CN205875176U - 通风路堤台阶式浆砌片石满铺护坡结构 - Google Patents
通风路堤台阶式浆砌片石满铺护坡结构 Download PDFInfo
- Publication number
- CN205875176U CN205875176U CN201620350861.7U CN201620350861U CN205875176U CN 205875176 U CN205875176 U CN 205875176U CN 201620350861 U CN201620350861 U CN 201620350861U CN 205875176 U CN205875176 U CN 205875176U
- Authority
- CN
- China
- Prior art keywords
- layer
- embankment
- mortar flag
- slabstone
- flag stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620350861.7U CN205875176U (zh) | 2016-04-25 | 2016-04-25 | 通风路堤台阶式浆砌片石满铺护坡结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620350861.7U CN205875176U (zh) | 2016-04-25 | 2016-04-25 | 通风路堤台阶式浆砌片石满铺护坡结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875176U true CN205875176U (zh) | 2017-01-11 |
Family
ID=57687273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620350861.7U Active CN205875176U (zh) | 2016-04-25 | 2016-04-25 | 通风路堤台阶式浆砌片石满铺护坡结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875176U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313320A (zh) * | 2017-07-07 | 2017-11-03 | 安徽省新路建设工程集团有限责任公司 | 水泥混凝土路面嵌入式加筋沥青路面结构及施工方法 |
CN111364483A (zh) * | 2020-03-20 | 2020-07-03 | 中交第三航务工程局有限公司 | 一种干船坞坞墙后回填的施工方法 |
-
2016
- 2016-04-25 CN CN201620350861.7U patent/CN205875176U/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313320A (zh) * | 2017-07-07 | 2017-11-03 | 安徽省新路建设工程集团有限责任公司 | 水泥混凝土路面嵌入式加筋沥青路面结构及施工方法 |
CN111364483A (zh) * | 2020-03-20 | 2020-07-03 | 中交第三航务工程局有限公司 | 一种干船坞坞墙后回填的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887898B (zh) | 一种防护胀缩性岩土路堑边坡的方法及结构 | |
CN107558480B (zh) | 路基三维排水加强型生态护坡结构的施工方法 | |
CN103510441B (zh) | 防止寒区公路水损破坏的立体排水路基结构及施工方法 | |
CN100510278C (zh) | 填砂路基空心块生态防护方法 | |
CN203403426U (zh) | 膨胀土路堑边坡支护结构 | |
CN203383119U (zh) | 一种新型公路路堤拓宽结构 | |
CN202718138U (zh) | 一种自锁式生态挡土墙结构 | |
CN102383413A (zh) | 一种加固饱和流塑淤泥软土地基的施工方法 | |
CN104514216B (zh) | 一种填方渠道抗冻胀防渗结构及施工方法 | |
CN105887606B (zh) | 高寒冻土区深路堑保温渗水复合式暗沟及其施工方法 | |
CN112392127B (zh) | 一种树枝状埋入式柔性生态的斜坡排水沟及施工方法 | |
CN203498721U (zh) | 一种防止寒区公路水损破坏的立体排水路基结构 | |
CN107152012A (zh) | 水闸施工工艺 | |
CN105735328B (zh) | 通风路堤台阶式浆砌片石满铺护坡的施工方法 | |
CN109594442A (zh) | 园林道路施工工艺 | |
CN205502034U (zh) | 一种拱形骨架内栽砌戈壁卵石的路基边坡防护结构 | |
CN205875176U (zh) | 通风路堤台阶式浆砌片石满铺护坡结构 | |
CN204356788U (zh) | 柔性减胀生态护坡构造 | |
CN212405094U (zh) | 一种高含水量黏土填方地基排水系统 | |
CN206768838U (zh) | 一种膨胀土边坡防护结构 | |
CN216445914U (zh) | 一种水利工程河道复合式生态护坡 | |
CN103898824B (zh) | 高寒冻土地区路基用塑料排水板处理基底的方法 | |
CN113737722A (zh) | 一种适用于城市河道的兼具景观性的埋石混凝土挡墙护岸 | |
CN205804371U (zh) | 一种防护胀缩性岩土路堑边坡的结构 | |
CN103526727A (zh) | 一种水库大坝筑坝方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Nie Junsheng Inventor after: Chen Chuanyue Inventor after: Lin Jia Inventor before: Wang Xinquan Inventor before: Chen Xiaolin Inventor before: Zhu Kai |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170707 Address after: 610041 Sichuan city of Chengdu province Wuhou District two ring road west section of No. 90 Sichuan Expressway on the eighth floor A area, B area Patentee after: SICHUAN JIAOTOU CONSTRUCTION ENGINEERING Co.,Ltd. Address before: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 610041 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province Patentee after: Sichuan Communications Construction Group Co.,Ltd. Address before: 610041 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province Patentee before: SICHUAN JIAOTOU CONSTRUCTION ENGINEERING Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province Patentee after: Sichuan Communications Construction Group Co.,Ltd. Address before: 610041 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province Patentee before: Sichuan Communications Construction Group Co.,Ltd. |