CN205919319U - Water side excessive pressure uninstallation safety device of cold sediment ware of water -cooled - Google Patents
Water side excessive pressure uninstallation safety device of cold sediment ware of water -cooled Download PDFInfo
- Publication number
- CN205919319U CN205919319U CN201620726484.2U CN201620726484U CN205919319U CN 205919319 U CN205919319 U CN 205919319U CN 201620726484 U CN201620726484 U CN 201620726484U CN 205919319 U CN205919319 U CN 205919319U
- Authority
- CN
- China
- Prior art keywords
- water
- sediment ware
- cold sediment
- valve
- slag cooler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Furnace Details (AREA)
Abstract
The utility model discloses a water side excessive pressure uninstallation safety device of cold sediment ware of water -cooled. Water intake pipe and outlet pipe way on cold sediment ware and cold sediment ware, the isolating valve is installed on the road to the outlet pipe, spring safety valve is installed on the road to outlet pipe between cold sediment ware and the isolating valve. The sediment ware water side excessive pressure uninstallation safety device that cools installs on the pipeline section, must directly experience the cooling water chamber pressure that the barrel inclined before the isolated valve in cold sediment ware cooling water outlet pipe way, in time provides the protection. The utility model discloses an at the water side excessive pressure uninstallation safety device of cold sediment ware, install promptly and on the pipeline section, install a spring safety valve through tee bend lug connection before the valve of cold sediment ware outlet pipe way, guarantee the safety of cold sediment ware barrel equipment, prevent cold sediment ware water side excessive pressure bad equipment that expands or the fried danger of splitting. Ensure cold sediment ware system device's safety and stability operation.
Description
Technical field
This utility model belongs to technical field of thermoelectricity, the water side overvoltage unloading peace of more particularly to a kind of water cooling cold cinder device
Full device.
Background technology
When steam power plant's fluid bed boiler water-cooling formula slag cooler normally runs, the high temperature warm sludge in burner hearth passes through slag cooler roller
It is delivered on defeated slag crust band, then be transported away by defeated slag crust band;Period using the cooling water flowing through slag cooler cylinder body outer wall, by high temperature
The heat absorption of warm sludge is taken away, and keeps in the zone of reasonableness of slag reduction of slag cooler outlet.So on the one hand reclaim the row of taking away
The heat loss of slag, on the one hand ensures that defeated slag crust band does not contact high temperature warm sludge and produces danger.
Existing slag cooler is not because considering the probability of water side overvoltage when equipment manufacturer designs, so not providing reliable guarantor
Shield.When slag cooler normally runs, cooling water flows through slag cooler, and arranged at safety valve is in Normal Shutdown state;But work as slag cooler running
If in occur unexpected lead to cooling water Inlet and outlet water valve closing, the cooling water heating that cylinder retains is boosted to very high by high temperature warm sludge
Pressure, but nowhere pressure release, may result in slag cooler water side and the swollen bad equipment of overvoltage or the danger bursting occur.
For that purpose it is necessary to safe design is re-started to the water lateral line of slag cooler, thoroughly solve slag cooler water side overvoltage and damage
The potential safety hazard of bad equipment, and finally realize the safe and stable operation of slag cooler system equipment.
Utility model content
The purpose of this utility model is to provide a kind of water side overvoltage of water cooling cold cinder device to unload safety device, by
The water side overvoltage unloading safety device of slag cooler, that is, be arranged on pipeline section before slag cooler outlet pipeline valve, direct by threeway
Connect and a spring loaded safety valve is installed, if solve to occur in existing slag cooler running surprisingly leading to cooling water to pass in and out
Penstock is closed, and the cooling water heating that cylinder retains is boosted to very high pressure by high temperature warm sludge, but nowhere pressure release, may result in
The swollen bad equipment of overvoltage or the dangerous problem bursting in slag cooler water side.
For solving above-mentioned technical problem, this utility model is achieved through the following technical solutions:
This utility model is a kind of water side overvoltage unloading safety device of water cooling cold cinder device, including slag cooler and slag cooler
On inlet pipeline and outlet pipeline;Isolating valve, going out between described slag cooler and isolating valve, are provided with described outlet pipeline
Spring loaded safety valve is provided with water lines.Slag cooler water side overvoltage unloading safety device is mounted in slag cooler cooling water water outlet
It is ensured that energy direct feeling, to the cooling water chamber pressure of cylinder side, provides protection in time on pipeline section before pipeline barrier valve.
Further, the feeding mouth of described slag cooler is connected with the slag notch of boiler, and the discharging opening of described slag cooler is located at
Above defeated slag crust band.
Further, described spring loaded safety valve is fixed on outlet pipeline by three way cock, with slag cooler water side chamber
Do not set pass close point between body space it is ensured that the relief valve of device can play a protective role conscientiously, will not lead to because closing by mistake protect
Shield exits situation.Eliminate the water side valve door being likely to occur during slag cooler runs to close by mistake, lead to the swollen evil idea of slag cooler water side overvoltage to set
The standby or danger that bursts is it is ensured that the safe and stable operation of slag cooler system equipment.
This utility model has the advantages that
This utility model passes through to unload safety device in the water side overvoltage of slag cooler, that is, be arranged on slag cooler outlet pipeline valve
In front of the door on pipeline section, it is directly connected to a spring loaded safety valve is installed by threeway;When slag cooler normally runs cooling water flow through cold
Slag device, arranged at safety valve is in Normal Shutdown state;If but leading to cooling water inlet/outlet valve when appearance is unexpected in slag cooler running
Door is closed, and the cooling water heating that cylinder is retained by high temperature warm sludge boosts to after certain pressure, relief valve be actionable pressure release it is ensured that
The safety of slag cooler cylindrical apparatus, prevents the swollen bad equipment of slag cooler water side overvoltage or the danger bursting.Guarantee slag cooler system
The safe and stable operation of system equipment.
Certainly, implement arbitrary product of the present utility model to it is not absolutely required to reach all the above advantage simultaneously.
Brief description
In order to be illustrated more clearly that the technical scheme of this utility model embodiment, will make to required for embodiment description below
Accompanying drawing be briefly described it should be apparent that, drawings in the following description be only some embodiments of the present utility model,
For those of ordinary skill in the art, on the premise of not paying creative work, can also obtain according to these accompanying drawings
Other accompanying drawings.
Fig. 1 is a kind of structural representation of the water side overvoltage unloading safety device of water cooling cold cinder device of the present utility model;
Fig. 2 is the structural representation of traditional water cooling cold cinder device.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely description is it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of making creative work
The all other embodiment being obtained, broadly falls into the scope of this utility model protection.
Of the present utility model description in it is to be understood that term " perforate ", " on ", D score, " thickness ", " top ",
" in ", " length ", " interior ", indicating position or the position relationship such as " surrounding ", be for only for ease of description this utility model and simplification
Description, rather than indicate or imply that the assembly of indication or element must have specific orientation, with specific azimuth configuration and behaviour
Make, therefore it is not intended that to restriction of the present utility model.
Refer to shown in Fig. 1, this utility model is a kind of water side overvoltage unloading safety device of water cooling cold cinder device, including
Inlet pipeline 5 on slag cooler 2 and slag cooler 2 and outlet pipeline 4, outlet pipeline 4 is provided with isolating valve, slag cooler 2 with every
On outlet pipeline 4 between disconnected valve, spring loaded safety valve 6 is installed.Slag cooler 2 water side overvoltage unloading safety device is mounted in
On pipeline section before the barrier valve of slag cooler 2 cooling water outlet pipe road 4 it is ensured that can direct feeling to cylinder side cooling water chamber pressure,
Protection is provided in time.
Wherein, the feeding mouth of slag cooler 2 is connected with the slag notch of boiler, and the discharging opening of described slag cooler 2 is located at defeated slag crust
Above band 3.
Wherein, spring loaded safety valve 6 is fixed on outlet pipeline 4 by three way cock, with slag cooler 2 water side cavity space
Between do not set pass close point it is ensured that the relief valve of device can play a protective role conscientiously, protection will be led to exit because closing by mistake
Situation.Eliminate the water side valve door that is likely to occur during slag cooler 2 runs to close by mistake, lead to the swollen bad equipment of slag cooler 2 water side overvoltage or
The danger that bursts is it is ensured that the safe and stable operation of slag cooler 2 system equipment.
High warm when wherein Fig. 2 normally runs for existing steam power plant fluid bed boiler water-cooling formula slag cooler 2, in burner hearth
Slag is delivered on defeated slag crust band 3 by slag cooler 2 cylinder, then is transported away by defeated slag crust band 3;Period is using flowing through slag cooler 2
The cooling water of external wall.
High temperature warm sludge in boiler 1 thorax is delivered on defeated slag crust band 3 slag cooler 2 cylinder, then is conveyed by defeated slag crust band 3
Walk;Period, using the cooling water flowing through slag cooler 2 cylinder body outer wall, the heat absorption of high temperature warm sludge is taken away, and keeps slag cooler 2 to go out
In the zone of reasonableness that the slag of mouth reduces.So on the one hand reclaim the heat loss taking away deslagging, on the one hand ensure defeated slag crust band not
Contact high temperature warm sludge produces dangerous.
The water side overvoltage unloading safety device of slag cooler is arranged on pipeline section before slag cooler outlet pipeline valve, that is, pass through three
Lead to and be directly connected to a spring loaded safety valve is installed.When slag cooler 2 normally runs, cooling water flows through slag cooler 2, arranged at safety valve in
Normal Shutdown state;If but leading to cooling water Inlet and outlet water valve closing, high temperature warm sludge when appearance is unexpected in slag cooler 2 running
The cooling water heating that cylinder is retained boosts to after certain pressure, and relief valve is actionable pressure release it is ensured that slag cooler 2 cylindrical apparatus
Safety, prevent the swollen bad equipment of slag cooler 2 water side overvoltage or the danger bursting.Guarantee the safety of slag cooler 2 system equipment
Stable operation.
In the description of this specification, the description of reference term " embodiment ", " example ", " specific example " etc. means
In conjunction with the specific features of this embodiment or example description, structure, material or feature be contained in of the present utility model at least one
In embodiment or example.In this manual, the schematic representation of above-mentioned term is not necessarily referring to identical embodiment or
Example.And, the specific features of description, structure, material or feature can be in any one or more embodiments or examples
In combine in an appropriate manner.
This utility model preferred embodiment disclosed above is only intended to help illustrate this utility model.Preferred embodiment is simultaneously
There is no all of details of detailed descriptionthe, do not limit the specific embodiment that this utility model is only described yet.Obviously, according to this theory
The content of bright book, can make many modifications and variations.This specification is chosen and is specifically described these embodiments, is in order to preferably
Explain principle of the present utility model and practical application, so that skilled artisan can be best understood by and utilize this
Utility model.This utility model is only limited by claims and its four corner and equivalent.
Claims (3)
1. the water side overvoltage unloading safety device of a kind of water cooling cold cinder device, including the water inlet on slag cooler (2) and slag cooler (2)
Pipeline (5) and outlet pipeline (4) it is characterised in that: on described outlet pipeline (4), isolating valve, is installed, described slag cooler (2) with
On outlet pipeline (4) between isolating valve, spring loaded safety valve (6) is installed.
2. a kind of water side overvoltage unloading safety device of water cooling cold cinder device according to claim 1 is it is characterised in that institute
The feeding mouth stating slag cooler (2) is connected with the slag notch of boiler, and the discharging opening of described slag cooler (2) is located on defeated slag crust band (3)
Side.
3. a kind of water side overvoltage unloading safety device of water cooling cold cinder device according to claim 1 is it is characterised in that institute
State spring loaded safety valve (6) to be fixed on outlet pipeline (4) by three way cock.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620726484.2U CN205919319U (en) | 2016-07-11 | 2016-07-11 | Water side excessive pressure uninstallation safety device of cold sediment ware of water -cooled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620726484.2U CN205919319U (en) | 2016-07-11 | 2016-07-11 | Water side excessive pressure uninstallation safety device of cold sediment ware of water -cooled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205919319U true CN205919319U (en) | 2017-02-01 |
Family
ID=57875393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620726484.2U Expired - Fee Related CN205919319U (en) | 2016-07-11 | 2016-07-11 | Water side excessive pressure uninstallation safety device of cold sediment ware of water -cooled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205919319U (en) |
-
2016
- 2016-07-11 CN CN201620726484.2U patent/CN205919319U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107366895A (en) | A kind of method of quick-replaceable coke dry quenching boiler drum safety valve | |
CN203731447U (en) | Screw conveying slag cooler | |
CN205919319U (en) | Water side excessive pressure uninstallation safety device of cold sediment ware of water -cooled | |
CN206420172U (en) | Fused salt heat exchanging safety relief device in a kind of solar energy thermal-power-generating technology | |
CN209024570U (en) | A kind of blast furnace cooling board water system | |
CN207584372U (en) | Explosion-proof air accumulator | |
CN103730171B (en) | A kind of liquid heavy metal cooling natural circulation bath-type reactor auxiliary heating system | |
CN205877720U (en) | Fuel oil depot pipe -line system | |
CN209988406U (en) | Energy-saving type heating and dosing device | |
CN207471822U (en) | A kind of intelligent heating furnace controller | |
CN108180622A (en) | A kind of intelligent electric water heater based on Internet of Things | |
CN205300274U (en) | Electronic boiler of high temperature resistance | |
CN203629052U (en) | Cooling system preventing normal-pressure hot-water boiler from being too hot | |
CN203443366U (en) | Furnace opening double cooling water flange of alloy furnace | |
TWI657144B (en) | Blast furnace furnace cooling system | |
CN207062427U (en) | Solar cell spreads source thermostat | |
CN205843396U (en) | Power-off electric furnace cooling water system | |
CN205641997U (en) | Cooling system | |
CN209197114U (en) | A kind of gas heater | |
CN203231521U (en) | Water boiler | |
CN210319978U (en) | Boiler with cooling function | |
CN103196227A (en) | Conduction oil furnace capable of preventing conduction oil from coking in furnace tube and using method | |
CN216205165U (en) | Device for preventing cooling water from entering sealed electric arc furnace | |
CN214949835U (en) | Normal pressure type heating water container device | |
CN203348580U (en) | High-temperature-resistant water-cooling gate valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180720 Address after: 230000 Xiuning Road, Shushan District, Hefei, Anhui Province, No. 66 Patentee after: HEFEI THERMOELECTRIC GROUP CO., LTD. Address before: No. 50, Anhui high tech Zone, Tian Zhi Road, Hefei, Anhui Patentee before: Hefei Tianyuan Thermal Power Co., Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170201 Termination date: 20190711 |
|
CF01 | Termination of patent right due to non-payment of annual fee |