CN205941693U - Pipeline transition resistance surveys and connects device - Google Patents

Pipeline transition resistance surveys and connects device Download PDF

Info

Publication number
CN205941693U
CN205941693U CN201620888460.7U CN201620888460U CN205941693U CN 205941693 U CN205941693 U CN 205941693U CN 201620888460 U CN201620888460 U CN 201620888460U CN 205941693 U CN205941693 U CN 205941693U
Authority
CN
China
Prior art keywords
transition resistance
wire
resistance tester
test
jumper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620888460.7U
Other languages
Chinese (zh)
Inventor
李剑春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620888460.7U priority Critical patent/CN205941693U/en
Application granted granted Critical
Publication of CN205941693U publication Critical patent/CN205941693U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

The utility model provides a pipeline transition resistance surveys and connects device, including being used for testing the transition resistance tester of transition resistance resistance, the transition resistance tester is provided with the display screen, and still including test box and the power supply battery that is connected through power connecting wire and transition resistance tester, transition resistance tester and power supply battery all set up in the test box, install the switch that is used for the start -up and closes the transition resistance tester on the test box, and just it is provided with the observation window that is used for observing the display screen to test the box, all install test wire joint and jumper wire joint on testing two relative lateral walls of box, one of them test wire connects to be connected with the input of transition resistance tester through first test wire, and another test wire joint passes through the second test wire and is connected with the output of transition resistance tester, between connecting, two jumper wires are connected with the jumper wire. The utility model is simple in operation, aero, the non professional of being convenient for detects, in time discovers potential danger source.

Description

Pipeline transition resistance surveys connection device
Technical field
This utility model is related to pipeline anti-thunder technical field and in particular to a kind of pipeline transition resistance surveys connection device.
Background technology
When conveying material, the material of conveying and pipeline wall friction can produce electrostatic to pipeline, and electrostatic easily causes electricity fire Flower, easily causes accident when the material of conveying is the material having fire, explosion danger.Therefore related specifications regulation " has electrostatic The pipeline of grounding requirement, each intersegmental answers well conducting.When between each pair ring flange or nipple, resistance value is more than 0.03 Ω, should Wire is had to bridge ".Can be seen that whether meet the requirement of antistatic between ring flange or nipple and be from above-mentioned regulation No need to set up jumper to be size according to transition resistance to determine.If ring flange two ends transition resistance is more than 0.03 Ω When, electrostatic is just assembled easily at ring flange, produces electric spark, easily causes security incident, so jumper pair should be used Ring flange two ends are bridged so that the transition resistance at ring flange two ends is in the scope required by specification.In actual applications, The pipeline that conveying has the material of fire, explosion danger is in outdoor state, exposes to the sun and rain all the year round and leads to connecting bolt or jumper Corrosion condition occurs, and or when conveying material the vibrations that produce cause loosening or coming off of connecting bolt or jumper wire joint, Both situations all can cause the loose contact of ring flange two ends or transition resistance to be more than 0.03 Ω.But according to relevant regulations pair In combustible and explosive area lightning protection detection be every half a year once, and this detection can only be entered using special instrument by professional person OK, thus can not find that ring flange two ends transition resistance exceedes regulation in time.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, provides a kind of pipeline transition resistance to survey connection device, This device can solve the problems, such as cannot find that transition resistance exceedes regulation in time well.
For reaching above-mentioned requirements, this utility model adopts the technical scheme that:A kind of pipeline transition resistance is provided to survey tipping Put, including the transition resistance tester for testing transition resistance resistance, transition resistance tester is provided with display screen, also includes Test casing and the supplying cell being connected with transition resistance tester by electric power connection line, transition resistance tester and power supply electricity Pond may be contained within testing in casing, test casing is provided with the switch for starting and cutting out transition resistance tester, and surveys Examination casing is provided with the observation window for observing display screen;It is mounted on testing wire terminal on the relative side wall of test casing two And jumper wire joint, one of them is tested wire terminal and is connected with the input of transition resistance tester, separately by the first p-wire One test wire terminal is connected with the outfan of transition resistance tester by the second p-wire;Connect between two jumper wire joints It is connected to jumper.
This pipeline transition resistance survey connection device has the advantage that as follows:
(1) this device is erected on ring flange, and test wire terminal is connected all the time with the connecting bolt at ring flange two ends, when When needing detection, the switch pressed on test casing starts transition resistance tester, and the test result of transition resistance can show On the display screen of transition resistance tester, simple to operate, visual result, even do not possess lightning protection to detect the general of professional technique Logical patrol officer also can be detected, is easy to find in time and process potential danger source, improves the safety of combustible and explosive area;
(2) carry jumper in this device, when detection finds that ring flange two ends transition resistance is more than 0.03 Ω, directly will Two jumper wire joints are wired to the connecting bolt i.e. achievable bridging at ring flange two ends, need not individually connect bridging Line;The jumper that this carries can also be connected when transition resistance is less than 0.03 Ω, it is to avoid transition resistance increases suddenly formation peace Full hidden danger;
(3) test casing is made using explosion-proof lamp, internal filling epoxy resin glue, has fire-retardant, shockproof, waterproof, anti- The feature of dirt is it is adaptable to flammable and explosive substance such as produces, stores, conveying at the complicated place of environment;
(4) this device is used battery as power supply, has long service life, no territory of use's restriction, safe and reliable spy Point.
Brief description
Accompanying drawing described herein is used for providing further understanding of the present application, constitutes the part of the application, at this Represent same or analogous part, the schematic description and description of the application using identical reference number in a little accompanying drawings For explaining the application, do not constitute the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the structural representation of the application;
Connection diagram when Fig. 2 works for the application.
Specific embodiment
Purpose, technical scheme and advantage for making the application are clearer, below in conjunction with drawings and the specific embodiments, to this Application is described in further detail.
In the following description, quoting of " embodiment ", " embodiment ", " example ", " example " etc. is shown So the embodiment of description or example can include special characteristic, structure, characteristic, property, element or limit, but not each is real Apply example or example all necessarily includes special characteristic, structure, characteristic, property, element or limit.In addition, reuse phrase " according to One embodiment of the application " is although it is possible to refer to identical embodiment, but is not necessarily referring to identical embodiment.
For the sake of simplicity, eliminate in below describing well known to a person skilled in the art some technical characteristics.
According to an embodiment of the application, a kind of pipeline transition resistance is provided to survey connection device, as shown in figure 1, including using In the transition resistance tester 1 of test transition resistance resistance, transition resistance tester 1 is provided with display screen, also includes test box Body 2 and the supplying cell 4 being connected with transition resistance tester 1 by electric power connection line 3, transition resistance tester 1 and power supply electricity Pond 4 may be contained within testing in casing 2, and test casing 2 is provided with the switch for starting and cutting out transition resistance tester 1, And test casing 2 is provided with the observation window for observing display screen;It is mounted on testing on the relative side wall of test casing 2 two Wire terminal 5 and jumper wire joint 6, then have two test wire terminals 5 and two jumper wire joints 6, and one of p-wire connects 5 are connected with the input of transition resistance tester 1 by the first p-wire 7, and another test wire terminal 5 is passed through second and tested Line 8 is connected with the outfan of transition resistance tester 1;It is connected with jumper 9 between two jumper wire joints 6.
According to an embodiment of the application, test casing 2 and made using explosion-proof lamp, such as beryllium-bronze, aluminium bronze, J892 Copper alloy etc..
According to an embodiment of the application, test in casing 2 and be filled with fluid sealant, this fluid sealant is epoxide-resin glue, This device has the advantages that fire-retardant, shockproof, waterproof and dustproof after being filled through it is adaptable to flammable and explosive substance produces, stores, conveys In the place that environment is complicated.
This device is erected on ring flange 11, as shown in Fig. 2 two test wire terminals 5 are passed through to test 10 points of connecting wire The connecting bolt 12 at other mounting flange 11 two ends;When needing detection, the switch pressed on test casing 2 starts transition resistance Tester 1, the test result of transition resistance can be displayed on the display screen of transition resistance tester 1, and simple to operate, result is straight Seeing, even not possessing lightning protection to detect that the common patrol officer of professional technique also can be detected, being easy to find in time and process Potential danger source, improves the safety of combustible and explosive area.When detection finds that ring flange 11 two ends transition resistance is more than 0.03 Ω When, directly two jumper wire joints 6 are connected respectively to ring flange 11 two ends with bridging connecting wire 13 and can achieve bridging, no Jumper need to individually be connected.
Embodiment described above only represents several embodiments of the present utility model, and its description is more concrete and detailed, but The restriction to this utility model scope can not be interpreted as.It should be pointed out that for the person of ordinary skill of the art, Without departing from the concept of the premise utility, some deformation can also be made and improve, these broadly fall into this utility model Protection domain.Protection domain therefore of the present utility model should be defined by described claim.

Claims (4)

1. a kind of pipeline transition resistance surveys connection device, including the transition resistance tester for testing transition resistance resistance, described Transition resistance tester is provided with display screen it is characterised in that also including testing casing and by electric power connection line and transition electricity The supplying cell that resistance tester connects, described transition resistance tester and supplying cell may be contained within testing in casing, test box Switch for starting and cutting out transition resistance tester is provided with body, and tests casing and be provided with for observing display screen Observation window;It is mounted on testing wire terminal and jumper wire joint, one of p-wire on the relative side wall of test casing two Joint is connected with the input of transition resistance tester by the first p-wire, and the second p-wire is passed through in another test wire terminal It is connected with the outfan of transition resistance tester;It is connected with jumper between described two jumper wire joints.
2. pipeline transition resistance according to claim 1 surveys connection device it is characterised in that described test casing is using explosion-proof Material is made.
3. pipeline transition resistance according to claim 1 surveys connection device it is characterised in that being filled with described test box body Fluid sealant.
4. pipeline transition resistance according to claim 3 surveys connection device it is characterised in that described fluid sealant is epoxy resin Glue.
CN201620888460.7U 2016-08-16 2016-08-16 Pipeline transition resistance surveys and connects device Expired - Fee Related CN205941693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620888460.7U CN205941693U (en) 2016-08-16 2016-08-16 Pipeline transition resistance surveys and connects device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620888460.7U CN205941693U (en) 2016-08-16 2016-08-16 Pipeline transition resistance surveys and connects device

Publications (1)

Publication Number Publication Date
CN205941693U true CN205941693U (en) 2017-02-08

Family

ID=57917832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620888460.7U Expired - Fee Related CN205941693U (en) 2016-08-16 2016-08-16 Pipeline transition resistance surveys and connects device

Country Status (1)

Country Link
CN (1) CN205941693U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082598A (en) * 2019-04-24 2019-08-02 吉林省安全生产检测检验股份有限公司 Ring flange transition resistance measurement method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082598A (en) * 2019-04-24 2019-08-02 吉林省安全生产检测检验股份有限公司 Ring flange transition resistance measurement method

Similar Documents

Publication Publication Date Title
CN205844446U (en) Instrument is sent in a kind of Multifunction direct current examination
CN205941693U (en) Pipeline transition resistance surveys and connects device
CN206002564U (en) A kind of dielectric loss and insulation resistance test conversion equipment and pilot system
CN105572517A (en) Online monitoring type intelligent electrified switching-in protection device of lightning arrester and control method
CN202533541U (en) Cable core electrical measurement verifying device
CN208780759U (en) A kind of architectural electricity detection device of earth leakage protective device
CN109538854A (en) Flange reveals automatic alarm equipotential crossover assembly
CN212851349U (en) Explosion-proof IC card gauge head
CN201130213Y (en) High pressure electrification display trigger device for induction high pressure armored cable of electrification state
CN103607126A (en) External power source device of electric energy meter
CN203039480U (en) Transparent mode motor conjunction box
CN114094523A (en) Cable intelligence grounding box based on thing networking
CN206095299U (en) Humiture and electrostatic test system
CN207502662U (en) A kind of pressure resistant testing device for the equipment with video interface
CN113643454A (en) Fill electric pile on-site security and synthesize inspection device
CN106801789B (en) A kind of natural gas line leakage device and application method
CN102221661A (en) High pressure grounding line selection apparatus
CN207571234U (en) Electric leakage alarm
CN202083766U (en) High voltage grounding line selection apparatus
CN205880180U (en) Integrative device of examining of withstand voltage and earth impedance tester
CN206440780U (en) Electrostatic alarm
CN205680881U (en) Bobbin cable universal connector the end of a thread
CN2692913Y (en) Safety DC . AC dual-purpose blasting machine power supply
CN109969036A (en) The method and sensor changed for real-time monitoring power battery box relative position
CN211627301U (en) Detection device for environmental protection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20210816