CN205894731U - Reinforced structure of construction joint among reinforced concrete structure - Google Patents

Reinforced structure of construction joint among reinforced concrete structure Download PDF

Info

Publication number
CN205894731U
CN205894731U CN201620656600.8U CN201620656600U CN205894731U CN 205894731 U CN205894731 U CN 205894731U CN 201620656600 U CN201620656600 U CN 201620656600U CN 205894731 U CN205894731 U CN 205894731U
Authority
CN
China
Prior art keywords
stirrup
construction
construction joint
reinforcement
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620656600.8U
Other languages
Chinese (zh)
Inventor
李小荣
耿顺成
连剑
左郎
左一郎
王皓仪
周伟
金国定
张涛涛
夏力农
邓凯
郭帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201620656600.8U priority Critical patent/CN205894731U/en
Application granted granted Critical
Publication of CN205894731U publication Critical patent/CN205894731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a reinforced structure of construction joint among reinforced concrete structure, reinforced concrete structure includes cableway, stirrup, tension bar, tension bar and cableway depend on the inboard of stirrup and with it the ligature be in the same place, the diagonal bar reinforced structure includes that at least one passes the vertical planar diagonal bar in construction joint place, and weld respectively in setting up in the tension bar of bottom, setting up in the cableway at top at the bottom of diagonal bar, top, and the diagonal bar is 45 or 60 with the contained angle of tension bar. The utility model discloses a reinforced structure of construction joint among reinforced concrete structure safe and reliable, construction convenience have improved reinforced concrete structure's the intensity and the bearing capacity that shears, have guaranteed reinforced concrete structure's stability and security.

Description

The ruggedized construction of construction joint in a kind of reinforced concrete structure
Technical field
This utility model is related to a kind of ruggedized construction of construction joint in reinforced concrete structure, belongs to reinforced concrete structure Field of reinforcement.
Background technology
In concreting process, because design requirement or construction need segmentation to pour, and formerly, the concrete of after-pouring Between the seam that formed be construction joint.Construction joint is not the seam of necessary being, but in priority pouring concrete junction The weak disease face being formed, its presence can reduce the tension of concrete sample, shearing resistance, cracking resistance, the performance such as impervious.Ordinary circumstance Under, the concrete of a construction section answers continuous placing to ensure the globality of xoncrete structure, but if pouring area is excessive, or When special construction operation, such as half adverse construction method mode is it is possible to form construction joint.Though existing job specfication is to applying Indwelling position of work seam etc. is made that regulation it is desirable to construction joint should be retained in by the less position of shearing as far as possible, but work progress In unavoidable exist interim change design drawing, meet with the emergency situations such as extreme weather, construction joint may be forced indwelling in the end of beam Portion etc. is subject to the larger position of shearing.If dealt with improperly, will result in very great potential safety hazard, therefore, by effective measures Construction joint is carried out with reinforcing is very necessary.
Utility model content
The purpose of this utility model is for the problems referred to above and difficult point, overcomes in prior art because construction joint indwelling is improper The problem that the structure tension brought, shearing strength decline.
To achieve these goals, this utility model provides a kind of ruggedized construction of construction joint in reinforced concrete structure, Described reinforced concrete structure includes cableway, stirrup and tension reinforcement, and described tension reinforcement and cableway depend on hoop Together, described ruggedized construction includes at least one and passes through the oblique of construction joint place perpendicular for the inner side of muscle therewith colligation Muscle, the bottom of diagonal bar, top are respectively welded in being arranged at the tension reinforcement of bottom, be arranged at the cableway at top, diagonal bar with The angle of tension reinforcement is 45 ° or 60 °.
By being arranged through the diagonal bar of construction joint place perpendicular, then the structure of construction joint both sides is passed through diagonal bar and tiltedly The concrete pouring on muscle links together, and strengthens the intensity of ruggedized construction of the present utility model, improves its shear resistant capacity, Avoiding may the potential safety hazard that is occurred by the larger position of shearing in the end etc. of beam of indwelling because of construction joint.Practice of construction process In, can diagonal bar be set before concreting, have poured the structure completing simultaneously for concrete, also can pass through bar planting Mode diagonal bar is set, realize to the reinforcing pouring the structure completing.Diagonal bar welded top is in the erection on framework of steel reinforcement top On reinforcing bar, diagonal bar bottom welding is on the tension reinforcement of framework of steel reinforcement bottom.Due to being configured with tension reinforcement at construction joint, increase Add the abdomen muscle ratio of reinforcement at this, thus the diameter of diagonal bar will determine according to force analysis at construction joint.By 45 ° of the inclination angle of diagonal bar or 60 °, be conducive to the operation in engineering.
Further, described stirrup is closed stirrup, is to stirrup in the range of d in the left and right sides length of construction joint It is encrypted, wherein the value of d is 150-250 millimeter.By arranging encryption stirrup, Ke Yijin in construction joint left and right sides position One step strengthens the intensity of ruggedized construction of the present utility model, improves the shear resistant capacity of structure further.
Further, in described reinforced concrete structure, the ruggedized construction of construction joint is additionally included in and is arranged in horizontal direction The horizontal reinforcement on stirrup after being encrypted, described horizontal reinforcement is welded on described stirrup, described horizontal reinforcement with described Stirrup constitutes network structure.The network structure that horizontal reinforcement and described stirrup are formed has preferable strength and stability, can To further enhance the intensity of ruggedized construction of the present utility model, improve the shear resistant capacity of structure further.
Further, in described reinforced concrete structure, the ruggedized construction of construction joint includes two diagonal bars be arrangeding in parallel. Setting two diagonal bars being parallel to each other, compared to a diagonal bar is only set it is also possible to improve structure shear resistant capacity.
Further, described tension reinforcement, diagonal bar are high tensile reinforcement, and described cableway and stirrup are high tensile reinforcement or general Logical reinforcing bar, described high tensile reinforcement is yield strength 500mpa and above reinforcing bar.In ruggedized construction of the present utility model, due to Tension reinforcement and diagonal bar stress are larger, and therefore tension reinforcement and diagonal bar adopt high tensile reinforcement.Simultaneously as cableway and stirrup Stress is less, and therefore cableway and stirrup can adopt high tensile reinforcement or regular reinforcement.
This utility model has the advantages and positive effects that: construction joint in reinforced concrete structure of the present utility model Ruggedized construction is safe and reliable, easy construction, improves the intensity of reinforced concrete structure and shear resistant capacity it is ensured that reinforcing bar The stability of xoncrete structure and safety.
Brief description
Fig. 1 is the cross-sectional view at the construction joint of reinforced beam construction joint ruggedized construction of the present utility model;
Fig. 2 is the positive structure schematic of reinforced beam construction joint ruggedized construction of the present utility model;
Fig. 3 is that the horizontal reinforcement of reinforced beam construction joint ruggedized construction of the present utility model is arranged at the knot on stirrup Structure schematic diagram;
Wherein: 1, cableway, 2, diagonal bar, 3, tension reinforcement, 4, stirrup, 5, construction joint, 6, horizontal reinforcement.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely description is it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of making creative work The every other embodiment being obtained, broadly falls into the scope of this utility model protection.
This utility model construction is applied to the reinforced concrete structure that all carry construction joint, mainly includes armored concrete Beam.
Below in conjunction with the accompanying drawings this utility model is described in further details.
1st, in a kind of reinforced concrete structure construction joint ruggedized construction
As Figure 1-3, in a kind of reinforced concrete structure construction joint ruggedized construction, including the erection being arranged at top Reinforcing bar 1, stirrup 4, the tension reinforcement 3 being arranged at bottom and two diagonal bars 2, tension reinforcement 3 and cableway 1 depend on stirrup 4 inner side together with stirrup 4 colligation, diagonal bar 2 passes through construction joint 5 place perpendicular, and the welded top of diagonal bar 2 is erecting On reinforcing bar 1, the bottom welding of diagonal bar 2 is on tension reinforcement 3.Diagonal bar 2 is 45 ° or 60 ° with the angle of tension reinforcement 3.Stirrup 4 is adopted With for closed stirrup, being encrypted to stirrup 4 in construction joint 5 position.Between the two ends of stirrup 4 after being encrypted At least one horizontal reinforcement 6 is set, and horizontal reinforcement 6 constitutes network structure with stirrup 4.Can arrange before concreting tiltedly Muscle 2, it is also possible to carry out reinforcement and strengthening to the structure of casting concrete by way of bar planting, is arranged by way of bar planting Diagonal bar 2 and horizontal reinforcement 6.
Bar planting refers to boring on concrete, is then injected into high-strength anchoring adhesive, is inserted into diagonal bar 2 or horizontal reinforcement 6, waits After high-strength bar planting adhesive curing, diagonal bar 2 or horizontal reinforcement 6 are integrated with concrete bonding.
Tension reinforcement 3, diagonal bar 2 adopt high tensile reinforcement, cableway 1 and stirrup 4 to adopt high tensile reinforcement or regular reinforcement, institute Stating high tensile reinforcement is yield strength 500mpa and above reinforcing bar.
2nd, test result analysis
In test, make five reinforced beams altogether, the normal reinforced beam of respectively no construction joint be designated as la, lb;There are construction joint and unreinforced reinforced beam lc, ld;Have construction joint and arrange the ruggedized construction of the present invention reinforcing bar mix Solidifying soil beam le.
The test datas such as reinforced beam experimental data cracking load are listed in table 1.As shown in table 1, this test is main Investigate anti-shear ability.Typically require construction joint should be retained in by the less position of shearing as far as possible, but difficult in work progress Exempt to exist interim change design drawing, meet with the emergency situations such as extreme weather, construction joint may be forced indwelling in the end etc. of beam By the larger position of shearing.
In construction joint 5 cracking load result, la, lb, lc, ld cracking load is almost consistent;In addition, can by experimental result Know, the cracking load of the reinforced beam le of ruggedized construction of the setting present invention improves more than 10%, therefore setting diagonal bar 2 is right In the effect is significant improving shear resistant capacity.The Cracks of reinforced beam are to be reached capacity due to cutting area's concrete Tensile strength, the effect of the stirrup 4 being encrypted is mainly suppression construction joint 5 after concrete cracking and continues to launch;Diagonal bar 2 exists Before concrete cracking together with concrete tension, the stiffening effect to cracking load is also normal.
Table 1 reinforced beam experimental data
Test specimen is numbered Cracking load/kn
la 39.2
lb 38.3
lc 39.5
ld 38.2
le 48.0
Above test proves that the ruggedized construction of construction joint in reinforced concrete structure of the present utility model is not only substantially better than There are construction joint and unreinforced reinforced beam, be also significantly better than the normal reinforced beam of no construction joint, significantly improve The tension of reinforced concrete structure, shear behavior, speed of application is fast, low cost, and effect is good.
Above embodiment of the present utility model is described in detail, but described content has been only of the present utility model preferable Embodiment is it is impossible to be considered the practical range for limiting the present invention.All impartial changes made according to this utility model scope with Improve etc., all should still belong within this patent covering scope.

Claims (5)

1. in a kind of reinforced concrete structure construction joint ruggedized construction, described reinforced concrete structure includes being arranged at top Cableway (1), stirrup (4) and the tension reinforcement (3) being arranged at bottom, described tension reinforcement (3) and cableway (1) depend on In stirrup (4) inner side and together with stirrup (4) colligation it is characterised in that: construction joint in described reinforced concrete structure Ruggedized construction includes the diagonal bar (2) that at least one passes through construction joint (5) place perpendicular, and the bottom of diagonal bar (2), top are respectively Be welded in tension reinforcement (3), on cableway (1), diagonal bar (2) is 45 ° or 60 ° with the angle of tension reinforcement (3).
2. in reinforced concrete structure according to claim 1 construction joint ruggedized construction it is characterised in that: described stirrup (4) it is closed stirrup, be in the range of d stirrup (4) to be encrypted in the left and right sides length of construction joint (5), wherein d Value is 150-250 millimeter.
3. in reinforced concrete structure according to claim 2 construction joint ruggedized construction it is characterised in that: be additionally included in Horizontal reinforcement (6) on stirrup after being encrypted (4) is arranged on horizontal direction, described horizontal reinforcement (6) is welded in described On stirrup (4), described horizontal reinforcement (6) constitutes network structure with described stirrup (4).
4. in reinforced concrete structure according to claim 1 construction joint ruggedized construction it is characterised in that: described reinforcing bar In xoncrete structure, the ruggedized construction of construction joint includes two diagonal bars be arrangeding in parallel (2).
5. in reinforced concrete structure according to claim 1 construction joint ruggedized construction it is characterised in that: described tension Reinforcing bar (3), diagonal bar (2) are high tensile reinforcement, and described cableway (1) and stirrup (4) are high tensile reinforcement or regular reinforcement, described height Strong reinforcing bar is yield strength 500mpa and above reinforcing bar.
CN201620656600.8U 2016-06-28 2016-06-28 Reinforced structure of construction joint among reinforced concrete structure Active CN205894731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620656600.8U CN205894731U (en) 2016-06-28 2016-06-28 Reinforced structure of construction joint among reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620656600.8U CN205894731U (en) 2016-06-28 2016-06-28 Reinforced structure of construction joint among reinforced concrete structure

Publications (1)

Publication Number Publication Date
CN205894731U true CN205894731U (en) 2017-01-18

Family

ID=57769971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620656600.8U Active CN205894731U (en) 2016-06-28 2016-06-28 Reinforced structure of construction joint among reinforced concrete structure

Country Status (1)

Country Link
CN (1) CN205894731U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952183A (en) * 2016-06-28 2016-09-21 中铁建设集团有限公司 Reinforcing structure and reinforcing method of construction joint in reinforced concrete structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952183A (en) * 2016-06-28 2016-09-21 中铁建设集团有限公司 Reinforcing structure and reinforcing method of construction joint in reinforced concrete structure

Similar Documents

Publication Publication Date Title
CN104963415B (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN106121049B (en) Compound shear wall connect energy dissipation node and preparation method thereof with steel bar girder combination beam
CN105821750B (en) A kind of precast prestressed T plate and its application method
CN104032864A (en) Perforated web plate H-shaped steel connecting joint for connecting buckling-restrained steel plate wall with concrete frame
CN106759865A (en) A kind of U-shaped steel plate combination beam framework of steel core concrete column
CN110409618A (en) Plastic area steel fiber reinforced type steel concrete frame beam column node
CN207436371U (en) A kind of constructing structure of super-span girder with rolled steel section en cased in concrete
CN206599915U (en) Open pore steel plate shear connector
CN205894731U (en) Reinforced structure of construction joint among reinforced concrete structure
CN107366355A (en) Add the bean column node and its construction method of new beam on existing reinforced concrete frame column
CN105952183A (en) Reinforcing structure and reinforcing method of construction joint in reinforced concrete structure
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN205934722U (en) Seam bolted connection precast concrete decking
CN105350642B (en) The cap of one kind connection " rice " type Cast-in-place concrete beam
CN107587606A (en) High performance concrete chain type combining structure
CN110469054A (en) A kind of lattice steel reinforced concrete coupled column bean column node
CN110130208A (en) A kind of angle iron connecting piece for steel reinforced concrete combined bridge
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN206599881U (en) Integral prefabricated individual layer steel plate concrete combined shear wall
CN107299721A (en) A kind of precast concrete open tubular column node connecting structure and its construction method
CN107254881A (en) A kind of slope retaining structure and method for protecting support
CN202124934U (en) Connecting device for reinforced concrete beam and shear wall
CN107893499A (en) Light-duty spliced steel-concrete building plate composite flat beam and its construction method
CN207314561U (en) Ultra-high performance concrete plate seam connection structure
CN106088472A (en) A kind of aspect is than the stirrup attachment structure of combined steel and concrete column and installation method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant