CN205908296U CN201620629374.4U CN201620629374U CN205908296U CN 205908296 U CN205908296 U CN 205908296U CN 201620629374 U CN201620629374 U CN 201620629374U CN 205908296 U CN205908296 U CN 205908296U
Authority
CN
China
Prior art keywords
rock
fiber cloth
basalt fiber
anchor pole
country rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620629374.4U
Other languages
Chinese (zh)
Inventor
苏国韶
陈康
胡李华
汤世铖
陈智勇
江权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201620629374.4U priority Critical patent/CN205908296U/en
Application granted granted Critical
Publication of CN205908296U publication Critical patent/CN205908296U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a reduce country rock reinforcerment system of rock burst harm, includes screed -coat, basalt fiber cloth layer and a plurality of stocks, the screed -coat sets up on the country rock surface, the basalt fiber cloth layer sets up on the screed -coat surface, and a plurality of stocks distribute and implant on the country rock. Implementation method is: in rock mass excavation back, make level to the surperficial wet blasting one deck concrete of country rock, paste the basalt fiber cloth who has high tensile strength along concreted structure rapidly before treating the concrete initial set, then installing anchor, the stock passes basalt fiber cloth and concrete leveling layer plants the rock -entering body, thereby make the country rock, concrete is sprayed, basalt fiber cloth and stock crowd form a country rock reinforcerment system, show the tensile strength who improves the country rock top layer, thereby prevent effectively that the bending of country rock top layer splitting rock plate from being drawn the rupture, and then the emergence of suppression rock burst, or utilize top layer rock plate to take place high -speed launch in order to block that the rock burst fragment is direct to excavation face as the protection shield, reduce rock burst harm from this.

Description

A kind of surrounding rock consolidation system reducing rock burst harm
Technical field
This utility model is related to deep underground rock engineering wall rock reinforcing technology, belongs to rock mechanics and engineering technology neck Domain.
Background technology
With China's foundation engineering construction, HYDROELECTRIC ENERGY exploitation, mine resource exploitation, traffic tunnel engineering, railway construction Progressively deep (bury and be more than 800m), it will increasing deep underground chamber and Deep-buried Long And Big Tunnels/tunnel work occur Journey, the deep underground engineering dynamic disaster problem with rock burst as representative increases increasingly, causes grave danger to deep engineering, is system The critical bottleneck problem of about deep underground engineering Security Construction.
Rock burst is the hard fragility country rock generation ejection property destruction that high-ground stress area is caused due to Underground Engineering Excavation off-load A kind of geological disaster phenomenon.It is in the excavation off-load of the deep hard brittle rock under three-dimensional stress state, it will lead in rock mass Portion's stresses re-distribution and elastic strain energy local cluster.When excavating the stress concentration that causes or the country rock being caused by energetic disturbance When stress exceedes the bearing capacity of rock, country rock will produce violent power destruction, gather the rock block of great number of elastic energy Gone out with the ejection of speed faster.Rock burst has the sudden of height and randomness it is difficult to Accurate Prediction, and surrounding rock consolidation is One of most important means of current rock burst prevention and control.
Currently, bolt-spary supports system is most widely used a kind of form during underground rock cavern is reinforced.Cavern excavation Afterwards, the shotcrete layer applying rapidly and anchor pole can provide certain supporting power from free face for country rock, prevent country rock table The extensional cracking of layer, and the failure by shear within country rock can be controlled by anchor pole.But, descend engineering practice both at home and abroad in large quantities Show, bolt-spary supports system is not properly suited for thering is the country rock of strong rock burst tendency under large ground pressure it is difficult to prevent The only generation of strong rock burst.Main reason is that gunite concrete tensile strength is limited it is difficult to effectively prevent the tensioning of country rock top layer Splitting forms rock beam, fractures and then lead to the generation of rock burst after rock beam bending tensile.Additionally, the contact between anchor pole is not tight Close, lead to the weak area between anchor pole to become the breach of rock burst generation so that anchor pole is difficult to play combined supporting effect, lead Cause anchor pole arrangement density bigger than normal, thereby increase surrounding rock consolidation expense.For this reason, this utility model application has high-tensile spy The basalt fiber cloth of property is covered in country rock surface, significantly improves the tensile strength on country rock top layer, thus effectively preventing country rock table Layer splitting rock beam bending tensile fractures, and then suppresses the generation of rock burst, or by the use of top layer rock beam as protection shield to stop rock Directly there is high speed ejection to excavation face in quick-fried fragment, thus reduce rock burst harm.This system have realize easy, with low cost, The advantages of high energy absorption capacity, rock burst protection effect are good.
It is extremely strong or strong that the utility model patent for cn101270667a for the application publication number describes a kind of yield of deep-buried cavities The surrounding rock supporting system of strong or medium rock burst hole section, the mainly density by adjusting anchor pole and anchor cable control different degrees of Rock burst intensity, when rock burst intensity is high, needs to arrange the larger anchor pole of density and anchor cable, will bring the too high problem of reinforcement cost. Additionally, the adjustment of the arrangement density of supporting construction depends on the experience of Field Force, execute-in-place difficulty is larger.Further, rock burst Engineering practice proves, when especially strong rock burst occurs, when bar-mat reinforcement and gunite concrete fully effective can not stop that rock burst occurs High speed ejection and the rock fragment that goes out.
The utility model proposes the surrounding rock consolidation system that a kind of basalt fiber cloth of rock burst harm is acted on combining anchor, Absorbing energy when rock burst occurs not only by the change such as deformation and plate folding, thus reducing rock burst grade, and can hinder When only strong rock burst occurs, high speed rock fragment launches to country rock surface, thus being prevented effectively from or reducing rock burst hazard to people Member and the security threat of excavation equipment.
Utility model content
The utility model proposes a kind of basalt fiber cloth reducing rock burst harm acts on surrounding rock consolidation system with combining anchor System, this system mainly improves country rock top layer tensile property by having high-tensile basalt fiber cloth, and effectively strengthens The weak area of country rock between anchor pole, reaches the generation of suppression rock burst, or by the use of top layer rock beam as protection shield to shield rock Directly there is the purpose of high speed ejection destruction to excavation face in quick-fried fragment.
To achieve these goals, this utility model employs technical scheme below:
A kind of surrounding rock consolidation system reducing rock burst harm, including screed-coat, basalt fibre layer of cloth and some anchor poles, Described screed-coat is arranged on country rock surface, and described basalt fibre layer of cloth is arranged on levelling layer surface, and some anchor pole distributions are planted Enter on country rock.
Further, described screed-coat is gunite concrete, shotcrete or Binder Materials.Screed-coat possesses one Fixed stickiness, facilitates stickup and the fixation of follow-up basalt fiber cloth.
Further, the thickness of described basalt fiber cloth is 0.5mm, and surface density is 300g/m2.Described basalt Fiber cloth is with basalt fibre woven fabric as base material, soaks the bidirectional stretch cloth of coating braiding through the anti-emulsion of macromolecule, There is good alkali resistance, pliability and through broadwise high resistance pulling force.
Further, described anchor pole is to be implanted directly into formula machinery anchor pole.Described anchor pole mainly will be enclosed by frictional force Rock is fixed, such as reverse wedge formula anchor metal, pipe-seam type anchor rod etc..
Further, described basalt fiber cloth is pasted, and need to carry out in concrete initial set, flattens basalt during stickup Fiber cloth is allowed to surfaces externally and internally and is all impregnated with by concrete and is close to it is ensured that the tensile characteristics of basalt fiber cloth are fully sent out Wave.
Further, described anchor pole implantation need to be carried out rapidly after basalt fiber cloth pastes completion, prevents concrete Solidify in atmosphere, and can successfully basalt fiber cloth be fixed in levelling layer surface, make the basalt after the completion of maintenance Fiber cloth, anchor pole and country rock form unified overall.
Further, before implantation anchor pole, push the ribbon reserving hole in length and breadth of basalt fiber cloth aside, do bid Note, is easy to anchor pole implantation, and is unlikely to cut staple cloth.
Compared with prior art, the beneficial effect that this utility model possesses:
It is obviously improved Surrounding Rock Strength, reduce rock burst occurrence risk.The basalt fiber cloth being impregnated with by concrete is in country rock table Paste on face and concrete curing after the completion of, a stiffness layer is collectively forming with country rock surface due to the glued effect of concrete Greatly rock beam, is not susceptible to fracture under the anchorage effect of anchor pole, and country rock can put aside more elasticity energy, so that country rock Intensity is increased dramatically, so reducing the risk of rock burst generation on the whole.
A large amount of elastic strain energies absorbing in rock burst preparation process, are greatly reduced rock burst intensity.Increasing with mining depth Plus, underground chamber excavates the rock rupture that the high-ground stress that causes leads to will be inevitable, when rock is disturbed load action When, stress increases further.The rigidity of rock beam ensure that its big energy that will dissipate in snap-off process so that rock burst intensity drops Low, or even surrounding rock failure form can be made to switch to brittle break by rock burst ejection destruction, reach the effect reducing rock burst harm further Really.
Country rock surface forms rigid course, stops rock burst ejection from destroying, improves engineering safety coefficient.Traditional country rock adds Gu system, concrete spray coating can produce substantial amounts of " slungshot " as single surface supporting unit when rock burst occurs, and our Basalt fiber cloth in face forms the great rock beam of rigidity with country rock surface, and country rock surface is also finer and close, prevents rock burst During generation, the ejection of fragment and peeling, prevent engineering staff and equipment are worked the mischief.
With low cost, easy construction.The price of basalt fiber cloth be less than bar-mat reinforcement, can directly commercially, and The prefabricated of bar-mat reinforcement also needs to consume manually, and basalt fiber cloth is easy to hang than bar-mat reinforcement on bonding method.
Rigid flexible system, supporting construction has ductility.Supporting focus on control rock rupture after situation, rather than stop Rock rupture.The high-strength pulling-resisting characteristic of basalt fiber cloth also absorbs a large amount of country rocks while allowing country rock dilatancy and amasss The elasticity energy storing, greatly reduces the intensity of rock burst generation.After large deformation, conical anchor rod and friction bolt still possess Bearing capacity, the tension force on country rock surface is shifted to country rock depths, thus reach coupling hardness with softness, the effect of combined supporting.Additionally, This supporting construction possesses certain ductility, occurs to win time escape for workmen during rock burst, reduces engineering risk.
Brief description
Fig. 1 is the construction procedure flow chart of the surrounding rock consolidation system reducing rock burst harm described in the utility model;
Fig. 2 is tunnel cross sectional schematic diagram after embodiment completion described in the utility model;
Fig. 3 is utilization true triaxial rockburst testing machine schematic diagram described in the utility model;
Fig. 4 is sample upper bolt layout drawing described in the utility model;
Fig. 5 is the sample photo being mounted with anchor pole in true triaxial rockburst test described in the utility model;
Fig. 6 is sample rock burst destructive process high-speed camera sectional drawing in true triaxial rockburst test described in the utility model;
Fig. 7 is damage -form photo after sample rock burst in true triaxial rockburst test described in the utility model.
In figure:
1. screed-coat;2. basalt fibre layer of cloth;3. sample;4.x cuts somebody's hair to loading;5.z cuts somebody's hair to loading;6. rock sample is opened Hole;7. pad;8. stop the bending rock beam that rock burst fragment outwards launches;9. nut;10. threaded rod;11. anchor poles.
Specific embodiment
For making the purpose of this utility model, technical scheme become apparent from understanding, below in conjunction with one in Figure of description Embodiment and the indoor rock burst test of a basalt fiber cloth and combining anchor supporting rock sample, to technology of the present utility model Scheme is clearly and completely described.
The construction procedure of embodiment is as follows:
Step 101, in the tunnel surrounding surface wet shotcreting screed-coat excavating.
Specifically, by the section configuration tunneling of design, after the completion of excavation, adopt wet-spray technique on tunnel surrounding surface Gunite concrete screed-coat (can take 30mm thickness).Spraying operation first sprays upwards from arch springing or corner, gunite concrete surface Should substantially flat and state of trickling in moistening no dry spot or sliding.Screed-coat plays closing country rock, fills up wall-rock crack, prevents and treats and enclose The effect that rock air slaking and surface crag collapse.
Step 102, rapid stickup basalt fiber cloth before the initial set of concrete leveling layer.
Specifically, basalt fiber cloth cut growth is slightly over the value of Tunnel Design section girth, a width of 5 meters of square Shape cloth (width can also be that other can be beneficial to on-site cutting and the value of arrangement), along the paving one by one of tunnel piercing direction.Paste When, compression basalt fiber cloth is allowed to be impregnated with by cement mortar it is ensured that the high-strength pulling-resisting characteristic of basalt fiber cloth and concrete In conjunction with being not fully exerted after integral, and the lap of splice between adjacent rectangle basalt fiber cloth is not less than 300mm.
Step 103, pastes in basalt fiber cloth and completes and implantation anchor pole rapid on the country rock after concrete initial set.
Specifically, implant anchor pole using roof-bolter, the spacing between anchor pole will meet the support density of design requirement, and Less than 2m.Basalt fiber cloth lap-joint must have anchor pole to implant, and increases anchor pole implant density in this region.Note Before implantation anchor pole, push the ribbon reserving hole in length and breadth of basalt fiber cloth aside, make a mark, be easy to anchor pole implantation, and It is unlikely to cut staple cloth.Anchor pole implantation direction is tried one's best vertical with strata structure face.Make basalt fiber cloth by the support on anchor pole Disk is pushed down, and is close on country rock it is ensured that the integrity of the support system being made up of concrete, basalt fiber cloth, anchor pole.
Additionally, the laboratory test checking embodiment of basalt fiber cloth and combining anchor supporting effect is as follows:
Occurred under conditions of anchor pole and basalt fibre combined supporting come simulation rock using true triaxial pressure testing machine Rock burst or brittle break process, comprise the following steps:
1) rock sample preparation: rock sample is middle coarse grain red granite, takes from Guangxi Zhuang Autonomous Region Wuzhou Cenxi county.Rock Sample density is about 2607kg/m3, average uniaxial compressive strength is about 120mpa, and under room temperature, longitudinal wave velocity is about 5.2km/s, completely Property and uniformity are preferable.
2) rock sample processing: perforate direction is perpendicular to specimen surface, opening diameter 8mm, perforate depth 75mm ± 2mm.Perforate Carry out again afterwards cutting, polish, the specimen size after machine-shaping is 200mm × 100mm × 100mm, perforate is located at specimen surface Center, machining accuracy strictly presses the execution of International Rock mechanics association criterion.Anchor pole arrangement on sample is as shown in Figure 4.
3) implant anchor pole: from threaded rod and corresponding nut and square washer simulation anchor pole, make using cement mortar For cementing agent, threaded rod is binded in reserving hole.Described anchor pole adopts the hrb300 level threaded rod of a diameter of 6mm;Described Pallet dimension be 30mm × 30mm × 2.5mm, described nut is 4.8 grades of zinc-plated hex nuts for 6mm for the internal diameter;Duct is adopted It is in the milk with cement mortar.
4) paste basalt fiber cloth: cement mortar is equably applied on the scar having implanted anchor pole, then pastes one Layer and scar basalt fiber cloth in the same size, flatten basalt fiber cloth and are allowed to be impregnated with by cement mortar, reuse nut handle Square washer is fixed on fiber cloth surface, and maintenance is no less than seven days under the conditions of suitable temperature and humidity.Actual maintenance is complete The assay maps becoming is as shown in Figure 5.
5) install: the sample that maintenance is completed is placed in true triaxial test machine and carries out rock burst experiment.Using true triaxial test The schematic diagram that machine carries out rock burst experiment is as shown in Figure 3.
6) load: experiment (faces sky using the load mode of " five face stress-one side faces empty-axially loaded ", i.e. y-axis direction In the face of facade) minimum principal stress and x-axis direction intermediate principal stress be loaded into certain value after keep constant, according to certain plus Carry speed and gradually apply the load of biggest principal stress direction until there is rock burst.The σ x of this experiment takes 30mpa, σ y to take 5mpa, σ z The loading speed of direction load is 0.5mpa/s.
The rock burst destructive process of sample is as shown in Figure 6.
After experiment, the damage -form figure of sample is as shown in Figure 7.
Can be drawn by Fig. 7 and experimental data: first, the outermost rock mass of free face and fiber cloth are combined into a rigidity very Big rock beam, prevents the ejection to free face for the fragment.Secondly, although rock beam bending, peeling is not had to get off, and in bending When absorb substantial amounts of elasticity can, can be seen that from sample side and do not form the shearing crack running through, after rock burst sample is relatively Completely, rock burst intensity substantially reduces.Finally, from experimental data gained, the intensity of country rock is increased dramatically.

Claims (7)

  1. If a kind of reduce rock burst harm surrounding rock consolidation system it is characterised in that include screed-coat, basalt fibre layer of cloth and Dry root anchor pole, described screed-coat is arranged on country rock surface, and described basalt fibre layer of cloth is arranged on levelling layer surface, some anchors Bar is implanted on country rock.
  2. 2. the surrounding rock consolidation system reducing rock burst harm as claimed in claim 1 is it is characterised in that described screed-coat is spray Penetrate concrete, shotcrete or Binder Materials.
  3. 3. the surrounding rock consolidation system reducing rock burst harm as claimed in claim 1 is it is characterised in that described basalt fibre The thickness of cloth is 0.5mm, and surface density is 300g/m2.
  4. 4. the surrounding rock consolidation system reducing rock burst harm as claimed in claim 1 is it is characterised in that described anchor pole is direct Implanted machinery anchor pole.
  5. 5. the surrounding rock consolidation system reducing rock burst harm as claimed in claim 1 is it is characterised in that described basalt fiber cloth Stickup, need to carry out in concrete initial set, flatten basalt fiber cloth during stickup and be allowed to surfaces externally and internally and be all impregnated with by concrete And be close to it is ensured that the tensile characteristics of basalt fiber cloth are not fully exerted.
  6. 6. the surrounding rock consolidation system reducing rock burst harm as claimed in claim 1 is it is characterised in that described anchor pole implantation needs Carry out rapidly after basalt fiber cloth pastes completion, prevent concrete from solidifying in atmosphere, and can be successfully fine by basalt Wei Bu is fixed in levelling layer surface, so that the country rock after the completion of maintenance, basalt fiber cloth and anchor pole is formed unified overall.
  7. 7. as claimed in claim 1 reduce rock burst harm surrounding rock consolidation system it is characterised in that implantation anchor pole before, Push the ribbon reserving hole in length and breadth of basalt fiber cloth aside, make a mark, be easy to anchor pole implantation, and be unlikely to cut staple Cloth.
CN201620629374.4U 2016-06-22 2016-06-22 Reduce country rock reinforcerment system of rock burst harm Expired - Fee Related CN205908296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620629374.4U CN205908296U (en) 2016-06-22 2016-06-22 Reduce country rock reinforcerment system of rock burst harm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620629374.4U CN205908296U (en) 2016-06-22 2016-06-22 Reduce country rock reinforcerment system of rock burst harm

Publications (1)

Publication Number Publication Date
CN205908296U true CN205908296U (en) 2017-01-25

Family

ID=57812472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620629374.4U Expired - Fee Related CN205908296U (en) 2016-06-22 2016-06-22 Reduce country rock reinforcerment system of rock burst harm

Country Status (1)

Country Link
CN (1) CN205908296U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927244A (en) * 2016-06-22 2016-09-07 广西大学 Surrounding rock consolidation system for reducing rock burst hazards

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927244A (en) * 2016-06-22 2016-09-07 广西大学 Surrounding rock consolidation system for reducing rock burst hazards

Similar Documents

Publication Publication Date Title
Kang Support technologies for deep and complex roadways in underground coal mines: a review
Yu et al. Stability of close chambers surrounding rock in deep and comprehensive control technology
Li et al. Conservation of Jiaohe ancient earthen site in China
CN105804767B (en) A kind of the surrounding rock supporting construction method and surrounding rock supporting structure in the aqueous tunnel of coal mine
CN108643602A (en) A kind of outsourcing anchor steel ruggedized construction suitable for concrete beam and column node
CN109972538A (en) A kind of steel plate is interior to fill filler material composite reinforcement concrete bridge structure and construction technology
Gu et al. Occurrence mechanism of roof‐fall accidents in large‐section coal seam roadways and related support design for Bayangaole Coal Mine, China
WO2019109700A1 (en) Anchor bolting method for enhancing roof stability using reinforced roof and side of coal roadway
CN105927244A (en) Surrounding rock consolidation system for reducing rock burst hazards
Guo et al. Comprehensive treatment methods of floor heave disasters in mining areas of China
CN110645018B (en) Mine underground strong dynamic pressure roadway prestress anchor-charging integrated supporting structure and method
CN101871267A (en) Composite strengthening technology of aged reinforced concrete beam
CN205908296U (en) Reduce country rock reinforcerment system of rock burst harm
CN107503779A (en) A kind of extrusion pressing type Support System in Soft Rock Tunnels prestress anchorage cable group supporting construction and construction technology
Zhang et al. Dam foundation excavation techniques in China: a review
LU504639B1 (en) Method of Controlling the Stability of Surrounding Rocks of Large-section Railway Tunnels
Kałuża Analysis of in-plane deformation of walls made using AAC blocks strengthened by GFRP mesh
CN105201525B (en) A kind of recoverable preventing and treating pucking method
CN116558383A (en) Tunnel rock burst prevention and control method and system
Wu et al. Research on Failure Characteristics and Zoning Control Technology of Thick‐Soft Surrounding Rock for Deep Gob‐Side Entry Retaining
Qiao Experimental and numerical analysis of thin spray-on liner materials for use in underground mines
CN108729917A (en) The method for preventing bump
Zheng et al. Pullout behaviour of FRP anchors in clay bricks
CN207018018U (en) A kind of extrusion pressing type Support System in Soft Rock Tunnels prestress anchorage cable group's supporting construction
Yu et al. Grouting Technique for Gob‐Side Entry Retaining in Deep Mines

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125