Prior art keywords
construction
pipe column
steel
concrete
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620912971.8U
Other languages
Chinese (zh)
Inventor
韩淑坤
张海涛
李强
秦亮
王春锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201620912971.8U priority Critical patent/CN205935693U/en
Application granted granted Critical
Publication of CN205935693U publication Critical patent/CN205935693U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a cooperation steel -pipe column concrete lift -up construction's fixture, belongs to steel -pipe column concrete lift -up construction technical field. Include: convex steel sheet (1), concrete pump pipe head (2), hinge (3), fastening bolt (4), rubber packing pad circle (7), reinforcing bar check valve (12), wherein, convex steel sheet (1) and hinge (3) welding, concrete pump pipe head (2) and convex steel sheet (1) welding, bolted connection is adopted to fastening bolt (4) free end position trompil when the installation, and install between pump line head (2) inboard and steel -pipe column rubber packing pad circle (7), and wear in the preformed hole of pump line head (2) tip reinforcing bar check valve (12). The advantage lies in that simple manufacture, simple to operate, steel consume less, can dismantle used repeatedly. The extensive factory building steel -pipe column concrete lift -up construction of specially adapted can guarantee the jacking of steel -pipe column concrete and be under construction, accelerate the construction progress in succession, again can the saving measures cost.

Description

A kind of fixture of cooperation steel pipe column concrete lifting construction
Technical field
The utility model belongs to concrete lift-up technical field of construction, in particular, provides a kind of cooperation steel pipe column concrete The fixture of jack-up construction is it is adaptable to industrial premises steel pipe column concrete lifting is constructed.
Background technology
Because of the needs of operation, in steel pipe column concrete lifting construction, substantial amounts of pump pipe union is needed to be welded on steel pipe column bottom Portion, cooperation concrete lift-up construction, using the proportion of goods damageds of conventional method pump line are higher, progress is relatively slow, low construction efficiency, need to grind Study carefully a kind of new construction method and improve efficiency, cost-effective.
Content of the invention
The purpose of this utility model is to provide a kind of fixture of cooperation steel pipe column concrete lifting construction it is adaptable to industry Factory building steel pipe column concrete lifting is constructed, and recycling rate of waterused is higher.It is particularly suited for extensive factory building steel pipe column concrete lifting Construction, both can guarantee that steel pipe column concrete lifting continuously construct, accelerating construction progress, and can economy cost.
The utility model includes:Circular arc steel plate 1, concrete pump tube head 2, hinge 3, fastening bolt 4, rubber gasket 7 and reinforcing bar non-return valve 12;Wherein, circular arc steel plate 1 and hinge 3 weld, and concrete pump tube head 2 and circular arc steel plate 1 weld, tightly Fixing bolt 4 free end position perforate, with bolts when mounted, rubber gasket 7 is arranged on pump line head 2 inner side and steel Between tubing string, reinforcing bar non-return valve 12 is through the reserved in the hole of pump line head 2 end.
Preparation method:According to shown in Fig. 1, by hinge with Circular Steel plate weld firmly it is ensured that fixture is opened, closed freely; Perforate on the circular arc steel plate installing pump line side, opening diameter should be consistent with the Diameter of pump tube installed, will be preprepared Pump line is welded on the position of perforate on circular arc steel plate;Open two holes (4 position in Fig. 1) in the opening end of circular arc steel plate it is ensured that Fastening bolt can freely pass at this position, and fastens.).Circular arc steel plate 1 is two pieces of semicircles, and one end is fixing end, hinge Chain connects, and the other end is free end, adopts and is bolted connection.Steel plate material can adopt Q235B, and the radius of circular arc is according to steel pipe Column diameter determines it is ensured that after fixture closure, steel pipe column outer wall can be close in inner side.The selection of welding rod and welding quality need to meet specification Require, to ensure structure safety.Steel pipe column opening setting rubber gasket is it is ensured that fixture is connect with steel pipe column connecting portion The tight not spillage of seam.
The beneficial effects of the utility model are:
Made using steel plate, hinge, pump line, bolt, structure is simple, convenient to assemble and disassemble, steel consume and less, detachably repeat to make With, can effectively reduces cost, improve efficiency.Reduce steel pipe column welding times itself, so that pump line is connected with fixture.Install and remove All entirety is carried out.
When carrying out extensive steel pipe column jack-up construction, an a small amount of batch card can be made according to the quantity of daily jacking steel pipe column Tool, recycles.Fixture making is simple, easy for installation, steel consume less, detachable reuse, measure low cost.
Brief description
Fig. 1 is fixture structure schematic diagram (making detail drawing).
Fig. 2 is the construction first step, steel pipe column perforate.
Fig. 3 is construction second step, pastes sealing rubber ring.
Fig. 4 is construction the 3rd step, installs fixture.
Fig. 5 is construction the 4th step, and concrete towed pump is connected with pump line.
Fig. 6 is construction the 5th step, and concrete lift-up is constructed.
Fig. 7 is construction the 6th step, inserts reinforcing bar non-return valve, prevents concrete from flowing backwards.
Fig. 8 is construction the 7th step, removes towed pump.
Fig. 9 is construction the 8th step, removes fixture, and closure pours mouth.
Figure 10 is construction the 9th step, polishes smooth, brushing antirust paint.
In figure, circular arc steel plate 1, concrete pump tube head 2, hinge 3, fastening bolt 4, steel pipe column 5, steel pipe column go into operation former 6th, rubber gasket 7, fixture 8, concrete towed pump line 9, steam vent 10, concrete towed pump 11, reinforcing bar non-return valve 12.
Specific embodiment
The utility model includes:Circular arc steel plate 1, concrete pump tube head 2, hinge 3, fastening bolt 4, rubber gasket 7 and reinforcing bar non-return valve 12;Wherein, circular arc steel plate 1 and hinge 3 weld, and concrete pump tube head 2 and circular arc steel plate 1 weld, tightly Fixing bolt 4 free end position perforate, with bolts when mounted, rubber gasket 7 is arranged on pump line head 2 inner side and steel Between tubing string, reinforcing bar non-return valve 12 is through the reserved in the hole of pump line head 2 end.
Fig. 1~Figure 10 is a kind of specific embodiment of the present utility model.Below in conjunction with the accompanying drawings one is entered to the utility model Step explanation.
Fig. 1 is that the utility model steel pipe Post clamp makes detail drawing.Including:Circular arc steel plate 1, concrete pump tube head 2, hinge 3rd, fastening bolt 4.Circular arc steel plate 1 should be made using 10~15mm steel plate, and radian should carry out adding according to the diameter of steel pipe column Work is it is ensured that fixture can tightly be wrapped in steel pipe column crust;Concrete pump tube head 2 can be provided by commerical ready-mixed concrete supplying unit, many Make for discarded pump line head, it is 16mm circular hole it is ensured that up/down perforation, a diameter of 14mm reinforcing bar insertion that section diameter is left in pump line end Afterwards, can guarantee that the concrete having poured will not flow backwards, the spacing of circular hole is determined by concrete coarse aggregate particle size, general headroom For 10mm;Hinge 3 can be by customized outside the venue, with Circular Steel plate weld it is ensured that fixture is opened, closed freely;Fastening bolt 4 is using straight Footpath is more than 16mm bolt, double female single pads.
Fig. 2 is the construction first step, and in the position perforate high apart from steel pipe column bottom about 800mm, bore dia is 120mm, Perforate should adopt machining, should not adopt gas welding perforate.The steel plate of osseotomy site must not abandon, and keeps, to have constructed Block after finishing.
Fig. 3 is construction second step, installs rubber gasket it is ensured that fixture and steel pipe column connecting portion in the hole border held successfully Position sealing, not spillage, packing ring should ensure that width is not less than 40mm, and thickness is not less than 8mm.
Fig. 4 is construction the 3rd step, installs fixture, fastening bolt.
Fig. 5 is construction the 4th step, and concrete towed pump line is connected with fixture, is ready for concrete lift-up construction.
Fig. 6 is construction the 5th step, and concrete lift-up is constructed, and before jack-up construction, steel pipe column top should arrange a diameter of 80mm steam vent is it is ensured that air circulation.In construction, top arranges special messenger's nurse, in concrete ejection steam vent in an instant, Stop jack-up construction.
Fig. 7 is construction the 6th step, installs reinforcing bar non-return valve.
Fig. 8 is construction the 7th step, removes the pump line that towed pump is connected with fixture.
Fig. 9 is construction the 8th step, after concrete initial set, removes fixture, the concrete in cleaning fixture, closure jacking hole. Should there is certain settling amount in steel pipe column top concrete, be vented from top with the pea gravel concreten of label using jacking concrete Hole pours into steel pipe column inside it is ensured that steel pipe column interior concrete is closely knit, seamless.
Figure 10 is construction the 9th step, and weld seam position polishes smooth, brushing antirust paint.

Claims (1)

1. a kind of cooperation steel pipe column concrete lifting construction fixture it is characterised in that:Including:Circular arc steel plate (1), concrete Pump line head (2), hinge (3), fastening bolt (4), rubber gasket (7), reinforcing bar non-return valve (12);Wherein, circular arc steel plate (1) weld with hinge (3), concrete pump tube head (2) and circular arc steel plate (1) weld, and fastening bolt (4) free end position is opened Hole, with bolts when mounted, rubber gasket (7) is arranged on inside pump line head (2) and steel pipe column between, and reinforcing bar is inverse Only valve (12) is through the reserved in the hole of pump line head (2) end.
CN201620912971.8U 2016-08-21 2016-08-21 Cooperation steel -pipe column concrete lift -up construction's fixture Expired - Fee Related CN205935693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620912971.8U CN205935693U (en) 2016-08-21 2016-08-21 Cooperation steel -pipe column concrete lift -up construction's fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620912971.8U CN205935693U (en) 2016-08-21 2016-08-21 Cooperation steel -pipe column concrete lift -up construction's fixture

Publications (1)

Publication Number Publication Date
CN205935693U true CN205935693U (en) 2017-02-08

Family

ID=57948386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620912971.8U Expired - Fee Related CN205935693U (en) 2016-08-21 2016-08-21 Cooperation steel -pipe column concrete lift -up construction's fixture

Country Status (1)

Country Link
CN (1) CN205935693U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700222A (en) * 2021-09-08 2021-11-26 中铁二十局集团第六工程有限公司 Concrete pouring construction method in steel pipe column
CN113846846A (en) * 2021-09-13 2021-12-28 中国二十冶集团有限公司 Concrete jacking interface device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700222A (en) * 2021-09-08 2021-11-26 中铁二十局集团第六工程有限公司 Concrete pouring construction method in steel pipe column
CN113846846A (en) * 2021-09-13 2021-12-28 中国二十冶集团有限公司 Concrete jacking interface device
CN113846846B (en) * 2021-09-13 2023-02-24 中国二十冶集团有限公司 Concrete jacking interface device

Similar Documents

Publication Publication Date Title
CN205935693U (en) Cooperation steel -pipe column concrete lift -up construction's fixture
CN207673301U (en) Light gas lift reverse circulation drilling device
CN205315291U (en) Efflux drinking device
CN201448488U (en) Back valve and steel tube equipped with the same
CN201320508Y (en) Pneumatic injection device made of hole sealing materials
CN204201367U (en) A kind of small-bore pipeline on-line production send blocking device
CN204984342U (en) A hole sealing device for tunnel tunnelling gas drainage hole
CN104564105B (en) A kind of apparatus and method of two grades of sleeve pipes of seat earth grouting and reinforcing
CN204024068U (en) A kind of hoisting steel pipe pillar concrete connection control device
CN210135119U (en) Eccentric fluidic device
CN108131506A (en) The construction method that a kind of steel pipe is connect with FRP sand tube
CN204034406U (en) A kind of piping filter
CN204477361U (en) Mortar and concrete pumping pipe stop valve
CN211462342U (en) Automatic liquid drainage device of disc type vacuum filter
CN204386616U (en) A kind of device of seat earth grouting and reinforcing secondary sleeve pipe
CN209345728U (en) A kind of water conservancy irrigation device
CN109184748B (en) Pressure-controllable grouting equipment and method thereof
CN206280513U (en) A kind of lateral threeway plugging device
CN110306806A (en) A kind of steel pipe column concrete lifting tamping equipment and pouring method
CN208454769U (en) Mud handles concentration basin center distribution well pipe dredging device
CN206201210U (en) A kind of cement mortar air stirring conveying device
CN215057210U (en) Pressure vessel rapid water injection emptying device of power-free dust removal device of down-the-hole drill
CN206723678U (en) Large-sized forging four-way
CN209686410U (en) A kind of deep basal pit grouting device
CN203227524U (en) Hydraulic cover opening mechanism for ring hammer crusher

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208