CN205917710U - Connected node on basis - Google Patents

Connected node on basis Download PDF

Info

Publication number
CN205917710U
CN205917710U CN201620780166.4U CN201620780166U CN205917710U CN 205917710 U CN205917710 U CN 205917710U CN 201620780166 U CN201620780166 U CN 201620780166U CN 205917710 U CN205917710 U CN 205917710U
Authority
CN
China
Prior art keywords
basis
foundation
breach
connecting node
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620780166.4U
Other languages
Chinese (zh)
Inventor
李昌州
陈定球
俞大有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongmin Zhuyou House Technology Group Co ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620780166.4U priority Critical patent/CN205917710U/en
Application granted granted Critical
Publication of CN205917710U publication Critical patent/CN205917710U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of building engineering, a connected node on basis is disclosed, include first basis and second basis at least, first basis and second basis are U type basis, U type basis is rectangular shape and is equipped with U type groove, an at least lateral wall on first basis is equipped with the breach, the terminal surface concatenation on second basis is in breach department. In the work progress, on only needing to put the ground with U type basis, fall the prefab in position to the U type groove again, then cast -in -place a small amount of concrete, and need not a template, the construction is simple and convenient, in the aspect of the atress, adopt the U type basis of bar to be favorable to the prefab to transmit the guard action of lateral pressure, the groove arm in U type groove for connection structure is more firm, the utility model discloses setting up the breach with one of them basis of turning concatenation department, accomplishing the concatenation in the interior U type groove in basis, the concatenation also can be accomplished in concatenation department of the turning on basis to the prefab.

Description

A kind of connecting node on basis
Technical field
This utility model belong to construction engineering technical field and in particular to a kind of basis connecting node.
Background technology
Assembled architecture construction assembling when, the jail that prefabricated component, especially precoated plate and precast beam are connected with foundation ground Gu degree seriously governs the stability of whole building.At present, conventional prefabricated component is typically cast-in-place with the connected mode on basis Strip footing, after the completion of foundation construction, is set connecting reinforcing bar to basis, is finally connected reinforcing bar top with prefabricated component, Because connecting elements is fairly simple, it is poor with the steadiness that is connected of basis to often lead to prefabricated component, leads to structure cannot bear larger Load, therefore adopt conventional foundation, especially when prefabricated component is for Side fascia, under earth lateral pressure effect, wallboard is flat to bear Based on the Moments of face, under moment-out-plane effect, bottom section effective depth greatly reduces, and section bearing capacity reduces, wallboard Then become the weak link of stress with basic contact surface.
In sum, need a kind of connection being conducive to prefabricated component and basis of exploitation badly, and structural strength is higher with rigidity, whole The connecting node on the strong basis of body stability.
Utility model content
The purpose of this utility model is to provide a kind of connection being conducive to prefabricated component and basis, and structural strength is with rigidity relatively Height, the connecting node on the strong basis of stability in the large.
Above-mentioned purpose is to be achieved through the following technical solutions: a kind of basis connecting node, at least include first foundation and Second basis, described first foundation and the second basis are u-shaped basis, and described u-shaped basis is elongated and is provided with u-shaped groove, institute At least side wall stating first foundation is provided with breach, and the end face on described second basis splices in indentation, there.Described first foundation The setting of upper breach can be reserved in the prefabrication process of first foundation or site operation during according to actual feelings Condition cutting opens up.This utility model adopts the u-shaped basis of strip, is mainly used in the connection with wallboard, is different from prior art Middle use strip footing is put in the u-shaped groove on u-shaped basis it is only necessary to be put into u-shaped basis on ground, then by wallboard, then only Need cast-in-place a small amount of concrete, and without formwork supporting plate, easy construction;In terms of stress, be conducive to pre- using the u-shaped basis of bar shaped Product transmits lateral pressure, and the protective effect of the groove arm of u-shaped groove is so that attachment structure is more firm;Furthermore, this utility model bar shaped The use on u-shaped basis, the u-shaped groove on u-shaped basis cannot complete to splice in turning stitching portion, and prefabricated component cannot be ensured at turning The dropping place of stitching portion, this utility model, by wherein one basis instrument breach of turning stitching portion, completes the spelling of u-shaped groove in basis Connect, prefabricated component also can complete to splice in basic turning stitching portion.
Further, the breach of described first foundation is arranged on end sides, and described first foundation and the second basis splicing are in " l " type.
Further, the breach of described first foundation is arranged on the middle part of side wall, described first foundation and the second basis splicing It is in " t " type.
Further, also include the 3rd basis, described 3rd basis is u-shaped basis, described first foundation is provided with two breach, Two described breach are oppositely arranged on the middle part of two side respectively, and the end face on described second basis and the 3rd basis is spelled respectively It is connected on two indentation, there, described second basis, the 3rd basis and first foundation splicing are in " ten " font.
Further, the top of described u-shaped groove is wider than bottom.It is arranged such, the groove arm of u-shaped groove is in ramped shaped, u-shaped groove top Width is conducive to the dropping place of prefabricated component, and positioning action, especially the bottom width of u-shaped groove then can be played in the bottom of u-shaped groove to prefabricated component When degree and the cooperation of prefabricated component gap.
Further, the medial wall on described basis is provided with location rib.Fall in u-shaped groove for convenience of prefabricated component, usual u-shaped groove Width be more than the thickness of prefabricated component, the setting of location rib is mainly to ensure that dropping place position in basis for the prefabricated component keeps one Cause.
Further, described location rib is gradually thickening to bottom from top.Top and bottom described herein all with basis Top and bottom consistent.When prefabricated component dropping place, location rib has certain gradient, and guiding prefabricated component is to u-shaped trench bottom Mobile, be preferably relatively set with location rib in basic medial wall, when the distance in bottom for the location rib being oppositely arranged with When wallboard thickness is consistent, prefabricated component can be fixed on the middle part of u-shaped groove by fin, so ensure pre- in fallen with u-shaped basis Product dropping place as far as possible is at the middle part of u-shaped groove, and position consistency, keeps smooth.Location rib has positioning and fixes pre- The effect of product.
Further, the bottom of described u-shaped groove is provided with positive stop strip.In work progress, for increasing the prefabricated component falling in basis With basic cohesive force, adjust the flatness of prefabricated component simultaneously, screed can be laid in the bottom of u-shaped groove, so can be difficult to protect The height that card falls into the prefabricated component in basis is consistent, and arranges positive stop strip in the bottom of u-shaped groove, in all positive stop strips height In the case of consistent, all it is shelved on positive stop strip after prefabricated component dropping place, you can ensure that the height of prefabricated component is consistent.
Further, described location rib and positive stop strip and described basis one-piece casting molding.So, location rib and spacing Bar is more preferable with the globality on u-shaped basis, and compared to installation process, location rib and positive stop strip are fixed with the situation of installation, Constructing operation is more convenient.Certainly, location rib and positive stop strip can be to carry out pre-buried, Ran Houjin in basic prefabrication process The pouring of row basis, now location rib and positive stop strip prepared by steel material better.
Further, described positive stop strip is provided with least one and crosses slurry hole or cross stock tank.Setting one side crossing slurry hole or crossing stock tank Face ensures to fill out when slurry flow to u-shaped groove and have enough flowing spaces, substantial whole u-shaped groove, can avoid filling unreal, may be used simultaneously Slurry of filling out in gap between positive stop strip is connected integral, adhesion between basis and slurry, fills out the globality of slurry Higher, so, wallboard and u-shaped basis are reliably connected by filling out slurry formation, and that is, wallboard is more firm in basis, is difficult outside There is relative displacement in power effect and basis.
Brief description
The accompanying drawing constituting a part of the present utility model is used for providing further understanding to of the present utility model, and this practicality is new The schematic description and description of type is used for explaining this utility model, does not constitute to improper restriction of the present utility model.
Fig. 1~3 are respectively the transverse cross-sectional view of the connecting node on basis involved by a kind of embodiment of this utility model;
Fig. 4 is the vertical cross section figure of involved first foundation in Fig. 1;
Fig. 5 is the structural representation of the first foundation involved by a kind of embodiment of this utility model;
Fig. 6 is the vertical cross section figure of involved first foundation in Fig. 5.
In figure:
Basic 3 the 3rd basic 4 u-shaped grooves of 1 first foundation 2 second
5 breach, 6 location rib, 7 positive stop strip 8 crosses stock tank
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in detail, the description of this part is only exemplary and explanatory, Should not there is any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiment.
This utility model embodiment is as follows, with reference to Fig. 1~4, a kind of connecting node on basis, at least includes first foundation 1 With the second basis 2, described first foundation 1 and the second basis 2 be u-shaped basis, and described u-shaped basis is elongated and is provided with u-shaped Groove 4, at least side wall of described first foundation 1 is provided with breach 5, and the end face on described second basis 2 splices at breach 5.Institute The setting stating breach 5 on first foundation 1 can be reserved in the prefabrication process of first foundation 1 or site operation mistake Opened up according to practical situation cutting in journey.This utility model adopts the u-shaped basis of strip, is mainly used in the connection with wallboard, It is different from prior art using strip footing it is only necessary to be put into u-shaped basis on ground, then wallboard is put into the u on u-shaped basis In type groove 4, then only need cast-in-place a small amount of concrete, and without formwork supporting plate, easy construction;In terms of stress, using the u of bar shaped Type basis is conducive to prefabricated component transmission lateral pressure, and the protective effect of the groove arm of u-shaped groove 4 is so that attachment structure is more firm;Again Person, the use on this utility model bar shaped u-shaped basis, the u-shaped groove 4 on u-shaped basis cannot complete to splice in turning stitching portion, that is, no Method ensure the dropping place in turning stitching portion for the prefabricated component, this utility model by wherein one basis instrument breach 5 of turning stitching portion, Complete the splicing of u-shaped groove 4 in basis, prefabricated component also can complete to splice in basic turning stitching portion.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, the breach of described first foundation 1 5 are arranged on end sides, and described first foundation 1 and the second basis 2 splicing are in " l " type.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2, the breach of described first foundation 1 5 middle parts being arranged on side wall, described first foundation 1 and the second basis 2 splicing are in " t " type.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 3, also include the 3rd basis 3, institute Stating the 3rd basis 3 is u-shaped basis, and described first foundation 1 is provided with two breach 5, and two described breach 5 are oppositely arranged on respectively The middle part of two side, the end face on described second basis 2 and the 3rd basis 3 splices respectively at two breach 5, described second base Plinth the 2, the 3rd basis 3 and first foundation 1 splicing are in " ten " font.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 4, the top width of described u-shaped groove 4 In bottom.It is arranged such, the groove arm of u-shaped groove 4 is in ramped shaped, and u-shaped groove 4 top width is conducive to the dropping place of prefabricated component, u-shaped groove 4 Positioning action then can be played in bottom to prefabricated component, when especially the bottom width of u-shaped groove 4 is coordinated with prefabricated component gap.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 5 and Fig. 6, the inner side on described basis Wall is provided with location rib 6.Fall in u-shaped groove 4 for convenience of prefabricated component, the width of usual u-shaped groove 4 is more than the thickness of prefabricated component, fixed The setting of position fin 6 is mainly to ensure that dropping place position in basis for the prefabricated component is consistent.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 5 and Fig. 6, described location rib 6 Gradually thickening to bottom from top.Top and bottom described herein is all consistent with the top and bottom on basis.When prefabricated component falls During position, location rib 6 has certain gradient, and guiding prefabricated component moves to u-shaped groove 4 bottom, preferably in basic medial wall phase To being provided with location rib 6, when the distance in bottom for the location rib 6 being oppositely arranged is consistent with wallboard thickness, fin can be by Prefabricated component is fixed on the middle part of u-shaped groove 4, and so the prefabricated component dropping place as far as possible in guarantee fallen with u-shaped basis is in u-shaped groove 4 middle part, and position consistency, keep smooth.Location rib 6 has positioning and the effect of fixing prefabricated component.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 5 and Fig. 6, the bottom of described u-shaped groove 4 Portion is provided with positive stop strip 7.In work progress, for increasing prefabricated component and the cohesive force on basis falling in basis, adjust prefabricated simultaneously The flatness of part, can lay screed in the bottom of u-shaped groove 4, so can be difficult to ensure that the height of the prefabricated component falling in basis It is consistent, and positive stop strip 7 is set in the bottom of u-shaped groove 4, in the case that all positive stop strips 7 are highly consistent, prefabricated component dropping place All it is shelved on afterwards on positive stop strip 7, you can ensure that the height of prefabricated component is consistent.
On the basis of above-described embodiment, in another embodiment of this utility model, described location rib 6 and positive stop strip 7 with Described basis one-piece casting molding.So, location rib 6 and positive stop strip 7 are more preferable with the globality on u-shaped basis, and compared to peace Dress process is fixed the situation of installation to location rib 6 and positive stop strip 7, and constructing operation is more convenient.Certainly, location rib 6 With positive stop strip 7 can be carry out in basic prefabrication process pre-buried, then carry out basis pour, now location rib 6 He Positive stop strip 7 is prepared better by steel material.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 5 and Fig. 6, described positive stop strip 7 sets At least one is had to cross slurry hole or cross stock tank 8.Cross slurry hole or cross stock tank 8 setting on the one hand ensure to fill out slurry to u-shaped groove 4 flow when There are enough flowing spaces, enrich whole u-shaped groove 4, can avoid filling unreal, simultaneously can be by the gap between positive stop strip 7 Fill out slurry and connect integral, adhesion between basis and slurry, the globality filling out slurry is higher, so, wallboard and u-shaped basis Being reliably connected by filling out slurry formation, that is, wallboard is more firm in basis, being difficult in outer masterpiece with there is relative position with basis Move.
The above is only preferred implementation of the present utility model it is noted that common skill for the art For art personnel, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of basis connecting node, at least include first foundation and second basis it is characterised in that described first foundation and Second basis is u-shaped basis, and described u-shaped basis is elongated and is provided with u-shaped groove, and at least side wall of described first foundation sets Jagged, the end face on described second basis splices in indentation, there.
2. the connecting node on basis according to claim 1 is it is characterised in that the breach of described first foundation is arranged on end Portion side, described first foundation and the second basis splicing are in " l " type.
3. the connecting node on basis according to claim 1 is it is characterised in that the breach of described first foundation is arranged on side The middle part of wall, described first foundation and the second basis splicing are in " t " type.
4. the connecting node on basis according to claim 1 is it is characterised in that also include the 3rd basis, described 3rd base Plinth is u-shaped basis, and described first foundation is provided with two breach, and two described breach are oppositely arranged in two side respectively Portion, described second basis and the end face on the 3rd basis splice in two indentation, there respectively, described second basis, the 3rd basis and First foundation splicing is in " ten " font.
5. the connecting node on the basis according to Claims 1 to 4 any one is it is characterised in that the top of described u-shaped groove It is wider than bottom.
6. the connecting node on basis according to claim 5 is it is characterised in that the medial wall on described basis is provided with convex Rib.
7. according to claim 6 basis connecting node it is characterised in that described location rib from top to bottom by Gradual change is thick.
8. the connecting node on basis according to claim 7 is it is characterised in that the bottom of described u-shaped groove is provided with positive stop strip.
9. basis according to claim 7 connecting node it is characterised in that described location rib and positive stop strip with described Basic one-piece casting molding.
10. the connecting node on basis according to claim 9 is it is characterised in that described positive stop strip is provided with least one mistake Starch hole or cross stock tank.
CN201620780166.4U 2016-07-22 2016-07-22 Connected node on basis Expired - Fee Related CN205917710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620780166.4U CN205917710U (en) 2016-07-22 2016-07-22 Connected node on basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620780166.4U CN205917710U (en) 2016-07-22 2016-07-22 Connected node on basis

Publications (1)

Publication Number Publication Date
CN205917710U true CN205917710U (en) 2017-02-01

Family

ID=57872165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620780166.4U Expired - Fee Related CN205917710U (en) 2016-07-22 2016-07-22 Connected node on basis

Country Status (1)

Country Link
CN (1) CN205917710U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196091A (en) * 2020-10-12 2021-01-08 福建省锦秋建筑工程有限公司 Assembled building U-shaped groove foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196091A (en) * 2020-10-12 2021-01-08 福建省锦秋建筑工程有限公司 Assembled building U-shaped groove foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN208363127U (en) A kind of retaining wall structure of combined type high-speed rail platform
CN203498799U (en) Prefabricated hollow pipe pile water-facing envelop enclosure
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN103821180A (en) Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure
CN103061357B (en) Connection joint between basement base plate and underground diaphragm wall
CN205917862U (en) Connected node on basis
CN205917710U (en) Connected node on basis
CN110306591A (en) A kind of base pit engineering exempts to set the construction method of the underground structure of temporary support
CN212714296U (en) Box type roadbed and bridge transition structure
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN211285725U (en) Basin hills abrupt slope area high-rise building synthesizes earthquake-resistant structure
CN210481900U (en) Vertical lattice type prefabricated assembly segment and high-speed railway foundation assembled by same
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN111155535A (en) Underground continuous wall and foundation slab's pre-buried steel sheet connection structure
CN207017169U (en) A kind of high-filled subgrade culvert off-loading structure
CN106567365A (en) Earth and rockfill dam longitudinal reinforcement construction method
CN206503160U (en) A kind of continuous underground wall structure with measure of anti float
CN102561551A (en) Thick wall and construction method thereof
CN205917712U (en) Connected node on basis
CN209429054U (en) Seepage prevention of dam founda structure in ultra-deep thick-covering
CN115262531A (en) Forming and designing method for underground continuous wall serving as vibration isolation barrier
CN103362123A (en) Reverse Y-shaped filling pile and construction method thereof
CN210134293U (en) Horizontal lattice type prefabricated assembly segment and high-speed railway foundation assembled by same
CN109356101A (en) Seepage prevention of dam founda structure in ultra-deep thick-covering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180810

Address after: 410015 clocks Road 10, Kaifu District, Changsha, Hunan

Patentee after: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Address before: 410205 room 3005, complex building, Changsha Jin Xia bonded logistics center, 30 Xingang Road, Kaifu District, Changsha, Hunan.

Patentee before: Zhongmin Zhuyou Technology Investment Co.,Ltd.

TR01 Transfer of patent right
EE01 Entry into force of recordation of patent licensing contract

Assignee: Guangdong Hengli Investment Co.,Ltd.

Assignor: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Contract record no.: 2019430000020

Denomination of utility model: Connected node on basis

Granted publication date: 20170201

License type: Common License

Record date: 20190703

Assignee: Guangdong Jianhui Investment Consulting Co.,Ltd.

Assignor: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Contract record no.: 2019430000019

Denomination of utility model: Connected node on basis

Granted publication date: 20170201

License type: Common License

Record date: 20190703

Assignee: Yun yuan Qing

Assignor: ZHONGMIN ZHUYOU HOUSE TECHNOLOGY GROUP Co.,Ltd.

Contract record no.: 2019430000018

Denomination of utility model: Connected node on basis

Granted publication date: 20170201

License type: Common License

Record date: 20190703

EE01 Entry into force of recordation of patent licensing contract
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201

Termination date: 20210722

CF01 Termination of patent right due to non-payment of annual fee