CN205934900U - Bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system - Google Patents

Bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system Download PDF

Info

Publication number
CN205934900U
CN205934900U CN201620799818.9U CN201620799818U CN205934900U CN 205934900 U CN205934900 U CN 205934900U CN 201620799818 U CN201620799818 U CN 201620799818U CN 205934900 U CN205934900 U CN 205934900U
Authority
CN
China
Prior art keywords
tube
pile
sleeve pipe
bamboo joint
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620799818.9U
Other languages
Chinese (zh)
Inventor
魏纲
崔允亮
王新泉
朱田宇
姜婉青
项鹏飞
李栋梁
徐文轶
陈晓星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201620799818.9U priority Critical patent/CN205934900U/en
Application granted granted Critical
Publication of CN205934900U publication Critical patent/CN205934900U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system, its characterized in that: including the conductive plastic drain bar, the bamboo joint sleeve pipe, precast pile point and prefabricated cover plate, adopt strip conductive plastic drain bar to hug closely in the bamboo joint sleeve pipe outside, the determining deviation of being separated by adopts the steel loop fixed, bamboo joint tube -in -tube pile bottom is provided with the precast pile point, a pre -buried U shaped steel muscle in the precast pile point, conductive plastic drain bar bottom and U type steel bar connection, bamboo joint tube -in -tube pile top is provided with prefabricated cover plate, prefabricated cover plate reserves the fenestrate preformed hole of conductive plastic drain bar, the conductive plastic drain bar stretches out the preformed hole, the conductive plastic drain bar passes through the wire and is connected with DC power supply. The beneficial effects of the utility model are that: the bamboo joint tube -in -tube pile adopts bamboo joint formula sleeve pipe, is formed by one section one section bushing, has solved the heavy handled construction difficulty that leads to of conventional PVC sleeve pile sleeve pipe range degree, bamboo joint cover pipe racks is protruding, has improved ordinary plastic sheath tubular pile and surrounding soil's frictional force, improves the bearing capacity.

Description

The ring tube-in-tube pile joint reinforcing soft soil roadbed system of electric osmose
Technical field
This utility model belongs to Base Consolidation Engineering field, particularly to a kind of ring tube-in-tube pile joint electric osmose reinforcing soft soil Roadbed system is it is adaptable to Soft Ground is constructed.
Background technology
China coast widely distributed a large amount of Deep Thick Soft Ground, mainly include Tianjin, Lianyun Harbour, Shanghai, Zhoushan, Hangzhou, peaceful The areas such as ripple, Wenzhou, Foochow, Xiamen, Quanzhou, ZhangZhou, Guangzhou, soil property is mainly muck soil.These areas are to broadly fall into me Densely populated, the economically developed area of state, these areas are all built on a large scale.Because weak soil has water content High, the features such as natural void ratio is big, compressibility is high, permeability is little, shearing strength is low, the coefficient of consolidation is little, in architectural engineering, road Running into weak soil problem in the construction such as engineering not to be effectively treated, necessarily affecting the quality of engineering, thus influencing whether social warp The development of Ji, also can threaten the life and health safety of the people.
Road construction is the basis of economic development, is also the important process to be flourished that is bound to China's coming years.Mould Material sleeve pipe concrete-pile is a kind of rigidity embankment stake of novel small diameter although a plurality of highway and town road work at home Apply in journey, and obtain certain technical economic benefit, but because weak soil water content is very high, permeability is again poor, meeting exists Plastic sleeve concrete pile bottom produces very high excess pore water pressure, and is difficult to dissipate;Plastic sleeve concrete pile also can produce The serious soil compaction effect of life, this will make completed stake around produce floating, tilt;Additionally, plastic sleeve concrete pile table Although there is depression on the plastic bushing surface in face, can improving side friction to a certain extent, but due to being weak soil entirely around stake Reason, plastic sleeve concrete pile side friction is not still high, it usually needs closeer pile spacing can provide the roadbed of needs Bearing capacity, which results in the waste of resource, the rising of engineering cost.
Understand in sum, the method updating the process of weak soil is very necessary, especially need to improve plastic bushing When concrete-pile is reinforcing soft soil roadbed, existing serious excess pore water pressure, serious soil compaction effect, pile side friction are low Problem, the effect of every plastic sleeve concrete pile is performed to maximum, solve this problem will bring huge economy and Social benefit.
Utility model content
For pointedly solving the above problems, this project proposes one kind and combines ring pipe perfusion pile promotion stake week using electric osmose Dissipation of excess pore-water pressure and improve pile side friction, thus the system for reinforcing soft ground.
This ring tube-in-tube pile joint reinforcing soft soil roadbed system of electric osmose, includes conductive plasticss draining board, ring sleeve pipe, in advance Pile top processed and prefabricated cover plate, ring outside of sleeve is close to by conductive plasticss draining board, is mutually fixed using steel loop across a certain distance, Ring tube-in-tube pile bottom is provided with precast pile tip, a pre-buried single u-shaped reinforcing bar, conductive plasticss draining board bottom and U in precast pile tip Steel bar connects, and ring tube-in-tube pile top is provided with prefabricated cover plate, and the reserved of conductive plasticss draining board perforation reserved by prefabricated cover plate Hole, conductive plasticss draining board stretches out preformed hole, and conductive plasticss draining board is connected with DC source by wire.
As preferred:Described ring sleeve pipe is with raised Bamboo-shaped prefabricated PVC or PE pipe, often saves ring sleeve pipe two ends and sets It is equipped with connection screw thread.
As preferred:Described precast pile tip size is more than pile body, and precast pile tip is provided with steel immersed tube locating slot and ring sleeve pipe Positioning table.
As preferred:Described prefabricated the size of the cover plate is more than pile body, and ring sleeve pipe insertion groove is reserved in prefabricated cover plate bottom.
The beneficial effects of the utility model are:
1st, ring tube-in-tube pile adopt bamboo joint type sleeve pipe, by one section one section telescopic joint form, solve common plastics sleeve pipe Pile protection length of tube is difficult to control to lead to constructional difficulties.
2nd, ring sleeve belt is raised, improves the frictional force of common plasticses tube-in-tube pile and surrounding soil, thus improving carrying Power.
3rd, ring jacket exterior posts conductive plasticss draining board, and the moisture in ground can be promoted to discharge ground from draining board Base, dissipate the excess pore water pressure producing when constructing, and to solving, common plastics tube-in-tube pile soil extrusion in construction effect is highly effective.
4th, electroosmosis can promote the pore water between stake to flow to negative pole stake from positive pole stake rapidly, improves the carrying of inter-pile soil body Power, also has preferable facilitation to dissipation excess pore water pressure simultaneously.
5th, because electric osmose can produce electrochemical action to the soil body, promote stake surrounding soil consolidation, improve pile body frictional resistance, Increase the boundary strength between stake and the soil body.
6th, in precast pile tip, pre-buried connection reinforcing bar ensure that two conductive plasticss draining board conductive communication.On precast pile tip Immersed tube groove is used for pushing pile body using steel immersed tube.
7th, pre- leaving a blank is provided with prefabricated cover plate and can ensure that drainage channel.
Brief description
Fig. 1 is ring tube-in-tube pile elevation;
Fig. 2 is ring tube-in-tube pile cross-sectional view;
Fig. 3 is pile top profile;
Fig. 4 is pile top cross-sectional view;
Fig. 5 is ring tube-in-tube pile joint electric osmose reinforcing soft ground System planes layout drawing;
Fig. 6 is ring tube-in-tube pile joint electric osmose reinforcing soft ground schematic diagram;
Conductive plasticss draining board 1, ring sleeve pipe 2, U-shaped reinforcing bar 3, precast pile tip 4, positioning table 5, steel immersed tube positioning Groove 6, ring tube-in-tube pile 7, prefabricated cover plate 8, preformed hole 9 steel loop 10, steel immersed tube 11, DC source 12, wire 13.
Specific embodiment
With reference to embodiment, this utility model is described further.The explanation of following embodiments is only intended to help reason Solution this utility model.It should be pointed out that for those skilled in the art, without departing from this utility model principle On the premise of, this utility model can also be carried out with some improvement and modify, these improve and modification also falls into this utility model In scope of the claims.
As shown in figure 1, the wide 10cm of conductive plasticss draining board 1, using epoxy resin as binding agent by conductive plasticss draining Plate 1 tight bond on ring sleeve pipe 2, press design requirement and make, generally 15cm-20cm by ring sleeve pipe 2 diameter, vertically side To being evenly arranged 2 conductive plasticss draining boards 1.Steel is reserved with precast pile tip 4 (Fig. 3, Fig. 4) in conductive plasticss draining board 1 bottom Muscle connects, and connecting portion can be wrapped up using steel wire, be fastened using iron wire.Vertically steel loop 10 is set every 2m along direct sleeve pipe, Conductive plasticss draining board 1 is tightly secured on ring sleeve pipe 2, steel loop 10 joint can be using round steel welding or pre-manufactured steel collar bolt Tighten, by being disposed with the ring sleeve pipe 2 of conductive plasticss draining board 1, Ground Treatment needed using steel immersed tube 11 press-in, reach and set Meter depth, casting concrete.The ring tube-in-tube pile being pasted with conductive plasticss draining board 1 forms the enhancing stake of ring sleeve pipe electric osmose, bamboo Section sleeve pipe 2 electric osmose strengthens stake schematic diagram (Fig. 2, Fig. 3)
Ring tube-in-tube pile joint electric osmose reinforcing soft ground system, concrete construction method comprises the following steps:
1) armored concrete is adopted to make precast pile tip 4, precast pile tip 4 top surface reserves insertion end and immersed tube groove, prefabricated A pre-buried U-shaped reinforcing bar 3 in pile top 4, U-shaped reinforcing bar 3 exposes precast pile tip 4 top surface 20-40cm, and U-shaped reinforcing bar 3 exposed portion is being inserted Enter and hold both sides to be arranged symmetrically.
2) more piece ring sleeve pipe 2 head and the tail are connected, and be symmetrical arranged two conductive plasticss draining boards in ring sleeve pipe 2 both sides 1, often save ring sleeve pipe 2 and be fastened by iron wire with conductive plasticss draining board 1.
3) next root ring sleeve pipe 2 is inserted in the positioning table of pile top, and is fixed with iron wire, by two conductive plasticss drainings The two ends of the reserved U-shaped reinforcing bar 3 in pile top of plate 1 are connected.
4) steel immersed tube 11 is inserted in the ring sleeve pipe 2 connecting and conductive plasticss draining board 1, and immersed tube is embedded in pile top Immersed tube is pressed into ground using hidden pipe pile machine by vibration or static pressure mode by reserved immersed tube groove.
5) extract steel immersed tube 11, pile top and ring sleeve pipe are stayed in ground, the concrete perfusion in ring sleeve pipe 2.
6) reserved ring sleeve pipe 2 insertion groove and two preformed holes 9 on cover plate.
7) ring tube-in-tube pile top is inserted the insertion groove of prefabricated cover plate 8, and two conductive plasticss draining boards 1 are passed through pre- Box out and stretch out prefabricated cover plate 8.
8) conductive plasticss draining board 1 is connected by insulated conductor 13, the conductive plasticss draining board 1 on a campshed is passed through Same wire 13 connects and connects DC source 12 positive pole as anode, and the conductive plasticss draining board 1 on an adjacent campshed is led to Cross a wire 13 to connect as negative electrode connection DC source 12 negative pole.
9) pore water in ground discharges ground by conductive plasticss draining board 1;
10) making blotter, and filling roadbed, persistently carry out drainage by electroosmosis during filling roadbed, according to draining Effect carries out intermittently power-on and electrode conversion, and drainage by electroosmosis meets design requirement to subgrade settlement.

Claims (4)

1. a kind of ring tube-in-tube pile joint reinforcing soft soil roadbed system of electric osmose it is characterised in that:Including conductive plasticss draining board (1), ring sleeve pipe (2), precast pile tip (4) and prefabricated cover plate (8), conductive plasticss draining board (1) is close to ring sleeve pipe (2) outward Side, mutually adopts steel loop (10) to fix, ring tube-in-tube pile bottom is provided with precast pile tip (4), in precast pile tip (4) across a certain distance A pre-buried single u-shaped reinforcing bar (3), conductive plasticss draining board (1) bottom is connected with U-shaped reinforcing bar (3), and ring tube-in-tube pile top is provided with Prefabricated cover plate (8), the preformed hole (9) that conductive plasticss draining board (1) is bored a hole reserved by prefabricated cover plate, and conductive plasticss draining board (1) is stretched Go out preformed hole (9), conductive plasticss draining board (1) is connected with DC source (12) by wire (13).
2. the ring tube-in-tube pile according to claim 1 joint reinforcing soft soil roadbed system of electric osmose it is characterised in that:Described bamboo Section sleeve pipe (2) is with raised Bamboo-shaped prefabricated PVC or PE pipe, often saves ring sleeve pipe (2) two ends and is provided with connection screw thread.
3. the ring tube-in-tube pile according to claim 1 joint reinforcing soft soil roadbed system of electric osmose it is characterised in that:Described pre- Pile top (4) size processed is more than pile body, and precast pile tip (4) is provided with the positioning table (5) of steel immersed tube locating slot (6) and ring sleeve pipe (2).
4. the ring tube-in-tube pile according to claim 1 joint reinforcing soft soil roadbed system of electric osmose it is characterised in that:Described pre- Cover plate (8) size processed is more than pile body, and ring sleeve pipe (2) insertion groove is reserved in prefabricated cover plate (8) bottom.
CN201620799818.9U 2016-07-26 2016-07-26 Bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system Withdrawn - After Issue CN205934900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620799818.9U CN205934900U (en) 2016-07-26 2016-07-26 Bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620799818.9U CN205934900U (en) 2016-07-26 2016-07-26 Bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system

Publications (1)

Publication Number Publication Date
CN205934900U true CN205934900U (en) 2017-02-08

Family

ID=57927393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620799818.9U Withdrawn - After Issue CN205934900U (en) 2016-07-26 2016-07-26 Bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system

Country Status (1)

Country Link
CN (1) CN205934900U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192984A (en) * 2016-07-26 2016-12-07 浙江大学城市学院 The ring tube-in-tube pile associating reinforcing soft soil roadbed system of electric osmose and construction method
CN108677640A (en) * 2018-05-30 2018-10-19 山东大学 A kind of electric osmose facture and road structure reducing roadbed moisture content

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192984A (en) * 2016-07-26 2016-12-07 浙江大学城市学院 The ring tube-in-tube pile associating reinforcing soft soil roadbed system of electric osmose and construction method
CN108677640A (en) * 2018-05-30 2018-10-19 山东大学 A kind of electric osmose facture and road structure reducing roadbed moisture content

Similar Documents

Publication Publication Date Title
CN106192984B (en) The reinforcing soft soil roadbed system of ring tube-in-tube pile joint electric osmose and construction method
CN105297704B (en) A kind of electric osmose strengthens stake reinforcing flexible foundation device and construction method
CN102704463B (en) Vacuum pre-compaction and electro-osmosis combined reinforcing device and method for muck foundation
CN104846711B (en) The electroosmosis method reinforced for soil-slope
CN105672064B (en) A kind of high-speed railway subgrade cable trough and shoulder protector construction method
CN206233951U (en) Depressurize drainage system in a kind of high-speed railway double track tunnel base
CN205934900U (en) Bamboo joint tube -in -tube pile is united electric osmose and is consolidated weak soil road bed system
CN100443668C (en) Large area soft ground treatment separated layer and time electroosmotic precipitation union vacuum precipitation method
CN203346750U (en) Long-short pile raft structure roadbed of deep spongy soil region
CN201588206U (en) Water discharge pile pipe
CN203238642U (en) Supporting retaining wall of foundation pit
CN205116152U (en) Soft basic device is consolidated in electric osmose reinforcing stake
CN101881025B (en) Design method for shallow-buried flexible anti-slide pile for deep covering layer slope retaining
CN212801479U (en) Soft soil foundation prestressed anchor rod reinforcing structure
CN205501983U (en) Decompression drainage tubular pile
CN201762701U (en) Control retaining device of plastic drainage board process quality automatic control system
CN201232181Y (en) Permeable structure of rigid drainage pile
CN215441857U (en) Layered water immersion device for treating deep collapsible loess foundation
CN206233950U (en) Depressurize drainage system in a kind of high-speed railway single-track tunnel base
CN205776410U (en) A kind of being applicable to suppresses the tunnel bottom structure of interstitital texture protuberance cracking at the bottom of tunnel
CN208056248U (en) A kind of drainage ditch expansion joint water stop
CN109914442B (en) Integrative stake of electroosmosis drainage
CN204959733U (en) Bored concrete pile steel reinforcement cage structure
CN204676521U (en) A kind of consolidating mud soil electrochemical modification hardened system
CN202124857U (en) Splitting pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20180206