CN205907605U - Laser positioning device that steel bridge segmental hoisting was under construction night - Google Patents

Laser positioning device that steel bridge segmental hoisting was under construction night Download PDF

Info

Publication number
CN205907605U
CN205907605U CN201620699290.8U CN201620699290U CN205907605U CN 205907605 U CN205907605 U CN 205907605U CN 201620699290 U CN201620699290 U CN 201620699290U CN 205907605 U CN205907605 U CN 205907605U
Authority
CN
China
Prior art keywords
steel
bolt
girder
night
antelabium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620699290.8U
Other languages
Chinese (zh)
Inventor
苏昱晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201620699290.8U priority Critical patent/CN205907605U/en
Application granted granted Critical
Publication of CN205907605U publication Critical patent/CN205907605U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a laser positioning device that steel bridge segmental hoisting was under construction night for the hoist and mount location of steel structure bridge's segmentation steel case roof beam, including laying the laser emitter on installing steel case roof beam and laying the measurement board of taking the scale on waiting to install steel case roof beam. When construction hoist and mount at night, will treat to have installed steel case roof beam and lift by crane to the preset position after, open the laser emitter who installs on the steel case roof beam, utilize light along straight line propagation's principle, will manifest a luminous point on waiting to install the measurement board on the steel case roof beam. If the in position of luminous point be in to measure the initial point of scale on the board, then the explanation wait to install steel case position of sill and put the accuracy, if the installation not on the initial point, is then explained and has the error that site operations personnel accessible reads the coordinate of measuring on the board, adjusts the position of waiting to install steel case roof beam in the position of luminous point for wait to install steel case roof beam and installed steel case roof beam and also can realize accuracy, quick location at night, showing and reducing on -the -spot manpower measuring work load, reduce the human cost.

Description

The laser locating apparatus that a kind of steel bridge segmental hoisting carries on construction work at night
Technical field
The utility model is related to the realm of building construction, the laser positioning that more particularly, to a kind of steel bridge segmental hoisting carries on construction work at night Device.
Background technology
At present, in the construction of city steel structure bridge, the lifting positioning for segmentation steel box-girder mostly adopts total powerstation etc. Optical gauge, this may bring problems with:
1) although total powerstation can read coordinate data automatically, its leveling, be aligned, may there is still a need for artificial operate Produce operating error;
2) because steel construction is very sensitive for temperature change, therefore the lifting of steel construction (especially cantilever lifting) is mostly selected Select at night (i.e. when temperature constant), night is not enough, is unfavorable for the positioning to steel box-girder for the survey crew.
According to the preliminary search result to existing patent, do not find related special dedicated for bridge hoisting laser positioning Profit.The patent of laser is applied mainly to have in science of bridge building following two, wherein first is to measure using laser ranging system A kind of bridge span (patent name: laser measuring device for measuring of bridge span, application number: 201520033787.1), second is Measure deformation (patent name: highway bridge bearing capacity detection means, application in loading test for the bridge using laser technology Number: 201520234990.5).
Therefore, how to provide a kind of facilitate site operation personnel at night, steel box-girder accurately and fast to be positioned, reduce The laser locating apparatus that the steel bridge segmental hoisting of the workload of live manpower measurement carries on construction work at night, it has also become construction circle need to be entered The technical problem of one step improvement and optimization.
Utility model content
The purpose of this utility model is the laser locating apparatus providing a kind of steel bridge segmental hoisting to carry on construction work at night, by Installed with steel box-girder to be installed on lay generating laser and measurement plate with a scale respectively, site operation personnel can be facilitated At night, steel box-girder is accurately and fast positioned, reduced human cost.
For solving above-mentioned technical problem, the utility model following technical scheme of offer:
The laser locating apparatus that a kind of steel bridge segmental hoisting carries on construction work at night, for the hanging of segmentation steel box-girder of steel structure bridge Set position, including being laid in the generating laser installed on steel box-girder and be laid in a scale on steel box-girder to be installed Measurement plate.
Preferably, in the laser locating apparatus that above-mentioned steel bridge segmental hoisting carries on construction work at night, described generating laser cloth On the top center line installing steel box-girder, described measurement plate with a scale is laid in the top center of steel box-girder to be installed On line.
Preferably, in the laser locating apparatus that above-mentioned steel bridge segmental hoisting carries on construction work at night, described steel box-girder to be installed With the joint of steel box-girder is installed along some fixed mechanisms of abutment joint direction spaced set.
Preferably, in the laser locating apparatus that above-mentioned steel bridge segmental hoisting carries on construction work at night, described fixed mechanism includes Steel tank with antelabium, t type bolt, nut and Two bors d's oeuveres angle steel, described have installed that steel box-girder is corresponding with steel box-girder to be installed to be set Put the steel tank with antelabium described in, corresponding lip ring is fixed on by t type bolt and nut respectively in the two ends of described Two bors d's oeuveres angle steel On the steel tank of edge.
Preferably, in the laser locating apparatus that above-mentioned steel bridge segmental hoisting carries on construction work at night, the described steel tank with antelabium Including base plate, two side plates and two antelabium top boards, described base plate, two side plates and two antelabium top boards surround a square Shape chamber, has opening between two antelabium top boards.
Preferably, in the laser locating apparatus that above-mentioned steel bridge segmental hoisting carries on construction work at night, described t type bolt includes phase The bolt head connecting and shank of bolt, the distance of described opening is more than external diameter and the external diameter less than bolt head of shank of bolt, described double Spell and open up, on angle steel, the bolt hole that the shank of bolt for described t type bolt passes through, described t type bolt can be along described with antelabium Steel tank moves, and described bolt head is located in corresponding rectangular chamber, and described shank of bolt sequentially passes through the described of the steel tank with antelabium It is fixed by nut after the corresponding bolt hole of opening and described Two bors d's oeuveres angle steel.
Preferably, in the laser locating apparatus that above-mentioned steel bridge segmental hoisting carries on construction work at night, described bolt hole is oval Hole.
Preferably, in the laser locating apparatus that above-mentioned steel bridge segmental hoisting carries on construction work at night, the horizontal stroke of described Two bors d's oeuveres angle steel Section is in t type, and described Two bors d's oeuveres angle steel is formed by two angle splice joints, and a right-angle side alignment of described two angle steel is close to connect, On another right-angle side of described two angle steel, correspondence opens up two groups of slotted holes passing through for shank of bolt.
From techniques disclosed above scheme, compared with prior art, the beneficial effects of the utility model are as follows:
First, the laser locating apparatus that the steel bridge segmental hoisting that the utility model provides carries on construction work at night, are pacified using being laid in Generating laser in steel loading box beam and be laid in measurement plate with a scale on steel box-girder to be installed, night lifting construction When, will treat that having installed steel box-girder is lifted to precalculated position, then turns on the generating laser installing on steel box-girder, using light edge The principle of straightline propagation, the measurement plate on steel box-girder to be installed will become apparent from out luminous point.If the position of luminous point is exactly in survey The initial point of template high scale, then illustrate steel box-girder position to be installed accurately, if instead the position of luminous point not on initial point, is then said There is error in bright installation;On-site personnel can adjust the position of steel box-girder to be installed in time by reading the coordinate in measurement plate Put so that steel box-girder to be installed and installed steel box-girder and also enable accurately and fast to position at night, effectively increase steel construction The installation accuracy of bridge hoisting construction and installation effectiveness, the installation accuracy especially carrying on construction work at night and installation effectiveness, substantially reduce The workload of live manpower measurement, reduces human cost.
2nd, the laser locating apparatus that the steel bridge segmental hoisting that the utility model provides carries on construction work at night, in described steel to be installed Box beam with the joint of steel box-girder is installed along some fixed mechanisms of abutment joint direction spaced set, described fixed mechanism includes Steel tank with antelabium, t type bolt, nut and Two bors d's oeuveres angle steel, described have installed that steel box-girder is corresponding with steel box-girder to be installed to be set Put the steel tank with antelabium described in, corresponding lip ring is fixed on by t type bolt and nut respectively in the two ends of described Two bors d's oeuveres angle steel On the steel tank of edge, on the one hand fixed using bolt, solve existing horse plate weld time length, quality uncontrollable, to weather environment A series of problems, such as have high demands;On the other hand, because the stress performance of Two bors d's oeuveres angle steel is substantially better than horse plate, therefore this device is favourable Safety guarantee in raising construction;Another further aspect, in addition to the steel tank with antelabium, t type bolt, nut, opens the double of slotted hole Spell angle steel all can Reusability, cost-effective;
3rd, the laser locating apparatus that the steel bridge segmental hoisting that the utility model provides carries on construction work at night, on the one hand, described t type Bolt includes the bolt head being connected and shank of bolt, and the distance of described opening is more than the external diameter of shank of bolt and is less than the outer of bolt head Footpath, described Two bors d's oeuveres angle steel opens up the bolt hole that the shank of bolt for described t type bolt passes through, described t type bolt can be along institute State the steel tank with antelabium to move, described bolt head is located in corresponding rectangular chamber, and described shank of bolt sequentially passes through with antelabium It is fixed by nut after the corresponding bolt hole of the described opening of steel tank and described Two bors d's oeuveres angle steel, in steel case to be installed during use Beam is lifted to precalculated position and completes and installed after the coarse positioning of steel box-girder, by t type bolt along the insertion of the steel tank side with antelabium In steel tank with antelabium, described t type bolt can move along the described steel tank with antelabium, such that it is able to achieve direction across bridge Fine setting.On the other hand, because the bolt hole on Two bors d's oeuveres angle steel adopts slotted hole, it is achieved thereby that vertical bridge to fine setting.By horizontal stroke Bridge thus realizing the position adjustments of steel box-girder to be installed, realizes steel box-girder to be installed to vertical bridge to the fine setting of this both direction With being accurately positioned of steel box-girder is installed.
Brief description
Fig. 1 is the structural representation of laser locating apparatus that carries on construction work at night of steel bridge segmental hoisting of the utility model one embodiment Figure;
Fig. 2 is the schematic diagram of measurement plate in the utility model one embodiment;
Fig. 3 is that the structure of laser locating apparatus that carries on construction work at night of steel bridge segmental hoisting of another embodiment of the utility model is shown It is intended to;
Fig. 4 is the structural representation of the steel tank with antelabium in another embodiment of the utility model;
Fig. 5 is the side view of Fig. 4;
Fig. 6 is the structural representation of Two bors d's oeuveres angle steel in another embodiment of the utility model;
Fig. 7 is the side view of Fig. 6;
Fig. 8 is the structural representation of t type bolt in another embodiment of the utility model;
Fig. 9 is the perspective view of fixed mechanism in another embodiment of the utility model.
In figure: 1- steel box-girder to be installed, 2- have installed steel box-girder, 3- generating laser, 4- measurement plate, the steel with antelabium for the 5- Groove, 6-t type bolt, 61- bolt head, 62- shank of bolt, 7- nut, 8- Two bors d's oeuveres angle steel, 81- slotted hole.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes the laser that carries on construction work at night of steel bridge segmental hoisting Positioner is described in further detail.According to following explanation and claims, advantages and features of the present utility model will more Clear.It should be noted that, accompanying drawing all in the form of very simplification and all using non-accurately ratio, only in order to convenient, distinct Ground aids in illustrating the purpose of the utility model embodiment.
Embodiment one
Refer to Fig. 1 to Fig. 2, present embodiment discloses the laser locating apparatus that a kind of steel bridge segmental hoisting carries on construction work at night, For the lifting positioning of the segmentation steel box-girder of steel structure bridge, including be laid in install generating laser 3 on steel box-girder 2 with And it is laid in the measurement plate 4 with a scale on steel box-girder 1 to be installed.
The utility model is using being laid in the generating laser 3 installed on steel box-girder 2 and be laid in steel case to be installed Measurement plate 4 with a scale on beam 1, during night lifting construction, will treat that having installed steel box-girder 2 is lifted to precalculated position, subsequently beats Drive the generating laser 3 installing on steel box-girder 2, using light along straightline propagation principle, the measurement plate on steel box-girder 1 to be installed Luminous point is will become apparent from out on 4.If the position of luminous point is exactly in the initial point of measurement plate 4 high scale, steel box-girder 1 to be installed is described Accurately, if instead the position of luminous point is not on initial point, then there is error in explanation installation for position;On-site personnel can be by reading Take the coordinate in measurement plate 4, adjust in time the position of steel box-girder 1 to be installed so that steel box-girder to be installed 1 and installed steel box-girder 2 also enabled accurately and fast to position at night, effectively increased the installation accuracy of steel structure bridge lifting construction and installed effect Rate, the installation accuracy especially carrying on construction work at night and installation effectiveness, significantly reduce the workload of live manpower measurement, reduce manpower Cost.
The lifting positioning of steel box-girder 2 is installed relatively it is preferred that in the present embodiment for the ease of steel box-girder 1 to be installed In the laser locating apparatus that steel bridge segmental hoisting carries on construction work at night, described generating laser 3 is laid in the top installing steel box-girder 2 On center line, described measurement plate 4 with a scale is laid on the top center line of steel box-girder 1 to be installed.
Implement two
Refer to Fig. 3 to Fig. 9, the present embodiment is with the difference of embodiment one: at above-mentioned steel bridge segmental hoisting night In the laser locating apparatus of construction, described steel box-girder 1 to be installed and installed the joint of steel box-girder 2 along between abutment joint direction etc. Away from some fixed mechanisms of setting.Described fixed mechanism includes the steel tank 5 with antelabium, t type bolt 6, nut 7 and Two bors d's oeuveres angle steel 8, described installation is correspondingly arranged the steel tank 5 with antelabium described in, described Two bors d's oeuveres angle steel 8 on steel box-girder 2 and steel box-girder 1 to be installed Two ends pass through t type bolt 6 and nut 7 respectively and be fixed on the corresponding steel tank 5 with antelabium.On the one hand, using t type bolt 6 And nut 7 is fixing, solve existing horse plate weld time length, quality is uncontrollable, a series of problems, such as weather environment is had high demands; On the other hand, because the stress performance of Two bors d's oeuveres angle steel 8 is substantially better than horse plate, therefore this device is conducive to improving the safety in construction Ensure;Another further aspect, in addition to the steel tank 5 with antelabium, t type bolt 6, nut 7, the Two bors d's oeuveres angle steel 8 opening slotted hole 81 all can be anti- Multiple use, cost-effective.
Preferably, in the laser locating apparatus that the steel bridge segmental hoisting of the present embodiment carries on construction work at night, described with antelabium Steel tank 5 includes base plate, two side plates and two antelabium top boards, and described base plate, two side plates and two antelabium top boards surround One rectangular chamber, has opening between two antelabium top boards.Described t type bolt 6 includes bolt head 61 and the bolt being connected Bar 62, the distance of described opening is more than external diameter and the external diameter less than bolt head 61 of shank of bolt 62, and described Two bors d's oeuveres angle steel 8 opens up The bolt hole passing through for the shank of bolt 62 of described t type bolt 6, described t type bolt 6 can move along the described steel tank 5 with antelabium Dynamic, described bolt head 61 is located in corresponding rectangular chamber, and described shank of bolt 62 sequentially passes through to be opened described in the steel tank 5 with antelabium It is fixed by nut 7 after the corresponding bolt hole of mouth and described Two bors d's oeuveres angle steel 8.During use, it is lifted in steel box-girder 1 to be installed Precalculated position, completes and has installed after the coarse positioning of steel box-girder 2, by t type bolt 6 along the steel tank 5 with antelabium side insert band In the steel tank 5 of antelabium, described t type bolt 6 can be mobile along the described steel tank 5 with antelabium, such that it is able to realize direction across bridge Fine setting.
Preferably, in the laser locating apparatus that the steel bridge segmental hoisting of the present embodiment carries on construction work at night, described bolt hole is Slotted hole 81.Because the bolt hole on Two bors d's oeuveres angle steel 8 adopts slotted hole 81, it is achieved thereby that vertical bridge to fine setting.So, pass through Direction across bridge finely tuning it is achieved that the position adjustments of steel box-girder to be installed 1 to this both direction with vertical bridge, finally realizes steel to be installed Box beam 1 with being accurately positioned of steel box-girder 2 is installed.
Preferably, in the laser locating apparatus that the steel bridge segmental hoisting of the present embodiment carries on construction work at night, described Two bors d's oeuveres angle steel 8 Cross section be in t type, described Two bors d's oeuveres angle steel 8 forms by two angle splice joints, and a right-angle side alignment of described two angle steel is close to Connect, on another right-angle side of described two angle steel, correspondence opens up two groups of slotted holes 81 passing through for shank of bolt 62.Due to Two bors d's oeuveres The stress performance of angle steel 8 is substantially better than horse plate, using Two bors d's oeuveres angle steel 8 as above be conducive to improving steel box-girder 1 to be installed with The connection reliability of steel box-girder 2 is installed it is ensured that construction safety.
Foregoing description is only the description to the utility model preferred embodiment, not any limit to the utility model scope Fixed, any change that the those of ordinary skill in the utility model field does according to the disclosure above content, modification, belonging to right will Seek the protection domain of book.

Claims (8)

1. the laser locating apparatus that a kind of steel bridge segmental hoisting carries on construction work at night, for the lifting of the segmentation steel box-girder of steel structure bridge Positioning is it is characterised in that include being laid in the generating laser installing on steel box-girder and being laid on steel box-girder to be installed Measurement plate with a scale.
2. steel bridge segmental hoisting as claimed in claim 1 carries on construction work at night laser locating apparatus are it is characterised in that described laser Transmitter is laid on the top center line installing steel box-girder, and described measurement plate with a scale is laid in steel box-girder to be installed On top center line.
3. the laser locating apparatus that steel bridge segmental hoisting as claimed in claim 1 carries on construction work at night are it is characterised in that described wait to pacify Steel loading box beam with the joint of steel box-girder is installed along some fixed mechanisms of abutment joint direction spaced set.
4. steel bridge segmental hoisting as claimed in claim 3 carries on construction work at night laser locating apparatus are it is characterised in that described fixation Mechanism includes the steel tank with antelabium, t type bolt, nut and Two bors d's oeuveres angle steel, described has installed steel box-girder and steel box-girder to be installed On be correspondingly arranged the steel tank with antelabium described in, it is right that the two ends of described Two bors d's oeuveres angle steel are fixed on by t type bolt and nut respectively On the steel tank with antelabium answered.
5. steel bridge segmental hoisting as claimed in claim 4 carries on construction work at night laser locating apparatus are it is characterised in that described lip ring The steel tank of edge includes base plate, two side plates and two antelabium top boards, and described base plate, two side plates and two antelabium top boards enclose Become a rectangular chamber, between two antelabium top boards, there is opening.
6. steel bridge segmental hoisting as claimed in claim 5 carries on construction work at night laser locating apparatus are it is characterised in that described t type Bolt includes the bolt head being connected and shank of bolt, and the distance of described opening is more than the external diameter of shank of bolt and is less than the outer of bolt head Footpath, described Two bors d's oeuveres angle steel opens up the bolt hole that the shank of bolt for described t type bolt passes through, described t type bolt can be along institute State the steel tank with antelabium to move, described bolt head is located in corresponding rectangular chamber, and described shank of bolt sequentially passes through with antelabium It is fixed by nut after the corresponding bolt hole of the described opening of steel tank and described Two bors d's oeuveres angle steel.
7. steel bridge segmental hoisting as claimed in claim 6 carries on construction work at night laser locating apparatus are it is characterised in that described bolt Hole is slotted hole.
8. steel bridge segmental hoisting as claimed in claim 7 carries on construction work at night laser locating apparatus are it is characterised in that described Two bors d's oeuveres The cross section of angle steel is in t type, and described Two bors d's oeuveres angle steel is formed by two angle splice joints, and a right-angle side alignment of described two angle steel is tight Patch connects, and on another right-angle side of described two angle steel, correspondence opens up two groups of slotted holes passing through for shank of bolt.
CN201620699290.8U 2016-07-05 2016-07-05 Laser positioning device that steel bridge segmental hoisting was under construction night Active CN205907605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620699290.8U CN205907605U (en) 2016-07-05 2016-07-05 Laser positioning device that steel bridge segmental hoisting was under construction night

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620699290.8U CN205907605U (en) 2016-07-05 2016-07-05 Laser positioning device that steel bridge segmental hoisting was under construction night

Publications (1)

Publication Number Publication Date
CN205907605U true CN205907605U (en) 2017-01-25

Family

ID=57804435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620699290.8U Active CN205907605U (en) 2016-07-05 2016-07-05 Laser positioning device that steel bridge segmental hoisting was under construction night

Country Status (1)

Country Link
CN (1) CN205907605U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107498404A (en) * 2017-09-20 2017-12-22 杭州力龙液压有限公司 Tune machine method, knife rest and the grinding machine of centerless grinder
CN108362277A (en) * 2018-04-03 2018-08-03 中国建筑第八工程局有限公司 Shaped steel bracing members machine straightening device and its application method
CN108505450A (en) * 2018-05-09 2018-09-07 中建三局基础设施建设投资有限公司 A kind of steel pipe arch bridge hanger erection simulator and application method
CN110029585A (en) * 2019-05-23 2019-07-19 郑州大学 A kind of device and application method for precast segment assembly straight bridge alignment control
CN110374013A (en) * 2019-07-24 2019-10-25 重庆交通建设(集团)有限责任公司 Steel box-girder lifts positioning device and construction method
CN111206508A (en) * 2020-02-27 2020-05-29 中交一公局海威工程建设有限公司 Method and device for controlling central axis of suspension casting construction of linear bridge
CN111648239A (en) * 2020-04-23 2020-09-11 中铁十六局集团第四工程有限公司 Segmental beam construction positioning device and segmental beam construction method
CN112663499A (en) * 2020-12-01 2021-04-16 中铁二局集团有限公司 Positioning and mounting method for lower chord of steel truss girder of cable-stayed bridge
CN113684768A (en) * 2021-10-27 2021-11-23 四川东泉机械设备制造有限公司 Small box girder positioning method and device
CN114351590A (en) * 2021-12-14 2022-04-15 上海市基础工程集团有限公司 Accurate positioning device and method for field installation of steel box girder manufacturing segment
CN114960440A (en) * 2022-05-29 2022-08-30 中国五冶集团有限公司 Positioning device for beam erection

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107498404A (en) * 2017-09-20 2017-12-22 杭州力龙液压有限公司 Tune machine method, knife rest and the grinding machine of centerless grinder
CN108362277B (en) * 2018-04-03 2023-11-21 中国建筑第八工程局有限公司 Profile steel support straightening device and use method thereof
CN108362277A (en) * 2018-04-03 2018-08-03 中国建筑第八工程局有限公司 Shaped steel bracing members machine straightening device and its application method
CN108505450A (en) * 2018-05-09 2018-09-07 中建三局基础设施建设投资有限公司 A kind of steel pipe arch bridge hanger erection simulator and application method
CN110029585A (en) * 2019-05-23 2019-07-19 郑州大学 A kind of device and application method for precast segment assembly straight bridge alignment control
CN110029585B (en) * 2019-05-23 2024-04-19 郑州大学 Device for linear control of segment prefabrication and assembly linear bridge and use method
CN110374013A (en) * 2019-07-24 2019-10-25 重庆交通建设(集团)有限责任公司 Steel box-girder lifts positioning device and construction method
CN111206508A (en) * 2020-02-27 2020-05-29 中交一公局海威工程建设有限公司 Method and device for controlling central axis of suspension casting construction of linear bridge
CN111648239A (en) * 2020-04-23 2020-09-11 中铁十六局集团第四工程有限公司 Segmental beam construction positioning device and segmental beam construction method
CN112663499A (en) * 2020-12-01 2021-04-16 中铁二局集团有限公司 Positioning and mounting method for lower chord of steel truss girder of cable-stayed bridge
CN113684768A (en) * 2021-10-27 2021-11-23 四川东泉机械设备制造有限公司 Small box girder positioning method and device
CN114351590A (en) * 2021-12-14 2022-04-15 上海市基础工程集团有限公司 Accurate positioning device and method for field installation of steel box girder manufacturing segment
CN114351590B (en) * 2021-12-14 2024-05-31 上海市基础工程集团有限公司 Device and method for accurately positioning field installation of steel box girder manufacturing section
CN114960440A (en) * 2022-05-29 2022-08-30 中国五冶集团有限公司 Positioning device for beam erection

Similar Documents

Publication Publication Date Title
CN205907605U (en) Laser positioning device that steel bridge segmental hoisting was under construction night
CN205907604U (en) Steel bridge segmental hoisting counterpoint fixing device
CN104060544B (en) The construction technology that a kind of pipeline suspension crossing bridge body of a bridge is installed
CN206189277U (en) Steel case arched bridge political integrity section arch rib promotes measurement system
CN104389268B (en) A kind of steel tower column with location structure and construction method for hanging thereof
CN105507325A (en) Pile stabilizing and positioning platform
CN104457687B (en) Laser Measuring ramp and tilt measurement thereof
CN104457619A (en) Structure and method for installing perpendicularity sensor on ultralong tubular pillar
CN109898399A (en) A kind of assembled Landscape Bridge and its assembling method
CN103451338B (en) Ascending pipe and five-way ball mounting method for blast furnace gas system
CN205889917U (en) Formpiston location interfacing apparatus and fan blade mould
CN104404888B (en) A kind of large-scale aerial gradient adjustment Lift-on/Lift-off System and application
CN206922397U (en) It is a kind of can bidirectional modulation assembled cable bearer
CN203323740U (en) Building settlement nondestructive measurement leveling rod bracket
CN103983256A (en) Anchor mooring construction surveying method for contact network in tunnel
CN206891404U (en) Horizontal displacement monitoring measurement apparatus after a kind of city track traffic engineering rail
CN212612029U (en) Prefabricated assembled substructure installation space gesture supervisory equipment
CN205822454U (en) Welding lattice column device
CN214224118U (en) Pushing construction monitoring structure of prestressed concrete continuous beam bridge
CN213090758U (en) Auxiliary alignment device for building engineering paying-off
CN208313306U (en) A kind of total station convenient for record
CN209308059U (en) Overhead contact built-in bolt positioning device
CN204313826U (en) New pattern laser inclination measurement device
CN207846217U (en) A kind of sub-wire tube type rope saddle back court assembled positioning device
CN208829133U (en) A kind of large equipment single hook hauling positioning device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant