Connect, this will run into the problem in the how smooth excretion of joining place for the mud-rock flow.By in recent years across the ruuning situation of highway culvert Investigation, find most culverts concentrated down the mud-rock flow let out or fragmentary under the mud-rock flow let out block, 14.3% culvert is entering hole Mouth is completely plugged, and 85.7% culvert is blocked at hole Nei Huochu hole, thereby it is ensured that mud-rock flow being capable of unobstructed row in culvert The major issue let out is it is simply that how by the structure design of culvert, expanding mud-rock flow draining space, reducing and let out under mud-rock flow Resistance.
Content of the invention
The technical problems to be solved in the utility model is:For above-mentioned problem, provide one kind across Debris Flow along Highways Ditch arranges guide structure it is intended to expanding mud-rock flow draining space, reducing the resistance let out under mud-rock flow.
This utility model be employed technical scheme comprise that:A kind of across Debris Flow along Highways ditches arrange guide structure, this guide structure cloth It is placed in the middle of original cheuch, the downstream Heng You highway of this original cheuch, highway bottom is built culvert, above culvert and road surface Between backfill rock ballast, built barricade outside rock ballast, be provided with retaining wall foundation corresponding to below barricade, in culvert bottom, its feature exists In:Build open channel and be connected with culvert phase in original cheuch;Described culvert is divided along hole axis to both sides with entering hole for starting point It is in horn-like for not extending out angle Q °;Culvert along hole axis longitudinal slope i be more than open channel section longitudinal mean inclination;The outlet of culvert End and barricade binding site are with 1:Ramping up of N extends to outside wall.
Described angle Q ° is 5~12 °.
Described longitudinal slope i is more than longitudinal mean inclination of open channel section.
Described slope N is 5~10.
This utility model beneficial effect is:This utility model is for solution across Debris Flow along Highways ditches row's guide structures are easily blocked Lose a difficult problem for its function, provide a kind of across Debris Flow along Highways ditches to arrange guide structure, culvert is set to (along excretion direction) in level It is set to tubaeform, and to the vertical diffuser of exit setting in the middle part of culvert, thus expanding mud-rock flow draining space, reducing The resistance let out under mud-rock flow and the risk being blocked by mud-rock flow across highway culvert, have stronger specific aim and practicality.
Brief description
Fig. 1 is this utility model site plan.
Fig. 2 is the A-A profile of Fig. 1.
Fig. 3 is B portion enlarged drawing in Fig. 1.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, the present embodiment is that a kind of across Debris Flow along Highways ditches arrange guide structure, this guide structure cloth It is placed in the middle of original cheuch 4, the downstream Heng You highway 101 of this original cheuch, highway bottom is built has culvert 2, above culvert Backfill rock ballast 102 and road surface between, built barricade 3 outside rock ballast, be provided with retaining wall foundation corresponding to below barricade, in culvert bottom 3-1, is built open channel 1 in original cheuch 4 and is mutually connected with culvert 2;Culvert 2 is divided along hole axis to both sides with entering hole for starting point It is in horn-like for not extending out angle Q °;Culvert 2 should be greater than longitudinal mean inclination of 1 section of open channel along longitudinal slope i of hole axis;Culvert 2 The port of export and barricade 3 binding site with 1:Ramping up of N extends to outside wall.
The specific embodiment of the present embodiment is as follows:
A. open channel 1:Based on the landform of original cheuch 4, carry out excavating the ditch bed longitudinal direction slope phase widened with original cheuch 4 Near open channel 1 so that in ditch mud-rock flow steadily return groove, it is to avoid multidirectional trickling;
B. culvert 2:The downstream Heng You highway 101 of original cheuch 4, builds, in highway bottom, the culvert being mutually connected with open channel 1 Hole 2, and backfill rock ballast 102 above culvert 2 and road surface between;This culvert, to enter hole as starting point, divides along hole axis to both sides Not Kuo Zhang Q ° of certain angle (Q ° generally 5~12 °) so that culvert 2 is in horn-like in the plane;Guarantee that mudstone flows through open channel 1 After flowing into culvert 2 afterwards, traveling section constantly increases, the resistance effectively producing in the diffusion of release mud-rock flow;Culvert 2 is along hole axis Longitudinal slope i be also mud-rock flow can smooth excretion key, generally, longitudinal slope i should be greater than the longitudinally average slope of open channel 1 Degree, such as has ready conditions, and increases the head fall of culvert 2 as possible, to improve impulsive force when letting out under mud-rock flow, increases the possibility passed through Property;
The flow section of culvert 2 should determine come flow rate calculation according to mud-rock flow, the structure stress of culvert should combine with arrangement of reinforcement The load COMPREHENSIVE CALCULATING such as the dynamic load of highway 101, backfill rock ballast 102 determine;
C. barricade 3:Investigation finds, most culverts 2 are blocked at hole Nei Huochu hole, for this phenomenon, in backfill Barricade 3 is built in rock ballast 102 outside, is provided with retaining wall foundation 3-1 corresponding to below barricade, in culvert 2 bottom, in the outlet of culvert 2 End and barricade 3 binding site are with 1:Ramping up of N (N generally 5~10) extends to outside barricade 3, thus effectively increasing The excretion section of mud-rock flow in culvert 2, releases the resistance producing in mud-rock flow diffusion it is ensured that mud-rock flow 2 will not in culvert It is blocked.

Claims (4)

1. one kind across Debris Flow along Highways ditch row guide structure, this structure is arranged in the middle of original cheuch (4), the downstream of original cheuch Heng You highway (101), highway bottom is built culvert (2), and backfill rock ballast (102) and road surface between above culvert, outside rock ballast Built barricade (3), corresponding to being provided with retaining wall foundation (3-1) below barricade, in culvert (2) bottom it is characterised in that:In primitive groove Build open channel (1) in paddy (4) and be mutually connected with culvert (2);Described culvert (2) is divided along hole axis to both sides with entering hole for starting point It is in horn-like for not extending out angle Q °;Culvert (2) along hole axis longitudinal slope i be more than open channel section longitudinal mean inclination;Culvert (2) The port of export and barricade (3) binding site with 1:Ramping up of N extends to outside barricade (3).
2. across Debris Flow along Highways ditch row's guide structure according to claim 1 it is characterised in that:Described angle Q ° be 5~ 12°.
3. across Debris Flow along Highways ditch row's guide structure according to claim 1 and 2 it is characterised in that:Described longitudinal slope i is more than Longitudinal mean inclination of open channel section.
4. across Debris Flow along Highways ditch row's guide structure according to claim 3 it is characterised in that:Described slope N is 5~10.
CN201620665133.5U 2016-06-24 2016-06-24 Stride highway debris flow gully row and lead structure Active CN205975511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620665133.5U CN205975511U (en) 2016-06-24 2016-06-24 Stride highway debris flow gully row and lead structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620665133.5U CN205975511U (en) 2016-06-24 2016-06-24 Stride highway debris flow gully row and lead structure

Publications (1)

Publication Number Publication Date
CN205975511U true CN205975511U (en) 2017-02-22

Family

ID=58022485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620665133.5U Active CN205975511U (en) 2016-06-24 2016-06-24 Stride highway debris flow gully row and lead structure

Country Status (1)

Country Link
CN (1) CN205975511U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356097A (en) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 The water discharge tunnel makeup of the imports for ditch water process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356097A (en) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 The water discharge tunnel makeup of the imports for ditch water process
CN109356097B (en) * 2018-11-29 2023-09-19 中国电建集团成都勘测设计研究院有限公司 A drainage tunnel import structure for ditch water treatment

Similar Documents

Publication Publication Date Title
CN106087953B (en) A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow
CN207267975U (en) A kind of bed stabilization structure for being used under shield tunnel wear river
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN205975511U (en) Stride highway debris flow gully row and lead structure
CN109610486A (en) A kind of high slope Permeable interlayer trapping method
CN210797432U (en) Water conservancy river course bank protection
CN208748465U (en) A kind of accessible ramp dankness type gutter
JP6267592B2 (en) Drainage structure and catchment
CN106592687A (en) Rainwater collection system for container-type movable house
CN207828803U (en) A kind of Box-shaped Drainage Culvert of combination retaining wall
CN207295446U (en) A kind of bridge pave-load layer water-proof drainage structure
CN109235184A (en) A kind of highway Loess cutting border slope combined drainage system
CN106049373B (en) Mud-rock flow is blocked gravity dam structure
CN205046656U (en) Slow down and erode drop well
CN204475172U (en) Bridge floor greenbelt waterproof and water drainage system
CN205399343U (en) Reinforcement type waterproof and anti -seepage bank protection
CN207620014U (en) A kind of Novel underground room seepage treatment structure
CN207699962U (en) A kind of road engineering roadbed
CN207739096U (en) A kind of pavement of road gutter of side wall infiltration
CN208685362U (en) The arragement construction of city non-motorized lane
CN207775842U (en) A kind of Spillway chute bottom plate drainage system structure
CN207211173U (en) CFRD reverse drainage system
CN207672364U (en) Water on urban streets tapping equipment
CN206887798U (en) Small micro- culvert
CN218952240U (en) Communication structure of retaining wall and roadbed drainage ditch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180428

Address after: No. 82, Hudong Road, Gulou District, Fuzhou, Fujian Province

Patentee after: China Electric Power Construction Group aviation Port Construction Co., Ltd.

Address before: 310014 Chao Wang Road, Xiacheng City, Hangzhou, Zhejiang Province, No. 22

Patentee before: Co., Ltd of East China Investigation and Design Institute of electricity Jian group of China

TR01 Transfer of patent right