CN205934913U - Resistance to plucking anticorrosion stake - Google Patents

Resistance to plucking anticorrosion stake Download PDF

Info

Publication number
CN205934913U
CN205934913U CN201620562864.7U CN201620562864U CN205934913U CN 205934913 U CN205934913 U CN 205934913U CN 201620562864 U CN201620562864 U CN 201620562864U CN 205934913 U CN205934913 U CN 205934913U
Authority
CN
China
Prior art keywords
pile
pile body
resistance
plucking
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620562864.7U
Other languages
Chinese (zh)
Inventor
吴金钻
曾少雷
梁俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'an Mountain Hong Tai Building Materials Limited-Liability Co
Original Assignee
Ma'an Mountain Hong Tai Building Materials Limited-Liability Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'an Mountain Hong Tai Building Materials Limited-Liability Co filed Critical Ma'an Mountain Hong Tai Building Materials Limited-Liability Co
Priority to CN201620562864.7U priority Critical patent/CN205934913U/en
Application granted granted Critical
Publication of CN205934913U publication Critical patent/CN205934913U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a resistance to plucking anticorrosion stake belongs to structural engineering mechanics field. It includes pile body, square pile bolck end, pile extension position and slip casting pipe, and square pile bolck end position in the top of pile body, pile extension position lie in the middle part of pile body, and the upper surface of slip casting guan congfang pile bolck end through the pile extension position, stretches out pile body bottom surface inside running through the pile body, and surperficial one end is served to the slip casting pipe side of lieing in pile bolck is the injected hole. Secret back is buryyed to the pile body, manages slip casting to slip casting from the injected hole, and the slurry flows from slip casting socle portion, fuses together with on every side silt or rock for what the resistance to plucking anticorrosion stake bottom was firm fixes on the ground. The middle part of slip casting pipe is provided with out the thick liquid and manages, and play thick liquid pipe goes out to starch the lateral surface that the pile body is stretched out to the one end of managing on stretching out the lateral surface of pile body from the middle part of pile body, forms the grout outlet, goes out one end and slip casting pipe intercommunication that the thick liquid was managed. It has increased side frictional resistance, and the slurry wraps up the pile body simultaneously, plays the anti -corrosion effect, increase of service life.

Description

A kind of resistance to plucking anticorrosion stake
Technical field
This utility model is related to support pile field, more particularly, to a kind of resistance to plucking anticorrosion stake.
Background technology
With the quickening of urban construction, the construction of deep-foundation pit engineering gets more and more, and resistance to plucking problem is also more and more prominent simultaneously. Further, since general ground is all containing subsoil water, when stake is squeezed into or is pressed in foundation soil, entering underground pile body can be by consubstantiality The long-pending soil body squeezes to surrounding.Pile peripheral earth natural structure is destroyed, and the hydraulic pressure in soil body hole drastically raises the super hole of formation Gap water pressure, makes stake float, and all collateral resistances of stake simultaneously and end resistance reduce, and the bearing capacity of stake accordingly reduces.In general, on Floating the reason is structure body weight and sidewall of basement frictional force sum is less than caused by water buoyancy.Upper floating treatment method is taken out The cooperation of the methods such as water, decompression, loading and washed-out sand is used, but the structure floating after processing seldom can be returned and is sink to former elevation, remaining Float-amount need to borrow building later work to process.Through after a while, general weak soil needs several months or longer, and super hole gradually disappears Dissipate, soil structures are progressively recovered, and the bearing capacity of stake also gos up accordingly.Generally this phenomenon is the time effect of piling.Pile foundation Technical specification is pointed out, in Deep Thick Soft Ground place, when using sheet intensive have soil-squeezing action stake when, should using effective cut down super Pore pressure and the measure of soil compaction effect.After stake enters in soil, it is all excess pore water in 0.2mm around stake, this water needs to be up to Several days or just can disappear (the disappearance speed of various soil layer water is different) to the several months, excess pore pressure and water disappear after stake One piece can be touched with soil, make stake reach the bearing capacity that design is wanted after contact, but this needs one of time, one As just can reach the bearing capacity that a stable state and design are wanted all about the time of 3-20 days.But, for When some engineerings tighter to construction period it is necessary to wait reach the bearing capacity that design needs, just can be to it Carry out the process of next step construction, waste huge man power and material.
For having corrosivity soil layer, existing square pile does not have corrosion resistant effect, after a period of time is usually used, meeting Appearance skews, the phenomenon rocked, and this threatens to life security, for not economical during life-time service, needs periodically Change, waste time and energy, and square pile change after produce waste material can environment be caused necessarily bear.
Chinese utility model patent, Authorization Notice No.:CN201762703U, authorized announcement date:2011.03.16, disclose A kind of foundation square pile, this foundation square pile has square cross section, on four angles of described foundation square pile, along described foundation square pile Length direction is twist straggly to be provided with multiple grooves.In this utility model, due to the presence of groove, increased stake and soil layer Contact area, through calculating, the external surface area of 10% stake can be increased;Increase frictional resistance, be effectively improved resistance to plucking Power.The another volume of concrete because of geosynclinal concave and then minimizing can reduce 3%, further save cost and decrease the wasting of resources.Its It is disadvantageous in that, 1) groove in this patent increased the difficulty pouring, and causes cost of manufacture high, long in time limit;2) this patent For square, the lower dress of inconvenience, base drag is larger.
Utility model content
1. utility model technical problem to be solved
The problem of environment is polluted in support pile cast in situs for prior art, and this utility model provides a kind of Anti-pull Corrosion stake.It is free from environmental pollution in use, and makes the cycle is short of support pile, has prevented the phenomenon of waste of raw materials, Save cost of manufacture.
2. technical scheme
For solving the above problems, the technical scheme that this utility model provides is:
A kind of resistance to plucking anticorrosion stake, including pile body, square pile top, pile extension position and Grouting Pipe, square pile top is located at pile body Top, pile extension position be located at pile body middle part, the upper surface from square pile top for the Grouting Pipe extends through inside pile body, by pile extension Position, reaches pile body bottom end surface.Pile extension position can increase the length of pile body, is easy to meet higher customer demand.
The section shape and size of pile body is unrestricted, can be square, regular pentagon, or circular, according to need Depending on wanting, the length of pile body is also unrestricted, depending on application scenario, can be used in carrying solar photovoltaic cell panel, or Person is used as electric pole etc., cell panel heavier-weight, and pile body is imbedded behind underground, the slip casting into Grouting Pipe, pulp-water and pile body bottom mud Husky or rock mutually merges so that a kind of resistance to plucking anticorrosion stake of the present invention, is firmly fixed on the ground, to bear The weight of the weights such as solar photovoltaic cell panel.
Pile concrete adopts C60 High Strength Concrete, and reinforcing bar adopts HRB600 high tensile reinforcement (5 grades), and the selection of these materials increases Add the overall structural strength of square pile.Pile body concrete with the addition of concrete fiber, improves the crack resistance of pile body.
Preferably, Grouting Pipe is injected hole positioned at square pile top upper surface one end.Pile body embedment underground after, from injected hole to Grouting Pipe slip casting, slurry flows out from slip casting bottom of the tube, with the silt of surrounding or rock merges so that resistance to plucking anticorrosion stake Bottom is firmly fixed on the ground.
Preferably, the middle part of Grouting Pipe is provided with grout outlet, and grout outlet reaches the lateral surface of pile body from the middle part of pile body On, the lateral surface of pile body is stretched out in one end of grout outlet, forms grout outlet, one end of grout outlet is connected with Grouting Pipe;Along pile body Grout outlet and grout outlet, and the axisymmetrical with regard to pile body are uniformly provided with length direction.
Behind pile body embedment underground, from injected hole to Grouting Pipe slip casting, slurry passes sequentially through Grouting Pipe and grout outlet, from pulp Mouthful flow out, with pile body in the middle part of around silt or rock merges so that the middle part of resistance to plucking anticorrosion stake is firmly fixed On the ground, and every 2-5m in pile body symmetrical installation grout outlet, increase side skin friction, slurry is by pile body bag simultaneously Wrap, play etch-proof effect, increase the service life.
Preferably, the upper surface from square pile top for the Grouting Pipe extends through inside pile body, reaches pile body bottom end surface, with circle Ring connects, and slurry outlet is distributed with annulus.
Behind pile body embedment underground, from injected hole to Grouting Pipe slip casting, slurry passes sequentially through Grouting Pipe and annulus, from slurry outlet Flow out, merge with the silt of pile body bottom periphery or rock so that the bottom of resistance to plucking anticorrosion stake is more firmly solid It is scheduled on the ground.
Preferably, annulus is parallel with pile body bottom place plane, and annulus is evenly distributed with slurry outlet.
So arrange after, resistance to plucking anticorrosion stake can smoothly be fixed in the soil body, slurry from slurry outlet outflow after, uniformly The silt with pile body bottom periphery or rock merge so that the bottom stress balance of resistance to plucking anticorrosion stake, more firm Gu.
Preferably, the cross sectional shape of pile body is square.
Using the foursquare Pedicellus et Pericarpium Trapae of pile body, increase the frictional resistance between pile body and the soil body, improve the resistance to plucking of pile body Can, increase the overall extraction-resistant behavior of resistance to plucking anticorrosion stake and frictional resistance so that resistance to plucking anticorrosion stake will not when by external force Rock, the required weight carrying in the pile body such as solar photovoltaic cell panel at support top that can consolidate top.
Preferably, pile extension position is located in pile body, and the top and bottom at pile extension position are laid with grout outlet, on grout outlet It is in down cross abutting joint.
After slip casting, slurry wraps up to pile body, serves etch-proof effect, and improves side skin friction, can Be applied to the soil layer of moderate corrosion.
Preferably, on two sides of the pile body that grout outlet is located at, on two other side of pile body, form friction pattern is distributed with. Form friction pattern further increases the frictional resistance of pile body, thus further increasing the extraction-resistant behavior of pile body, correspondingly, increased The overall extraction-resistant behavior of resistance to plucking anticorrosion stake and frictional resistance;Around grout outlet that one side of pile body is provided with and grout outlet Some protection muscle of distribution, the form friction pattern on another side of pile body relative with being provided with grout outlet, this two sides make Resistance to plucking anticorrosion stake integrally keeps stress balance.
Preferably, described form friction pattern is arcuation, and this arc structure is recessed on the surface of pile body.Pile body sinks to underground When, the soil body form such as the silt around the arcuate recess structure (fish-striated) of form friction pattern and pile body or mud mutually merges one Rise, resistance to plucking anticorrosion stake is cemented, increase the resistance to plucking side skin friction of pile body.
Preferably, also include pile top, pile top is located at the bottom of pile body, and the section of pile top is H type, and hole is cut in the side of pile top. It is earthed in vivo in pile body, during sinking, pile top is located at pile body foremost, play the effect that guiding pile body sinks, just Penetrate soil layer in pile body, be preferably deep into inside soil body.The section of pile top is H type, and the arch section of pile top bottom serves The effect of embedded ground, improves the bearing capacity of square pile.Hole is cut in the side of pile top, plays consolidating between pile top and the soil body after slip casting Change acts on;The pile top of H type is deep into inside soil body, and after slip casting, the pile top of H type is combined one by slurry with the soil body of surrounding Rise, increase the firm performance of resistance to plucking of resistance to plucking anticorrosion stake further.
Pile top is linked together with pile body bottom, and the upper surface from square pile top for the Grouting Pipe extends through inside pile body, stretches out To pile body bottom end surface, connect with annulus, annulus is located in pile top.
Behind one side pile body embedment underground, from injected hole to Grouting Pipe slip casting, slurry passes sequentially through Grouting Pipe and annulus, from Slurry outlet flows out, the pile top with pile body bottom, and the soil body combination of shape and state such as the silt of surrounding or rock is together so that resistance to plucking The bottom of anticorrosion stake is more firmly fixed on the ground;On the other hand, the pile top of H type is deep into inside soil body, after slip casting, H The pile top of type is combined together by slurry with the soil body of surrounding, increases the firm performance of resistance to plucking of resistance to plucking anticorrosion stake further.
Grouting behind shaft or drift lining increased the effect of pile body bottom solidification and the side-friction force of pile body side, improves 30% to carrying, Especially pile body bottom, is linked together by the firm soil body with surrounding of slip casting, solves asking of prefabricated pile breakout capacity difference Topic.
The whitewashing at pile extension position, wraps up to whole pile extension position, serves the anticorrosive effect to stake, and increased side Frictional resistance, using with corrosive soil layer and underground uplift pile.The square pile high capacity of the present invention, holding force layer depth, resistance to plucking is imitated Really good, anti-horizontal capability is strong, and cost performance is high, low cost.
3. beneficial effect
The technical scheme being provided using this utility model, compared with prior art, is had the advantages that:
(1) square pile pile concrete of the present utility model adopts C60 High Strength Concrete, and reinforcing bar adopts HRB600 high tensile reinforcement (5 Level), the selection of these materials increased the overall structural strength of square pile.Pile body concrete with the addition of concrete fiber, improves The crack resistance of pile body;
(2) this practical square pile, pile body is imbedded behind underground, the slip casting into Grouting Pipe, pulp-water and pile body bottom silt Or rock mutually merges so that a kind of resistance to plucking anticorrosion stake of the present invention, is firmly fixed on the ground, to bear too The weight of the weights such as sun energy photovoltaic battery panel;
(3), behind pile body embedment underground, from injected hole to Grouting Pipe slip casting, slurry passes sequentially through Grouting Pipe and grout outlet, from Grout outlet flow out, with pile body in the middle part of around silt or rock merges so that the middle part of resistance to plucking anticorrosion stake is firm Fixing and every 2-5m in pile body symmetrical installation grout outlet, increase side skin friction on the ground, slurry is by stake simultaneously Body wraps up, and plays etch-proof effect;
(4) it is earthed in vivo in pile body, during sinking, pile top is located at pile body foremost, play under guiding pile body Heavy effect, is easy to pile body and penetrates soil layer, be preferably deep into inside soil body.The section of pile top is H type, the arc of pile top bottom Part, serves the effect of embedded ground, improves the bearing capacity of square pile.Hole is cut in the side of pile top, play after slip casting pile top with Solidification between the soil body;The pile top of H type is deep into inside soil body, and after slip casting, the pile top of H type passes through slurry with the soil body of surrounding Body is combined together, and increases the firm performance of resistance to plucking of resistance to plucking anticorrosion stake further;
(5) pile top and pile body bottom link together, and the upper surface from square pile top for the Grouting Pipe extends through inside pile body, stretches Go out to pile body bottom end surface, connect with annulus, annulus is located in pile top;Behind one side pile body embedment underground, from injected hole to note Slurry pipe slip casting, slurry passes sequentially through Grouting Pipe and annulus, flows out from slurry outlet, the pile top with pile body bottom, and the mud of surrounding The soil body combination of shape and state such as sand or rock is together so that the bottom of resistance to plucking anticorrosion stake is more firmly fixed on the ground;Another Aspect, the pile top of H type is deep into inside soil body, and after slip casting, the pile top of H type is combined together by slurry with the soil body of surrounding, Increase the firm performance of resistance to plucking of resistance to plucking anticorrosion stake further;
(6) grouting behind shaft or drift lining increased the effect of pile body bottom solidification and the side-friction force of pile body side, and carrying is improve 30%, especially pile body bottom, linked together by the firm soil body with surrounding of slip casting, solve prefabricated pile breakout capacity poor Problem;
(7) whitewashing at pile extension position, wraps up to whole pile extension position, serves the anticorrosive effect to stake, and increases Side skin friction, using with corrosive soil layer and underground uplift pile, increase the service life;The square pile bearing capacity of the present invention Height, supporting course is examined, and resistance to plucking effect is good, and anti-horizontal capability is strong, and cost performance is high, low cost.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is annulus schematic diagram of the present utility model;
Fig. 3 is square pile top plan view of the present utility model;
Fig. 4 is pile top plane graph of the present utility model.
Label declaration in schematic diagram:
1st, square pile top;2nd, injected hole;21st, Grouting Pipe;4th, pile top;5th, form friction pattern;6th, pile body;7th, grout outlet;72nd, pulp Pipe;8th, annulus;81st, slurry outlet;9th, pile extension position.
Specific embodiment
For further appreciating that content of the present utility model, in conjunction with drawings and Examples, this utility model is described in detail.
Embodiment 1
In conjunction with Fig. 1-4, a kind of resistance to plucking anticorrosion stake, including pile body 6, square pile top 1, pile extension position 9 and Grouting Pipe 21, side Stake top end 1 is located at the top of pile body 6, and pile extension position 9 is located at the middle part of pile body 6, and the upper surface from square pile top 1 for the Grouting Pipe 21 passes through Through inside pile body 6, by pile extension position 9, reach pile body 6 bottom end surface.
Square pile top 1 is one piece of adapter plate, and the section shape and size of pile body 6 is unrestricted, can be square, positive five Side shape, or circular, as needed depending on, the length of pile body 6 is also unrestricted, depending on application scenario, can be used in Carry solar photovoltaic cell panel, or as electric pole etc., cell panel heavier-weight, pile body 6 is imbedded behind underground, to Grouting Pipe Slip casting in 21, pulp-water and pile body 6 bottom silt or rock mutually merges so that a kind of resistance to plucking anticorrosion of the present invention Stake, is firmly fixed on the ground, to bear the weight of the weights such as solar photovoltaic cell panel.
Pile concrete adopts C60 High Strength Concrete, and reinforcing bar adopts HRB600 high tensile reinforcement (5 grades), and the selection of these materials increases Add the overall structural strength of square pile.Pile body 6 concrete with the addition of concrete fiber, improves the crack resistance of pile body 6.
Embodiment 2
Similar to Example 1, difference is, Grouting Pipe 21 is injected hole 2 positioned at square pile top 1 upper surface one end. Behind pile body 6 embedment underground, from injected hole 2 to Grouting Pipe 21 slip casting, slurry flows out from Grouting Pipe 21 bottom, with the silt of surrounding or Rock merges so that resistance to plucking anticorrosion stake bottom is firmly fixed on the ground.
Embodiment 3
Similar to Example 2, difference is, the middle part of Grouting Pipe 21 is provided with grout outlet 72, and grout outlet 72 is from stake The middle part of body 6 reaches on the lateral surface of pile body 6, and the lateral surface of pile body 6 is stretched out in one end of grout outlet 72, forms grout outlet 7, goes out One end of slurry pipe 72 is connected with Grouting Pipe 21;Grout outlet 7 and grout outlet 72 are uniformly provided with along along the length direction of pile body 6, and close Axisymmetrical in pile body.
Behind pile body 6 embedment underground, from injected hole 2 to Grouting Pipe 21 slip casting, slurry passes sequentially through Grouting Pipe 21 and grout outlet 72, flow out from grout outlet 7, with pile body 6 middle part around silt or rock merges so that the middle part of resistance to plucking anticorrosion stake It is firmly fixed on the ground, and every 2-5m in pile body 6 symmetrical installation grout outlet 72, increase side skin friction, with When slurry pile body 6 is wrapped up, play etch-proof effect.
Embodiment 4
Similar to Example 1, it is a difference in that, the upper surface from square pile top 1 for the Grouting Pipe 21 extends through inside pile body 6, Reach pile body 6 bottom end surface, connect with annulus 8, slurry outlet 81 is distributed with annulus 8.
Behind pile body 6 embedment underground, from injected hole 2 to Grouting Pipe 21 slip casting, slurry passes sequentially through Grouting Pipe 21 and annulus 8, Flow out from slurry outlet 81, merge with the silt of pile body 6 bottom periphery or rock so that the bottom of resistance to plucking anticorrosion stake more For being firmly fixed on the ground.
Embodiment 5
Similar to Example 4, difference is, annulus 8 is parallel with pile body 6 bottom place plane, and annulus 8 uniformly divides It is furnished with slurry outlet 81.
So arrange after, resistance to plucking anticorrosion stake can smoothly be fixed in the soil body, slurry from slurry outlet 81 outflow after, all The even silt with pile body 6 bottom periphery or rock merges so that the bottom stress balance of resistance to plucking anticorrosion stake, more Firmly.
Embodiment 6
Similar to Example 1, difference is, the cross sectional shape of pile body 6 is square.Square using pile body 6 Pedicellus et Pericarpium Trapae, increase the frictional resistance between pile body 6 and the soil body, improve the extraction-resistant behavior of pile body 6, increase resistance to plucking anticorrosion stake overall Extraction-resistant behavior and frictional resistance so that resistance to plucking anticorrosion stake will not be rocked when by external force, the support top that can consolidate The required weight carrying in pile body 6 top such as solar photovoltaic cell panel.
Embodiment 7
Similar to Example 1, difference is, pile extension position 9 is located in pile body 6, the top and bottom at pile extension position 9 It is laid with grout outlet 72, grout outlet is in cross abutting joint about 72.After slip casting, slurry wraps up to pile body 6, plays Etch-proof effect, and improve side skin friction, can be applied to the soil layer of moderate corrosion.
Embodiment 8
Similar to Example 1, difference is, on 6 two sides of pile body that grout outlet 7 is located at, other the two of pile body 6 On individual side, form friction pattern 5 is distributed with.Form friction pattern 5 further increases the frictional resistance of pile body 6, thus further increasing stake The extraction-resistant behavior of body 6, correspondingly, increased the overall extraction-resistant behavior of resistance to plucking anticorrosion stake and frictional resistance;6 one sides of pile body The grout outlet 7 being provided with and some protection muscle (71) of grout outlet 7 surrounding distribution, the pile body 6 relative with being provided with grout outlet 7 Form friction pattern 5 on another side, this two sides make resistance to plucking anticorrosion stake integrally keep stress balance.
Embodiment 9
Similar to Example 1, difference is, described form friction pattern 5 is arcuation, and this arc structure is recessed in pile body 6 Surface.When pile body 6 sinks to underground, the silt around the arcuate recess structure (fish-striated) of form friction pattern 5 and pile body 6 or silt The soil body form such as mud mutually merges, and resistance to plucking anticorrosion stake is cemented, and increases the resistance to plucking side skin friction of pile body 6.
Embodiment 10
Similar to Example 1, difference is, also includes pile top 4, pile top 4 be located at pile body 6 bottom, pile top 4 cut Face is H type, and hole is cut in the side of pile top 4.
It is earthed in vivo in pile body, during sinking, pile top 4 is located at pile body 6 foremost, play under guiding pile body 6 Heavy effect, is easy to pile body 6 and penetrates soil layer, be preferably deep into inside soil body.The section of pile top 4 is H type, the arc of pile top bottom Shape part, serves the effect of embedded ground, improves the bearing capacity of square pile.Hole is cut in the side of pile top 4, plays pile top after slip casting Solidification between 4 and the soil body;The pile top 4 of H type is deep into inside soil body, after slip casting, the soil body of the pile top of H type 4 and surrounding It is combined together by slurry, increase the firm performance of resistance to plucking of resistance to plucking anticorrosion stake further.
Pile top 4 is linked together with pile body 6 bottom, and Grouting Pipe 21 extends through in pile body 6 from the upper surface on square pile top 1 Portion, is reached pile body 6 bottom end surface, is connected with annulus 8, and annulus 8 is located in pile top 4.
Behind one side pile body 6 embedment underground, from injected hole 2 to Grouting Pipe 21 slip casting, slurry pass sequentially through Grouting Pipe 21 with Annulus 8, flows out from slurry outlet 81, the pile top 4 with pile body 6 bottom, and the soil body combination of shape and state such as the silt of surrounding or rock exists Together so that the bottom of resistance to plucking anticorrosion stake is more firmly fixed on the ground;On the other hand, the pile top 4 of H type is deep into the soil body Inside, after slip casting, the pile top 4 of H type and the soil body of surrounding are combined together by slurry, increase resistance to plucking anticorrosion stake further The firm performance of resistance to plucking.
Grouting behind shaft or drift lining increased the effect of pile body 6 bottom solidification and the side-friction force of pile body 6 side, and carrying is improve 30%, especially pile body 6 bottom, linked together by the firm soil body with surrounding of slip casting, solve prefabricated pile breakout capacity The problem of difference.
The whitewashing at pile extension position 9, wraps up to whole pile extension position 9, serves the anticorrosive effect to stake, and increased Side skin friction, using with corrosive soil layer and underground uplift pile.Square pile high capacity in the present embodiment, supporting course is examined, Resistance to plucking effect is good, and anti-horizontal capability is strong, and cost performance is high, low cost.
Below schematically this utility model and embodiments thereof are described, this description does not have restricted, accompanying drawing Shown in be also one of embodiment of the present utility model, actual structure is not limited thereto.So, if this area Those of ordinary skill enlightened by it, without departing from this utility model create objective in the case of, design without creative The frame mode similar to this technical scheme and embodiment, all should belong to protection domain of the present utility model.

Claims (10)

1. a kind of resistance to plucking anticorrosion stake, including pile body (6) it is characterised in that also include square pile top (1), pile extension position (9) and Grouting Pipe (21), square pile top (1) is located at the top of pile body (6), and pile extension position (9) are located at the middle part of pile body (6), Grouting Pipe (21) upper surface from square pile top (1) extends through pile body (6) inside, by pile extension position (9), reaches pile body (6) bottom Surface.
2. a kind of resistance to plucking anticorrosion stake according to claim 1 is it is characterised in that Grouting Pipe (21) is located at square pile top (1) upper surface one end is injected hole (2).
3. a kind of resistance to plucking anticorrosion stake according to claim 1 is it is characterised in that the middle part of Grouting Pipe (21) is provided with out Slurry pipe (72), grout outlet (72) reaches the lateral surface of pile body (6) from the middle part of pile body (6), and one end of grout outlet (72) is stretched Go out the lateral surface of pile body (6), form grout outlet (7), one end of grout outlet (72) is connected with Grouting Pipe (21);Along pile body (6) Grout outlet (7) and grout outlet (72) are uniformly provided with length direction, and the axisymmetrical with regard to pile body.
4. a kind of resistance to plucking anticorrosion stake according to claim 2 is it is characterised in that Grouting Pipe (21) is from square pile top (1) Upper surface to extend through pile body (6) internal, reach pile body (6) bottom end surface, connect with annulus (8), annulus is distributed with (8) Slurry outlet (81).
5. a kind of resistance to plucking anticorrosion stake according to claim 4 is it is characterised in that annulus (8) is located with pile body (6) bottom Plane is parallel, and annulus (8) is evenly distributed with slurry outlet (81).
6. a kind of resistance to plucking anticorrosion stake according to claim 3 is it is characterised in that also include pile top (4), pile top (4) with Pile body (6) bottom links together, and the upper surface from square pile top (1) for the Grouting Pipe (21) extends through pile body (6) inside, reaches Pile body (6) bottom end surface, is connected with annulus (8), and annulus (8) is located in pile top (4).
7. a kind of resistance to plucking anticorrosion stake according to claim 3 is it is characterised in that pile extension position (9) are located at pile body (6) Interior, the top and bottom of pile extension position (9) are laid with grout outlet (72), and grout outlet (72) is in cross abutting joint up and down.
8. a kind of resistance to plucking anticorrosion stake according to claim 7 is it is characterised in that the pile body (6) two that is located at of grout outlet (7) On individual side, on two other side of pile body (6), form friction pattern (5) is distributed with.
9. a kind of resistance to plucking anticorrosion stake according to claim 8, should it is characterised in that described form friction pattern (5) is arcuation Arc structure is recessed on the surface of pile body (6).
10. a kind of resistance to plucking anticorrosion stake according to claim 1 is it is characterised in that also include pile top (4), pile top (4) position In the bottom of pile body (6), the section of pile top (4) is H type, and hole is cut in the side of pile top (4).
CN201620562864.7U 2016-06-03 2016-06-03 Resistance to plucking anticorrosion stake Active CN205934913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620562864.7U CN205934913U (en) 2016-06-03 2016-06-03 Resistance to plucking anticorrosion stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620562864.7U CN205934913U (en) 2016-06-03 2016-06-03 Resistance to plucking anticorrosion stake

Publications (1)

Publication Number Publication Date
CN205934913U true CN205934913U (en) 2017-02-08

Family

ID=57931993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620562864.7U Active CN205934913U (en) 2016-06-03 2016-06-03 Resistance to plucking anticorrosion stake

Country Status (1)

Country Link
CN (1) CN205934913U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685273A (en) * 2019-11-08 2020-01-14 马鞍山宏泰建材股份有限公司 Resistance-increasing square pile and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685273A (en) * 2019-11-08 2020-01-14 马鞍山宏泰建材股份有限公司 Resistance-increasing square pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN105274922B (en) A kind of antiskid key steel-pipe pile composite construction and method for repairing landslide roadbed
CN106988343A (en) A kind of town road pipeline protection structure and its construction method
CN108661069A (en) Close on the wall piled anchor composite structure and method of old Retaining Wall Reinforcement under the load of river road surface
CN107663865A (en) A kind of cable-stayed type immersed tube tunnel structure and method
CN109162289A (en) The prefabricated carrying pier structure of one kind and its construction method
CN114263211A (en) Retaining wall and construction method thereof
CN210857112U (en) Hidden water conservancy slope protection structure
CN202672143U (en) Back-anchor type flexible pile top uplift pile
CN205934913U (en) Resistance to plucking anticorrosion stake
CN102626946A (en) Manufacture method for concrete irregular fender post
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN107237343A (en) A kind of many wall type nodular diaphragm walls as bridge foundation for soft soil foundation
CN201502065U (en) Anchor rod joint excavation compound basis
CN205954668U (en) Special stake in photovoltaic basis
CN105297763A (en) Assembled type flexible half-excavation foundation for electric transmission lines in mountainous areas
CN203654280U (en) Pressure dispersion type anti-pulling anchor rod
CN205171537U (en) Mountain area transmission line assembled flexibility is partly drawn and is dug basis
CN205557535U (en) Compound retaining wall of arch campshed formula
CN213203989U (en) Bridge engineering toper slope protection structure
CN205954610U (en) Frictional resistance side's stake of enhancement mode resistance to plucking
CN204570669U (en) A kind of cast-in-place concrete pile
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN204510181U (en) A kind of phytal zone drilling platform
CN103981859B (en) Construction method of node structure of guide walls of underground diaphragm wall and ground under heavy load
CN205387721U (en) Highway retaining wall reinforced structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant