- CN205886395U CN205886395U CN201620797916.9U CN201620797916U CN205886395U CN 205886395 U CN205886395 U CN 205886395U CN 201620797916 U CN201620797916 U CN 201620797916U CN 205886395 U CN205886395 U CN 205886395U
- Authority
- CN
- China
- Prior art keywords
- water
- waterwheel
- examination
- energy
- cistern
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to an energy -conserving water system in workshop tries water, including trying the water workshop, drinking station, escape canal, sedimentation tank, cistern and water tank, the escape canal centers on trying the water, the workshop is inside to be set up all around, sedimentation tank and cistern setting are in the workshop outside of trying the water, drinking station, escape canal, sedimentation tank, cistern and water tank loop through the pipeline intercommunication and loop in. The utility model discloses an energy -conserving water system in workshop tries water has realized the reuse of water fresh water in experimental, practices thrift manufacturing cost, has reduced the waste of water resource.
Description
Technical field
The utility model is related to energy-conservation water system between a kind of examination waterwheel, belongs to water circulating apparatus technical field.
Background technology
At present, global resources are nervous, and freshwater resources are rare, and social environmental pollution is serious, and people research and develop new science and technology, can not
Quote or water that water quality is poor passes through to purify for water capable of direct drinking.
Any enterprise is all pursued with cost minimization benefit for final, in enterprise production process, Ying Yan
Control production cost.Through investigation, after enterprise produces water purifier, its performance to be tested, need water test, early stage is all by municipal administration certainly
Water, after tap water pipe network storage tank, accesses, by being in charge of, the equipment that every needs are tested, by machine after equipment debugging
Internal water emits, and direct dispatch, to sewer pipe network, causes greatly to waste, and virtually increases production cost.
In order to reduce the waste of water resource, realize the recycling of fresh water in water test, save production cost, be to need at present
Problem to be solved.
Utility model content
The technical problems to be solved in the utility model is, not enough for prior art, and proposition one kind is realized light in water test
The recycling of water, saves energy-conservation water system between the examination waterwheel of production cost.
The utility model is that the technical scheme solving above-mentioned technical problem proposition is: energy-conservation water system between a kind of examination waterwheel
System, include between examination waterwheel, drinking fountain stand, gutter, sedimentation basin, cistern and water tank, gutter is around trying inside circumference between waterwheel
Setting, sedimentation basin and cistern are arranged on outside between examination waterwheel, and drinking fountain stand, gutter, sedimentation basin, cistern and water tank lead to successively
Cross pipeline connection and form loop.
The improvement of technique scheme is: is provided with accurate filter between cistern and water tank.
The improvement of technique scheme is: is provided with the first supply-water pump between water tank and accurate filter.
The improvement of technique scheme is: is provided with the second supply-water pump between water tank and drinking fountain stand.
The improvement of technique scheme is: sedimentation basin is provided with the first gap, the first gap and water passage.
The improvement of technique scheme is: cistern is provided with the second gap, the second gap and water passage.
The improvement of technique scheme is: drinking fountain stand has five, and five drinking fountain stands are arranged along gutter uniform intervals.
The improvement of technique scheme is: cistern at least, and 5 meters of the length of cistern is wide 5 meters, deep 2 meters.
The utility model using the beneficial effect of technique scheme is:
(1) of the present utility model examination waterwheel between energy-conservation water system due to drinking fountain stand, gutter, sedimentation basin, cistern and
Water tank pass sequentially through pipeline connection formed loop it is achieved that in water test fresh water recycling, save production cost, decrease
The waste of water resource;
(2) between examination waterwheel of the present utility model, energy-conservation water system precipitates because the water of draining ditch water discharge first passes through sedimentation basin
After enter back into cistern, greatly reduce suspended impurity in water it is ensured that in cistern the cleaning of water pure;
(3) of the present utility model examination waterwheel between energy-conservation water system due to being provided with secondary filter between cistern and water tank
Device, before accurate filter is located at the first supply-water pump, the impurity in filter water and particle, it is prevented from the first supply-water pump abrasion,
Extend the service life of the first supply-water pump;
(4) between examination waterwheel of the present utility model, energy-conservation water system is provided with the first gap due to sedimentation basin, and first overflows
The mouth of a river and water passage, the water in sedimentation basin, after beyond its capacity, can enter sewer by the first gap;
(5) between examination waterwheel of the present utility model, energy-conservation water system is provided with the second gap due to cistern, and second overflows
The mouth of a river and water passage, the water in cistern, after beyond its capacity, can enter sewer by the second gap;
(6) between examination waterwheel of the present utility model, energy-conservation water system has five due to drinking fountain stand, is capable of multiple stage water purification
Machine carries out water test simultaneously, improves the operating efficiency of water test;
(7) between examination waterwheel of the present utility model energy-conservation water system due to cistern at least, reservoir storage is big, can
Meet routine use demand.
Brief description
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation that the utility model embodiment tries energy-conservation water system between waterwheel;
Wherein: between 1- examination waterwheel;2- second supply-water pump;3- gutter;4- drinking fountain stand;5- sedimentation basin;6- cistern;7- essence
Close filter;8- first supply-water pump;9- sewer;10- second gap;11- first gap;12- water tank.
Specific embodiment
Embodiment
Energy-conservation water system between the examination waterwheel of the present embodiment, as shown in figure 1, include 1, drinking fountain stand 4, gutter between examination waterwheel
3rd, sedimentation basin 5, cistern 6 and water tank 12, gutter 3 sets around trying 1 inside circumference setting between waterwheel, sedimentation basin 5 and cistern 6
Put outside 1 between examination waterwheel, drinking fountain stand 4, gutter 3, sedimentation basin 5, cistern 6 and water tank 12 pass sequentially through pipeline connection and formed
Loop.It is disposed with accurate filter 7 and the first supply-water pump 8 between cistern 6 and water tank 12.Water tank 12 and drinking fountain stand 4 it
Between the second supply-water pump 2 is installed.Drinking fountain stand 4 has five, and five drinking fountain stands 4 are arranged along gutter 3 uniform intervals, water tank 12
Connected with five drinking fountain stands 4 respectively by pipeline.Sedimentation basin 5 is provided with the first gap 11, and cistern 6 is provided with the second spilling water
Mouth 10, the first gap 11 is connected with sewer 9 respectively with the second gap 10.Cistern 6 is one, 5 meters of the length of cistern,
Wide 5 meters, deep 2 meters.
Energy-conservation water system between the examination waterwheel of the present embodiment, anti-seep measure has been done in gutter 3, and has the gradient, precipitation
Drainage pipeline networks is carried out in pond 5, and drainage pipeline networks carries out the filter screen stoping foreign matters from being blocked, and the foreign matter in waste water is cleared up in time, to ensure
The clarity that waste water reuses.Filter bag is installed inside accurate filter, filter bag can be reused.Install in 1 between examination waterwheel
Water tank 12 liquid-level floater should be installed, if in water tank 12 water level be less than must condition, the first supply-water pump 8 automatic notes inward
Water, it is ensured that being full of water in water tank 12, thus, goes round and begins again.
Between the examination waterwheel of the present embodiment, operationally, water purifier carries out water examination at drinking fountain stand 4 to energy-conservation water system respectively
Test, the waste water that water test produces enters gutter 3 by drinking fountain stand 4, waste water enters sedimentation basin 5 by gutter 3 and precipitated,
Water after precipitation enters cistern 6, and when water level decreasing in water tank 12, the first supply-water pump 8 starts, by the water warp in cistern 6
Cross after accurate filter 7 filters and send into water tank 12, the water in water tank 12 is delivered to each drinking fountain stand 4 by the second supply-water pump 2, and formation follows
Ring.
The utility model is not limited to above-described embodiment.The technical scheme that all employing equivalents are formed, all falls within this reality
Protection domain with new requirement.
Claims (8)
1. between a kind of examination waterwheel energy-conservation water system it is characterised in that: include between examination waterwheel, drinking fountain stand, gutter, sedimentation basin,
Cistern and water tank, inside circumference setting between waterwheel is tried around described in described gutter, and described sedimentation basin and cistern are arranged on
Outside between described examination waterwheel, described drinking fountain stand, gutter, sedimentation basin, cistern and water tank pass sequentially through pipeline connection and are formed back
Road.
2. according to claim 1 examination waterwheel between energy-conservation water system it is characterised in that: between described cistern and water tank
It is provided with accurate filter.
3. according to claim 2 examination waterwheel between energy-conservation water system it is characterised in that: described water tank and accurate filter
Between the first supply-water pump is installed.
4. according to claim 3 examination waterwheel between energy-conservation water system it is characterised in that: between water tank and drinking fountain stand install
There is the second supply-water pump.
5. according to claim 4 examination waterwheel between energy-conservation water system it is characterised in that: described sedimentation basin is provided with first
Gap, described first gap and water passage.
6. according to claim 5 examination waterwheel between energy-conservation water system it is characterised in that: described cistern is provided with second
Gap, described second gap and water passage.
7. according to claim 6 examination waterwheel between energy-conservation water system it is characterised in that: described drinking fountain stand has five, institute
State five drinking fountain stands to arrange along described gutter uniform intervals.
8. according to claim 7 examination waterwheel between energy-conservation water system it is characterised in that: described cistern at least
Individual, 5 meters of the length of described cistern, wide 5 meters, deep 2 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620797916.9U CN205886395U (en) | 2016-07-27 | 2016-07-27 | Energy -conserving water system in workshop tries water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620797916.9U CN205886395U (en) | 2016-07-27 | 2016-07-27 | Energy -conserving water system in workshop tries water |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205886395U true CN205886395U (en) | 2017-01-18 |
Family
ID=57784710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620797916.9U Active CN205886395U (en) | 2016-07-27 | 2016-07-27 | Energy -conserving water system in workshop tries water |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205886395U (en) |
-
2016
- 2016-07-27 CN CN201620797916.9U patent/CN205886395U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204502491U (en) | A kind of spiral-flow type pollution cutting device | |
CN105735449B (en) | A kind of urban road rainwater collecting and treating system | |
CN206267267U (en) | A kind of rainwater-collecting reclaiming system | |
CN205222960U (en) | Residence community rainwater processing system | |
CN104986827B (en) | Water purification installation | |
CN208933036U (en) | A kind of oil resistant ceramic membrane oil recovery try production | |
CN106045148A (en) | Novel intelligent electric flocculation treatment apparatus of power plant coal-containing wastewater | |
CN110565767A (en) | Saline and alkaline area rainwater regulation retrieval and utilization system | |
CN205886395U (en) | Energy -conserving water system in workshop tries water | |
CN203329467U (en) | Rotary table filter tank | |
CN201760140U (en) | Improved sewage filter | |
CN203269640U (en) | Efficient integrated water purifier | |
CN205796748U (en) | A kind of water treatment deposition defecator | |
CN210032065U (en) | Municipal rainwater filtering and discharging device | |
CN103961915B (en) | Non-valve filter with double filter layers | |
CN105271574A (en) | Comprehensive treatment device for power plant wastewater | |
CN205042224U (en) | Sewage draining device | |
CN205099516U (en) | Processing apparatus is synthesized to thermal power plant's waste water | |
CN210522003U (en) | Simple composite sedimentation tank for construction site | |
CN205676279U (en) | A kind of papermaking wastewater reclaiming system | |
CN205224235U (en) | City rain flood regulation device | |
CN203668115U (en) | Up-flow flat-bottomed anaerobic reactor | |
CN203795231U (en) | Off-machine water recycling tower | |
CN205340250U (en) | High -efficient fibrous filter pond | |
CN202962010U (en) | Fiber filtering tank capable of uniformly adjusting backflushing, water distribution and gas distribution |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||