CN205955743U - Tbm刀盘 - Google Patents

Tbm刀盘 Download PDF

Info

Publication number
CN205955743U
CN205955743U CN201620855397.7U CN201620855397U CN205955743U CN 205955743 U CN205955743 U CN 205955743U CN 201620855397 U CN201620855397 U CN 201620855397U CN 205955743 U CN205955743 U CN 205955743U
Authority
CN
China
Prior art keywords
cutterhead
pipe
blade disc
high pressure
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620855397.7U
Other languages
English (en)
Inventor
张金良
刘宗仁
张远生
杨晓箐
杨道坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201620855397.7U priority Critical patent/CN205955743U/zh
Application granted granted Critical
Publication of CN205955743U publication Critical patent/CN205955743U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型公开了一种TBM刀盘,包括刀盘,设在刀盘中心的中心钻头;刀盘上十字形排列设置有多个牙轮钻头,每个牙轮钻头的一侧设有高压喷嘴,刀盘上开设有多个进排浆口;位于刀盘后方设有由前隔板和后隔板构成的环形高压水仓,环形高压水仓内设置有排渣管,排渣管的一个管口与设在前隔板底部的进渣腔室密封连通,排渣管另一个管口与渣浆泵进浆口相连通;在刀盘上设有超高压供水回转接头和供电回转接头,高压喷嘴通过超高压供水回转接头与超高压水源相连通,牙轮钻头的电源输入端通过供电回转接头与TBM主控制室电气连接。本实用新型采用牙轮钻头和超高压水力射流进行破岩,达到提高隧洞掘进开挖效率、降低投资成本之目的。

Description

TBM刀盘
技术领域
本实用新型涉及隧洞掘进机(TBM),尤其是涉及TBM刀盘。
背景技术
隧洞掘进机(TBM:Tunnel Boring Machine)广泛用于长隧洞机械化施工中。目前的隧洞掘进机破岩刀具多采用单刃滚刀,其原理为滚刀在巨大推力和回转力矩作用下对岩石实施压、滚、劈、磨作用,以使岩石压裂、涨裂、剪裂、磨碎,达到破岩的目的。隧洞掘进机的掘进工作过程由掘进作业和换步作业交替进行。在掘进作业时,隧洞掘进机的刀头为沿隧洞轴线作直线运动和绕轴线作单方向回转运动的复合螺旋运动,被破碎的岩石由刀盘上的铲斗落入胶带输送机上并向机后输出,出渣一般采用连续胶带输送机或有轨运输矿车两种方式。据有关工程资料统计,常规TBM施工平均月进尺为500m~800m,少数工程个别月进尺会超过1000m,这就使得长隧洞施工工期一般长达数年到十多年,严重制约着工程的工期。如何提高隧洞掘进机的隧洞掘进开挖效率,一直是本领域技术人员研究的课题。
发明内容
本实用新型目的在于提供一种TBM刀盘,达到超高压水力辅助破岩。
为实现上述目的,本实用新型采取下述技术方案:
本实用新型所述的TBM刀盘,包括刀盘,设置在所述刀盘中心位置处的中心钻头;刀盘上以所述中心钻头为中心十字形排列设置有多个牙轮钻头,位于每个牙轮钻头的一侧均设置有高压喷嘴,刀盘上均布排列开设有多个进排浆口;位于所述刀盘后方设置有由前隔板和后隔板构成的环形高压水仓,所述前隔板和后隔板固定在护盾上,前隔板上部开设有出水口,所述出水口与设置在环形高压水仓内的连通管上管口密封连通,所述连通管下管口位于环形高压水仓的下部;所述环形高压水仓内设置有排渣管,所述排渣管的一个管口与设置在前隔板底部的进渣腔室密封连通,排渣管的另一个管口与渣浆泵的进浆口相连通;在刀盘上设置有超高压供水回转接头和供电回转接头,所述每个高压喷嘴均通过所述超高压供水回转接头与超高压水源相连通,所述每个牙轮钻头的电源输入端均通过所述供电回转接头与TBM主控制室电气连接。
本实用新型优点在于采用牙轮钻头和超高压水力射流进行隧洞掘进机的破岩,破岩后采用渣浆泵取代现有的皮带机或轨道车出渣。从而达到提高隧洞掘进开挖效率、降低出渣投资成本之目的。
附图说明
图1是本实用新型的结构示意图。
图2是本实用新型所述刀盘工作面的结构示意图。
图3是本实用新型所述牙轮钻头的结构示意图。
图4是图3的左视图。
图5是本实用新型所述高压喷嘴的结构示意图。
具体实施方式
如图1-5所示,本实用新型所述的TBM刀盘,包括刀盘1,设置在所述刀盘1中心位置处的中心钻头3;刀盘1上以所述中心钻头3为中心十字形排列设置有多个牙轮钻头4,位于每个牙轮钻头4的一侧均设置有高压喷嘴5,刀盘1上均布排列开设有多个进排浆口6;位于所述刀盘1后方设置有由前隔板7和后隔板8构成的环形水仓9,所述前隔板7和后隔板8与护盾2固定连接,前隔板7上开设有出水口10,所述出水口10与设置在环形高压水仓9内的连通管11上管口密封连通,所述连通管11的下管口位于环形高压水仓9的下部;环形高压水仓9内设置有排渣管12,所述排渣管12的一个管口与设置在前隔板7底部的进渣腔室13密封连通,排渣管12的另一个管口与渣浆泵14的进浆口相连通;在刀盘1上设置有超高压供水回转接头15和供电回转接头16,所述每个高压喷嘴5均通过所述超高压供水回转接头15与外部超高压水源相连通,所述每个牙轮钻头4均通过所述供电回转接头16与TBM主控制室电气连接。
本实用新型工作原理简述如下:
使用时,首先将隧洞掘进机的刀盘驱动轴17间隙穿过环形高压水仓9、超高压供水回转接头15和供电回转接头16后与刀盘1固定连接即可,推进部分与现有TBM工作方式类似,由推力油缸和步进支架组成。
工作时,牙轮钻头4自转破碎岩石,同时自高压喷嘴5喷出的高压水力射流将牙轮钻头4破碎后的岩屑迅速冲离掌子面,使牙轮钻头4的牙齿能够始终接触新的岩体,同时,高压水力射流使得牙轮钻头4破碎岩石产生的裂缝产生延伸、扩张和破裂效应,大大增加了破岩效率,减少了牙轮钻头4阻力和刀具磨损,延长刀具使用寿命。当一个行程全部钻完后,由TBM的步进支架向前行走一个行程,继续重复上述步骤。
开挖钻出的渣液混合体进入环形高压水仓9底部的进渣腔室13,经排渣管12和渣浆泵14排出。当开挖钻出的渣液混合体较稠不利于渣浆泵14工作时,通过向环形高压水仓9内充以压缩空气形成空气缓冲层,在气压作用下环形高压水仓9内的水自连通管11上管口进入位于刀盘1与前隔板7之间的区域,对渣液混合体进行稀释。因此只要调节压缩空气的压力,就可以控制开挖面上相应的碎屑粘稠度以保证渣浆泵14正常。

Claims (1)

1.一种TBM刀盘,包括刀盘,设置在所述刀盘中心位置处的中心钻头;其特征在于:刀盘上以所述中心钻头为中心十字形排列设置有多个牙轮钻头,位于每个牙轮钻头的一侧均设置有高压喷嘴,刀盘上均布排列开设有多个进排浆口;位于所述刀盘后方设置有由前隔板和后隔板构成的环形高压水仓,所述前隔板和后隔板固定在护盾上,前隔板上部开设有出水口,所述出水口与设置在环形高压水仓内的连通管上管口密封连通,所述连通管下管口位于环形高压水仓的下部;所述环形高压水仓内设置有排渣管,所述排渣管的一个管口与设置在前隔板底部的进渣腔室密封连通,排渣管的另一个管口与渣浆泵的进浆口相连通;在刀盘上设置有超高压供水回转接头和供电回转接头,所述每个高压喷嘴均通过所述超高压供水回转接头与超高压水源相连通,所述每个牙轮钻头的电源输入端均通过所述供电回转接头与TBM主控制室电气连接。
CN201620855397.7U 2016-08-09 2016-08-09 Tbm刀盘 Expired - Fee Related CN205955743U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620855397.7U CN205955743U (zh) 2016-08-09 2016-08-09 Tbm刀盘

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620855397.7U CN205955743U (zh) 2016-08-09 2016-08-09 Tbm刀盘

Publications (1)

Publication Number Publication Date
CN205955743U true CN205955743U (zh) 2017-02-15

Family

ID=57974308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620855397.7U Expired - Fee Related CN205955743U (zh) 2016-08-09 2016-08-09 Tbm刀盘

Country Status (1)

Country Link
CN (1) CN205955743U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089225A (zh) * 2016-08-09 2016-11-09 黄河勘测规划设计有限公司 Tbm刀盘及排渣系统
CN109899079A (zh) * 2019-04-11 2019-06-18 黄河勘测规划设计研究院有限公司 具备pdc钻头辅助破岩的tbm刀盘
CN110529134A (zh) * 2019-10-17 2019-12-03 黄河勘测规划设计研究院有限公司 用于土压平衡盾构机的高压水力辅助掘进刀盘
CN110847926A (zh) * 2019-10-25 2020-02-28 中国科学院武汉岩土力学研究所 水力切割刀具模块及联合破岩tbm装置及方法
CN110988979A (zh) * 2019-12-19 2020-04-10 中国地质大学(武汉) Tbm高压脉冲水射流破岩震源超前探测装置及方法
CN113187539A (zh) * 2021-03-17 2021-07-30 中铁二十三局集团第六工程有限公司 一种用于tbm的拆分运输装置及其使用方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089225A (zh) * 2016-08-09 2016-11-09 黄河勘测规划设计有限公司 Tbm刀盘及排渣系统
CN109899079A (zh) * 2019-04-11 2019-06-18 黄河勘测规划设计研究院有限公司 具备pdc钻头辅助破岩的tbm刀盘
CN110529134A (zh) * 2019-10-17 2019-12-03 黄河勘测规划设计研究院有限公司 用于土压平衡盾构机的高压水力辅助掘进刀盘
CN110847926A (zh) * 2019-10-25 2020-02-28 中国科学院武汉岩土力学研究所 水力切割刀具模块及联合破岩tbm装置及方法
CN110988979A (zh) * 2019-12-19 2020-04-10 中国地质大学(武汉) Tbm高压脉冲水射流破岩震源超前探测装置及方法
CN113187539A (zh) * 2021-03-17 2021-07-30 中铁二十三局集团第六工程有限公司 一种用于tbm的拆分运输装置及其使用方法
CN113187539B (zh) * 2021-03-17 2024-04-02 中铁二十三局集团第六工程有限公司 一种用于tbm的拆分运输装置及其使用方法

Similar Documents

Publication Publication Date Title
CN205955743U (zh) Tbm刀盘
CN106089225B (zh) Tbm刀盘
CN205823287U (zh) 超高压水力辅助破岩tbm刀盘
CN109882073A (zh) 可变径双高压搅喷桩及其变径方法
CN106065776A (zh) 超高压水力辅助破岩tbm刀盘
CN105736006A (zh) 高压水射流全断面岩石掘进机刀盘设计方法
CN201424940Y (zh) 一种泥水盾构机防泥饼装置
CN105156035B (zh) 一种活齿pdc钻头
CN103452559A (zh) 竖井盾构机
CN212317853U (zh) 一种无源挤压式脉冲煤屑射流破煤卸压增透装置
CN105971663A (zh) 一种煤层高压水力割缝压裂的钻孔布置结构及增透方法
CN109899079A (zh) 具备pdc钻头辅助破岩的tbm刀盘
CN111794682A (zh) 一种无源挤压式脉冲煤屑射流破煤卸压增透装置及使用方法
CN110529134A (zh) 用于土压平衡盾构机的高压水力辅助掘进刀盘
CN102268966B (zh) 一种破碎硬岩钻头及对硬岩进行破碎的方法
CN203867474U (zh) 适用于塑性泥岩快速钻进的钻头结构
CN201802398U (zh) 一种硬岩掘进机
CN207245713U (zh) 适于敞开式掘进机的破岩刀盘
CN103939024B (zh) 一种硬砂质土钻头
CN209875157U (zh) 具备pdc钻头辅助破岩的tbm刀盘
CN211924168U (zh) 一种具有冲击破岩功能的盾构机刀盘
CN109882189A (zh) 一种适用于断层破碎带的马蹄形半断面盾构机及施工方法
CN201747279U (zh) 地质勘探凿岩钻机钎头
CN105170677B (zh) 一种环保型无水挤压条棒状硬质合金坯料的装置
CN209212160U (zh) 新型复锥pdc牙轮复合钻头

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215

Termination date: 20180809