CN205870844U - Concrete pole curing room - Google Patents
Concrete pole curing room Download PDFInfo
- Publication number
- CN205870844U CN205870844U CN201620619493.1U CN201620619493U CN205870844U CN 205870844 U CN205870844 U CN 205870844U CN 201620619493 U CN201620619493 U CN 201620619493U CN 205870844 U CN205870844 U CN 205870844U
- Authority
- CN
- China
- Prior art keywords
- curing
- water tank
- heat dissipation
- electric pole
- air inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a concrete pole curing room, including curing pool and maintenance cover, curing pool side upper end is equipped with the scavenge port, the scavenge port passes through pipeline and heat exchanger intercommunication, the cooling water outlet of heat exchanger passes through pipeline intercommunication water tank, be equipped with the air extractor between scavenge port and the heat exchanger, the curing pool bottom is equipped with the heat dissipation chamber, being connected of heat dissipation chamber and curing pool is equipped with a plurality of air vents on the face, heat dissipation chamber bottom central authorities are equipped with bellied air inlet, umbelliform manger plate lid is installed to the air inlet top, the air inlet passes through pipeline intercommunication steam generator, heat dissipation chamber bottom is equipped with the outlet, pipeline intercommunication water tank is passed through to the outlet, be equipped with the filter between outlet and the water tank, maintenance cover internal surface central authorities are equipped with spray set, and spray set passes through hose intercommunication water tank, is equipped with the suction pump between spray set and the water tank, has improved the maintenance ability, has reduced the energy consumption, has reduced manufacturing cost, has reduced the loss of steam, and is more energy -concerving and environment -protective, has safe, laborsaving, simple and convenient, efficient characteristics.
Description
Technical field
This utility model relates to cement electric pole and manufactures field, a kind of cement electric pole fog room.
Background technology
Cement pole needs band mould to carry out steam curing in manufacturing process, and steam curing process is generally divided into and quiet stops, rises
Temperature, constant temperature, 4 stages of cooling, in order to prevent goods from causing concrete to produce because internal-external temperature difference is excessive or thermostat temperature is too high
Crack, should strictly control steam-cured during heating-cooling speed and thermostat temperature.
The most quiet stop the stage
Quiet stop the stage and be also referred to as precuring phase, preposition phase or standing phase, for after product molding and steam curing start before at air
One period of standing time under environment.This stage mainly ensures that in concrete, cement has carried out a certain degree of aquation, has one
Fixed structural strength, produces destruction to prevent temperature raising period volume of concrete from expanding to structure.Resting time in stage should be according to ring
The change of border temperature makes the appropriate adjustments, but should follow and preferably grow unsuitable short principle.
2. the temperature rise period
Temperature rise period is divided into two steps, is i.e. warming up to 60 degrees centigrade from ambient temperature;Keep about two hours
After rise to 80 degrees centigrade again, as the longest in the fruit product in early days precuring time, nascent structure intensity is the highest, and heating rate can phase
Should improve;Otherwise, then need slowly.
3. the constant temperature stage
The main control parameters in constant temperature stage is thermostat temperature and constant temperature time.For cement and concrete goods, constant temperature
The temperature in stage is the highest and curing time is the longest, and the intensity of the fastest and final acquisition of the strength development of goods is the highest.But it is too high
Thermostat temperature and the longer heat time of supporting can cause the loss of goods later strength or other characteristic impaired, so selecting suitably
Thermostat temperature is extremely important for steam-cured process.The temperature in constant temperature stage should be maintained at 80 degrees centigrade, and the retention time should
Control at about 23 hours.
4. temperature-fall period
Temperature-fall period slowly to stop vapour, uniform decrease in temperature, holding humidity.In season in summer in autumn two, rate of temperature fall should control 25 Celsius
About degree per hour;Should control in season in winter in spring two to be advisable per hour at 15 degrees centigrade.Time used determined according to the production cycle,
The temperature-fall period time, the longer the better.After steam curing is removed completely, still have to goods are carried out maintenance, protect as covered geotextiles
Wet, spray warm water, it is ensured that high-strength concrete late maintaining quality, reduce the generation in crack.
Producing of steam curing cement and concrete goods crack is mainly the crack that steam curing system improperly causes,
It is heated uneven mainly due to concrete and causes " swelling " of concrete, or swollen due between concrete and mould
The swollen inharmonious and shear stress that causes;It is thus desirable to the water of preference temperature sprays, excessive temperature stress will not be produced,
Avoid the generation in crack.
In the manufacturing process of cement pole, pour the product of molding and to put into together with mould in steam curing cellar for storing things and steam
Vapour maintenance, but if single carrying out maintenance, then inefficiency, have a strong impact on make efficiency;Meanwhile, cement pole and mould are hanging
During entering and hanging out maintenance cellar for storing things, need the upper end by maintenance is stored to open so that substantial amounts of steam overflows, waste the energy, make
Industry scene is full of steam, affects the sight line of operating personnel, there is potential safety hazard, and operating personnel makees in hot and humid environment
Industry, work under bad environment.
Utility model content
In order to make up above deficiency, this utility model provides a kind of cement electric pole fog room, to solve above-mentioned background skill
Problem in art.
The technical solution of the utility model is:
A kind of cement electric pole fog room, including curing pool and curing cover, upper end, described curing pool side is provided with ventilation mouth, institute
State ventilation mouth to be connected with heat exchanger by pipeline, the cooling water outlet of described heat exchanger by pipeline communication water tank, described in change
It is provided with air exhauster between QI KOU and heat exchanger, bottom described curing pool, is provided with the company of heat dissipation cavity, described heat dissipation cavity and curing pool
Junction is provided with some passages, and described heat dissipation cavity bottom center is provided with the air inlet of projection, and described air inlet is arranged above
Umbrella water deflector cover, described air inlet passes through pipeline communication steam generator, is provided with discharge outlet, described draining bottom described heat dissipation cavity
Mouth, by water tank described in pipeline communication, is provided with filter between described discharge outlet and described water tank;
Described curing cover inner surface central authorities are provided with spray equipment, and described spray equipment passes through soft pipe connection water tank, described spray
Suction pump it is provided with between shower device and water tank.
As preferred technical scheme, also include that PLC, described PLC are electrically connected with temperature receptacle, in described curing cover
Surface is provided with temperature sensor.
As preferred technical scheme, described PLC is electrically connected with described steam generator by controller.
As preferred technical scheme, described PLC is electrically connected with described suction pump by suction pump controller.
As preferred technical scheme, described PLC is electrically connected with described air exhauster by air exhauster controller.
As preferred technical scheme, described curing cover center of top is provided with suspension ring.
As preferred technical scheme, described curing pool periphery being provided around groove, described curing cover bottom periphery sets
There is protruding lid limit.
As preferred technical scheme, the cross section of described curing cover be triangle, semicircle, arch and yi word pattern wherein
One.
As preferred technical scheme, the diameter of described umbrella water deflector cover is more than the diameter of described air inlet.
Owing to have employed technique scheme, a kind of cement electric pole fog room, including curing pool and curing cover, described maintenance
Upper end, side, pond is provided with ventilation mouth, and described ventilation mouth is connected with heat exchanger by pipeline, the cooling water outlet of described heat exchanger
By pipeline communication water tank, it is provided with air exhauster between described ventilation mouth and heat exchanger, bottom described curing pool, is provided with heat dissipation cavity,
Described heat dissipation cavity is provided with some passages with the joint face of curing pool, and described heat dissipation cavity bottom center is provided with the air inlet of projection
Mouthful, described air inlet is arranged above umbrella water deflector cover, and described air inlet passes through pipeline communication steam generator, described heat dissipation cavity
Bottom is provided with discharge outlet, and described discharge outlet, by water tank described in pipeline communication, was provided with between described discharge outlet and described water tank
Filter;Described curing cover inner surface central authorities are provided with spray equipment, and described spray equipment passes through soft pipe connection water tank, and described spray fills
Putting and be provided with suction pump between water tank, this utility model disposably completes maintenance cooling process, reduces job step, improves
Work efficiency, a large amount of steam produced after simultaneously completing curing procedure by air exhauster pump, it is to avoid operation field is a large amount of
Steam exists affects the danger that staff realizes, and reduces the hot and humid situation of working environment simultaneously, improves work
Environment, and the waste effectively avoiding water resource makes full use of water resource, reduces the cost of production, and effectively drops
Low pipe of cement produces the phenomenon in crack in maintenance to be occurred.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only
It is embodiments more of the present utility model, for those of ordinary skill in the art, before not paying creative work
Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of this utility model embodiment;
Fig. 2 is this utility model embodiment PLC electric connection structure schematic diagram;
Wherein: 1-curing pool;2-curing cover;3-heat dissipation cavity;4-air inlet;5-umbrella water deflector cover;6-steam generator;7-
Discharge outlet;8-passage;9-water tank;10-takes a breath mouth;11-air exhauster;12-heat exchanger;13-cooling water outlet;14-sprays dress
Put;15-flexible pipe;16-suction pump;17-temperature sensor;18-filter;19-is around groove;20-projection lid limit;21-controls
Device;22-air exhauster controller;23-suction pump controller;24-suspension ring;25-PLC;26-temperature receptacle.
Detailed description of the invention
This utility model is further illustrated below in conjunction with the accompanying drawings with specific embodiment.
As depicted in figs. 1 and 2, this embodiment offers a kind of cement electric pole fog room, including curing pool 1 and curing cover 2,
Upper end, described curing pool 1 side is provided with ventilation mouth 10, and described ventilation mouth 10 is connected with heat exchanger 12 by pipeline, and described heat is handed over
Change planes 12 cooling water outlet 13 by pipeline communication water tank 9, be provided with air exhauster 11 between described ventilation mouth 10 and heat exchanger 12,
Being provided with heat dissipation cavity 3 bottom described curing pool 1, described heat dissipation cavity 3 is provided with some passages 8 with the joint face of curing pool 1, described
Heat dissipation cavity 3 bottom center is provided with the air inlet 4 of projection, and described air inlet 4 side is provided with umbrella water deflector cover 5, and described air inlet 4 leads to
Piping connection steam generator 6, is provided with discharge outlet 7 bottom described heat dissipation cavity 3, described discharge outlet 7 connects described by pipeline
Water tank 9, is provided with filter 18 between described discharge outlet 7 and described water tank 9;Described curing cover 2 inner surface central authorities are provided with spray dress
Putting 14, described spray equipment 14 connects described water tank 9 by flexible pipe 15, is provided with between described spray equipment 14 and described water tank 9
Suction pump 16.
Also including that PLC25, described PLC25 are electrically connected with described temperature receptacle 26, described curing cover 2 inner surface is provided with
Temperature sensor 17.
Described PLC25 is electrically connected with described steam generator 6 by controller 21.
Described PLC25 is electrically connected with described suction pump 16 by suction pump controller 23.
Described PLC25 is electrically connected with described air exhauster 11 by air exhauster controller 22.
Described curing cover 2 center of top is provided with suspension ring 24, convenient operation.
Being provided around groove 19 on described curing pool 1 periphery, described curing cover 2 bottom periphery is provided with protruding lid limit 20.
The cross section of described curing cover 2 is triangle, semicircle, arch and yi word pattern one therein, enhanced stability.
The diameter of described umbrella water deflector cover 5 is more than the diameter of described air inlet 4.
Cement electric pole band mould is put into curing pool 1 by this embodiment in the course of the work, by the protruding lid limit of curing cover 2
20 mouthfuls enter on curing pool 1 periphery in the groove 19, a certain amount of obstruct medium will be imported around groove 19 in, it is to avoid work
During a large amount of steam overflow, affect maintenance efficiency, PLC25 passes through controller 21 and opens steam generator 6, steam generator
6 steam produced enter heat dissipation cavity by pipeline, through the uniform heat radiation in curing pool 1 of passage 8, make cement electric pole
Can thermally equivalent, it is ensured that the temperature of cement electric pole is heated evenly, reduce crack phenomenon and occur, curing cover 2 inner surface simultaneously
On temperature sensor 17 temperature information of curing pool 1 is passed to PLC through temperature receptacle 26, it is achieved water in curing pool 1 is steamed
A control of temperature, at the end of maintenance, operation PLC is by controller 21 steam off generator 6, and PLC25 is by taking out simultaneously
Water pump controller 23 opens suction pump 16, and the water in water tank 9 is sent to spray equipment 14, spray equipment by flexible pipe by suction pump 16
14 carry out cooling process for the cement electric pole in curing pool 1, temperature sensor 17 by temperature information in curing pool 1 through temperature reception
Device 26 passes to PLC25, and when the temperature set in reducing temperature and reaching PLC25, PLC25 is closed by suction pump controller 23
Suction pump 16, because can produce substantial amounts of steam and water in temperature-fall period, wherein water can penetrate into heat dissipation cavity through passage 8
3, through the discharge outlet 7 bottom heat dissipation cavity 3 after filter 18 impurity screening, return water tank 9, continue with, because air inlet
Mouthfuls 4 be arranged over umbrella water deflector cover 5, and air inlet 4 is in heat dissipation cavity internal projection, passes through pipeline thus without occurring that water pours in down a chimney
The phenomenon entering steam generator 6 occurs, safety is high;When PLC25 closes suction pump 16, PLC25 is controlled by air exhauster
Air exhauster 11 opened by device 22, and a large amount of steam having in curing pool 1 are drawn into heat by ventilation mouth 10 and hand over by air exhauster 11
Change planes 12, heat exchanger 12 by the heat absorption of steam, recycling, and the water of water vapor condensation can be through in heat exchanging process
Subcooled water outlet 13 enters water tank 9 by pipeline, reuses.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.One's own profession
Skilled person will appreciate that of industry, this utility model is not restricted to the described embodiments, described in above-described embodiment and description
Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model is also
Have various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model
Claimed scope is defined by appending claims and equivalent thereof.
Claims (9)
1. a cement electric pole fog room, including curing pool and curing cover, it is characterised in that: upper end, described curing pool side is provided with
Ventilation mouth, described ventilation mouth is connected with heat exchanger by pipeline, and the cooling water outlet of described heat exchanger passes through pipeline communication water
Case, is provided with air exhauster between described ventilation mouth and heat exchanger, be provided with heat dissipation cavity bottom described curing pool, and described heat dissipation cavity is with foster
The joint face protecting pond is provided with some passages, and described heat dissipation cavity bottom center is provided with the air inlet of projection, on described air inlet
Side is provided with umbrella water deflector cover, and described air inlet passes through pipeline communication steam generator, is provided with discharge outlet bottom described heat dissipation cavity,
Described discharge outlet, by water tank described in pipeline communication, is provided with filter between described discharge outlet and described water tank;
Described curing cover inner surface central authorities are provided with spray equipment, and described spray equipment is by water tank described in soft pipe connection, described spray
Suction pump it is provided with between shower device and water tank.
2. a kind of cement electric pole fog room as claimed in claim 1, it is characterised in that: also include PLC, described PLC and temperature
Receptor is electrically connected with, and described curing cover inner surface is provided with temperature sensor.
3. a kind of cement electric pole fog room as claimed in claim 2, it is characterised in that: described PLC passes through controller with described
Steam generator is electrically connected with.
4. a kind of cement electric pole fog room as claimed in claim 2, it is characterised in that: described PLC passes through suction pump controller
It is electrically connected with described suction pump.
5. a kind of cement electric pole fog room as claimed in claim 2, it is characterised in that: described PLC passes through air exhauster controller
It is electrically connected with described air exhauster.
6. a kind of cement electric pole fog room as claimed in claim 1, it is characterised in that: described curing cover center of top is provided with hangs
Ring.
7. a kind of cement electric pole fog room as claimed in claim 1, it is characterised in that: it is provided around on described curing pool periphery
Groove, described curing cover bottom periphery is provided with protruding lid limit.
8. a kind of cement curing room as described in claim 1 or 6, it is characterised in that: the cross section of described curing cover is triangle
Shape, semicircle, arch and yi word pattern one therein.
9. a kind of cement electric pole fog room as claimed in claim 1, it is characterised in that: the diameter of described umbrella water deflector cover is more than
The diameter of described air inlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620619493.1U CN205870844U (en) | 2016-06-22 | 2016-06-22 | Concrete pole curing room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620619493.1U CN205870844U (en) | 2016-06-22 | 2016-06-22 | Concrete pole curing room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205870844U true CN205870844U (en) | 2017-01-11 |
Family
ID=57690753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620619493.1U Expired - Fee Related CN205870844U (en) | 2016-06-22 | 2016-06-22 | Concrete pole curing room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205870844U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106945161A (en) * | 2017-04-07 | 2017-07-14 | 成都亨通兆业精密机械有限公司 | Cement slurry property test cement mortar water-bath curing box |
CN114397928A (en) * | 2021-12-31 | 2022-04-26 | 长沙金湘水泥制品有限公司 | Intelligent electric pole maintenance system and method |
-
2016
- 2016-06-22 CN CN201620619493.1U patent/CN205870844U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106945161A (en) * | 2017-04-07 | 2017-07-14 | 成都亨通兆业精密机械有限公司 | Cement slurry property test cement mortar water-bath curing box |
CN114397928A (en) * | 2021-12-31 | 2022-04-26 | 长沙金湘水泥制品有限公司 | Intelligent electric pole maintenance system and method |
CN114397928B (en) * | 2021-12-31 | 2023-04-11 | 长沙金湘水泥制品有限公司 | Intelligent electric pole maintenance system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105666671B (en) | A kind of rotary curing box of cement concrete test block | |
CN205870844U (en) | Concrete pole curing room | |
CN203907568U (en) | Full-automatic electromagnetic steam generator | |
CN206380397U (en) | One kind is used for the wet device of warm canopy intelligent temperature control control | |
CN205537068U (en) | Safe compounding machine drying device | |
CN204707588U (en) | Booth | |
CN104350979B (en) | The greenhouse of a kind of improvement | |
CN206620584U (en) | A kind of agricultural green house of vegetables based on solar energy | |
CN105946107B (en) | A kind of intelligence overall process temperature control steam curing kiln | |
CN206557635U (en) | A kind of intelligent breeding curing system of forest | |
CN207435408U (en) | A kind of brewing device easy to remove | |
CN205969455U (en) | Cement maintenance water tank | |
CN204612375U (en) | A kind of New drying device produced for quartzite slate | |
CN203653416U (en) | Kiln cooling device | |
CN104525864B (en) | A kind of floating sand machine | |
CN204187599U (en) | A kind of still kettle afterheat steam recycling device | |
CN209307470U (en) | A kind of pit carburizing furnace convenient for lifting | |
CN208736103U (en) | A kind of prepared slices of Chinese crude drugs raw material fast-drying device | |
CN206588342U (en) | A kind of continuous casting intermediate inlet toasts bottom extractor fan online | |
CN205718310U (en) | Dehumidifying heat pump | |
CN206390247U (en) | A kind of air-flowing type lemon is drying to make drying baker | |
CN205209096U (en) | Full -automatic horizontal capsule drying device | |
CN205403364U (en) | Utilize coal drying device of waste heat | |
CN204746037U (en) | High -efficient sulfur trioxide gas heating device that dehumidificaties | |
CN217862439U (en) | Flower mud foaming solidification thermostated container |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20210622 |