CN205949916U - Roof drilling equipment - Google Patents
Roof drilling equipment Download PDFInfo
- Publication number
- CN205949916U CN205949916U CN201620930379.0U CN201620930379U CN205949916U CN 205949916 U CN205949916 U CN 205949916U CN 201620930379 U CN201620930379 U CN 201620930379U CN 205949916 U CN205949916 U CN 205949916U
- Authority
- CN
- China
- Prior art keywords
- installing pipe
- action bars
- top plate
- operating handle
- boring device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a roof drilling equipment belongs to building instruments technical field. It has solved the problem that the deviation appears in the regulative mode of current rig support too complicated and adjusting position easily. This roof drilling equipment, including the chassis, drilling motor and the vertical installation pipe of fixing on the chassis, this roof drilling equipment still includes the action bars, the upper end at the action bars is fixed to the drilling motor, the lower extreme of action bars is pegged graft intraductally in the installation, the clearance has between the lateral wall of action bars and the inside wall of installation pipe, be equipped with at least one gyro wheel on the lateral wall of action bars, the inside wall of gyro wheel and installation pipe pastes mutually that lean on and the gyro wheel can roll from top to bottom along the inside wall of installation pipe, be equipped with the operating handle that can stretch out the installation pipe on the action bars, operating handle can lean on with the upper end counterbalance of installation pipe. The height of the regulation drilling motor of this roof drilling equipment ability accuracy.
Description
Technical field
This utility model belongs to building technique with the apparatus field, is related to a kind of boring device of top plate.
Background technology
In building decoration, fitting-out work ceiling construction and installation, needing in building top board is that arrangement is each
Class suspension rod, hanger erection method is divided into two classes, and a class is using pre-buried construction technology, and another kind of is to be installed using rearmounted method;
Then rearmounted installation method need to implant anchoring piece, at building top board bottom by default position in building top board bottom hole
Portion's boring needs the manual and high operation of frame, is a laborious, time-consuming job, and drilling depth and perpendicularity are difficult to control,
Larger by operator's factor and the high j ob impact of frame, and construction speed is slow, quality controllability is not high.
For above-mentioned defect, people have developed various boring device of top plates:
As Chinese patent application (application number:200520067799.2) disclose a kind of rig for top plate drilling and prop up
Frame, including the vertical pole that is connected of power outfan of carrier base, force application apparatus and the bottom and force application apparatus that are placed in ground, also
Overlap including lower end and pole upper part, the connecting rod of rigging up;Carrier base is provided with wear, leading with through hole for pole
To location-plate, pole upper end and connecting rod lower end be respectively equipped with connecting bolt cooperation by connecting rod be fixed on pole, two or
The equidistant screwed hole of person's two or more.
Although above-mentioned patent to some extent solves the series of problems of existing manual frame high operation presence,
Do not adapt to the top board of any height, and adjust the height of whole rig bracket by adjusting the position of two poles, and lead to
Cross bolt to adjust rig bracket so that deviation easily in the position of regulative mode too complex and regulation, lead to bored hole
Position produces deviation, affects work efficiency.
Content of the invention
The purpose of this utility model is that there are the problems referred to above for existing technology it is proposed that a kind of boring device of top plate,
How technical problem to be solved in the utility model is so that boring device of top plate can accurately adjust the height of bore motor.
The purpose of this utility model can be realized by following technical proposal:
A kind of boring device of top plate, including underframe, bore motor and the installing pipe being vertically fixed on underframe, its feature exists
In this boring device of top plate also includes action bars, and described bore motor is fixed on the upper end of action bars, the lower end of described action bars
It is plugged in installing pipe, there is between the side wall of described action bars and the medial wall of installing pipe gap, the side wall of described action bars
It is provided with least one roller, the medial wall phase of described roller and installing pipe reclines and roller can be along on the medial wall of installing pipe
Lower rolling, described action bars is provided with the operating handle that can stretch out installing pipe, and described operating handle can be with the upper end phase of installing pipe
Against.
When needing to top plate drilling, reach specified location with hand propelled operating handle to bore motor, now with holding
The position living operating handle holding action bars is constant, and bore motor can be holed to top board, after boring terminates, decontrols operation
Handle, now action bars is due to the effect slide downward of self gravitation, when action bars slides into the upper of operating handle and installing pipe
End leans, and then action bars is returned in situ so that can adjust according to specific circumstances during boring
The height of bore motor, and then make the position that bore motor is holed on top board more accurate;And the effect of roller, can make
Action bars can quickly slide so that the regulation of the position of action bars is quicker in installing pipe, and now installing pipe vertically sets
Put, action bars slides in installing pipe, connect so that the position of bore motor boring is not in deviation so that bore motor is on top
Boring on plate is more accurate.
In above-mentioned boring device of top plate, described installing pipe includes installing pipe one and installing pipe two, described installing pipe one
Vertically it is fixed on underframe, described installing pipe two is plugged in installing pipe one, the lower end of described action bars is plugged on installing pipe two
Interior, described operating handle can be leant with the upper end of installing pipe two, and described installing pipe two can be along on the medial wall of installing pipe one
Lower slider is simultaneously fixed by securing member.
The setting of this structure, can adjust the position of installing pipe two in advance when the height apart from floor for the top board is too high, then
During concrete boring, the further height adjusting action bars, accurately to determine the position of boring so as to brill
During the height of hole motor is adjusted, can first adjust the height of installing pipe two, and then boring device of top plate is fitted
With the boring from various highly different top boards.
In above-mentioned boring device of top plate, described roller has four, and four described rollers are along the side wall of action bars
Circumferentially disposed.
The setting of this structure, can make action bars quickly slide up and down, and then make the regulation of the height of bore motor
Convenient.
In above-mentioned boring device of top plate, the upper end of described action bars is provided with dust-receiving plate, and described dust-receiving plate adopts transparent
Plastics are made, and the edge turnover of described dust-receiving plate forms opening up accommodating chamber, and described bore motor is located at and accommodates intracavity.
The setting of this structure, during boring, because the garbage energy dropping of holing falls on dust-receiving plate on top board
Receiving intracavity so that people is when holding operating handle, be not in that rubbish drops on the body of people or in eyes, operation more
Plus convenience, dust-receiving plate is made using transparent plastic so that when the rubbish in dust-receiving plate piles with, operator can see in time, side
The timely cleaning of convenient to operate personnel.
In above-mentioned boring device of top plate, described action bars is additionally provided with the control bar that can stretch out installing pipe, described control
Bar processed is located at the top of operating handle, and described control bar is provided with the button of energy keyhole motor switch.
Operator hold operating handle by the bore motor movement on action bars to specified location, and operator can be by
The shift knob of lower bore motor, now bore motor start working, after the completion of bore motor work, operator are by button
Reset, and then make more preferable to the control of bore motor in operating process.
Compared with prior art, this boring device of top plate has advantages below:
1st, pass through to be arranged with action bars in installing pipe, the height of operator's moving operation bar, and in action bars and peace
Roller is set between tubulature so that the movement of action bars is more quick and convenient, and then makes the position of boring device of top plate more
Accurate.
2nd, the setting of installing pipe one and installing pipe two, can adjust the position of installing pipe two, then the mistake in concrete boring in advance
Cheng Zhong, the further height adjusting action bars, accurately to determine the position of boring, boring device of top plate can be enable to be suitable for
Boring from various highly different top boards.
Brief description
Fig. 1 is the sectional view after the assembling of this boring device of top plate.
Fig. 2 is the side view after the assembling of this boring device of top plate.
In figure, 1, underframe;2nd, bore motor;3rd, installing pipe;31st, installing pipe one;32nd, installing pipe two;4th, action bars;41、
Roller;42nd, operating handle;43rd, control bar;431st, button;44th, dust-receiving plate;441st, accommodating chamber;5th, securing member.
Specific embodiment
The following is specific embodiment of the utility model and combine accompanying drawing, the technical solution of the utility model is made further
Description, but this utility model is not limited to these embodiments.
As shown in figure 1, this boring device of top plate, including underframe 1, bore motor 2 and the installation being vertically fixed on underframe 1
Pipe 3.
Specifically, as depicted in figs. 1 and 2, this boring device of top plate also includes action bars 4, and bore motor 2 is fixed on behaviour
Make the upper end of bar 4, the lower end of action bars 4 is plugged in installing pipe 3, have between the side wall of action bars 4 and the medial wall of installing pipe 3
There is gap, the side wall of action bars 4 is provided with least one roller 41, and in the present embodiment, roller 41 has four, four rolling
41 is circumferentially disposed along the side wall of action bars 4, and the medial wall phase of roller 41 and installing pipe 3 reclines and roller 41 can be along installing pipe
3 medial wall scroll-up/down, action bars 4 is provided with the operating handle 42 that can stretch out installing pipe 3, operating handle 42 energy and installing pipe
3 upper end leans, and action bars 4 is additionally provided with the control bar 43 that can stretch out installing pipe 3, and control bar 43 is located at operating handle 42
Top, control bar 43 is provided with the button 431 of energy keyhole motor 2 switch.
When needing to top plate drilling, reach specified location with hand propelled operating handle 42 to bore motor 2, now use handss
The position holding operating handle 42 holding action bars 4 is constant, and bore motor 2 can be holed to top board, after boring terminates, puts
Open operation handle, now action bars 4 is due to the effect slide downward of self gravitation, when action bars 4 slide into operating handle 42 with
The upper end of installing pipe 3 leans, and then action bars 4 is returned in situ so that energy is according to concrete during boring
The height to adjust bore motor 2 for the situation, operator hold operating handle 42, and the bore motor 2 on action bars 4 is mobile
To specified location, operator can press the shift knob 431 of bore motor 2, and now bore motor 2 is started working, and works as brill
After the completion of hole motor 2 work, button 431 is resetted by operator, and then makes in operating process to the control of bore motor 2 more
Good so that the position holed on top board of bore motor 2 is more accurate;And the effect of roller 41, action bars 4 can be enable quick
In installing pipe 3 slide so that the regulation of the position of action bars 4 is quicker, now installing pipe 3 is vertically arranged, action bars 4
Slide in installing pipe 3, connect so that the position of bore motor 2 boring is not in deviation so that bore motor 2 is on top board
Boring is more accurate.
Further, as depicted in figs. 1 and 2, installing pipe 3 includes installing pipe 1 and installing pipe 2 32, installing pipe one
31 are vertically fixed on underframe 1, and installing pipe 2 32 is plugged in installing pipe 1, and the lower end of action bars 4 is plugged on installing pipe two
In 32, installing pipe 2 32 can be along the medial wall scroll-up/down of installing pipe 1 and fixing by securing member 5, action bars 4 upper
End is provided with dust-receiving plate 44, and dust-receiving plate 44 is made using transparent plastic, and the edge turnover of dust-receiving plate 44 forms opening up appearance
Receive chamber 441, bore motor 2 is located in accommodating chamber 441.
The setting of this structure, can adjust the position of installing pipe 2 32 in advance when the height apart from floor for the top board is too high,
Again during concrete boring, the further height adjusting action bars 4, accurately to determine the position of boring so that
During the height of bore motor 2 is adjusted, can first adjust the height of installing pipe 2 32, and then top plate drilling is filled
Put the boring being suitable for from various highly different top boards.
Specific embodiment described herein is only explanation for example to this utility model spirit.This utility model institute
Belong to those skilled in the art described specific embodiment can be made with various modifications or supplement or using similar
Mode substitute, but without departing from of the present utility model spirit or surmount scope defined in appended claims.
Claims (5)
1. a kind of boring device of top plate, including underframe (1), bore motor (2) and the installing pipe being vertically fixed on underframe (1)
(3) it is characterised in that this boring device of top plate also includes action bars (4), described bore motor (2) is fixed on action bars (4)
Upper end, the lower end of described action bars (4) is plugged in installing pipe (3), and the side wall of described action bars (4) is interior with installing pipe (3)
There is between the wall of side gap, the side wall of described action bars (4) is provided with least one roller (41), described roller (41) and installation
The medial wall phase of pipe (3) reclines and roller (41) can be along the medial wall scroll-up/down of installing pipe (3), on described action bars (4)
It is provided with the operating handle (42) that can stretch out installing pipe (3), described operating handle (42) can be leant with the upper end of installing pipe (3).
2. boring device of top plate according to claim 1 is it is characterised in that described installing pipe (3) includes installing pipe one
(31) and installing pipe two (32), described installing pipe one (31) is vertically fixed on underframe (1), and described installing pipe two (32) is socketed in
In installing pipe one (31), the lower end of described action bars (4) is plugged in installing pipe two (32), and described operating handle (42) can be with peace
The upper end of tubulature two (32) leans, and described installing pipe two (32) can slide up and down and lead to along the medial wall of installing pipe one (31)
Cross securing member (5) fixing.
3. boring device of top plate according to claim 1 is it is characterised in that described roller (41) has four, four institutes
The side wall stating roller (41) along action bars (4) is circumferentially disposed.
4. the boring device of top plate according to claim 1 or 2 or 3 is it is characterised in that the upper end of described action bars (4) sets
There is dust-receiving plate (44), described dust-receiving plate (44) is made using transparent plastic, the edge turnover formation of described dust-receiving plate (44) is opened
Mouth accommodating chamber (441) upward, described bore motor (2) is located in accommodating chamber (441).
5. the boring device of top plate according to claim 1 or 2 or 3 is it is characterised in that be additionally provided with described action bars (4)
The control bar (43) of installing pipe (3) can be stretched out, described control bar (43) is located at the top of operating handle (42), described control bar
(43) it is provided with the button (431) that energy keyhole motor (2) switchs on.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620930379.0U CN205949916U (en) | 2016-08-23 | 2016-08-23 | Roof drilling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620930379.0U CN205949916U (en) | 2016-08-23 | 2016-08-23 | Roof drilling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205949916U true CN205949916U (en) | 2017-02-15 |
Family
ID=57977625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620930379.0U Active CN205949916U (en) | 2016-08-23 | 2016-08-23 | Roof drilling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205949916U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110274020A (en) * | 2019-06-04 | 2019-09-24 | 中国人民解放军68612部队 | A kind of control stick emulating drilling machine |
-
2016
- 2016-08-23 CN CN201620930379.0U patent/CN205949916U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110274020A (en) * | 2019-06-04 | 2019-09-24 | 中国人民解放军68612部队 | A kind of control stick emulating drilling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201231532Y (en) | Mobile boring device for building top board | |
CN107860607A (en) | A kind of soil remediation soil sampling apparatus | |
CN208223851U (en) | A kind of geotechnical engineering ground sampler | |
CN205949916U (en) | Roof drilling equipment | |
CN206241307U (en) | A kind of wall eminence drilling equipment of simple structure | |
CN117405495A (en) | Fatigue performance test equipment is drawn to crack opening and shutting of concrete | |
CN206677242U (en) | A kind of boring device of top plate | |
CN204326075U (en) | A kind of drill steel extracting apparatus | |
CN207074537U (en) | A kind of architectural design sample Mobile exhibiting system | |
CN205735565U (en) | A kind of structural sheeting drilling equipment | |
CN215492549U (en) | Sampling device for soil aniline static cycle extraction detection | |
CN210082116U (en) | Drilling equipment for construction | |
CN205599974U (en) | Portable drilling tool | |
CN212287555U (en) | Workstation is used in building engineering quality testing | |
CN207386639U (en) | Vertical perforating machine | |
CN214769151U (en) | Bar planting drilling equipment for building | |
CN212254650U (en) | Construction detects auxiliary device | |
CN206637196U (en) | A kind of device for work high above the ground | |
CN219532549U (en) | Deep soil detects sampling device | |
CN217631126U (en) | Novel building construction platform | |
CN219710259U (en) | Visual deep foundation sampling device | |
CN215943393U (en) | Interior decoration construction dust isolating device | |
CN205521234U (en) | Electric hammer auxiliary device that punches | |
CN217595974U (en) | Auxiliary plate bottom drilling lifting support device | |
CN218535160U (en) | Vertical bar planting trompil auxiliary device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |