CN205875638U - Supplementary support of making level - Google Patents

Supplementary support of making level Download PDF

Info

Publication number
CN205875638U
CN205875638U CN201620786301.6U CN201620786301U CN205875638U CN 205875638 U CN205875638 U CN 205875638U CN 201620786301 U CN201620786301 U CN 201620786301U CN 205875638 U CN205875638 U CN 205875638U
Authority
CN
China
Prior art keywords
face
fixed part
terminal surface
framework
levelling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620786301.6U
Other languages
Chinese (zh)
Inventor
杨宇轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Twin Stone (wuhan) Building Materials Co Ltd
Original Assignee
Twin Stone (wuhan) Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Twin Stone (wuhan) Building Materials Co Ltd filed Critical Twin Stone (wuhan) Building Materials Co Ltd
Priority to CN201620786301.6U priority Critical patent/CN205875638U/en
Application granted granted Critical
Publication of CN205875638U publication Critical patent/CN205875638U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a supplementary support of making level, include: framework, its two open end form first terminal surface and second terminal surface, first terminal surface and second terminal surface parallel arrangement respectively, the interior fixed part of placing the framework in, its third terminal surface and fourth terminal surface that has parallel arrangement, the third terminal surface lies in the coplanar with first terminal surface, and the fourth terminal surface lies in the coplanar with the second terminal surface, the splice bar of connection framework and fixed part, splice bar one end and first terminal surface parallel and level, the other end and second terminal surface parallel and level, be provided with the fixed orifices that runs through third terminal surface and fourth terminal surface on the fixed part. The utility model discloses a supplementary support of making level that framework, fixed part and splice bar formed has two parallel arrangement's plane to fixed orifices cooperation on accessible screw and the fixed part sets up supplementary support of making level in waiting the position of making level, and can directly carry out the wall or ground cement is floating, has avoided carrying on the floating screed and has waited the floating screed and dry and waste time, and it is favorable to improving wall and the ground efficiency of making level.

Description

Assist levelling support
Technical field
This utility model relates to levelling technology of decorateing, and especially relates to the levelling support of a kind of auxiliary.
Background technology
When carrying out indoor decoration, need to carry out levelling to indoor wallboard and ground, to ensure the attractive in appearance of entirety decoration Property.At present, levelling usual manner for first wall or ground being got ready, floating screed, then general floating screed mortar has been done after Wall or ground are floating.Due to needs wait floating screed natural air drying, be easily caused and delay the duration, and get ready, floating screed requirement height unfavorable In improving efficiency of construction.
Utility model content
The purpose of this utility model is to overcome above-mentioned technical deficiency, proposes one and assists levelling support, solves existing skill In art levelling time get floating screed ready after need stop work waiting cause the technical problem that efficiency of construction is low.
For reaching above-mentioned technical purpose, the technical solution of the utility model provides one to assist levelling support, including,
One framework, two openings of described framework form the first end face and the second end face, described first end face and respectively Biend be arranged in parallel;
Being built in the fixed part of described framework, described fixed part has the 3rd end face and the 4th end face be arrangeding in parallel, institute Stating the 3rd end face to be generally aligned in the same plane with described first end face, described 4th end face is generally aligned in the same plane with described second end face; And
Connect the dowel of described framework inwall and described fixed part outer rim, described dowel one end and described first end face Concordant, the other end is concordant with described second end face;
Wherein, described fixed part is provided with one and runs through described 3rd end face and the fixing hole of the 4th end face.
Preferably, described fixing hole is shoulder hole.
Preferably, described framework be oval ring-type, toroidal, triangle are ring-type or polygon ring-type.
Preferably, described framework is circular, and described fixed part is circular, and described framework coaxially sets with described fixed part Put.
Preferably, described fixing hole is coaxially disposed with described fixed part.
Preferably, described dowel at least two, and be evenly arranged along described fixed part circumference respectively.
Preferably, the vertical dimension of described first end face and the second end face is 1mm, 2mm, 5mm, 10mm or 20mm.
Compared with prior art, the levelling support of auxiliary that this utility model is formed by framework, fixed part and dowel has There are two planes be arrangeding in parallel, and can coordinate to be arranged at levelling for auxiliary support with the fixing hole on fixed part by screw and treat Levelling position, directly can carry out wall or ground cement is floating, it is to avoid carry out floating screed and waiting floating screed is dried and wastes time, It is conducive to improving wall and floor leveling efficiency.
Accompanying drawing explanation
Fig. 1 is the attachment structure schematic diagram of the levelling support of auxiliary of the present utility model;
Fig. 2 is the A-A direction view of Fig. 1 of the present utility model.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to this utility model.Should be appreciated that specific embodiment described herein is only in order to explain This utility model, is not used to limit this utility model.
Referring to Fig. 1, Fig. 2, embodiment of the present utility model provides the levelling support of a kind of auxiliary, including,
One framework 1, two openings of described framework 1 form the first end face 11 and the second end face 12, described first end respectively Face 11 and the second end face 12 be arranged in parallel;
Being built in the fixed part 2 of described framework 1, described fixed part 2 has the 3rd end face 21 and the 4th end be arrangeding in parallel Face 22, described 3rd end face 21 is generally aligned in the same plane with described first end face 11, described 4th end face 22 and described second end face 12 are generally aligned in the same plane;And
Connect the dowel 3 of described framework 1 inwall and described fixed part 2 outer rim, described dowel 3 one end and described first End face 11 is concordant, the other end is concordant with described second end face 12;
Wherein, described fixed part 2 is provided with one and runs through described 3rd end face 21 and the fixing hole 23 of the 4th end face 22.
Concrete, framework 1, fixed part 2 and dowel 3 connect formation and assist levelling support to have two ends be arrangeding in parallel Face, during construction, can be fixed on fixed part 2 by screw and treat levelling position, assist an end face of levelling support to fit in Wall or ground, other end is then concordant with needing levelling plane, and the thickness i.e. assisting levelling support is to need levelling thickness Degree, the vertical dimension between the first end face 11 and the second end face 12 is in other words needs levelling thickness.Owing to framework 1 is with solid Determine to be formed with space between portion 2 such that it is able to assist levelling support to be connected in one floating cement and the present embodiment, floating Need only to when wall or ground to plaster on wall or ground to assist levelling support away from original wall or ground End face is concordant, which ensure that levelling efficiency.
In order to ensure the demand assisting levelling support to disclosure satisfy that different levelling thickness, the levelling support of auxiliary of the present embodiment Be set to five sizes of 1mm, 2mm, 5mm, 10mm, 20mm including thickness, above-mentioned five different sizes can any stack combinations One-tenth different size, and then meet the levelling demand of different-thickness, such as when levelling thickness is 7mm, can by two thickness respectively Auxiliary levelling support fixing hole for 2mm and 5mm is coaxially disposed, and screw sequentially passes through the above-mentioned two levelling support of auxiliary i.e. Can.
When being fixed on wall or ground in order to avoid screw, the screw cap end of screw protrude from framework 1 the first end face 11 or Second end face 12, fixing hole 23 described in the present embodiment is shoulder hole so that the screw cap end of screw can be placed in shoulder hole, and then The flatness that when avoiding plaster leveling, screw impact is levelling.
When specifically arranging, framework 1 can be arranged as required to as different shapes, the most oval ring-type, circular, three square rings Shape or any polygon ring-type, wherein described in the present embodiment, framework 1 is preferably arranged to circular, and corresponding can be by described fixed part 2 are provided in round, and described framework 1 is coaxially disposed with described fixed part 2, to ensure that screw is steady to assist levelling support to fix Qualitative.Wherein, described fixing hole 23 is coaxially disposed with described fixed part 2.
Dowel 3 should not be the most unsuitable the most very few when arranging, and crosses the space caused at most between adjacent two dowels 3 Too small, to plaster and should not connect as one with assisting levelling support, it is unfavorable for the stability plastered in raising wall or ground, very few The bulk strength then assisting levelling support is relatively low, is easily caused framework 1 and deforms upon and cause the first end face 11 and the second end face 12 Being distorted, it is unfavorable for floating planarization, therefore described in the present embodiment, dowel 3 sets at least to two, and the present embodiment is excellent Choosing is set to four dowels 3, and four dowels 3 are evenly arranged along described fixed part 2 circumference.
Wherein, levelling support is assisted to be connected as an entirety with plastering for the ease of the present embodiment, can be by outside framework 1 Wall, inwall, the first end face 11 and the second end face 12 are disposed as crude, outside the surface of corresponding dowel 3 and fixed part 2 Wall, the 3rd end face the 21, the 4th end face 22 all may be configured as crude.
The present embodiment assist levelling support be preferably arranged to PVC material, with avoid being embedded at plaster interior after corruption and cause Wall or ground after plastering are damaged.
Compared with prior art, the levelling support of auxiliary that this utility model is formed by framework, fixed part and dowel has There are two planes be arrangeding in parallel, and can coordinate to be arranged at levelling for auxiliary support with the fixing hole on fixed part by screw and treat Levelling position, directly can carry out wall or ground cement is floating, it is to avoid carry out floating screed and waiting floating screed is dried and wastes time, It is conducive to improving wall and floor leveling efficiency.
The above detailed description of the invention of the present utility model, is not intended that the restriction to this utility model protection domain. Any various other made according to technology of the present utility model design change and deformation accordingly, should be included in this practicality In novel scope of the claims.

Claims (7)

1. one kind assists levelling support, it is characterised in that include,
One framework, two openings of described framework form the first end face and the second end face, described first end face and the second end respectively Face be arranged in parallel;
Being built in the fixed part of described framework, described fixed part has the 3rd end face and the 4th end face be arrangeding in parallel, and described Three end faces are generally aligned in the same plane with described first end face, and described 4th end face is generally aligned in the same plane with described second end face;And
Connecting the dowel of described framework inwall and described fixed part outer rim, described dowel one end is put down with described first end face Together, the other end is concordant with described second end face;
Wherein, described fixed part is provided with one and runs through described 3rd end face and the fixing hole of the 4th end face.
The levelling support of auxiliary the most according to claim 1, it is characterised in that described fixing hole is shoulder hole.
The levelling support of auxiliary the most according to claim 2, it is characterised in that described framework be oval ring-type, toroidal, three Square ring shape or polygon ring-type.
The levelling support of auxiliary the most according to claim 3, it is characterised in that described framework is circular, described fixed part For circle, and described framework is coaxially disposed with described fixed part.
The levelling support of auxiliary the most according to claim 3, it is characterised in that described fixing hole coaxially sets with described fixed part Put.
6. according to the levelling support of the auxiliary described in claim 4 or 5, it is characterised in that described dowel at least two, and point It is not evenly arranged along described fixed part circumference.
The levelling support of auxiliary the most according to claim 6, it is characterised in that described first end face and the second end face vertical Distance is 1mm, 2mm, 5mm, 10mm or 20mm.
CN201620786301.6U 2016-07-25 2016-07-25 Supplementary support of making level Expired - Fee Related CN205875638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620786301.6U CN205875638U (en) 2016-07-25 2016-07-25 Supplementary support of making level

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620786301.6U CN205875638U (en) 2016-07-25 2016-07-25 Supplementary support of making level

Publications (1)

Publication Number Publication Date
CN205875638U true CN205875638U (en) 2017-01-11

Family

ID=57697189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620786301.6U Expired - Fee Related CN205875638U (en) 2016-07-25 2016-07-25 Supplementary support of making level

Country Status (1)

Country Link
CN (1) CN205875638U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836743A (en) * 2017-03-29 2017-06-13 彭程 A kind of bed course leveling unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836743A (en) * 2017-03-29 2017-06-13 彭程 A kind of bed course leveling unit

Similar Documents

Publication Publication Date Title
CN105672634A (en) Auxiliary tile sticking device
CN205875638U (en) Supplementary support of making level
CN202596184U (en) Lifting node for assembly type large wallboard
CN205688653U (en) A kind of concrete hollow block
CN203846704U (en) Bamboo stand column bordure used for decoration
CN204571282U (en) Water-bearing concrete construction gang form system
CN203257077U (en) Architectural supporting tube
CN211172960U (en) A reentrant corner making devices for waterproof engineering
CN204418559U (en) A kind of bolt-type syndeton for connecting stair upper end
CN203283960U (en) Paper tube
CN207177142U (en) Gypsum glass fiber reinforcement gypsum moulding mounting structure
CN202882366U (en) Ingot-shaped trowel
CN206205253U (en) A kind of wall block
JP3146788U (en) Variable length cylindrical sleeve for through hole formation
CN206376347U (en) A kind of adjustable road surface sewage inspection well new device
CN204983176U (en) Prefabricated plate is connecting piece for amalgamation
CN104453017A (en) Module wall for house building
CN204326356U (en) A kind of Self-heat-insulating concrete building block
CN204456184U (en) Base plate position support replacement structure
CN210164063U (en) Be used for concrete square column and wall connection department node structure
CN204326307U (en) The module wall that a kind of building construction uses
CN205604684U (en) Arc external corner ware of plastering
CN210316066U (en) Be applied to prefabricated wallboard that has door frame structure of prefabricated building
CN205153256U (en) Building presets standard element
CN203201148U (en) Combined inner support of wall template

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20190725

CF01 Termination of patent right due to non-payment of annual fee