CN205927670U - Electrolysis trough bottom plate concatenation rigid fastening structure - Google Patents

Electrolysis trough bottom plate concatenation rigid fastening structure Download PDF

Info

Publication number
CN205927670U
CN205927670U CN201620951769.6U CN201620951769U CN205927670U CN 205927670 U CN205927670 U CN 205927670U CN 201620951769 U CN201620951769 U CN 201620951769U CN 205927670 U CN205927670 U CN 205927670U
Authority
CN
China
Prior art keywords
platform
bottom plate
base plate
electrolysis trough
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620951769.6U
Other languages
Chinese (zh)
Inventor
王创军
张�杰
刘德发
吴晏平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan construction machinery manufacturing and Installation Engineering Co., Ltd.
Original Assignee
Fourteen Metallurgical Construction Group Yunnan Machinery Manufacturing Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourteen Metallurgical Construction Group Yunnan Machinery Manufacturing Installation Engineering Co Ltd filed Critical Fourteen Metallurgical Construction Group Yunnan Machinery Manufacturing Installation Engineering Co Ltd
Priority to CN201620951769.6U priority Critical patent/CN205927670U/en
Application granted granted Critical
Publication of CN205927670U publication Critical patent/CN205927670U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model relates to an electrolysis trough bottom plate concatenation rigid fastening structure belongs to electrolysis trough preparation construction technical field, the technical problem that will solve provides an electrolysis trough bottom plate concatenation rigid fastening structure, welding manufacture bottom plate non -deformable, and welding quality is good, and work efficiency is high, the technical scheme who adopts is: an electrolysis trough bottom plate concatenation rigid fastening structure, includes first platform, second platform, hinge and connecting bolt, be equipped with a plurality of setting elements on the first platform, the mounted position of setting element is corresponding with the end web wheel exterior feature of treating processing, first platform and second platform side by side and the symmetry set up, and first platform and second platform meet the side and pass through the hinge and articulate mutually, the opposite side of first platform and second platform all is equipped with corresponding a plurality of screws, and first platform and the upset of second platform are overlapped and be fixed with the cooperation of corresponding screw through a plurality of connecting bolt, the utility model is used for both sides welding to the pot shell bottom plate.

Description

A kind of electrolysis bath base plate splices rigid fixation structure
Technical field
A kind of this utility model electrolysis bath base plate splices rigid fixation structure, belongs to electrolysis bath and makes technical field of construction, It is specifically related to the equipment of welding production pot shell base plate.
Background technology
Cell with self baking anode because its high energy consumption by country eliminate, now replace and be exactly large-scale pre-baked without exception Anode electrolytic tank, with grooved from small to large, technical requirements improve constantly, and the manufacture difficulty of electrolysis bath is also being constantly increasing. The huge structure of pot shell, the welding quality of base plate has been largely fixed the integrally-built symmetry of electrolysis bath again and has stablized Property is it is ensured that the welding quality of base plate has great importance.The length and width size of base plate, compared with thickness of slab, belongs to thin type component, Easily it is deformed when making, transport and lifting, and existing welding tooling equipment is using relatively cumbersome, in welding process Base plate is also susceptible to deform, and in turn results in base plate distortion, and welding quality declines to a great extent.
Utility model content
This utility model overcomes the shortcomings of that prior art exists, and technical problem to be solved is to provide a kind of cell bottom Plate splices rigid fixation structure, and welding production base plate is unlikely to deform, and welding quality is good, high working efficiency.
In order to solve above-mentioned technical problem, this utility model be employed technical scheme comprise that:A kind of electrolysis bath base plate splicing Rigid fixation structure, including the first platform, the second platform, hinge and connecting bolt, described first platform is provided with multiple positioning Part, the installation site of described keeper is corresponding with base plate profile to be processed, described first platform and the second platform side by side and It is symmetrical arranged, and the first platform and the second platform side that connects is hinged by hinge, described first platform and the second platform Opposite side is equipped with corresponding multiple screws, the first platform and the second platform upset overlap and by multiple connecting bolts and phase Screw cooperation is answered to fix.
On the first described platform and the second platform, all activity is equipped with multiple foundary weight, and described foundary weight is placed on bottom to be processed The default weld seam both sides of plate.
This utility model is compared with the existing technology had an advantageous effect in that:This utility model is that Double tabletop is mutually hinged Structure, in tabular weldment welding by both sides, positive and negative welding exchange when, upset is integrally clamped by this utility model, base plate is difficult Deformation is it is ensured that construction quality, easy to use efficient, meets construction period.
Brief description
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 uses the schematic diagram of step b for this utility model.
Fig. 3 uses the schematic diagram of step c for this utility model.
Fig. 4 uses the schematic diagram of step d for this utility model.
Fig. 5 is fixing schematic diagram on the first platform for the base plate in this utility model.
In figure:1 is the first platform, and 2 is the second platform, and 3 is hinge, and 4 is keeper, and 5 is base plate, and 6 is foundary weight, and 7 is spiral shell Hole.
Specific embodiment
As shown in figure 1, a kind of this utility model electrolysis bath base plate splicing rigid fixation structure, including the first platform 1, second Platform 2, hinge 3 and connecting bolt, described first platform 1 is provided with multiple keepers 4, the installation site of described keeper 4 with Base plate 5 profile to be processed is corresponding, and described first platform 1 and the second platform 2 side by side and are symmetrical arranged, and the first platform 1 He Second platform 2 side that connects is hinged by hinge 3, and the opposite side of described first platform 1 and the second platform 2 is equipped with corresponding Multiple screws 7, the first platform 1 and the second platform 2 overturn overlapping and pass through multiple connecting bolts with corresponding screw 7 cooperation admittedly Fixed.
On the first described platform 1 and the second platform 2, all activity is equipped with multiple foundary weight 6, and described foundary weight 6 is placed on to be added The default weld seam both sides of work base plate 5.
The length and width size of base plate 5, compared with thickness of slab, belongs to thin type component, easily produces when making, transporting and lifting Deformation;In order to prevent excessive weld seam from producing welding contraction distortion in design, base plate only arranges a longitudinal butt weld(I.e. wide The splicing in degree direction), the horizontal butt weld of base plate(The i.e. splicing of length direction)Setting depend on electrolysis bath grooved size, Therefore, steel plate must be purchased by scale during baseboard material buying, the stitching position of weld seam has to comply with design drawing and requires, and base plate all should Leave cutting, retaining wall on slope surplus, welding contracted quantity and secondary stuff-assignment cutting surplus 20mm, make the base plate of group postwelding reach drawing Design requirement.
Base plate blanking adopts semiautomatic flame cutting machine to cut, the debris such as the splashing of part periphery and ferrum oxide after its blanking All should remove clean.
Groove can be cut using semiautomatic flame cutting machine or edge planer planing;The burr of finished edge periphery, The debris such as ferrum oxide all should be removed totally.
Before assembled base plate 5, local deformation rectification should be carried out to steel plate, antidote can be entered using flame straightening or veneer reeling machine Row leveling, base plate 5 assembly welding, due to being two-sided welding, is assembled in and carries out on this utility model, and splicing gap is less than 2mm, With electric welding discontinuous point weldering, with angle grinder, an overlap is ground off, then run-on tab, receipts arc plate are welded in abutment joint end.
This utility model is applied to weld the occupation mode of base plate 5:
A., before welding, by Fig. 5, the steel making base plate 5 are fixed on the first platform 1, to control welding deformation, positioning Part 4 is fixed to steel plate position, makes the position of weldment and the gap at edge keep constant, this utility model in welding process As shown in figure 1, after first base plate 5 front automatic submerged arc welding being welded;
B. overturn the second platform 2, make that base plate 5 is fixing to be located between the first platform 1 and the second platform 2, with bolt to first Platform 1 is fixedly connected with the second platform 2, as shown in Figure 2;
C. this utility model is integrally overturn 180 ° again, as shown in Figure 3;
D. and then take off bolt the first platform 1 is opened, make this utility model as shown in figure 4, and to base plate 5 carbon arc gas Plane back chipping, then welded with automatic submerged arc welding.
Weld base plate 5 with this utility model, when base plate 5 is carried out with upset after one side is soldered, keep base plate indeformable, Welding quality is good.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all this Any modification, equivalent and improvement made within the spirit of utility model and principle etc., all should wrap in this utility model model In enclosing.

Claims (2)

1. a kind of electrolysis bath base plate splicing rigid fixation structure it is characterised in that:Including the first platform(1), the second platform(2)、 Hinge(3)And connecting bolt, described first platform(1)It is provided with multiple keepers(4), described keeper(4)Installation site With base plate to be processed(5)Profile is corresponding, described first platform(1)With the second platform(2)Side by side and be symmetrical arranged, and first Platform(1)With the second platform(2)The side that connects passes through hinge(3)It is hinged, described first platform(1)With the second platform(2)'s Opposite side is equipped with corresponding multiple screws(7), the first platform(1)With the second platform(2)Upset is overlapping and passes through multiple companies Connecting bolt and corresponding screw(7)Cooperation is fixed.
2. a kind of electrolysis bath base plate splicing rigid fixation structure according to claim 1 it is characterised in that:Described first Platform(1)With the second platform(2)On all activities be equipped with multiple foundary weight(6), described foundary weight(6)It is placed on base plate to be processed(5) Default weld seam both sides.
CN201620951769.6U 2016-08-27 2016-08-27 Electrolysis trough bottom plate concatenation rigid fastening structure Active CN205927670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620951769.6U CN205927670U (en) 2016-08-27 2016-08-27 Electrolysis trough bottom plate concatenation rigid fastening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620951769.6U CN205927670U (en) 2016-08-27 2016-08-27 Electrolysis trough bottom plate concatenation rigid fastening structure

Publications (1)

Publication Number Publication Date
CN205927670U true CN205927670U (en) 2017-02-08

Family

ID=57953728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620951769.6U Active CN205927670U (en) 2016-08-27 2016-08-27 Electrolysis trough bottom plate concatenation rigid fastening structure

Country Status (1)

Country Link
CN (1) CN205927670U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108406152A (en) * 2018-05-03 2018-08-17 云南建投机械制造安装工程有限公司 Manufacture of large-size prebaked anode electrolytic bath shell engineering method
CN111774803A (en) * 2020-07-24 2020-10-16 上海外高桥造船有限公司 Mail steamer sheet metal upset frock

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108406152A (en) * 2018-05-03 2018-08-17 云南建投机械制造安装工程有限公司 Manufacture of large-size prebaked anode electrolytic bath shell engineering method
CN111774803A (en) * 2020-07-24 2020-10-16 上海外高桥造船有限公司 Mail steamer sheet metal upset frock

Similar Documents

Publication Publication Date Title
CN205927670U (en) Electrolysis trough bottom plate concatenation rigid fastening structure
CN103009009B (en) Welding method for ultra-large type three-section transformer oil tank
CN105057855A (en) Erecting welding technological method for single-upper-ring type large segmented stand ring with sole plates
CN105458469A (en) Welded aluminum alloy box and welding method
CN206474820U (en) The narrow gap welding groove of sheet material
CN117733352A (en) Technological method for efficiently welding longitudinal joints of pipe plug boxes
CN101386994B (en) Aluminum cell casing and preparation method thereof
CN102922096A (en) On-site assembly welding method for large aluminum tower
CN204417618U (en) A kind of aluminium electrolysis anode guide rod coupling device
CN204135547U (en) A kind of electric welding machine being exclusively used in stainless steel trough welding
CN106552832A (en) A kind of manufacturing process of nuclear fuel storage framework bush square tube
CN201301344Y (en) Shell of aluminum reduction cell
CN210231973U (en) Special equipment for multi-station simultaneous welding forming of water tank panel
CN208495468U (en) A kind of band steel bending device
CN207205651U (en) A kind of large-scale steel welding tooling
CN206335319U (en) Compressor pipe fitting welding positioning tool
CN207952500U (en) Box-type room bottom girder briquetting roller combines
CN210306489U (en) Stepped rotary welding tool for reamer
CN205141046U (en) Bar group battery
CN211387392U (en) Welding groove for PAW thick plate
CN208067529U (en) Pressure vessel thick plates cutting auxiliary device after pre-bending
CN210306422U (en) Full utmost point ear electricity core ultrasonic welding anchor clamps
CN213900716U (en) Two-dimensional connecting device of stainless steel tank body
CN204545678U (en) Submerged-arc welding machine dolly bracing or strutting arrangement
CN216938895U (en) Welding positioning device for H-shaped beam without back chipping

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 650000 Songming, Yunnan, Yang Linzhen,

Patentee after: Yunnan construction machinery manufacturing and Installation Engineering Co., Ltd.

Address before: 650000 Songming, Yunnan, Yang Linzhen,

Patentee before: Fourteen Metallurgical Construction Group Yunnan Machinery Manufacturing Installation Engineering Co., Ltd.