CN205876360U - Interim support system is used in tunnel two side wall drift method excavation construction - Google Patents

Interim support system is used in tunnel two side wall drift method excavation construction Download PDF

Info

Publication number
CN205876360U
CN205876360U CN201620876760.3U CN201620876760U CN205876360U CN 205876360 U CN205876360 U CN 205876360U CN 201620876760 U CN201620876760 U CN 201620876760U CN 205876360 U CN205876360 U CN 205876360U
Authority
CN
China
Prior art keywords
tunnel
pilot tunnel
upper support
side wall
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620876760.3U
Other languages
Chinese (zh)
Inventor
周玉兵
胡立正
徐磊
岳阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN201620876760.3U priority Critical patent/CN205876360U/en
Application granted granted Critical
Publication of CN205876360U publication Critical patent/CN205876360U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses an interim support system is used in tunnel two side wall drift method excavation construction, lay temporary supporting structure in the hole in tunnel hole including a plurality of forward after by, temporary supporting structure all installs in at the beginning of one steelframe in every hole, just a steelframe includes steel bow member, bottom link and controls two hunch foot steelframes, and the preliminary mounting bracket that just props up the steelframe is constituteed to steel bow member and two hunch foot steelframes, temporary supporting structure is all as an organic whole with the preliminary mounting bracket fastening connection that is located its outside in every hole, left side wall pilot tunnel, right side wall pilot tunnel and hunch portion pilot tunnel constitution in the tunnel hole tentatively excavate the hole body, and temporary supporting structure includes two lateral part support frames, upper strut frame, upper portion bearing structure and two lateral part bearing structure in the hole. The utility model has the advantages of simple structure and reasonable design and the dismouting is simple and convenient, excellent in use effect, can cooperate with tunnel initial stage supporting construction and strut excavating the shaping hole body to can effectively strut follow -up excavation region.

Description

Tunnel and Double side heading method excavation construction temporary supporting system
Technical field
This utility model belongs to technical field of tunnel construction, especially relates to a kind of tunnel and Double side heading method excavation construction Use temporary supporting system.
Background technology
Two side-wall pilot tunnel is a kind of mode of tunnel excavation, also known as twin side heading method or glasses working, belongs to new Austria One branch of method, with New Austrian Tunneling Method ultimate principle as foundation.When using two side-wall pilot tunnel to carry out tunnel excavation, used opens Wa Mian branch is generally in the form of and tunnel excavation section is divided into four pieces, i.e. left side wall base tunnel (also referred to as left side wall pilot tunnel), right side Wall base tunnel (also referred to as right side wall pilot tunnel), upper core cubsoil region base tunnel (also referred to as upper core cubsoil region pilot tunnel) and get out of a predicament or an embarrassing situation Excavation base tunnel (excavation pilot tunnel of also referred to as getting out of a predicament or an embarrassing situation).Field measurement shows, the subsidence caused by two side-wall pilot tunnel is only The 1/2 of short benching tunnelling method.Although two side-wall pilot tunnel excavated section piecemeal is many, disturbance is big, the time of initial support tunneling boring Guan Bi Long, but the most each self-closing after excavation of each piecemeal, thus develop hardly in construction intermediate deformation.Double side wall is led Hole method construction safety, but speed is relatively slow, relatively costly.When using two side-wall pilot tunnel to carry out tunnel excavation, due to excavated section Piecemeal is many, it is necessary to arrange temporary supporting system, on the one hand prevents follow-up excavation region from caving in, on the other hand to excavating molding hole Body carries out effective support, to guarantee construction safety.But nowadays, when using two side-wall pilot tunnel to carry out tunnel excavation, there is no one The construction method of individual unification, standard and specification is available for following, and the temporary supporting system used exists structure the most to some extent The problems such as complexity, dismounting is inconvenient, support effect is poor.
Utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, it is provided that a kind of tunnel Two side-wall pilot tunnel excavation construction temporary supporting system, its simple in construction, reasonable in design and dismounting is easy, using effect is good, Can match with Tunnel structure and carry out supporting to excavating molding hole body, and follow-up excavation region can be carried out effectively Supporting.
For solving above-mentioned technical problem, the technical solution adopted in the utility model is: a kind of tunnel and Double side heading method is opened Excavation construction temporary supporting system, it is characterised in that: include multiple before backward, being laid in tunnel along longitudinal extension direction, tunnel Temporary support structure in the hole in hole, in each described hole, temporary support structure is mounted on one and carries out Tunnel at the beginning of supporting Prop up in steelframe;A described just steelframe includes that the arch wall to Tunnel carries out the steel arch-shelf of supporting, to carrying out supporting bottom Tunnel Bottom link and the arch springing steelframe that is connected between steel arch-shelf and bottom link of two, left and right, two described arch springings Steelframe symmetry is laid in the left and right sides of bottom link, steel arch-shelf and two described just steelframes of described arch springing steelframe composition Preliminary installing rack;In each described hole, temporary support structure is all fastenedly connected with the described preliminary installing rack being positioned at outside it is one Body, in each described hole, temporary support structure is all laid in same tunnel cross-section with the described preliminary installing rack being positioned at outside it On;
Described Tunnel includes left side wall pilot tunnel, right side wall pilot tunnel, upper core cubsoil region pilot tunnel and is positioned at described top Excavation pilot tunnel of getting out of a predicament or an embarrassing situation immediately below the pilot tunnel of Core Soil region, described left side wall pilot tunnel and described right side wall pilot tunnel symmetrically cloth If, described upper core cubsoil region pilot tunnel and excavation pilot tunnel of getting out of a predicament or an embarrassing situation be respectively positioned on described left side wall pilot tunnel and right side wall pilot tunnel it Between;Described upper core cubsoil region pilot tunnel is divided into arch pilot tunnel and is positioned at the middle part pilot tunnel immediately below the pilot tunnel of arch;Described left side Wall pilot tunnel, described right side wall pilot tunnel and arch pilot tunnel composition preliminary excavation hole body, be positioned at described preliminary excavation hole body in Tunnel The region of inner side is follow-up excavation region;
In described hole, temporary support structure includes that two symmetries prop up the side supports being located at the left and right sides, follow-up excavation region Frame, upper support shelf being supported in follow-up excavation area top, be supported in above upper support shelf with described preliminary installation Upper support structure between frame and two are respectively supported between two described side supports framves and described preliminary installing rack Side supports structure, two described side supports structures lay respectively in described left side wall pilot tunnel and described right side wall pilot tunnel, institute State upper support structure and be positioned at arch pilot tunnel, described upper support shelf and two described side supports frame composition medial branch support frames Frame, the described side supports structure of described medial support framework, described upper support structure and two is all laid in same vertical plane On.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: two described side supports Structure is symmetrically laid.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: described follow-up excavation region Left and right sides wall be curved wall, described side supports frame is curved support frame.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: described upper support structure Including multiple upper support posts laid from left to right, the bottom support of described upper support post is in upper support shelf and it pushes up Portion is supported on described preliminary installing rack.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: described upper support structure Include that three described upper support posts, three described upper support posts include that is supported in a top in the middle part of upper support shelf Midfoot support post and two symmetries are laid in the side supports post of the described midfoot support post left and right sides, two described side supports Post is respectively supported at above the left and right sides of upper support shelf;
Described midfoot support post is vertical support column;Two described side supports posts are curved support post and the two difference Be supported in above two described side supports framves, each described side supports frame all with the described side supports of the side of being supported on Post connects one arc support of formation.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: described upper support post is I-steel.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: each described side supports Structure all includes that the cross-brace beam that multiple tracks is from top to bottom laid, described cross-brace beam are that level is laid, described cross-brace The inside and outside two ends of beam are respectively supported between side supports frame and described preliminary installing rack.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: described left side wall pilot tunnel with Right side wall pilot tunnel is the most from top to bottom divided into upper lateral part pilot tunnel, middle sidepiece pilot tunnel and following side pilot tunnel;
Each described side supports structure all includes twice cross-brace beam, and cross-brace beam described in twice is respectively positioned at Upper cross-brace beam bottom upper lateral part pilot tunnel and be positioned at the middle cross-brace beam bottom middle sidepiece pilot tunnel.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: described cross-brace beam is I-steel.
Above-mentioned tunnel and Double side heading method excavation construction temporary supporting system, is characterized in that: described side supports frame and Upper support shelf is I-steel.
This utility model compared with prior art has the advantage that
1, simple in construction, reasonable in design and dismounting simplicity, efficiency of construction is high.
2, the simple in construction of temporary support structure in hole, reasonable in design and dismounting is easy, using effect is good, right including two Claim to prop up and be located at the side supports frame of the left and right sides, follow-up excavation region, a upper support being supported in follow-up excavation area top Frame, the upper support structure being supported in above upper support shelf between the preliminary installing rack of a first steelframe and two support respectively Side supports structure between two side supports framves and preliminary installing rack, upper support shelf and two side supports frame compositions Medial support framework, medial support framework is supported in follow-up excavation areas outside, installs simplicity and supports firm, and can be to follow-up Excavation region carries out effective support, it is ensured that work progress is safe and reliable;Meanwhile, by upper support structure and two side supports Structure is fastenedly connected with the just preliminary installing rack of a steelframe and is integrated, and can improve the overall steady of temporary support structure in hole further Solidity, and just prop up the installation process of preliminary installing rack in steelframe owing to being now only completed, bottom link is not also installed, thus Now just a steelframe is unclosed, and in using hole, preliminary installing rack can effectively be supported by temporary support structure, it is thus possible to effectively Ensureing the supporting effect of preliminary installing rack, in hole, temporary support structure and a just steelframe are with the use of can be to excavating molding hole body (i.e. the preliminary excavation hole body of Tunnel) carries out effective support, and supporting intensity is high, can ensure that Tunnel effect.
3, set up easy and labor intensity is low, saving of work and time.
4, using effect is good and practical value high, is laid in tunnel along longitudinal extension direction, tunnel including multiple before backward Temporary support structure in the hole in hole, in each hole, temporary support structure is mounted on a first Zhi Gang that Tunnel carries out supporting In frame;In each hole, temporary support structure is all fastenedly connected with the preliminary installing rack being positioned at outside it and is integrated, each described hole Interior temporary support structure is all laid on same tunnel cross-section with the preliminary installing rack being positioned at outside it, thus this utility model In temporary support structure is installed in preliminary installing rack in each hole used and it is fastenedly connected with preliminary installing rack and is integrated, by It is the supporting construction that Tunnel is carried out preliminary bracing supporting in a just steelframe, and all just steelframe fastenings in Tunnel Connecting as one, so making temporary support structure in all holes of the present utility model to be fastenedly connected is an entirety, and with Just a steelframe with the use of, thus carry out supporting to excavating molding hole body.
In sum, this utility model simple in construction, reasonable in design and dismounting is easy, using effect is good, can with tunnel at the beginning of Phase supporting construction matches and carries out supporting to excavating molding hole body, and follow-up excavation region can be carried out effective support.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is installation position schematic diagram of the present utility model.
Fig. 2 is holding state schematic diagram of the present utility model.
Description of reference numerals:
1 upper lateral part pilot tunnel;Sidepiece pilot tunnel in 2;3 following side pilot tunnels;
Cross-brace beam on 4;Cross-brace beam in 5;6 follow-up excavation regions;
7 arch pilot tunnels;Pilot tunnel in the middle part of 8-;9 get out of a predicament or an embarrassing situation excavation pilot tunnel;
9-1 Tunnel;Link bottom 10-1;10-2 arch springing steelframe;
10-3 steel arch-shelf;11-1 side supports frame;11-2 upper support shelf;
11-3 upper support post.
Detailed description of the invention
As shown in Figure 1 and Figure 2, this utility model includes multiple being laid in tunnel along longitudinal extension direction, tunnel before backward Temporary support structure in the hole of hole 9-1, in each described hole, temporary support structure is mounted on one and carries out Tunnel 9-1 In first the steelframe protected;A described just steelframe includes the arch wall of Tunnel 9-1 carrying out the steel arch-shelf 10-3 of supporting, to Tunnel The bottom link 10-1 and two, the left and right that carry out supporting bottom 9-1 are connected to steel arch-shelf 10-3 and bottom link 10-1 Between arch springing steelframe 10-2, two described arch springing steelframe 10-2 symmetries are laid in the left and right sides of bottom link 10-1, steel Bow member 10-3 and the preliminary installing rack of two described just steelframes of described arch springing steelframe 10-2 composition;Prop up in each described hole temporarily Support structure is all fastenedly connected with the described preliminary installing rack being positioned at outside it and is integrated, and in each described hole, temporary support structure is equal It is laid on same tunnel cross-section with the described preliminary installing rack being positioned at outside it;
Described Tunnel 9-1 includes left side wall pilot tunnel, right side wall pilot tunnel, upper core cubsoil region pilot tunnel and is positioned on described Excavation pilot tunnel 9 of getting out of a predicament or an embarrassing situation immediately below the pilot tunnel of Core Soil region, portion, described left side wall pilot tunnel is with described right side wall pilot tunnel symmetrically Laying, described upper core cubsoil region pilot tunnel and excavation pilot tunnel 9 of getting out of a predicament or an embarrassing situation are respectively positioned on described left side wall pilot tunnel and right side wall pilot tunnel Between;Described upper core cubsoil region pilot tunnel is divided into arch pilot tunnel 7 and is positioned at the middle part pilot tunnel 8 immediately below arch pilot tunnel 7;Described Left side wall pilot tunnel, described right side wall pilot tunnel and arch pilot tunnel 7 form preliminary excavation hole body, Tunnel 9-1 is positioned at described tentatively The region of excavation Ti Nei side, hole is follow-up excavation region 6;
In described hole, temporary support structure includes that two symmetries prop up the side supports being located at the left and right sides, follow-up excavation region Frame 11-1, upper support shelf 11-2 being supported in follow-up excavation area top, be supported in above upper support shelf 11-2 with Upper support structure between described preliminary installing rack and two are respectively supported at two described side supports frame 11-1 with described Side supports structure between preliminary installing rack, two described side supports structures lay respectively at described left side wall pilot tunnel and described In right side wall pilot tunnel, described upper support structure is positioned at arch pilot tunnel 7, described upper support shelf 11-2 and two described sidepieces Bracing frame 11-1 forms medial support framework, and described medial support framework, described upper support structure and two described sidepieces prop up Support structure is all laid on same vertical plane.
In the present embodiment, two described side supports structures are symmetrically laid.
In the present embodiment, the left and right sides wall in described follow-up excavation region is curved wall, described side supports frame 11- 1 is curved support frame.
Actual adding man-hour, described upper support structure includes multiple upper support post 11-3 laid from left to right, described The bottom support of upper support post 11-3 is in upper support shelf 11-2 and its top braces is on described preliminary installing rack.And And, the top of described upper support post 11-3 is all supported in the arch of steel arch-shelf 10-3.
In the present embodiment, described upper support structure includes three described upper support post 11-3, three described tops Support column 11-3 includes that a midfoot support post being supported in top in the middle part of upper support shelf 11-2 and two symmetries are laid in institute Stating the side supports post of the midfoot support post left and right sides, two described side supports posts are respectively supported at upper support shelf 11-2 Above the left and right sides;
Described midfoot support post is vertical support column;Two described side supports posts are curved support post and the two difference It is supported in above two described side supports frame 11-1, each described side supports frame 11-1 all described with the side of being supported on Side supports post connects one arc support of formation.
Time actually used, can according to specific needs, to upper support post 11-3's included in described upper support structure The installation position of quantity and each upper support post 11-3 adjusts accordingly respectively.
Each described side supports structure all includes the cross-brace beam that multiple tracks is from top to bottom laid, described cross-brace beam Lay in level, the inside and outside two ends of described cross-brace beam be respectively supported at side supports frame 11-1 and described preliminary installing rack it Between.Further, the outer end of described cross-brace beam is supported in steel arch-shelf 10-3 sidepiece.
In the present embodiment, described left side wall pilot tunnel and right side wall pilot tunnel are the most from top to bottom divided into upper lateral part pilot tunnel 1, middle sidepiece Pilot tunnel 2 and following side pilot tunnel 3.Thus, the excavated section of institute's construction tunnel includes 9 pilot tunnels, the excavation of institute's construction tunnel are executed Work method is two side-wall pilot tunnel, and uses nine excavations, also referred to as nine pilot tunnel methods of double side wall.
Each described side supports structure all includes twice cross-brace beam, and cross-brace beam described in twice is respectively positioned at Upper cross-brace beam bottom upper lateral part pilot tunnel 14 and be positioned at the middle cross-brace beam 4 bottom middle sidepiece pilot tunnel 2.
Time actually used, can according to specific needs, to the number of cross-brace beam included by each described side supports structure The installation position of amount and each road cross-brace beam adjusts accordingly respectively.
In the present embodiment, described upper support post 11-3 is I-steel.Described cross-brace beam is I-steel.Further, institute State side supports frame 11-1 and upper support shelf 11-2 is I-steel.
Actual add man-hour, described upper support post 11-3, described cross-brace beam, side supports frame 11-1 and upper support Frame 11-2 can also use other type of shaped steel rod member.
During practice of construction, first along longitudinal extension direction, tunnel by the backward front described left side wall pilot tunnel to Tunnel 9-1, institute State right side wall pilot tunnel and arch pilot tunnel 7 excavate respectively, the described left side wall pilot tunnel excavated, described right side wall pilot tunnel and Arch pilot tunnel 7 forms described preliminary excavation hole body;Preliminary excavation hole body is carried out before backward along longitudinal extension direction, tunnel again Preliminary bracing is constructed, and completes the installation process of multiple described just described preliminary installing rack of a steelframe, multiple described just steelframe Described preliminary installing rack between the longitudinally connected part laid along longitudinal extension direction, tunnel by multiple tracks be fastenedly connected and be integrated, Described longitudinally connected part is longitudinal reinforcement;Meanwhile, in the described preliminary installing rack of each described just steelframe, it is respectively mounted one Temporary support structure in described hole, the most just completes installation process of the present utility model.Along longitudinal extension direction, tunnel by backward Before the front secondary lining to described preliminary excavation hole body is constructed, first by backward front in temporary support structure in described hole Described upper support structure and two described side supports structures remove respectively.Further, along longitudinal extension direction, tunnel Before follow-up excavation region 6 being carried out excavation construction before backward, first by before backward in temporary support structure in described hole Described medial support framework is removed.
The above, be only preferred embodiment of the present utility model, not impose any restrictions this utility model, every Any simple modification, change and equivalent structure change above example made according to this utility model technical spirit, the most still Belong in the protection domain of technical solutions of the utility model.

Claims (10)

1. a tunnel and Double side heading method excavation construction temporary supporting system, it is characterised in that: include multiple vertical along tunnel To bearing of trend by being laid in temporary support structure in the hole of Tunnel (9-1), temporary support knot in each described hole before backward Structure is mounted in a first steelframe that Tunnel (9-1) carries out supporting;A described just steelframe includes Tunnel (9-1) Arch wall carry out the steel arch-shelf (10-3) of supporting, Tunnel (9-1) bottom carried out bottom link (10-1) and the left side of supporting Right two arch springing steelframes (10-2) being connected between steel arch-shelf (10-3) and bottom link (10-1), two described arches Foot steelframe (10-2) symmetry is laid in the left and right sides of bottom link (10-1), steel arch-shelf (10-3) and two described arch springing steel Frame (10-2) forms the preliminary installing rack of a described just steelframe;In each described hole temporary support structure all be positioned at outside it Described preliminary installing rack is fastenedly connected and is integrated, in each described hole temporary support structure all be positioned at outside it described tentatively Installing rack is laid on same tunnel cross-section;
Described Tunnel (9-1) includes left side wall pilot tunnel, right side wall pilot tunnel, upper core cubsoil region pilot tunnel and is positioned at described top Excavation pilot tunnel (9) of getting out of a predicament or an embarrassing situation immediately below the pilot tunnel of Core Soil region, described left side wall pilot tunnel is with described right side wall pilot tunnel symmetrically Laying, described upper core cubsoil region pilot tunnel and excavation pilot tunnel (9) of getting out of a predicament or an embarrassing situation are respectively positioned on described left side wall pilot tunnel and lead with right side wall Between hole;Described upper core cubsoil region pilot tunnel is divided into arch pilot tunnel (7) and is positioned at the middle part pilot tunnel immediately below arch pilot tunnel (7) (8);Described left side wall pilot tunnel, described right side wall pilot tunnel and arch pilot tunnel (7) composition preliminary excavation hole body, in Tunnel (9-1) The region being positioned at Ti Nei side, described preliminary excavation hole is follow-up excavation region (6);
In described hole, temporary support structure includes that two symmetries prop up the side supports frame being located at the left and right sides, follow-up excavation region (11-1), one is supported in the upper support shelf (11-2) of follow-up excavation area top, is supported in upper support shelf (11-2) Upper support structure between square and described preliminary installing rack and two are respectively supported at two described side supports framves (11-1) And the side supports structure between described preliminary installing rack, two described side supports structures lay respectively at described left side wall pilot tunnel With in described right side wall pilot tunnel, described upper support structure is positioned at arch pilot tunnel (7), described upper support shelf (11-2) and two Individual described side supports frame (11-1) composition medial support framework, described medial support framework, described upper support structure and two Individual described side supports structure is all laid on same vertical plane.
2. according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 1, it is characterised in that: two Individual described side supports structure is symmetrically laid.
3., according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 1 or 2, its feature exists In: the left and right sides wall in described follow-up excavation region is curved wall, and described side supports frame (11-1) is curved support frame.
4. according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 3, it is characterised in that: institute State upper support structure and include multiple upper support post (11-3) laid from left to right, the end of described upper support post (11-3) Portion is supported in upper support shelf (11-2), and above and its top braces is on described preliminary installing rack.
5. according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 4, it is characterised in that: institute State upper support structure and include that three described upper support posts (11-3), three described upper support posts (11-3) include one It is supported in the midfoot support post above upper support shelf (11-2) middle part and two symmetries are laid in about described midfoot support post The side supports post of both sides, two described side supports posts are respectively supported at above the left and right sides of upper support shelf (11-2);
Described midfoot support post is vertical support column;Two described side supports posts are curved support post and the two supports respectively In two described side supports framves (11-1) top, each described side supports frame (11-1) all with the side of being supported on Described side supports post connects one arc support of formation.
6. according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 4, it is characterised in that: institute Stating upper support post (11-3) is I-steel.
7., according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 1 or 2, its feature exists In: each described side supports structure all includes the cross-brace beam that multiple tracks is from top to bottom laid, and described cross-brace beam is water Plain cloth sets, the inside and outside two ends of described cross-brace beam be respectively supported at side supports frame (11-1) and described preliminary installing rack it Between.
8. according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 7, it is characterised in that: institute State left side wall pilot tunnel and be the most from top to bottom divided into upper lateral part pilot tunnel (1), middle sidepiece pilot tunnel (2) and following side pilot tunnel with right side wall pilot tunnel (3);
Each described side supports structure all includes twice cross-brace beam, and cross-brace beam described in twice is respectively positioned at upside The upper cross-brace beam (4) of portion's pilot tunnel (1) bottom and be positioned at the middle cross-brace beam (4) bottom middle sidepiece pilot tunnel (2).
9. according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 7, it is characterised in that: institute Stating cross-brace beam is I-steel.
10., according to the tunnel and Double side heading method excavation construction temporary supporting system described in claim 1 or 2, its feature exists In: described side supports frame (11-1) and upper support shelf (11-2) are I-steel.
CN201620876760.3U 2016-08-12 2016-08-12 Interim support system is used in tunnel two side wall drift method excavation construction Expired - Fee Related CN205876360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620876760.3U CN205876360U (en) 2016-08-12 2016-08-12 Interim support system is used in tunnel two side wall drift method excavation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620876760.3U CN205876360U (en) 2016-08-12 2016-08-12 Interim support system is used in tunnel two side wall drift method excavation construction

Publications (1)

Publication Number Publication Date
CN205876360U true CN205876360U (en) 2017-01-11

Family

ID=57704456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620876760.3U Expired - Fee Related CN205876360U (en) 2016-08-12 2016-08-12 Interim support system is used in tunnel two side wall drift method excavation construction

Country Status (1)

Country Link
CN (1) CN205876360U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988757A (en) * 2017-04-14 2017-07-28 中铁四局集团有限公司 The double -side approach construction technology of reserved rock pillar and hanging by bolt combination
CN108442943A (en) * 2018-03-05 2018-08-24 北京市政建设集团有限责任公司 A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN109139021A (en) * 2018-11-01 2019-01-04 中铁十八局集团有限公司 A kind of more pilot tunnel Construction Organization Methods of multi-step
CN109973123A (en) * 2019-03-28 2019-07-05 西安建筑科技大学 A kind of multiple-arch tunnel middle drift gib arch method for dismounting

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988757A (en) * 2017-04-14 2017-07-28 中铁四局集团有限公司 The double -side approach construction technology of reserved rock pillar and hanging by bolt combination
CN108442943A (en) * 2018-03-05 2018-08-24 北京市政建设集团有限责任公司 A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN109139021A (en) * 2018-11-01 2019-01-04 中铁十八局集团有限公司 A kind of more pilot tunnel Construction Organization Methods of multi-step
CN109973123A (en) * 2019-03-28 2019-07-05 西安建筑科技大学 A kind of multiple-arch tunnel middle drift gib arch method for dismounting

Similar Documents

Publication Publication Date Title
CN205876360U (en) Interim support system is used in tunnel two side wall drift method excavation construction
CN104653187B (en) Water-rich sand layer geology large cross-section tunnel excavation method
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN205936644U (en) Tunnel lining construction structure based on two side wall drift methods
CN110439571A (en) Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel
CN103603679B (en) For arch crown steel frame and the method for tunnel construction of arch, supporting tunnel
CN109209397B (en) Pass through that high angle is inverse to rush rich water richness sand tomography method for tunnel construction
CN106567718B (en) A kind of construction method of compound stratum list arch super-span subway station kerve support replacement
CN107605490B (en) Single hole large cross-section tunnel double side wall construction conversion process
CN109555528B (en) Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation and method for protecting support
CN108487911A (en) The compound crossing method construction method of longspan tunnel bilateral wall under complex geological condition
CN109057807A (en) A kind of gradual change Large span tunnel reversely digs method
CN104405411B (en) Oversized variable cross section tunnel supporting structure
CN106246190B (en) A kind of nine base tunnel construction methods of tunnel and Double side wall
CN101769154A (en) Excavation supporting method for tunnel construction
CN101539021B (en) Road tunnel excavation method
CN106837357A (en) A kind of no-dig technique pipe-roof method of use curve pipe canopy
CN104481546A (en) Doubly curved arch construction method for enabling inclined shaft of soft rock tunnel to enter main tunnel
CN112324442A (en) Excavation method of large-section tunnel
CN107120119B (en) The construction method of Underground Subway Station
CN104295301A (en) Shallow-buried excavation construction method for cataclastic rock subway tunnel intersection
CN106121660B (en) Two side-wall pilot tunnel lining construction technique based on portable full hall scaffold
CN111396062B (en) Non-span-reduction construction method for super-large section loess tunnel through operation railway under close proximity
CN107218044A (en) A kind of excavation method of extrusion rock small-clear-distance tunnel
CN203716985U (en) Advanced dual guide hole of mountain ridge soft foundation tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111