CN205894699U - Pipeline rack for civil construction - Google Patents
Pipeline rack for civil construction Download PDFInfo
- Publication number
- CN205894699U CN205894699U CN201620842081.4U CN201620842081U CN205894699U CN 205894699 U CN205894699 U CN 205894699U CN 201620842081 U CN201620842081 U CN 201620842081U CN 205894699 U CN205894699 U CN 205894699U
- Authority
- CN
- China
- Prior art keywords
- electric lifter
- installation set
- electric elevator
- installation sleeve
- civil construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 11
- 238000009434 installation Methods 0.000 claims abstract description 33
- 230000003028 elevating effect Effects 0.000 claims 2
- 238000011161 development Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
本实用新型公开了一种土木建筑用管道放置架,它涉及土木建筑用具技术领域;底架的上端安装有轴承座,轴承座的上端安装有电动升降器一,电动升降器一的升降杆上安装有安装套一,安装套一的上端安装有电动升降器二,电动升降器二的升降杆上安装有安装套二,安装套二的上端安装有支撑杆,支撑杆的上端安装有支撑板,支撑板的外侧安装有围栏,安装套一与安装套二的外侧壁上均安装有放置架,放置架上安装有数个挡板,电源模块安装在底架的内部,操作面板安装在底架上,电源模块与操作面板的一端连接,操作面板的另一端分别与电动升降器一、电动升降器二连接;本实用新型便于实现快速安装与放置,使用方便,操作简便,工作效率高,节省时间。
The utility model discloses a pipe placing rack for civil construction, which relates to the technical field of civil construction appliances; a bearing seat is installed on the upper end of the bottom frame, an electric lifter 1 is installed on the upper end of the bearing seat, and a lifting rod of the electric lifter 1 is installed. Installation sleeve 1 is installed, the upper end of installation sleeve 1 is equipped with electric lifter 2, installation sleeve 2 is installed on the lifting rod of electric lifter 2, support rod is installed on the upper end of installation sleeve 2, and support plate is installed on the upper end of support rod , the outer side of the support plate is installed with a fence, the outer wall of the installation sleeve 1 and the installation sleeve 2 are installed with a shelf, several baffles are installed on the shelf, the power module is installed inside the bottom frame, and the operation panel is installed on the bottom frame Above, the power module is connected to one end of the operation panel, and the other end of the operation panel is respectively connected to the electric lifter 1 and the electric lifter 2; time.
Description
技术领域technical field
本实用新型涉及土木建筑用具技术领域,具体涉及一种土木建筑用管道放置架。The utility model relates to the technical field of civil construction appliances, in particular to a pipe placing frame for civil construction.
背景技术Background technique
土木建筑是建造各类工程设施的科学技术的统称。它既指所应用的材料、设备和所进行的勘测、设计、施工、保养维修等技术活动;也指工程建设的对象,即建造在地上或地下、陆上或水中,直接或间接为人类生活、生产、军事、科研服务的各种工程设施。Civil engineering is a general term for the science and technology of building various engineering facilities. It not only refers to the applied materials, equipment and technical activities such as survey, design, construction, maintenance and repair; , production, military, and various engineering facilities for scientific research services.
土木工程是伴随着人类社会的发展而发展起来的。它所建造的工程设施反映出各个历史时期社会经济、文化、科学、技术发展的面貌,因而土木工程也就成为社会历史发展的见证之一。Civil engineering is developed along with the development of human society. The engineering facilities it built reflect the social economy, culture, science, and technological development in various historical periods, so civil engineering has become one of the witnesses of social and historical development.
现有的土木建筑用管道放置架在使用时不能实现升降,导致在施工与放置时不方便,而且浪费时间,工作效率低。The existing pipeline placement racks for civil engineering cannot be raised and lowered during use, which leads to inconvenient construction and placement, waste of time, and low work efficiency.
实用新型内容Utility model content
本实用新型的目的在于针对现有技术的缺陷和不足,提供一种土木建筑用管道放置架。The purpose of the utility model is to provide a pipe placing frame for civil engineering in view of the defects and deficiencies of the prior art.
为了解决背景技术所存在的问题,本实用新型的一种土木建筑用管道放置架,它包含底架、行走轮、轴承座、电动升降器一、安装套一、电动升降器二、安装套二、支撑杆、支撑板、放置架、挡板、电源模块、操作面板;底架的底部安装有行走轮,底架的上端安装有轴承座,轴承座的上端安装有电动升降器一,电动升降器一的升降杆上安装有安装套一,安装套一的上端安装有电动升降器二,电动升降器二的升降杆上安装有安装套二,安装套二的上端安装有支撑杆,支撑杆的上端安装有支撑板,支撑板的外侧安装有围栏,安装套一与安装套二的外侧壁上均安装有放置架,放置架上安装有数个挡板,电源模块安装在底架的内部,操作面板安装在底架上,电源模块与操作面板的一端连接,操作面板的另一端分别与电动升降器一、电动升降器二连接。In order to solve the problems existing in the background technology, a pipeline placement frame for civil construction of the present invention includes a chassis, a walking wheel, a bearing seat, an electric lifter one, an installation sleeve one, an electric lifter two, and an installation sleeve two , support rods, support plates, racks, baffles, power modules, and operation panels; the bottom of the bottom frame is equipped with walking wheels, the upper end of the bottom frame is equipped with a bearing seat, and the upper end of the bearing seat is equipped with an electric lifter. An installation sleeve 1 is installed on the lifting rod of the device 1, an electric lifter 2 is installed on the upper end of the installation sleeve 1, an installation sleeve 2 is installed on the lifting rod of the electric lifter 2, a support rod is installed on the upper end of the installation sleeve 2, and the support rod A support plate is installed on the upper end of the support plate, and a fence is installed on the outer side of the support plate. A shelf is installed on the outer wall of the installation sleeve 1 and the installation sleeve 2. Several baffles are installed on the shelf, and the power module is installed inside the bottom frame. The operation panel is installed on the base frame, the power supply module is connected with one end of the operation panel, and the other end of the operation panel is respectively connected with the first electric lifter and the second electric lifter.
作为优选,所述的电动升降器一、电动升降器二的外表面均安装有保护壳。As a preference, the outer surfaces of the first electric lifter and the second electric lifter are equipped with protective shells.
作为优选,所述的支撑板上安装有数个隔板。Preferably, several partitions are installed on the support plate.
本实用新型有益效果为:便于实现快速安装与放置,使用方便,操作简便,工作效率高,节省时间。The beneficial effects of the utility model are: it is convenient to realize fast installation and placement, convenient to use, easy to operate, high in work efficiency and time-saving.
附图说明Description of drawings
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
附图标记说明:Explanation of reference signs:
1-底架;2-行走轮;3-轴承座;4-电动升降器一;5-安装套一;6-电动升降器二;7-安装套二;8-支撑杆;9-支撑板;10-放置架;11-挡板;12-电源模块;13-操作面板。1-underframe; 2-walking wheel; 3-bearing seat; 4-electric lifter 1; 5-installation set 1; 6-electric lifter 2; 7-installation set 2; 8-support rod; 9-support plate ; 10-placement frame; 11-baffle; 12-power supply module; 13-operating panel.
具体实施方式detailed description
下面结合附图,对本实用新型作进一步的说明。Below in conjunction with accompanying drawing, the utility model is described further.
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及具体实施方式,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施方式仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be understood that the specific embodiments described here are only used to explain the present utility model, and are not intended to limit the present utility model.
如图1所示,本具体实施方式采用如下技术方案:它包含底架1、行走轮2、轴承座3、电动升降器一4、安装套一5、电动升降器二6、安装套二7、支撑杆8、支撑板9、放置架10、挡板11、电源模块12、操作面板13;底架1的底部安装有行走轮2,底架1的上端安装有轴承座3,轴承座3的上端安装有电动升降器一4,电动升降器一4的升降杆上安装有安装套一5,安装套一5的上端安装有电动升降器二6,电动升降器二6的升降杆上安装有安装套二7,安装套二7的上端安装有支撑杆8,支撑杆8的上端安装有支撑板9,支撑板9的外侧安装有围栏,安装套一5与安装套二7的外侧壁上均安装有放置架10,放置架10上安装有数个挡板11,电源模块12安装在底架1的内部,操作面板13安装在底架1上,电源模块12与操作面板13的一端连接,操作面板13的另一端分别与电动升降器一4、电动升降器二6连接。As shown in Figure 1, this specific embodiment adopts the following technical scheme: it includes an underframe 1, a walking wheel 2, a bearing seat 3, an electric lifter one 4, an installation sleeve one 5, an electric lifter two 6, and an installation sleeve two 7 , support rod 8, support plate 9, placement frame 10, baffle plate 11, power supply module 12, operation panel 13; the bottom of chassis 1 is equipped with walking wheels 2, and the upper end of chassis 1 is equipped with bearing seat 3, bearing seat 3 An electric lifter one 4 is installed on the upper end of the electric lifter one 4, and an installation cover one 5 is installed on the lifting rod of the electric lifter one 4, and an electric lifter two 6 is installed on the upper end of the installation cover one 5, and an electric lifter two 6 is installed on the lifting rod of the electric lifter two 6 There is installation cover two 7, and the upper end of installation cover two 7 is equipped with support bar 8, and the upper end of support bar 8 is equipped with support plate 9, and the outside of support plate 9 is equipped with fence, and the outer sidewall of installation cover one 5 and installation cover two 7 A shelf 10 is installed on each of the shelves, and several baffles 11 are installed on the shelf 10. The power module 12 is installed inside the bottom frame 1, and the operation panel 13 is installed on the bottom frame 1. The power module 12 is connected to one end of the operation panel 13. , the other end of the operation panel 13 is connected with the electric lifter one 4 and the electric lifter two 6 respectively.
进一步的,所述的电动升降器一4、电动升降器二6的外表面均安装有保护壳。Further, the outer surfaces of the first electric lifter 4 and the second electric lifter 6 are equipped with protective shells.
进一步的,所述的支撑板9上安装有数个隔板。Further, several partitions are installed on the support plate 9 .
本具体实施方式的工作原理为:使用时,通过放置架10、挡板11的配合实现分隔式放置与支撑,同时,通过电动升降器一4、电动升降器二6来带动放置架10的升降,便于工作时进行安装与更换管道,同时轴承座3能使得放置架10与支撑板9进行旋转,在安装与拆卸时便于调节角度,同时能提高安全性,放置时比较方便。The working principle of this specific embodiment is: when in use, separate placement and support are realized through the cooperation of the placement frame 10 and the baffle plate 11, and at the same time, the lifting of the placement frame 10 is driven by the electric lifter one 4 and the electric lifter two 6 , It is convenient to install and replace the pipeline during work, and the bearing block 3 can make the placement frame 10 and the support plate 9 rotate, which is convenient for adjusting the angle when installing and dismounting, and can improve safety at the same time, and is more convenient when placed.
以上所述,仅用以说明本实用新型的技术方案而非限制,本领域普通技术人员对本实用新型的技术方案所做的其它修改或者等同替换,只要不脱离本实用新型技术方案的精神和范围,均应涵盖在本实用新型的权利要求范围当中。The above is only used to illustrate the technical solution of the utility model without limitation, other modifications or equivalent replacements made by those skilled in the art to the technical solution of the utility model, as long as they do not depart from the spirit and scope of the technical solution of the utility model , should be covered in the scope of the claims of the present utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620842081.4U CN205894699U (en) | 2016-08-05 | 2016-08-05 | Pipeline rack for civil construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620842081.4U CN205894699U (en) | 2016-08-05 | 2016-08-05 | Pipeline rack for civil construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205894699U true CN205894699U (en) | 2017-01-18 |
Family
ID=57784081
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620842081.4U Expired - Fee Related CN205894699U (en) | 2016-08-05 | 2016-08-05 | Pipeline rack for civil construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205894699U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106088606A (en) * | 2016-08-05 | 2016-11-09 | 金陵科技学院 | A kind of civil construction pipeline rack |
-
2016
- 2016-08-05 CN CN201620842081.4U patent/CN205894699U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106088606A (en) * | 2016-08-05 | 2016-11-09 | 金陵科技学院 | A kind of civil construction pipeline rack |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106088606A (en) | A kind of civil construction pipeline rack | |
| CN105711632A (en) | Breakage-proof transporting trolley for exterior wall tile | |
| CN203266040U (en) | Mounting platform for power system of fuel battery automobile | |
| CN103894805B (en) | Installing platform of power system of fuel cell car | |
| CN204558922U (en) | A kind of hoisting structure of power distribution cabinet | |
| CN202398989U (en) | Horizontal mounting device of plate heat exchanger | |
| CN106166734B (en) | Indoor and outdoor electrician installation and maintenance operation platform | |
| CN205367613U (en) | Automatic feeding device of ground iron conduit | |
| CN203621841U (en) | Tubular bus welding platform | |
| CN203242940U (en) | Novel carrying cart used for handcart switch | |
| CN204525323U (en) | The operation of power networks portable dismounting instrument of scheduling giant-screen | |
| CN205469205U (en) | Breakage -proof floor truck of exterior wall tile | |
| CN204000633U (en) | A kind of sandbox detachable precompressed reaction frame for precompressed | |
| CN204195229U (en) | A kind of blower motor assembly streamline | |
| CN205739208U (en) | The tower transfer system of wind turbine power generation unit | |
| CN204308531U (en) | A kind of power station stator apparatus for examination and repair | |
| CN202667202U (en) | Furnace tube washing machine | |
| CN203836942U (en) | Operation device advancing device inside circulating fluidized bed boiler furnace | |
| CN206130864U (en) | But solar panel of convenient to detach battery integration street lamp | |
| CN204179792U (en) | Hydro-generator lower frame inspection platform | |
| CN206084419U (en) | Equipment alignment translation device | |
| CN204199800U (en) | A kind of box photovoltaic inversion room | |
| CN202424002U (en) | Spacer rod hoisting tool used safely | |
| CN204874621U (en) | Laboratory is with simple and convenient quenching equipment | |
| CN103078260B (en) | Mechanism case installs special purpose device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170118 Termination date: 20200805 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |