CN205877406U - Casing centralization stationary device - Google Patents

Casing centralization stationary device Download PDF

Info

Publication number
CN205877406U
CN205877406U CN201620696513.5U CN201620696513U CN205877406U CN 205877406 U CN205877406 U CN 205877406U CN 201620696513 U CN201620696513 U CN 201620696513U CN 205877406 U CN205877406 U CN 205877406U
Authority
CN
China
Prior art keywords
handle
screens
intersection
casing centralization
centre gripping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620696513.5U
Other languages
Chinese (zh)
Inventor
魏肇基
盛佳佳
朱恩卿
林奕周
赵满堂
庄恢凰
崔广伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Original Assignee
GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd filed Critical GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority to CN201620696513.5U priority Critical patent/CN205877406U/en
Application granted granted Critical
Publication of CN205877406U publication Critical patent/CN205877406U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a casing centralization stationary device belongs to pipe location installation field, and it includes the handle and attend two rotary rods of intersection's articulated through the handle, and the intersection is equipped with the centre gripping screens, and the intersection is between handle both ends, and two rotary rods also are equipped with the centre gripping screens, and two rotary rods launch the same angle along handle the central axis bilateral symmetry, centre gripping screens apart from intersection's equidistance on two rotary rods. Above -mentioned scheme is passed through handle, rotary rod and centre gripping screens and is produced six limit point, makes casing centralization rapid, fix a position simultaneously and the fixing device supporting sleeve pipe, the reduction is rocked, has solved sleeve pipe axiality shortcoming not up to standard after the installation of riser.

Description

The device that a kind of casing centralization is fixing
Technical field
This utility model relates to pipe location and installation field, particularly relates to the device that a kind of casing centralization is fixing.
Background technology
Existing conventional standpipe through-flooring sleeve pipe seldom uses fixing technology placed in the middle, is generally to block Journey, by the distance of ruler measurement sleeve pipe to standing tube outer wall whether as, and then fix between two parties.The fixing side of traditional casing centralization Although method plays a role to casing centralization is fixing, but this method is in actual mechanical process, needs repetitive measurement Lose time;And owing to lacking fixation during reality blocks, sleeve pipe can rock, ultimately result in axiality Not.Once sleeve pipe has blocked, and the deviation of generation would become hard to be modified again, and can only dismantle and reinstall.
Utility model content
The purpose of this utility model is that providing a kind of is quickly centered about sleeve pipe the fixing device being fixed.
Technical solution adopted in the utility model is:
The device that a kind of casing centralization is fixing, including handle with by hinged two swingles of the intersection on handle, institute Stating intersection and be provided with clamping screens, described intersection, between handle both ends, swingle described in two also is provided with clamp screens, Swingle described in two crosses along handle center's axis symmetrical expansion equal angular, the retaining wedge distance of positions on swingle described in two Place is equidistant.
Being further used as the improvement of technical solutions of the utility model, the centre of handle and two swingles is equipped with chute.
Being further used as the improvement of technical solutions of the utility model, clamping screens includes two be vertically installed on chute The bolt that can move along chute and the nut of correspondence.
It is further used as the improvement of technical solutions of the utility model, each chute is labeled with scale.
The beneficial effects of the utility model: the device that this casing centralization is fixed is by handle and two swingles and three groups of clampings Card potential energy produces six limit points so that this device can the most coaxially position double pipe;Held by handle and clamping screens Care set pipe, thus rocking of producing during counteracting closure, it is possible to stable double pipe axialities.
Accompanying drawing explanation
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the integral installation structure chart of this utility model embodiment;
Fig. 2 is the structure drawing of device that the casing centralization of this utility model embodiment is fixing.
Detailed description of the invention
With reference to Fig. 1, Fig. 2, the device installation environment that this casing centralization is fixed includes mounted standpipe 4 and is enclosed within standpipe 4 The sleeve pipe 3 to be installed of outside.The fixing device of casing centralization include handle 5 and by the intersection 8 on handle 5 hinged two Swingle 6;It is provided with clamping screens 2 at intersection 8, two swingles 6 also is provided with clamp screens 2;Clamping screens 2 includes two groups Bolt and nut, both form the structure of U-shaped like groove, and two bolts individually can slide respectively on chute 7, can reversely move The outer wall of rear gripping sleeve 3;Two swingles 6 respectively can be independently rotated around intersection 8, and after above-mentioned three assembling, structure is as Y shape Support.Described handle 5 and two swingles 6 are all prefabricated with chute 7, and described chute 7 is used for installing clamping screens 2.As in figure 2 it is shown, Wherein on handle 5, a bolt group of intersection 8 is mainly used in location and fixes two swingles 6, and by two swingle 6 end bands Dynamic its moves;Another root is the most movable, for being matched for clamping tightly the cross section annulus of sleeve pipe 3 with corresponding bolt.On described chute 7 also There is scale 9, it is simple under the different mounting condition of record, clamp the scale value of screens 2 correspondence.
The device that casing centralization after correctly installing and using is fixed is as it is shown in figure 1, two swingles 6 are along handle 5 central axis Symmetrical expansion equal angular, the clamping screens 2 on swingle 6 described in two is equidistant away from intersection 8.Grasp by holding handle 5 Making, handle 5 one end contact standpipe 4 with two swingle 6 inner side edges, and three groups on handle 5 and two swingles 6 clamp screens 2 simultaneously Block and be enclosed within the outer wall of sleeve pipe 3 outside standpipe 4.Placement Y shaped bracket is to relevant position, by early fixed three limit points 1 Can promptly be centered about sleeve pipe 3 with three clamping screens 2, its geometrical principle is at 3 and determines a plane, and 3 really A fixed center of circle;This device support sleeve pipe 3 simultaneously, closely counteracts rocking of closure process generation, makes installation rear profile tube 4 and set Pipe 3 axiality is guaranteed.
As this utility model preferred embodiment, as it is shown in figure 1, two swingles 6 generally ensure that end is fixed on friendship At remittance 8, intersection 8 regulate its position, angular relationship.So, two swingles 6 seem symmetrical, attractive in appearance, particularly scale 9 energy Enough show contrast number the most intuitively.
As this utility model preferred embodiment, during practice of construction, its operational approach includes:
A) first according to model, the limit point 1 between standpipe 4 and sleeve pipe 3 and the scale of clamping screens 2 are adjusted by chute 7 Value;
Clamping screens 2 scale value is directly adjusted when b) then using
C) the clamping screens 2 as U-lag is buckled in the outer wall of sleeve pipe 3, adjusts handle 5 and contacts with the limit point 1 of two swingles 6 Standpipe 4;
D) by two bolts against, make clamping screens 2 fasten the outer wall of sleeve pipe 3.
Certainly, this utility model is created and is not limited to above-mentioned embodiment, and those of ordinary skill in the art are not disobeying Also can make equivalent variations or replacement on the premise of back of the body this utility model spirit, the modification of these equivalents or replacement are all contained in this In application claim limited range.

Claims (4)

1. the device that a casing centralization is fixing, it is characterised in that: include handle (5) and by crossing on described handle (5) Two swingles (6) that place (8) is hinged, described intersection (8) place is provided with clamping screens (2), and described intersection (8) is between handle (5) between both ends, swingle described in two (6) also being provided with clamp screens (2), swingle described in two (6) is along handle (5) central shaft Line symmetrical expansion equal angular, the clamping screens (2) on swingle described in two (6) is equidistant away from intersection (8).
The device that casing centralization the most according to claim 1 is fixing, it is characterised in that: described handle (5) and two swingles (6) centre is equipped with the chute (7) providing clamping screens (2) to slide.
The device that casing centralization the most according to claim 2 is fixing, it is characterised in that: described clamping screens (2) includes erecting Directly being arranged on two on chute (7) can be along the bolt of chute (7) movement and the nut of correspondence.
The device that casing centralization the most according to claim 2 is fixing, it is characterised in that: it is respectively marked with on each described chute (7) Scale (9).
CN201620696513.5U 2016-07-01 2016-07-01 Casing centralization stationary device Active CN205877406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620696513.5U CN205877406U (en) 2016-07-01 2016-07-01 Casing centralization stationary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620696513.5U CN205877406U (en) 2016-07-01 2016-07-01 Casing centralization stationary device

Publications (1)

Publication Number Publication Date
CN205877406U true CN205877406U (en) 2017-01-11

Family

ID=57693595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620696513.5U Active CN205877406U (en) 2016-07-01 2016-07-01 Casing centralization stationary device

Country Status (1)

Country Link
CN (1) CN205877406U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962821A (en) * 2020-07-10 2020-11-20 广东省工业设备安装有限公司 Automatic centering and inverting method for vertical shaft pipeline
CN114603501A (en) * 2022-02-25 2022-06-10 中国建筑第八工程局有限公司 Pipe centering device in sleeve and construction method thereof
CN114603501B (en) * 2022-02-25 2024-04-30 中国建筑第八工程局有限公司 Pipe centering device in casing pipe and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962821A (en) * 2020-07-10 2020-11-20 广东省工业设备安装有限公司 Automatic centering and inverting method for vertical shaft pipeline
CN114603501A (en) * 2022-02-25 2022-06-10 中国建筑第八工程局有限公司 Pipe centering device in sleeve and construction method thereof
CN114603501B (en) * 2022-02-25 2024-04-30 中国建筑第八工程局有限公司 Pipe centering device in casing pipe and construction method thereof

Similar Documents

Publication Publication Date Title
WO2020098202A1 (en) Geological structure physical simulation experiment device for ultra-high gravity field of large-scale centrifugal machine
CN205877406U (en) Casing centralization stationary device
CN205253790U (en) Tube bending machine
CN105040951B (en) Arc GRG mounting structures
CN204125844U (en) Tied arch bridge hanger rod embedded hole centralising device
CN106425567A (en) Seat type fixture for missile noses
CN208866653U (en) For welding the positioning device of modular unit
CN205888477U (en) Welding fixture
CN205733909U (en) A kind of fixture processing vertical shaft bearing
CN205629203U (en) But quick assembly disassembly's angle bending machine
CN204571786U (en) Triroller gate movement
CN103226228A (en) Multi-posture adjusting mechanism for nonlinear big-caliber optical element
CN206041931U (en) Front inspection device
CN205253791U (en) Hydraulic pipe bender
CN207609426U (en) A kind of tunnel aluminum template system
CN208086713U (en) Flange turn-over mechanism and flange processing line with it
CN206817060U (en) A kind of single screw Equipoising support apparatus
CN207830931U (en) A kind of angle-adjustable support
CN104143789B (en) Conducting rod assembling tool
CN105369942B (en) A kind of curtain wall point support device
CN206245534U (en) Building novel curtain wall
CN105317182A (en) Balcony guardrail
CN206259163U (en) A kind of adjustable outstanding device of guitar
CN204282625U (en) Multi-angle easily regulates aluminium grid
CN203981435U (en) A kind of constant-speed sampling device of fly ash

Legal Events

Date Code Title Description
GR01 Patent grant