CN205935609U - Operation platform encorbelments - Google Patents

Operation platform encorbelments Download PDF

Info

Publication number
CN205935609U
CN205935609U CN201620857047.4U CN201620857047U CN205935609U CN 205935609 U CN205935609 U CN 205935609U CN 201620857047 U CN201620857047 U CN 201620857047U CN 205935609 U CN205935609 U CN 205935609U
Authority
CN
China
Prior art keywords
operating platform
platform
stand
operation platform
encorbelmenting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620857047.4U
Other languages
Chinese (zh)
Inventor
马红强
李朝鹏
裴跃锋
肖仕浪
雷少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201620857047.4U priority Critical patent/CN205935609U/en
Application granted granted Critical
Publication of CN205935609U publication Critical patent/CN205935609U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an operation platform encorbelments, including the base platform, locate grudging post on the base platform, locate the grudging post upside and hang from the operation platform body of grudging post, locate the operation platform body week the portion safety barrier, slope connect the cat ladder between grudging post and operation platform body and be used for maintaining balanced weight box, on the base platform is located to the weight box, outstanding side position in the both sides of grudging post of weight box and operation platform body. Among this kind of operation platform encorbelments, the operation platform body hangs from the grudging post, and simultaneously, whole operation platform encorbelments's stability can be maintain through the weight box, need among the operation platform encorbelments can effectively to reduce the density of erectting of the shaft -like structure that sets up, guaranteeing under the safe circumstances, the influence of operation platform to the construction progress has been reduced, workman and vehicle can more freely be gone together, can alternate the operation between each construction unit, construction progress is accelerated, be favorable to guaranteeing engineering construction quality, reduction of erection time.

Description

Encorbelment operating platform
Technical field
This utility model is related to construction engineering technical field, encorbelments operating platform particularly to one kind.
Background technology
According to existing construction method and construction technology, the side eaves board of urban commercial complex Zhongting both sides in construction, Full hall scaffold is set up on first floor base plate, workman is constructed on full hall scaffold, the erection density of full hall scaffold is relatively Greatly, take up room more.
However, the construction content of side eaves board is more, workload is larger, construction duration longer, whole engineering special Industry is complete, operation is more, subpackage unit is more, first floor full hall scaffold be likely to result in workmen and vehicle cannot freely with OK, constituent parts cannot intert operation, has a strong impact on construction speed.
Therefore, how in the case of ensureing safety, to reduce the impact to construction speed for the operating platform, accelerate construction progress, It is the current technical issues that need to address of those skilled in the art.
Utility model content
In view of this, the purpose of this utility model is to provide one kind to encorbelment operating platform, can be in the situation ensureing safety The lower reduction impact to construction speed for the operating platform, accelerates construction progress.
For achieving the above object, this utility model provides following technical scheme:
One kind is encorbelmented operating platform, including base platform, located at the stand in described base platform, in described stand Side and the cantilevered out operating platform body in described stand, the safety barrier located at all portions of described operating platform body, inclination company Be connected to cat ladder between described stand and described operating platform body and the ballast box for maintaining balance, described ballast box located at In described base platform, the cantilevered out side of described ballast box and described operating platform body is located at the both sides of described stand.
Preferably, the downside of described base platform is provided with universal wheel.
Preferably, it is connected with the cant beam for improving stability between described stand and described base platform.
Preferably, described operating platform body include rectangle girder, be set in parallel in described girder at least two Secondary beam and the cover plate being layed on the upside of described girder and described secondary beam, described secondary beam spaced set.
Preferably, described cover plate is core-board.
Preferably, described girder is fixedly connected with square steel sleeve pipe, and described square steel sleeve pipe is socketed described safety barrier and passes through Bolt is fixed.
Preferably, described stand includes the vertical scalariform frame of the upside in all portions located at described base platform and is connected to Bridging between relative described scalariform frame.
Preferably, described ballast box includes casing and the sand in described casing.
Preferably, described base platform, described operating platform body and described safety barrier are galvanized part.
Preferably, the outside of described operating platform of encorbelmenting is provided with antirust paint.
This utility model provide the inclusion base platform of operating platform of encorbelmenting, the stand in base platform, located at On the upside of stand and the cantilevered out operating platform body in stand, the safety barrier located at all portions of operating platform body, tilt connect Cat ladder between stand and operating platform body and the ballast box for maintaining balance, ballast box, in base platform, is joined The cantilevered out side of loaded van and operating platform body is located at the both sides of stand.
This kind of encorbelment in operating platform, operating platform body cantilevered out in stand, meanwhile, can remain whole by ballast box Encorbelment the stability of operating platform, the erection density of the rod-like structure needing to arrange in operating platform of encorbelmenting can be effectively reduced, In the case of ensureing safety, reduce the impact to construction speed for the operating platform, workman and vehicle can be relatively freely same OK, operation can be interted between each unit in charge of construction, accelerate construction progress, advantageously ensure that engineering construction quality, shorten work Phase;Additionally, support body making is simple and convenient, swift to operate, advantageously reduce the input of lease material, save construction cost.
Brief description
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or in description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, drawings in the following description are only It is embodiment of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to the accompanying drawing providing.
Fig. 1 is provided the side view of the specific embodiment of operating platform of encorbelmenting by this utility model;
Fig. 2 is provided the front view of the specific embodiment of operating platform of encorbelmenting by this utility model;
Fig. 3 is provided the top view of the specific embodiment of operating platform of encorbelmenting by this utility model;
Fig. 4 is provided the top view of operating platform body in the specific embodiment of operating platform of encorbelmenting by this utility model;
Fig. 5 is provided the side view of operating platform body in the specific embodiment of operating platform of encorbelmenting by this utility model.
In Fig. 1 to Fig. 5,1 is operating platform body, and 11 is girder, and 12 is secondary beam, and 2 is safety barrier, and 3 is cat ladder, and 4 are Stand, 5 is universal wheel, and 6 is ballast box, and 7 is cant beam, and 8 is base platform, and 9 is square steel sleeve pipe.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely description is it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of making creative work The every other embodiment being obtained, broadly falls into the scope of this utility model protection.
Core of the present utility model is to provide one kind to encorbelment operating platform, can reduce operation in the case of ensureing safety The impact to construction speed for the platform, accelerates construction progress.
Refer to the side view that Fig. 1 to 5, Fig. 1 is provided the specific embodiment of operating platform of encorbelmenting by this utility model;Figure The front view of 2 specific embodiments that operating platform of encorbelmenting is provided by this utility model;Fig. 3 is provided by this utility model to encorbelment The top view of the specific embodiment of operating platform;Fig. 4 is provided by this utility model in the specific embodiment of operating platform of encorbelmenting The top view of operating platform body;Fig. 5 is provided operating platform in the specific embodiment of operating platform of encorbelmenting by this utility model The side view of body.
This utility model is provided in a kind of specific embodiment of operating platform of encorbelmenting, and operating platform of encorbelmenting includes pedestal puts down Platform 8, stand 4, operating platform body 1, safety barrier 2, cat ladder 3 and ballast box 6.In base platform 8, operation is flat for stand 4 Playscript with stage directions body 1 located at the upside of stand 4 and cantilevered out outside stand 4, safety barrier 2 is located at all portions of operating platform body 1, cat ladder 3 are connected between stand 4 and operating platform and cat ladder 3 is obliquely installed, and ballast box 6 is arranged in base platform 8, and ballast box 6 It is located at the both sides of stand 4 with the cantilevered out side of operating platform body 1, ballast box 6 can make operating platform holding balance of encorbelmenting.
This kind of encorbelment in operating platform, operating platform body 1 cantilevered out in stand 4, can be maintained by ballast box 6 meanwhile Entirely encorbelment the stability of operating platform, the erection that can effectively reduce the rod-like structure needing to arrange in operating platform of encorbelmenting is close Degree, in the case of ensureing safety, reduces the impact to construction speed for the operating platform, workman and vehicle can be relatively freely Colleague, can intert operation between each unit in charge of construction, accelerate construction progress, advantageously ensure that engineering construction quality, shorten Duration;Additionally, support body making is simple and convenient, swift to operate, advantageously reduce the input of lease material, save construction cost.
In above-described embodiment, the downside of base platform 8 can also arrange universal wheel 5, is specifically as follows nylon iron core bearing Universal caster wheel.In base platform 8 downside setting universal wheel 5, be conducive to the movement of operating platform of encorbelmenting, can further speed up and apply Work process.
In each embodiment above-mentioned, cant beam 7 between stand 4 and base platform 8, can also be connected, flat to improve operation of encorbelmenting The stability of playscript with stage directions body 1.Alternatively, base platform 8 can be rectangle frame, and one end of cant beam 7 can be connected to the one of rectangle frame Individual end points, the other end can be connected to stand 4 middle part in the vertical, to ensure stablizing effect.
In each embodiment above-mentioned, operating platform body 1 specifically can include the girder 11 of rectangle, and that is, girder 11 is operation The outermost housing of platform body 1, at least two secondary beams 12 are set in parallel in girder 11, and girder 11 is laid with secondary beam 12 upside There is cover plate, secondary beam 12 specifically can save material with spaced set while ensureing stability.Specifically, secondary beam 12 Identical two parts can be divided into, be divided into the both sides in girder 11, often partly include at least two secondary beams 12 be arrangeding in parallel, And the parallel setting of all secondary beams 12, to ensure the reliability of secondary beam 12 and the connection of girder 11.Certainly, operating platform Hollow frame that is mutually sheathed and being connected and cover plate can be included, or carry out other structures setting.
Specifically, cover plate can be core-board, and core-board is also known as lumber core, and should prevent bear when connecting Plate, low price, and intensity is preferable.Wherein, core-board specifically can by self threading pin be fixed on operating platform body 1 or Other positions.Certainly, cover plate can also be steel plate or other materials part.
In each embodiment above-mentioned, girder 11 can be fixedly connected with square steel sleeve pipe 9, square steel sleeve pipe 9 is socketed safety protective On hurdle 2, square steel sleeve pipe 9 can be achieved a fixed connection by bolt with safety barrier 2, easy for installation.Certainly, safety barrier 2 with Can realize being connected with operating platform body 1 by welding or other modes.
In each embodiment above-mentioned, stand 4 specifically can include the vertical ladder of the upside in all portions located at base platform 8 Shape frame and the bridging being connected between relative scalariform frame, support body density is less, and stability is preferable.Specifically, above-mentioned On the basis of the operating platform body 1 with secondary beam 12 for the girder 11, scalariform frame can be vertically located at the one of operating platform body 1 Two relative edge of side, so that operating platform body 1 is only cantilevered out from the side of scalariform frame, are conducive to saving material, reduce outstanding Choose the overall weight of operating platform.Preferably, by being welded to connect, and can ensure that weld seam is full between each several part in stand 4 And meet related specifications requirement, connect reliable.Certainly, stand 4 can also be tripod or other structures.
In each embodiment above-mentioned, for improving the stability of cat ladder 3, the middle part of cat ladder 3 can be provided with perpendicular to inclined ladder The strengthening support of every grade of ladder.
In each embodiment above-mentioned, ballast box 6 specifically can include casing and the sand in casing, is easy to take on the spot Material, and cost is relatively low.Certainly, ballast box 6 it can also be provided that bloom or carry out other setting.Specifically, ballast box 6 is permissible For at least two, to ensure safety, from and position setting more flexible.
In each embodiment above-mentioned, base platform 8, operating platform body 1 and safety barrier 2 can be galvanized part, To meet strength demand, extend the service life of operating platform of encorbelmenting.Certainly, encorbelment the material choosing of all parts in operating platform Use not limited to this.
In each embodiment above-mentioned, the outside of operating platform of encorbelmenting is also provided with antirust paint, to increase the service life.
Alternatively, safety barrier 2 can enclose the edge being located at the cantilevered out stand 4 of operating platform body 1, to ensure that protection can Lean on.Certainly, safety barrier 2 can also enclose located at the surrounding of operating platform body 1 or carry out other settings.
In a kind of specific application, the connection processing sequence of operating platform all parts of encorbelmenting can be put down for first welding pedestal Platform 8, then weld universal wheel 5, then welding operation platform body 1 and safety barrier 2, specifically can adopt in operating platform body 1 Weld girder 11 with zinc-plated square steel, secondary beam 12 is welded using equal leg angle, then welding scalariform frame and cat ladder 3, cat ladder 3 is concrete Can be welded by angle steel, laying cover plate and placement ballast box 6, then weld bridging afterwards, finally flat to operation of encorbelmenting Platform integrally three times antirust paints of brush.
In this specification, each embodiment is described by the way of going forward one by one, and what each embodiment stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Above operating platform body of encorbelmenting provided by the utility model is described in detail.Tool used herein Body example is set forth to principle of the present utility model and embodiment, and the explanation of above example is only intended to help understand Method of the present utility model and its core concept.It should be pointed out that for those skilled in the art, do not taking off On the premise of this utility model principle, this utility model can also be carried out with some improvement and modify, these improve and modify Also fall in this utility model scope of the claims.

Claims (10)

1. one kind encorbelments operating platform it is characterised in that including base platform (8), the stand in described base platform (8) (4), on the upside of described stand (4) and cantilevered out operating platform body (1) in described stand (4), located at described operating platform The safety barrier (2) in all portions of body (1), inclination are connected to climbing between described stand (4) and described operating platform body (1) Terraced (3) and the ballast box (6) for maintaining balance, described ballast box (6) in described base platform (8), described ballast box (6) it is located at the both sides of described stand (4) with the cantilevered out side of described operating platform body (1).
2. operating platform of encorbelmenting according to claim 1 is it is characterised in that the downside of described base platform (8) is provided with ten thousand To wheel (5).
3. operating platform of encorbelmenting according to claim 2 is it is characterised in that described stand (4) and described base platform (8) Between be connected with cant beam (7) for improving stability.
4. operating platform of encorbelmenting according to claim 3 is it is characterised in that described operating platform body (1) includes rectangle Girder (11), at least two secondary beams (12) being set in parallel in described girder (11) and be layed in described girder (11) and institute State the cover plate on the upside of secondary beam (12), described secondary beam (12) spaced set.
5. operating platform of encorbelmenting according to claim 4 is it is characterised in that described cover plate is core-board.
6. operating platform of encorbelmenting according to claim 5 is it is characterised in that described girder (11) is fixedly connected with square steel set Pipe (9), described square steel sleeve pipe (9) is socketed described safety barrier (2) and is bolted.
7. the operating platform of encorbelmenting according to claim 1 to 6 any one is it is characterised in that described stand (4) includes setting Vertical scalariform frame and the shears being connected between relative described scalariform frame in the upside in all portions of described base platform (8) Support.
8. according to claim 7 encorbelment operating platform it is characterised in that described ballast box (6) include casing and located at Sand in described casing.
9. operating platform of encorbelmenting according to claim 8 is it is characterised in that described base platform (8), described operating platform Body (1) and described safety barrier (2) are galvanized part.
10. operating platform of encorbelmenting according to claim 9 is it is characterised in that the outside of described operating platform of encorbelmenting is provided with Antirust paint.
CN201620857047.4U 2016-08-09 2016-08-09 Operation platform encorbelments Expired - Fee Related CN205935609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620857047.4U CN205935609U (en) 2016-08-09 2016-08-09 Operation platform encorbelments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620857047.4U CN205935609U (en) 2016-08-09 2016-08-09 Operation platform encorbelments

Publications (1)

Publication Number Publication Date
CN205935609U true CN205935609U (en) 2017-02-08

Family

ID=57923091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620857047.4U Expired - Fee Related CN205935609U (en) 2016-08-09 2016-08-09 Operation platform encorbelments

Country Status (1)

Country Link
CN (1) CN205935609U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877718A (en) * 2020-08-06 2020-11-03 武汉市明煌建筑劳务有限公司 Anti-toppling scaffold for bridge road and building construction and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877718A (en) * 2020-08-06 2020-11-03 武汉市明煌建筑劳务有限公司 Anti-toppling scaffold for bridge road and building construction and construction method
CN111877718B (en) * 2020-08-06 2021-12-17 惠州市德威市政建设有限公司 Anti-toppling scaffold for bridge road and building construction and construction method

Similar Documents

Publication Publication Date Title
CN102296858B (en) Roof steel structure for cement production line clinker warehouse and construction method thereof
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN103061506A (en) Construction method of steel structure dome
CN105804380A (en) Lifting portable scaffold
CN104195948A (en) Bridge hanging pipeline pushing installation and construction method
CN109573851B (en) Arc-shaped roof internode steel truss hanging and installing integrated device and butt-joint hanging method
CN204626411U (en) A kind of pile foundation steel bar cage erecting device
CN205935609U (en) Operation platform encorbelments
CN106049843B (en) A kind of suspension type anti-shake construction platform and its installation method
CN115162594A (en) Construction method based on BIM floor support plate process deepening
CN103114754A (en) Alternative hoisting method for conjoined coal bunker top truss girder pre-placing
CN204590598U (en) A kind of readily removable inner corner trim unit for aluminum alloy mould plate system
CN104452715A (en) Special operation platform suitable for single pile offshore construction
CN206329024U (en) Hanging large-span steel-reinforced concrete structure construction steel platform
CN111005454B (en) Flue gas purification room net rack block hoisting construction method
CN102677912B (en) Temporary supporting device
CN105696782A (en) Novel mobile operation platform
CN204662501U (en) A kind of pass in and out immersed tube vertical occasional passage
CN204024084U (en) Easy unloading type triangular pipe truss just spells moulding bed
CN215254455U (en) Fireproof hanging basket for high-altitude welding of steel structure
CN205296203U (en) Tower crane basis connection structure
CN211110825U (en) Automatic feeding machine for pipeline installation
CN204775305U (en) Two round dismantled and assembled simple and easy conveyers of large -scale steel member in job site
CN204040442U (en) A kind of integral lifting elevator hoistways operating platform
CN203514287U (en) Special operating platform suitable for independent pile offshore construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20210809