CN205873817U - Fixed guide formula hydraulic pressure lifting platform - Google Patents

Fixed guide formula hydraulic pressure lifting platform Download PDF

Info

Publication number
CN205873817U
CN205873817U CN201620561330.2U CN201620561330U CN205873817U CN 205873817 U CN205873817 U CN 205873817U CN 201620561330 U CN201620561330 U CN 201620561330U CN 205873817 U CN205873817 U CN 205873817U
Authority
CN
China
Prior art keywords
gear
suspender
fixed pulley
supporter
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620561330.2U
Other languages
Chinese (zh)
Inventor
陆留往
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Lujia Heavy Industry Co Ltd
Original Assignee
Jiangsu Lujia Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Lujia Heavy Industry Co Ltd filed Critical Jiangsu Lujia Heavy Industry Co Ltd
Priority to CN201620561330.2U priority Critical patent/CN205873817U/en
Application granted granted Critical
Publication of CN205873817U publication Critical patent/CN205873817U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a fixed guide formula hydraulic pressure lifting platform, this lifting platform includes first support frame, the second support frame, and set up the operation post between this first support frame and second support frame, this first support frame includes first supporter, the second supporter, and can vertical slip set up first hoist between this first supporter and second supporter, this second support frame includes the third supporter, the fourth supporter, and can vertical slip set up second hoist between this third supporter and fourth supporter, be equipped with at least one first assembly pulley and at least one first gear train on this first hoist, this first assembly pulley is including setting up the first fixed pulley on this first hoist, and set up the third fixed pulley that lies in this first fixed pulley top on this first hoist, it is equipped with the second fixed pulley to lie in this first fixed pulley below on this first support frame.

Description

Fixing guide tracked hydraulic lifting operation platform
Technical field
This utility model relates to lift work platform, more particularly, it relates to a kind of fixing guide tracked hydraulic lifting operation Platform.
Background technology
Along with the increase of work high above the ground demand, hydraulic lifting operation platform is widely used in productive life, existing Hydraulic lifting operation platform relies on the lifting of hydraulic lifting post and regulates height, but existing hydraulic lifting post Liftable has Limit, the wicking height of hydraulic lifting post generally becomes one to one with job platform wicking height, virtually reduces hydraulic lifting post Work efficiency.
Utility model content
The technical problems to be solved in the utility model is, for the drawbacks described above of prior art, it is provided that a kind of fixing is led Rail hydraulic lifting operation platform.
This utility model solves its technical problem and be the technical scheme is that the fixing guide tracked hydraulic lifting of structure one Job platform, this lift work platform includes the first bracing frame, the second bracing frame and is arranged at this first bracing frame and second Operation post between bracing frame, this first bracing frame includes the first supporter, the second supporter and can vertically be slideably positioned in First suspender between this first supporter and second supporter, this second bracing frame include the 3rd supporter, the 4th supporter, with And can vertically be slideably positioned in the second suspender between the 3rd supporter and the 4th supporter, this first suspender is provided with at least one Individual first assembly pulley and at least one first gear train, this first assembly pulley includes that be arranged on this first suspender first is fixed sliding Take turns and be arranged on this first suspender and be positioned at the 3rd fixed pulley above this first fixed pulley, this first bracing frame is positioned at It is provided with the second fixed pulley below this first fixed pulley, the first gear that this first gear train includes being arranged on this first suspender, And be arranged on this first suspender and be positioned at the 3rd gear above this first gear, this first bracing frame is positioned at this first tooth Being provided with the second gear below wheel, this second suspender is provided with at least one second assembly pulley and at least one second gear train, should Second assembly pulley includes the 4th fixed pulley being arranged on this second suspender and is arranged on this second suspender and is positioned at the 4th The 6th fixed pulley above fixed pulley, this second bracing frame is positioned at below the 4th fixed pulley and is provided with the 5th fixed pulley, and this is years old Two gear trains include the 4th gear being arranged on this second suspender and are arranged on this second suspender and are positioned at the 4th gear 6th gear of top, this second bracing frame is positioned at below the 4th gear and is provided with the 5th gear;
It is installed with the first cross bar between this first supporter and second supporter, this first cross bar is installed with the first hydraulic pressure Lifting column, this first hydraulic lifting capital end abuts, between the 3rd supporter and the 4th supporter bottom this first suspender Be installed with the second cross bar, this second cross bar be installed with the second hydraulic lifting post, this second hydraulic lifting capital end with this second Abut bottom suspender;
This lift work platform also includes the first hoist cable, the second hoist cable, the first chain, the second chain, this first hoist cable One end and this first cross bar are fixing to be connected, and this first hoist cable second end walks around this first fixed pulley upper semi-circle further around crossing this second calmly Pulley lower half circle, fixes with this operation post after then passing around the 3rd fixed pulley upper semi-circle again and is connected;This first chain first end Fixing with this first cross bar and be connected, this first chain second end walks around this first gear upper semi-circle further around crossing this second gear lower half Circle, fixes with this operation post after then passing around the 3rd gear upper semi-circle again and is connected;This second hoist cable first end and this second horizontal stroke Bar is fixing to be connected, and this second hoist cable second end walks around the 4th fixed pulley upper semi-circle further around crossing the 5th fixed pulley lower half circle, so After walk around the 6th fixed pulley upper semi-circle after fixing with this operation post be again connected;This second chain first end is solid with this second cross bar Fixed connecting, this second chain second end walks around the 4th gear upper semi-circle further around crossing the 5th gear lower half circle, then passes around the Fix with this operation post again after six gear upper semi-circles and be connected.
In fixing guide tracked hydraulic lifting operation platform described in the utility model, inside this first supporter, it is provided with confession The first chute that this first suspender slides, is provided with the second chute slided for this first suspender inside this second supporter, this is the years old It is provided with the 3rd chute slided for this second suspender inside three supporters, is provided with for this second suspender sliding inside the 4th supporter The 4th dynamic chute.
In fixing guide tracked hydraulic lifting operation platform described in the utility model, this first suspender includes the first shaped as frame Body, being arranged at the first pulley of this first frame body the first side, be arranged at the second pulley of this first frame body the second side, this is years old One pulley vertically can slide in this first chute, and this second pulley vertically can slide in this second chute.
In fixing guide tracked hydraulic lifting operation platform described in the utility model, this first fixed pulley and the first gear Being arranged in this first frame body, the 3rd fixed pulley and the 3rd gear are arranged at above this first frame body, this second fixed cunning Wheel and the second gear are rotatably arranged on this first cross bar.
In fixing guide tracked hydraulic lifting operation platform described in the utility model, this second suspender includes the second shaped as frame Body, being arranged at the 3rd pulley of this second frame body the first side, be arranged at the 4th pulley of this second frame body the second side, this is years old Three pulleys vertically can slide in the 3rd chute, and the 4th pulley vertically can slide in the 4th chute.
In fixing guide tracked hydraulic lifting operation platform described in the utility model, the 4th fixed pulley and the 4th gear Being arranged in this second frame body, the 6th fixed pulley and the 6th gear are arranged at above this second frame body, and the 5th is fixed sliding Wheel and the 5th gear are rotatably arranged on this second cross bar.
Implement fixing guide tracked hydraulic lifting operation platform of the present utility model, have the advantages that this reality of use During with novel fixing guide tracked hydraulic lifting operation platform, upwards supported by the first hydraulic lifting post and the second hydraulic lifting post Push away the first suspender and the second suspender, in the first suspender uphill process, owing to the first cross bar is for being fixedly installed, first hoist cable the first end Fix with the first cross bar, first hoist cable the second end walk around after the first fixed pulley, the second fixed pulley and the 3rd fixed pulley again with work Industry platform is fixing to be connected, by above-mentioned setting, when the first suspender be pushed upwardly distance be 1 meter time, operation post is by rise of hanging oneself From for 4 meters, in like manner, the second suspender is also such, can realize the rising distance that operation post rising distance is hydraulic lifting post The effect of four times, improves the service efficiency of hydraulic lifting post.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the structural representation that this utility model fixes guide tracked hydraulic lifting operation platform;
Fig. 2 is that this utility model fixes the structural representation of the first suspender in guide tracked hydraulic lifting operation platform;
Fig. 3 is the winding mode schematic diagram that this utility model fixes the first hoist cable in guide tracked hydraulic lifting operation platform.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, new to this practicality below in conjunction with accompanying drawing Type embodiment is described in further detail.
As shown in Figure 1, 2, 3, in fixing guide tracked hydraulic lifting operation platform first embodiment of the present utility model, should Lift work platform 1 includes first bracing frame the 2, second bracing frame 3 and is arranged at this first bracing frame 2 and the second bracing frame 3 Between operation post 4, this first bracing frame 2 includes first supporter the 5, second supporter 6 and can vertically be slideably positioned in this First suspender 9 between first supporter 5 and the second supporter 6, this second bracing frame 3 includes the 3rd supporter the 7, the 4th supporter 8 and can vertically be slideably positioned in the second suspender 10 between the 3rd supporter 7 and the 4th supporter 8, on this first suspender 9 Being provided with at least one first assembly pulley and at least one first gear train, this first assembly pulley includes being arranged at this first suspender 9 On the first fixed pulley 11 and be arranged on this first suspender 9 and be positioned at the 3rd fixed pulley 13 above this first fixed pulley 11, Being positioned on this first bracing frame 2 below this first fixed pulley 11 and be provided with the second fixed pulley 12, this first gear train includes being arranged at The first gear 14 on this first suspender 9 and be arranged on this first suspender 9 and be positioned at the 3rd tooth above this first gear 14 Wheel 16, this first bracing frame 2 is positioned at below this first gear 14 and is provided with the second gear 15, and this second suspender 10 is provided with at least One the second assembly pulley and at least one second gear train, this second assembly pulley includes be arranged on this second suspender 10 the 4th Fixed pulley 17 and be arranged on this second suspender 10 and be positioned at the 6th fixed pulley 19 above the 4th fixed pulley 17, this is second years old Be positioned on bracing frame 3 below the 4th fixed pulley 17 and be provided with the 5th fixed pulley 18, this second gear train include being arranged at this second The 4th gear 20 on suspender 10 and be arranged on this second suspender 10 and be positioned at the 6th gear above the 4th gear 20 22, this second bracing frame 3 is positioned at below the 4th gear 20 and is provided with the 5th gear 21;
It is installed with the first cross bar 23 between this first supporter 5 and second supporter 6, this first cross bar 23 is installed with One hydraulic lifting post 25, this first hydraulic lifting post 25 top abuts bottom this first suspender 9, the 3rd supporter 7 and It is installed with the second cross bar 24 between four supporters 8, this second cross bar 24 is installed with the second hydraulic lifting post 26, this second hydraulic pressure Lifting column 26 top abuts bottom this second suspender 10;
This lift work platform 1 also includes first hoist cable the 30, second hoist cable, the first chain, the second chain, this first hoist cable 30 first ends 31 are fixed with this first cross bar 23 and are connected, and this first hoist cable 30 second end 32 walks around this first fixed pulley 11 upper semi-circle Further around crossing this second fixed pulley 12 lower half circle, fixing even with this operation post 4 again after then passing around the 3rd fixed pulley 13 upper semi-circle Connect;This first chain first end is fixed with this first cross bar 23 and is connected, and this first chain second end is walked around on this first gear 14 Semicircle is further around crossing this second gear 15 lower half circle, fixing even with this operation post 4 again after then passing around the 3rd gear 16 upper semi-circle Connect;This second hoist cable first end is fixed with this second cross bar 24 and is connected, and this second hoist cable second end walks around the 4th fixed pulley 17 Upper semi-circle further around crossing the 5th fixed pulley 18 lower half circle, then pass around after the 6th fixed pulley 19 upper semi-circle again with this operation post 4 Fixing connection;This second chain first end is fixed with this second cross bar 24 and is connected, and this second chain second end walks around the 4th tooth Take turns 20 upper semi-circles further around crossing the 5th gear 21 lower half circle, then pass around after the 6th gear 22 upper semi-circle again with this operation post 4 Fixing connection.
When using fixing guide tracked hydraulic lifting operation platform 1 of the present utility model, by the first hydraulic lifting post 25 He Second hydraulic lifting post 26 upwards pushes the first suspender 9 and the second suspender 10, in the first suspender 9 uphill process, owing to first is horizontal Bar 23 is for being fixedly installed, and the first hoist cable 30 first end 31 and the first cross bar 23 are fixed, and the first hoist cable 30 second end 32 walks around first Fixing with operation post 4 the most again after fixed pulley the 11, second fixed pulley 12 and the 3rd fixed pulley 13 it is connected, by above-mentioned setting, when the One suspender 9 is pushed upwardly distance when being 1 meter, operation post 4 by rise of hanging oneself from for 4 meters, in like manner, the second suspender 10 be also as This, can realize the effect that operation post 4 raises four times of the rising distance that distance is hydraulic lifting post, improves hydraulic lifting post Service efficiency.
Further, inside this first supporter 5, it is provided with the first chute slided for this first suspender 9, this second support It is provided with the second chute slided for this first suspender 9 inside body 6, is provided with for this second suspender 10 sliding inside the 3rd supporter 7 The 3rd dynamic chute, is provided with the 4th chute slided for this second suspender 10 inside the 4th supporter 8.
Further, this first suspender 9 includes the first frame body 27, is arranged at the first of this first frame body 27 first side Pulley 28, being arranged at the second pulley 29 of this first frame body 27 second side, this first pulley 28 can erect in this first chute Straight slip, this second pulley 29 vertically can slide in this second chute.
Further, this first fixed pulley 11 and the first gear 14 are arranged in this first frame body 27, and the 3rd is fixed sliding Wheel 13 and the 3rd gear 16 are arranged at above this first frame body 27, and this second fixed pulley 12 and the second gear 15 are rotatably arranged On this first cross bar 23.
Further, this second suspender 10 includes the second frame body, is arranged at the 3rd cunning of this second frame body the first side Wheel, being arranged at the 4th pulley of this second frame body the second side, the 3rd pulley vertically can slide in the 3rd chute, and this is the years old Four pulleys vertically can slide in the 4th chute.
Further, the 4th fixed pulley 17 and the 4th gear 20 are arranged in this second frame body, the 6th fixed pulley 19 and the 6th gear 22 be arranged at above this second frame body, the 5th fixed pulley 18 and the 5th gear 21 are rotatably arranged at this On second cross bar 24.
The foregoing is only embodiment of the present utility model, not thereby limit the scope of the claims of the present utility model, every Utilize equivalent structure or equivalence flow process conversion that this utility model description and accompanying drawing content made, or be directly or indirectly used in Other relevant technical fields, are the most in like manner included in scope of patent protection of the present utility model.

Claims (6)

1. a fixing guide tracked hydraulic lifting operation platform, it is characterised in that described lift work platform includes the first support Frame, the second bracing frame and be arranged at the operation post between described first bracing frame and the second bracing frame, described first bracing frame Including the first supporter, the second supporter and can vertically be slideably positioned between described first supporter and the second supporter First suspender, described second bracing frame includes the 3rd supporter, the 4th supporter and can vertically be slideably positioned in the described 3rd Second suspender between supporter and the 4th supporter, described first suspender be provided with at least one first assembly pulley and at least one First gear train, described first assembly pulley includes the first fixed pulley being arranged on described first suspender and is arranged at described It is positioned at the 3rd fixed pulley above described first fixed pulley on first suspender, described first bracing frame is positioned at described first fixed sliding Being provided with the second fixed pulley below wheel, described first gear train includes the first gear, the Yi Jishe being arranged on described first suspender It is placed on described first suspender and is positioned at the 3rd gear above described first gear, described first bracing frame is positioned at described first Being provided with the second gear below gear, described second suspender is provided with at least one second assembly pulley and at least one second gear Group, described second assembly pulley includes the 4th fixed pulley being arranged on described second suspender and is arranged at described second suspender On be positioned at the 6th fixed pulley above described 4th fixed pulley, described second bracing frame is positioned at below described 4th fixed pulley and sets The 5th fixed pulley, described second gear train is had to include the 4th gear being arranged on described second suspender and are arranged at described It is positioned at the 6th gear above described 4th gear on second suspender, described second bracing frame is positioned at below described 4th gear It is provided with the 5th gear;
It is installed with the first cross bar between described first supporter and the second supporter, described first cross bar is installed with the first hydraulic pressure Lifting column, described first hydraulic lifting capital end abuts bottom described first suspender, and described 3rd supporter and the 4th supports It is installed with the second cross bar between body, described second cross bar is installed with the second hydraulic lifting post, described second hydraulic lifting capital End abuts bottom described second suspender;
Described lift work platform also includes the first hoist cable, the second hoist cable, the first chain, the second chain, described first hoist cable One end is fixing with described first cross bar to be connected, and described first hoist cable the second end walks around described first fixed pulley upper semi-circle further around crossing institute State the second fixed pulley lower half circle, fix with described operation post again after then passing around the 3rd fixed pulley upper semi-circle and be connected;Described One chain the first end is fixing with described first cross bar to be connected, and described first chain the second end walks around described first gear upper semi-circle again Walk around described second gear lower half circle, fix with described operation post again after then passing around the 3rd gear upper semi-circle and be connected;Described Second hoist cable the first end is fixing with described second cross bar to be connected, and described second hoist cable the second end walks around described 4th fixed pulley upper half Circle, further around crossing described 5th fixed pulley lower half circle, is fixed even with described operation post after then passing around the 6th fixed pulley upper semi-circle again Connect;Described second chain the first end is fixing with described second cross bar to be connected, and described second chain the second end walks around described 4th tooth Wheel upper semi-circle, further around crossing described 5th gear lower half circle, is fixed with described operation post after then passing around the 6th gear upper semi-circle again Connect.
Fixing guide tracked hydraulic lifting operation platform the most according to claim 1, it is characterised in that described first supporter Inner side is provided with the first chute slided for described first suspender, is provided with and slides for described first suspender inside described second supporter The second chute, be provided with inside described 3rd supporter for described second suspender slide the 3rd chute, described 4th supporter Inner side is provided with the 4th chute slided for described second suspender.
Fixing guide tracked hydraulic lifting operation platform the most according to claim 2, it is characterised in that described first suspender bag Include the first frame body, be arranged at the first pulley of described first frame body the first side, be arranged at described first frame body the second side The second pulley, described first pulley vertically can slide in described first chute, and described second pulley can be described second sliding Vertically slide in groove.
Fixing guide tracked hydraulic lifting operation platform the most according to claim 3, it is characterised in that described first fixed pulley And first gear be arranged in described first frame body, described 3rd fixed pulley and the 3rd gear are arranged at described first frame body Top, described second fixed pulley and the second gear are rotatably arranged on described first cross bar.
Fixing guide tracked hydraulic lifting operation platform the most according to claim 2, it is characterised in that described second suspender bag Include the second frame body, be arranged at the 3rd pulley of described second frame body the first side, be arranged at described second frame body the second side The 4th pulley, described 3rd pulley vertically can slide in described 3rd chute, and described 4th pulley can be described 4th sliding Vertically slide in groove.
Fixing guide tracked hydraulic lifting operation platform the most according to claim 5, it is characterised in that described 4th fixed pulley And the 4th gear be arranged in described second frame body, described 6th fixed pulley and the 6th gear are arranged at described second frame body Top, described 5th fixed pulley and the 5th gear are rotatably arranged on described second cross bar.
CN201620561330.2U 2016-06-13 2016-06-13 Fixed guide formula hydraulic pressure lifting platform Expired - Fee Related CN205873817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620561330.2U CN205873817U (en) 2016-06-13 2016-06-13 Fixed guide formula hydraulic pressure lifting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620561330.2U CN205873817U (en) 2016-06-13 2016-06-13 Fixed guide formula hydraulic pressure lifting platform

Publications (1)

Publication Number Publication Date
CN205873817U true CN205873817U (en) 2017-01-11

Family

ID=57690492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620561330.2U Expired - Fee Related CN205873817U (en) 2016-06-13 2016-06-13 Fixed guide formula hydraulic pressure lifting platform

Country Status (1)

Country Link
CN (1) CN205873817U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107265368A (en) * 2017-07-14 2017-10-20 南京工业职业技术学院 A kind of automatic lifting ladder device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107265368A (en) * 2017-07-14 2017-10-20 南京工业职业技术学院 A kind of automatic lifting ladder device

Similar Documents

Publication Publication Date Title
CN104787588B (en) Full-automatic setting machine
CN205873817U (en) Fixed guide formula hydraulic pressure lifting platform
CN205873781U (en) Fixed guide formula hydraulic pressure lifting platform
CN206313358U (en) One kind works on overhead transmission line and uses pallet arrangement
CN201925286U (en) Medical multilevel synchronous telescopic cylinder
CN202829214U (en) Personnel and material construction hoist provided with driving mechanisms at tops of suspension coops
CN204716208U (en) A kind of bidentate ring beam-pumping unit
CN205527545U (en) Gantry lifting machine
CN205713036U (en) High pier over-form construction platform
CN203938403U (en) A kind of Manual hanger
CN205653063U (en) Gantry crane of hoist and mount container
CN211813320U (en) Movable hydraulic lifting working platform
CN205527193U (en) Two section double formula lifts
CN204035249U (en) Straightening of elevator guided turning device
CN203845645U (en) Hydraulic semi-automatic tank curtain door of vertical shaft elevator
CN203079643U (en) High-altitude hoisting apparatus
CN207932952U (en) Detachable hoisting gate frame
CN208571420U (en) Cable channel cover plate lifts lift tool
CN205575427U (en) Shaft well -bucket mobile device
CN205330549U (en) Oil derrick for petroleum drilling and repairing equipment
CN205709737U (en) A kind of high-lift operation hanging cradle
CN204702357U (en) A kind of elevator rope end mounting structure
CN206266128U (en) A kind of Novel overhead cat ladder structure
CN104817038B (en) A kind of simple type demolition blasting lift
CN203835281U (en) Novel drilling machine pedestal structure

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20170613

CF01 Termination of patent right due to non-payment of annual fee