CN205936584U - Perpendicular timing appearance of well drilling - Google Patents
Perpendicular timing appearance of well drilling Download PDFInfo
- Publication number
- CN205936584U CN205936584U CN201620937869.3U CN201620937869U CN205936584U CN 205936584 U CN205936584 U CN 205936584U CN 201620937869 U CN201620937869 U CN 201620937869U CN 205936584 U CN205936584 U CN 205936584U
- Authority
- CN
- China
- Prior art keywords
- rig
- scale
- mounting seat
- line
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a perpendicular timing appearance of well drilling, including be used for respectively with the solid be connected together's of rig sleeve (1) lateral wall wire hanging rod (2) and scale (3), wire hanging rod and scale all overlap cylinder diameter to the direction setting along the rig, wire hanging rod is located scale top and both align along the telescopic axial direction of rig, are equipped with the line of rabbet joint (31) to the direction along rig cover cylinder diameter on the scale, the line of rabbet joint runs through from top to bottom and is logical groove, last linked firmly plumb -line (4) of wire hanging rod, and the plumb -line lower extreme passes the line of rabbet joint and is connected with plumb bob (5), is equipped with the scale mark around the line of rabbet joint. The utility model discloses need not to use other supplementary measuring tools when measuring, can avoiding the influence of human factor, the measurement in succession, the reading is directly perceived, interference immunity is strong, and is easy and simple to handle, efficient. The utility model discloses be equipped with two wire hanging rod that become 90 degrees contained angles, can effectual assurance measuring precision through the plumb bob and the lower part scale in two position to guarantee the straightness that hangs down of well drilling, reach construction requirements.
Description
Technical field
This utility model is related to drilling measuring equipment, particularly, is related to a kind of vertical regulator of drilling well.
Background technology
Drilling engineering is widely used in exploration, the field such as building, underground heat, during wellbore construction, the inclination of drilling rod is needed
Strictly controlled, existing drilling well adjusting process is using artificial ceiling hammer, by measuring the upper and lower position of messenger wire and drilling rod
Distance and by calculating, draw the gradient of drilling rod, if it exceeds tolerance, adjust rig levelness, more repeatedly adopt
The mode of artificial ceiling hammer measures, until drilling rod sag meets drilling well requirement, complex operation, inefficiency, anthropic factor
Impact is big, and the loss that such as makes mistakes is big, and interference free performance is poor, and random big, accuracy cannot ensure.
Utility model content
This utility model purpose is to provide a kind of drilling well vertical regulator, to solve the problems, such as to propose in background technology.
For achieving the above object, this utility model provides a kind of vertical regulator of drilling well, including for respectively with rig
Standard trolley 2 and scale 3 that sleeve 1 side wall is fixed together, described standard trolley and scale are all arranged along rig sleeve radial direction,
Described standard trolley be located at described scale above and both along rig sleeve axial direction alignment, along rig sleeve on described scale
Radial direction is provided with the line of rabbet joint 31, and it is in groove that the described line of rabbet joint runs through mark up and down, and described standard trolley is fixed with messenger wire 4, messenger wire upper end
It is connected in and forms, on standard trolley, the point that is connected, messenger wire lower end is connected with plumb bob 5 through the line of rabbet joint, along rig sleeve in the radial direction
It is provided with the zero point of scale 3, the distance of described zero point to rig sleeve axial line and described connected point are to rig set in the middle part of the line of rabbet joint
The distance of cylinder axial line is consistent;After plumb bob remains stationary under self gravitation effect, in detection process, described messenger wire 4 passes through groove
When stitching cross point when 31 and the distance between described zero point and being more than a certain amount of, illustrate that the perpendicularity of drilling rod is unsatisfactory for requirement and needs
Adjust rig sleeve and drilling rod towards certain direction;Until the distance between described cross point and zero point completes when being less than or equal to a certain amount of
The adjustment of rig.
Described a certain amount of be value range according to the setting of the tolerance scope of drilling rod perpendicularity.
Further, described reset is on the midpoint in slot length direction in the radial direction along rig sleeve.
Further, described standard trolley and scale are all fixed in rig by the magnetic mounting seat 6 of carrying magnetic suction
In sleeve lateral wall, that is, described standard trolley and scale are each attached in magnetic mounting seat, magnetic mounting seat again adhesive to sleeve lateral wall
On.
Further, described magnetic mounting seat include for the upper mounting seat 61 fixing described standard trolley be used for fixing institute
State the lower mounting seat 62 of scale, between upper mounting seat and lower mounting seat, be connected with locating rod 7, and described locating rod is along rig sleeve
Axial direction setting is so that the length of locating rod can be used as the constant during calculating rig gradient.
Further, described upper mounting seat and lower mounting seat are semicircle ring structure, the upper mounting seat of semicircle ring structure and
The inner ring surface of lower mounting seat is mated with the outer wall of rig sleeve.
Further, the standard trolley being connected in rig sleeve lateral wall and scale are radial direction same positioned at rig sleeve
Angle between in plane two, and two standard trolleies and two scales is all higher than 0 degree and is less than 180 degree, two
Standard trolley is alignd along rig sleeve axial direction with two scales respectively, and two standard trolleies are all fixed with messenger wire and plumb bob.
Preferably, the angle between two standard trolleies in same sagittal plane is equal to 90 degree.
Beneficial effect:
The vertical regulator of drilling well of the present utility model passes through to protect along the standard trolley of rig sleeve axial direction alignment with scale
As the positioning datum of whole measuring instrument, the line of rabbet joint by scale and running through scale along rig sleeve axial direction is used as messenger wire
Measuring basiss, in measurement process, without using other ancillary gauges, the impact of anthropic factor in measurement process can be avoided, have
The seriality that ensure that measurement of effect, and reading is directly perceived, strong interference immunity, easy and simple to handle, efficiency high, can rapidly, efficiently adjust
The levelness of whole rig.
The vertical regulator of drilling well of the present utility model is provided with the standard trolleies of 90 degree angles of two one-tenth, and two standard trolleies are connected
Messenger wire can be used with plumb bob simultaneously, can effectively ensure the precision measuring by the plumb bob in two orientation and bottom scale, from
And ensure the perpendicularity of drilling well, reach construction requirement.
In addition to objects, features and advantages described above, this utility model also has other purposes, feature and excellent
Point.Below with reference to figure, this utility model is described in further detail.
Brief description
The accompanying drawing constituting the part of the application is used for providing further understanding to of the present utility model, of the present utility model
Schematic description and description is used for explaining this utility model, does not constitute to improper restriction of the present utility model.In accompanying drawing
In:
Fig. 1 is the overall structure diagram of this utility model preferred embodiment;
Fig. 2 is the A-A profile in this utility model Fig. 1;
Fig. 3 is the B-B profile in this utility model Fig. 1.
In figure:1- rig sleeve, 2- standard trolley, 3- scale, the 31- line of rabbet joint, 4- messenger wire, 5- plumb bob, 6- magnetic mounting seat, 61
Upper mounting seat, 62- lower mounting seat, 7- locating rod.
Specific embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in detail, but this utility model can be according to power
Profit requires the multitude of different ways limiting and covering to implement.
Referring to a kind of vertical regulator of drilling well of Fig. 1~Fig. 3, including for being connected in one with rig sleeve 1 side wall respectively
Standard trolley 2 and the scale 3 rising, standard trolley and scale are all arranged along rig sleeve radial direction, and described standard trolley is located at described mark
Above chi and both are along the axial direction alignment of rig sleeve, scale is provided with the line of rabbet joint 31 along rig sleeve radial direction, and edge
Rig sleeve axial direction (i.e. the depth direction of the line of rabbet joint 31), the line of rabbet joint is directed at standard trolley upwards, becomes downward through scale
Groove, standard trolley is fixed with flexible messenger wire 4, and messenger wire upper end is fixed on standard trolley 2 and forms the point that is connected, and messenger wire lower end passes through groove
Seam 31 is connected with plumb bob 5, in the zero point being provided with scale 3 along in the middle part of the rig sleeve line of rabbet joint in the radial direction, in the present embodiment,
Reset is on the midpoint in slot length direction in the radial direction along rig sleeve, and zero point is to rig sleeve axial line
The distance consistent (referring to Fig. 3) of distance and described connected point to rig sleeve axial line;When in detection process plumb bob from heavy sensation of the body
After the lower remains stationary of power effect, when messenger wire 4 passes through the cross point during line of rabbet joint 31 and the distance between described zero point to be more than a certain amount of, say
The perpendicularity of bright drilling rod is unsatisfactory for requiring and needs to adjust rig sleeve and drilling rod towards certain direction;Until between cross point and zero point
Distance complete the adjustment of rig when being less than or equal to a certain amount of.
In the present embodiment, standard trolley 2 and scale 3 are all fixed in rig by the magnetic mounting seat 6 of carrying magnetic suction
On the side wall of sleeve 1, that is, standard trolley and scale are each attached in magnetic mounting seat, magnetic mounting seat again adhesive to sleeve lateral wall
On.
In the present embodiment, magnetic mounting seat include for the upper mounting seat 61 fixing described standard trolley with for nonadjustable signal
Lower mounting seat 62, be connected with locating rod 7 between upper mounting seat and lower mounting seat, and locating rod set along rig sleeve axial direction
Put so that the length of locating rod can be used as the constant during calculating rig gradient.
In the present embodiment, upper mounting seat and lower mounting seat are semicircle ring structure, the upper mounting seat of semicircle ring structure and under
The inner ring surface of mounting seat is mated with the outer wall of rig sleeve, makes to fit between upper mounting seat and lower mounting seat and drilling area sleeve tighter
Close, as long as and two locating rods keep the inner ring surface axis parallel with upper mounting seat and lower mounting seat, that is, can guarantee that two fixed
Position bar is arranged along rig sleeve axial direction.
In the present embodiment, the standard trolley being connected in rig sleeve lateral wall and scale are footpath same positioned at rig sleeve
Angle α between two in plane, and two standard trolleies and two scales is equal to 90 degree, and two standard trolleies divide
Do not align along rig sleeve axial direction with two scales, two standard trolleies are all fixed with messenger wire and plumb bob.
Implementation process of the present utility model approximately as:
First by upper mounting seat and lower mounting seat adhesive to rig sleeve lateral wall, after plumb bob stops swinging, observe two and hang
Line deviates the distance of the positive and negative position of zero point of scale, the perpendicularity conversing drilling rod whether in the deviation range allowing, if deviation
Exceed allowed band, according to the center line offset direction in two lines of rabbet joint, adjustment rig sleeve and drilling rod in the opposite direction, adjusting
During whole, observe movement in the line of rabbet joint for the messenger wire, the perpendicularity of drilling rod meets and wants when messenger wire moves to the scope of scale permission
Ask, stop adjustment.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this
For the technical staff in field, this utility model can have various modifications and variations.All of the present utility model spirit and principle
Within, any modification, equivalent substitution and improvement made etc., should be included within protection domain of the present utility model.
Claims (7)
1. a kind of vertical regulator of drilling well is it is characterised in that include for being fixed together with rig sleeve (1) side wall respectively
Standard trolley (2) and scale (3), described standard trolley and scale are all arranged along rig sleeve radial direction, and described standard trolley is located at institute
State above scale and both are along the axial direction alignment of rig sleeve, described scale is provided with the line of rabbet joint along rig sleeve radial direction
(31), the described line of rabbet joint runs through up and down in groove, and described standard trolley is fixed with messenger wire (4), and messenger wire upper end is connected on standard trolley
And forming the point that is connected, messenger wire lower end is connected with plumb bob (5) through the line of rabbet joint, is setting along in the middle part of the rig sleeve line of rabbet joint in the radial direction
It is equipped with the zero point of scale (3), the distance of described zero point to rig sleeve axial line and described connected point are to rig sleeve axial line
Distance consistent;After plumb bob remains stationary under self gravitation effect, in detection process, described messenger wire (4) passes through the line of rabbet joint (31)
When cross point and described zero point between distance be more than a certain amount of when, illustrate the perpendicularity of drilling rod be unsatisfactory for require and needs towards certain
Individual direction adjustment rig sleeve and drilling rod;Until the distance between described cross point and zero point completes rig when being less than or equal to a certain amount of
Adjustment.
2. a kind of vertical regulator of drilling well according to claim 1 is it is characterised in that described standard trolley and scale all pass through
The magnetic mounting seat (6) of carrying magnetic suction is fixed in rig sleeve lateral wall, and that is, described standard trolley and scale are each attached to
In magnetic mounting seat, magnetic mounting seat again adhesive in sleeve lateral wall.
3. the vertical regulator of a kind of drilling well according to claim 2 it is characterised in that described magnetic mounting seat include for
The upper mounting seat (61) of fixing described standard trolley and the lower mounting seat (62) for fixing described scale, upper mounting seat and lower installation
It is connected with locating rod (7) between seat, and described locating rod is arranged so that the length of locating rod is permissible along rig sleeve axial direction
As the constant during calculating rig gradient.
4. a kind of vertical regulator of drilling well according to claim 3 is it is characterised in that described upper mounting seat and lower mounting seat
It is semicircle ring structure, the upper mounting seat of semicircle ring structure and the inner ring surface of lower mounting seat are mated with the outer wall of rig sleeve.
5. a kind of vertical regulator of drilling well according to claim 1 is it is characterised in that described reset is along rig set
On the cylinder midpoint in slot length direction in the radial direction.
6. the vertical regulator of a kind of drilling well according to any one in Claims 1 to 5 is it is characterised in that be connected in brill
Standard trolley in machine sleeve lateral wall and scale are two in the same sagittal plane of rig sleeve, and two standard trolleies
Between and the angle between two scales be all higher than 0 degree and be less than 180 degree, two standard trolleies respectively with two scales along rig
Sleeve axial direction aligns, and two standard trolleies are all fixed with messenger wire and plumb bob.
7. a kind of vertical regulator of drilling well according to claim 6 is it is characterised in that be located in same sagittal plane
Angle between two standard trolleies is equal to 90 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620937869.3U CN205936584U (en) | 2016-08-24 | 2016-08-24 | Perpendicular timing appearance of well drilling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620937869.3U CN205936584U (en) | 2016-08-24 | 2016-08-24 | Perpendicular timing appearance of well drilling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205936584U true CN205936584U (en) | 2017-02-08 |
Family
ID=57952258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620937869.3U Active CN205936584U (en) | 2016-08-24 | 2016-08-24 | Perpendicular timing appearance of well drilling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205936584U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113026730A (en) * | 2021-04-02 | 2021-06-25 | 东莞市建设工程检测中心 | Construction method for measuring verticality of vertical shaft |
CN116025277A (en) * | 2023-03-27 | 2023-04-28 | 山东省鲁南地质工程勘察院(山东省地质矿产勘查开发局第二地质大队) | Geological investigation rig |
CN117433497A (en) * | 2023-12-21 | 2024-01-23 | 仟亿达集团股份有限公司 | Device and method for measuring vertical deviation of cambered surface body equipment |
-
2016
- 2016-08-24 CN CN201620937869.3U patent/CN205936584U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113026730A (en) * | 2021-04-02 | 2021-06-25 | 东莞市建设工程检测中心 | Construction method for measuring verticality of vertical shaft |
CN116025277A (en) * | 2023-03-27 | 2023-04-28 | 山东省鲁南地质工程勘察院(山东省地质矿产勘查开发局第二地质大队) | Geological investigation rig |
CN117433497A (en) * | 2023-12-21 | 2024-01-23 | 仟亿达集团股份有限公司 | Device and method for measuring vertical deviation of cambered surface body equipment |
CN117433497B (en) * | 2023-12-21 | 2024-03-22 | 仟亿达集团股份有限公司 | Device and method for measuring vertical deviation of cambered surface body equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203769763U (en) | Azimuth and obliquity combined measuring instrument for drilling | |
CN205936584U (en) | Perpendicular timing appearance of well drilling | |
CN104060982B (en) | Distance measuring type down-hole drilling perforate azimuth measuring method | |
CN204359308U (en) | Underworkings Multifunctional measuring tool | |
CN202119368U (en) | Multifunctional measuring rod | |
CN202391408U (en) | Anti-collision range unit based on alternating magnetic field measurement | |
ITTO20110660A1 (en) | METHOD TO DIRECT VERTICAL PERFORATIONS | |
CN107121133A (en) | A kind of subway work vertical shaft connection triangle alignment system | |
CN109986526A (en) | A kind of the aperture tooling and boring method of the side of a ship side pipe mounting hole of watercraft engine room | |
CN101799288B (en) | Geological conimeter and geological conimeter compass | |
CN205262483U (en) | Hang down straightness and axis location's measuring tool of inspection wall body | |
CN103925913A (en) | Vertical shaft plumbing device | |
CN205637514U (en) | Multi -functional darby of plastering | |
CN104121897B (en) | Satellite positioning surveys bar | |
CN207147493U (en) | The testing apparatus for verticality of vertical member | |
CN107916921A (en) | A kind of portable MWD angular differences guiding ruler of laser and application method | |
CN203811180U (en) | Practical vertical shaft plumbing equipment applied to mine | |
CN202970699U (en) | Laser type angular-difference measuring instrument | |
CN102636101A (en) | Roadway surface convergence measuring method and roadway surface convergence sight scale | |
CN203053445U (en) | Formwork system perpendicularity testing tool | |
CN205537619U (en) | Level bar pinpoints | |
CN208381640U (en) | Orthogonal formula scale foot prop | |
CN206862366U (en) | A kind of building decoration engineering detection rule for verticality | |
CN202255403U (en) | Upper centering bracket for gyroscopic total station | |
CN106908030A (en) | A kind of architectural design special measurement device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |