CN205935888U - Anemometer tower convenient to it is good to build steadiness performance - Google Patents

Anemometer tower convenient to it is good to build steadiness performance Download PDF

Info

Publication number
CN205935888U
CN205935888U CN201620891416.1U CN201620891416U CN205935888U CN 205935888 U CN205935888 U CN 205935888U CN 201620891416 U CN201620891416 U CN 201620891416U CN 205935888 U CN205935888 U CN 205935888U
Authority
CN
China
Prior art keywords
support ring
anemometer tower
hole
build
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620891416.1U
Other languages
Chinese (zh)
Inventor
王洪星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI ZHIHENGDA TOWER Co Ltd
Original Assignee
HEBEI ZHIHENGDA TOWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI ZHIHENGDA TOWER Co Ltd filed Critical HEBEI ZHIHENGDA TOWER Co Ltd
Priority to CN201620891416.1U priority Critical patent/CN205935888U/en
Application granted granted Critical
Publication of CN205935888U publication Critical patent/CN205935888U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Indicating Or Recording The Presence, Absence, Or Direction Of Movement (AREA)

Abstract

The utility model discloses an anemometer tower convenient to it is good to build steadiness performance, including the montant, be equipped with first support ring and second support ring on the montant in proper order, be equipped with first through -hole on the first support ring, be equipped with the second through -hole on the second support ring, and be equipped with spring -Damper between first support ring and the second support ring, the bottom of montant is equipped with the base, be equipped with the bracing piece between base and the first support ring, this anemometer tower convenient to it is good to build steadiness performance is equipped with first through -hole and second through -hole, the staff is when buildding, can pass first through -hole and the second through -hole on the second support ring on the first support ring respectively with the nylon rope, then erect with the equipment of lifting by crane, therefore, the device is quick and convenient to use, having solved in the past, anemometer tower builds the inefficiency, a long difficult problem of time spent, spring -Damper between first support ring and the second support ring can effectively offset the damping that wind -force caused to anemometer tower, anemometer tower's steadiness has been improved simultaneously greatly.

Description

A kind of it is easy to build the good anemometer tower of steadiness performance
Technical field
This utility model is related to anemometer tower technical field, specially a kind of is easy to build the good anemometer tower of steadiness performance.
Background technology
Wind-force is a kind of inexhaustible, nexhaustible clean energy resource, has become the world today using wind-power electricity generation the most main One of regenerative resource wanted, and want to carry out wind-power electricity generation to be accomplished by wind parameter is acquired, therefore anemometer tower meet the tendency and Raw, anemometer tower is often distributed in the big place of wind-force, and therefore designer is in order to ensure the firm performance of anemometer tower usually survey wind The structure of Deethanizer design is often complicated, and so causing wastes time and energy when building, and builds inefficiency, for this reason, it is proposed that one Plant and be easy to build the good anemometer tower of steadiness performance.
Utility model content
The purpose of this utility model is to provide a kind of to be easy to build the good anemometer tower of steadiness performance, to solve the above-mentioned back of the body The problem proposing in scape technology.
For achieving the above object, this utility model provides following technical scheme:A kind of be easy to build steadiness performance good Anemometer tower, including montant, described montant is sequentially provided with the first support ring and the second support ring, described first support ring is provided with First through hole, the second support ring is provided with the second through hole, and is provided with spring-damper between the first support ring and the second support ring, The bottom of described montant is provided with pedestal, is provided with support bar between pedestal and the first support ring, and is socketed with damping bullet on support bar Spring, the top of described montant is provided with anemometer, and anemometer is connected with montant by connecting rod, and the end thread of connecting rod connects There is nut.
Preferably, the side of described pedestal is provided with engaging lug, and engaging lug is provided with installing hole.
Preferably, the number of described spring-damper is six, and spring-damper is coated with corrosion resistant layer.
Preferably, described support bar is expansion link.
Compared with prior art, the beneficial effects of the utility model are:This is easy to build the good anemometer tower of steadiness performance It is provided with first through hole and the second through hole, staff, when being built, can be each passed through in the first support ring with nylon rope First through hole and the second support ring on the second through hole, then erect with lifting appliance, rapid and convenient, solved in the past Anemometer tower build efficiency low, with the difficult problem of duration, the spring-damper between the first support ring and the second support ring can be effective Offset the damping that wind-force causes to anemometer tower, substantially increase the steadiness of anemometer tower, between the first support ring and pedestal simultaneously Support bar and support bar on socket damping spring, the extensional vibration power suffered by anemometer tower can be offset, it is to avoid anemometer tower Vibrate and tower body is caused damage, also increase the service life of anemometer tower simultaneously, arrange between montant and anemometer support Connecting rod, can effectively be fixed to anemometer, prevent anemometer from loosely causing equipment to scrap in advance due to fixation, reduce Output cost, creates extra value.
Brief description
Fig. 1 is this utility model structural representation.
In figure:1 montant, 2 spring-dampers, 3 first support rings, 4 engaging lugs, 5 support bars, 6 installing holes, 7 damping springs, 8 first through holes, 9 pedestals, 10 second through holes, 11 second support rings, 12 connecting rods, 13 anemometers, 14 nuts.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely description is it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of making creative work The every other embodiment being obtained, broadly falls into the scope of this utility model protection.
Refer to Fig. 1, this utility model provides a kind of technical scheme:A kind of it is easy to build the good survey wind of steadiness performance Tower, including montant 1, montant 1 is sequentially provided with the first support ring 3 and the second support ring 11, and the first support ring 3 is provided with first and leads to Hole 8, the second support ring 11 is provided with the second through hole 10, and is provided with spring damping between the first support ring 3 and the second support ring 11 Device 2, the bottom of montant 1 is provided with pedestal 9, is provided with support bar 5, and is socketed with support bar 5 between pedestal 9 and the first support ring 3 Damping spring 7, the top of montant 1 is provided with anemometer 13, and anemometer 13 is connected with montant 1 by connecting rod 12, and connecting rod 12 End thread be connected with nut 14, the side of pedestal 9 is provided with engaging lug 4, and engaging lug 4 is provided with installing hole 6, spring-damper 2 number is six, and spring-damper 2 is coated with corrosion resistant layer, and support bar 5 is expansion link.
Operation principle:Staff, when being built, can be each passed through first in the first support ring 3 with nylon rope The second through hole 10 on through hole 8 and the second support ring 11, is then erect with lifting appliance, the first support ring 3 and second Spring-damper 2 between pushing out ring 11 can effectively offset the damping that wind-force causes to anemometer tower, substantially increase survey wind simultaneously The steadiness of tower, on the support bar 5 between the first support ring 3 and pedestal 9 and support bar 5, the damping spring 7 of socket can be offset Extensional vibration power suffered by anemometer tower, it is to avoid anemometer tower vibrates and tower body caused damage, and also increases anemometer tower simultaneously Service life, arranges connecting rod 12 between montant 1 and anemometer 13 support, can effectively anemometer 13 be fixed, and prevents Only anemometer 13 loosely causes equipment to scrap in advance due to fixation, decreases output cost, creates extra value.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with multiple changes in the case of without departing from principle of the present utility model and spirit, repair Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of be easy to build the good anemometer tower of steadiness performance, including montant (1) it is characterised in that:On described montant (1) according to Secondary be provided with the first support ring (3) and the second support ring (11), described first support ring (3) is provided with first through hole (8), second Pushing out ring (11) is provided with the second through hole (10), and is provided with spring-damper between the first support ring (3) and the second support ring (11) (2), the bottom of described montant (1) is provided with pedestal (9), is provided with support bar (5) between pedestal (9) and the first support ring (3), and Damping spring (7) is socketed with strut (5), the top of described montant (1) is provided with anemometer (13), anemometer (13) is passed through to connect Bar (12) is connected with montant (1), and the end thread of connecting rod (12) is connected with nut (14).
2. according to claim 1 a kind of be easy to build the good anemometer tower of steadiness performance it is characterised in that:Described pedestal (9) side is provided with engaging lug (4), and engaging lug (4) is provided with installing hole (6).
3. according to claim 1 a kind of be easy to build the good anemometer tower of steadiness performance it is characterised in that:Described spring The number of antivibrator (2) is six, and spring-damper is coated with corrosion resistant layer on (2).
4. according to claim 1 a kind of be easy to build the good anemometer tower of steadiness performance it is characterised in that:Described support Bar (5) is expansion link.
CN201620891416.1U 2016-08-11 2016-08-11 Anemometer tower convenient to it is good to build steadiness performance Expired - Fee Related CN205935888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620891416.1U CN205935888U (en) 2016-08-11 2016-08-11 Anemometer tower convenient to it is good to build steadiness performance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620891416.1U CN205935888U (en) 2016-08-11 2016-08-11 Anemometer tower convenient to it is good to build steadiness performance

Publications (1)

Publication Number Publication Date
CN205935888U true CN205935888U (en) 2017-02-08

Family

ID=57917956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620891416.1U Expired - Fee Related CN205935888U (en) 2016-08-11 2016-08-11 Anemometer tower convenient to it is good to build steadiness performance

Country Status (1)

Country Link
CN (1) CN205935888U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487762A (en) * 2018-03-30 2018-09-04 胡向颖 A kind of Electronics and Information Engineering communication tower adapter
CN109057499A (en) * 2018-09-07 2018-12-21 温州大学瓯江学院 A kind of firm anemometer tower
CN112095824A (en) * 2019-06-18 2020-12-18 毓润(上海)生态科技有限公司 Shock-absorbing structure is consolidated to building
CN112763467A (en) * 2020-12-28 2021-05-07 中国科学院合肥物质科学研究院 Underwater dissolved gas in-situ detection device and detection method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487762A (en) * 2018-03-30 2018-09-04 胡向颖 A kind of Electronics and Information Engineering communication tower adapter
CN109057499A (en) * 2018-09-07 2018-12-21 温州大学瓯江学院 A kind of firm anemometer tower
CN112095824A (en) * 2019-06-18 2020-12-18 毓润(上海)生态科技有限公司 Shock-absorbing structure is consolidated to building
CN112763467A (en) * 2020-12-28 2021-05-07 中国科学院合肥物质科学研究院 Underwater dissolved gas in-situ detection device and detection method thereof

Similar Documents

Publication Publication Date Title
CN205935888U (en) Anemometer tower convenient to it is good to build steadiness performance
CN104779896A (en) Photovoltaic wind generating set
CN215059134U (en) Pre-stress annular tuned mass damper mounting structure for vibration reduction of fan tower
CN202402220U (en) Damping wind power generation tower
CN110242508A (en) High vibration damps tower frame for wind generating set
CN206908444U (en) A kind of generator with shock-absorbing function
CN201916135U (en) Lower section foundation ring of tower drum of wind driven generator
CN101135292B (en) Perpendicular wind-driven generator
CN211950745U (en) Bridge deck suspension type wind power generation device
CN214221404U (en) Wind energy and photovoltaic complementary wind turbine tower
CN104359072B (en) Street lamp power supply device based on wind pressure power generation
CN204386818U (en) Cabin support device
CN206707933U (en) A kind of wind turbine tower damping device
CN213807931U (en) Wind driven generator tower barrel lifting appliance mounting tool
CN204652287U (en) Photovoltaic wind turbine generator
CN205283146U (en) System for level and smooth little grid voltage power swing
CN110685858A (en) Multifunctional power generation equipment for outdoor use
CN214577544U (en) Supporting structure for wind power tower repairing device
CN213064303U (en) Crank-connecting rod mechanism of internal combustion generator
CN206244258U (en) A kind of wind-powered electricity generation torque force support arm installation frock
CN202082038U (en) Solar windmill
CN202756188U (en) Support frame for wind power tower
CN213063835U (en) Anti-cracking wind driven generator tower
CN220687492U (en) Reinforced wind power tower
CN218117946U (en) A wind-powered electricity generation stake ocean current vibration damper for marine ranching

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20190811