CN205857891U - Concrete electric pole strain cross arm mounting auxiliary - Google Patents

Concrete electric pole strain cross arm mounting auxiliary Download PDF

Info

Publication number
CN205857891U
CN205857891U CN201620712761.4U CN201620712761U CN205857891U CN 205857891 U CN205857891 U CN 205857891U CN 201620712761 U CN201620712761 U CN 201620712761U CN 205857891 U CN205857891 U CN 205857891U
Authority
CN
China
Prior art keywords
horn
corner
shoulder
arm
long rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620712761.4U
Other languages
Chinese (zh)
Inventor
杨建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhi Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Changzhi Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhi Power Supply Co of State Grid Shanxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Changzhi Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority to CN201620712761.4U priority Critical patent/CN205857891U/en
Application granted granted Critical
Publication of CN205857891U publication Critical patent/CN205857891U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

本实用新型公开一种结构简单,使用方便,能够克服砼电杆横担安装工具使用中的缺点,满足砼电杆耐张横担安装的辅助工具;采用的技术方案为:砼电杆耐张横担安装辅助工具,包括第一角担、第二角担和长杆双头螺丝,所述第一角担为角钢结构,所述第二角担为长条钢板结构,所述第一角担和第二角担平行相对设置,两个所述长杆双头螺丝垂直贯穿于第一角担和第二角担设置,且两个所述长杆双头螺丝的端部均通过第一螺母固定在第一角担和第二角担上,所述第一角担和第二角担的中部均设置有两个用于挂接固定皮带的通孔,所述第一角担的内侧两端均设置有定位板,所述第二角担的内侧两端均设置有勾板;本实用新型可广泛应用于电力维修领域。

The utility model discloses an auxiliary tool with simple structure and convenient use, which can overcome the shortcomings in the use of concrete pole cross-arm installation tools and satisfy the installation of concrete pole tension-resistant cross-arm; the adopted technical scheme is: concrete pole tension-resistant Auxiliary tools for cross arm installation, including the first horn, the second horn and long rod stud screws, the first horn is an angle steel structure, the second horn is a long steel plate structure, the first angle The shoulder and the second corner shoulder are arranged parallel to each other, the two long rod double-ended screws are vertically penetrated through the first corner shoulder and the second corner shoulder, and the ends of the two long rod double-ended screws pass through the first corner. Nuts are fixed on the first and second corner shoulders, and the middle parts of the first and second corner shoulders are provided with two through holes for hooking and fixing belts. The inside of the first corner shoulder Positioning plates are provided at both ends, and hook plates are provided at both ends of the inner side of the second horn; the utility model can be widely used in the field of electric power maintenance.

Description

砼电杆耐张横担安装辅助工具Auxiliary tool for installation of concrete pole tension cross arm

技术领域technical field

本实用新型砼电杆耐张横担安装辅助工具,属于电力线路施工架设中附件的安装技术领域。The utility model relates to an auxiliary tool for installing a tension-resistant cross-arm of a concrete pole, which belongs to the technical field of installing accessories in the construction and erection of electric lines.

背景技术Background technique

横担是组装电力杆塔的重要组成部分。在电力线路架设中,每个砼电杆顶部都需要安装相应的横担用来支撑架空线路,一般安装在距杆顶300-800mm处,根据砼电杆型号及用途的不同,可分为单横担、耐涨横担。在安装横担尤其耐张横担时,现有的安装方法一般是杆下组装好后吊上杆顶,然后必须两个人来抬起放入杆头内,由于横担穿有M型垫铁,垫铁和横担又都是处在活动状态,即使两人同时操作,也很难将组装好的耐张横担穿入杆顶内,费时费力而且双人工作危险程度很大。The cross arm is an important part of assembling the power tower. In the erection of power lines, the top of each concrete pole needs to be installed with a corresponding cross arm to support the overhead line. It is generally installed at a distance of 300-800mm from the top of the pole. According to the type and use of the concrete pole, it can be divided into single poles. Cross-arm, anti-expansion cross-arm. When installing cross-arms, especially tension-resistant cross-arms, the existing installation method is generally to hang the top of the pole after the pole is assembled, and then two people must lift it into the pole head, because the cross-arm is worn with M-shaped shims , The pad iron and the cross arm are all in the active state. Even if two people operate at the same time, it is difficult to penetrate the assembled tension cross arm into the top of the pole, which is time-consuming and laborious, and the double work is very dangerous.

实用新型内容Utility model content

本实用新型克服了现有技术存在的不足,提供了一种结构简单,使用方便,能够克服砼电杆横担安装工具使用中的缺点,满足砼电杆耐张横担安装的辅助工具。The utility model overcomes the deficiencies of the prior art and provides an auxiliary tool with simple structure and convenient use, which can overcome the shortcomings in the use of the concrete pole cross-arm installation tool and satisfy the installation of the concrete pole tension cross-arm.

为了解决上述技术问题,本实用新型采用的技术方案为:砼电杆耐张横担安装辅助工具,包括第一角担、第二角担和长杆双头螺丝,所述第一角担为角钢结构,所述第二角担为长条钢板结构,所述第一角担和第二角担平行相对设置,两个所述长杆双头螺丝垂直贯穿于第一角担和第二角担设置,且两个所述长杆双头螺丝的端部均通过第一螺母固定在第一角担和第二角担上,所述第一角担和第二角担的中部均设置有两个用于挂接固定皮带的通孔,所述第一角担的内侧两端均设置有定位板,所述第二角担的内侧两端均设置有勾板。In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: the auxiliary tool for installing the tension-resistant cross arm of the concrete pole, including the first angle shoulder, the second angle shoulder and the long rod double-headed screw, the first angle shoulder is Angle steel structure, the second corner is a long steel plate structure, the first corner and the second corner are arranged parallel to each other, and the two long rod double-headed screws vertically penetrate the first corner and the second corner set, and the ends of the two long-bar double-ended screws are fixed on the first and second corners through first nuts, and the middle parts of the first and second corners are all provided with Two through holes for hooking and fixing the belt, positioning plates are provided at both inner ends of the first corner shoulder, and hook plates are arranged at both inner ends of the second corner shoulder.

所述长杆双头螺丝在套装有两套垫片和第二螺母,所述垫片和第二螺母均位于第一角担和第二角担之间,所述垫片和第二螺母用于与第一角担和第二角担配合,将耐张横担夹持住。Two sets of gaskets and second nuts are set on the long rod double-ended screw, and the gaskets and the second nuts are both located between the first angle shoulder and the second angle shoulder, and the gaskets and the second nuts are used for Cooperate with the first horn and the second horn to clamp the tension cross arm.

所述长杆双头螺丝的中部外侧设置有手抓环。A grip ring is provided on the outside of the middle part of the long rod double-ended screw.

本实用新型与现有技术相比具有的有益效果是:本实用新型通过第一角担、第二角担和长杆双头螺丝以及固定皮带构成,第一角担、第二角担两侧立壁冲有穿螺丝的孔,在第一角担、第二角担中部设有用于挂接固定皮带的通孔,长杆双头螺丝中部和边部分别有卡横担的垫片和第二螺母,在长杆双头螺丝中部有用于悬挂安装附件和工具包的挂钩,固定皮带分别穿过通孔并固定在第一角担、第二角担上,本实用新型使电力安装人员在高空作业时省时省力,既减少了风险,又增加了施工安全系数,可以一人顺利完成耐张横担的安装。Compared with the prior art, the utility model has the beneficial effects that: the utility model is composed of the first angle shoulder, the second angle shoulder, the long rod double-headed screw and the fixed belt, and the first angle shoulder and the second angle shoulder are on both sides The vertical wall is punched with holes for threading screws, and the middle part of the first and second corners is provided with a through hole for hanging and fixing the belt. Nuts, in the middle of the long rod double-headed screws, there are hooks for hanging installation accessories and tool kits, and the fixing belts pass through the through holes respectively and are fixed on the first and second corner shoulders. It saves time and effort during operation, reduces risks, and increases the construction safety factor. One person can successfully complete the installation of the tension cross arm.

附图说明Description of drawings

下面结合附图对本实用新型做进一步的说明。Below in conjunction with accompanying drawing, the utility model is described further.

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图中:1为第一角担、2为第二角担、3为长杆双头螺丝、4为第一螺母、5为通孔、6为定位板、7为勾板、8为垫片、9为第二螺母、10为手抓环。In the figure: 1 is the first angle shoulder, 2 is the second angle shoulder, 3 is the long rod double head screw, 4 is the first nut, 5 is the through hole, 6 is the positioning plate, 7 is the hook plate, 8 is the gasket , 9 is the second nut, and 10 is the hand ring.

具体实施方式detailed description

如图1所示,本实用新型砼电杆耐张横担安装辅助工具,包括第一角担1、第二角担2和长杆双头螺丝3,所述第一角担1为角钢结构,所述第二角担2为长条钢板结构,所述第一角担1和第二角担2平行相对设置,两个所述长杆双头螺丝3垂直贯穿于第一角担1和第二角担2设置,且两个所述长杆双头螺丝3的端部均通过第一螺母4固定在第一角担1和第二角担2上,所述第一角担1和第二角担2的中部均设置有两个用于挂接固定皮带的通孔5,所述第一角担1的内侧两端均设置有定位板6,所述第二角担2的内侧两端均设置有勾板7。As shown in Figure 1, the auxiliary tool for installing the tension-resistant cross arm of the concrete pole of the utility model includes a first angle arm 1, a second angle arm 2 and a long rod double-headed screw 3, and the first angle arm 1 is an angle steel structure , the second corner shoulder 2 is a long steel plate structure, the first corner shoulder 1 and the second corner shoulder 2 are arranged in parallel and opposed to each other, and the two long rod stud screws 3 vertically penetrate through the first corner shoulder 1 and the second corner shoulder 2 The second angle shoulder 2 is provided, and the ends of the two long pole stud screws 3 are all fixed on the first angle pole 1 and the second angle pole 2 by the first nut 4, and the first angle pole 1 and the second angle pole 2 are fixed. The middle part of the second corner shoulder 2 is provided with two through holes 5 for hooking and fixing the belt, the inner two ends of the first corner shoulder 1 are all provided with positioning plates 6, the inner side of the second corner shoulder 2 Both ends are provided with hook plate 7.

所述长杆双头螺丝3在套装有两套垫片8和第二螺母9,所述垫片8和第二螺母9均位于第一角担1和第二角担2之间,所述垫片8和第二螺母9用于与第一角担1和第二角担2配合,将耐张横担夹持住。Two sets of washers 8 and second nuts 9 are set in the long rod double-ended screw 3, and the washers 8 and the second nuts 9 are both located between the first corner 1 and the second corner 2, and the The washer 8 and the second nut 9 are used to cooperate with the first horn 1 and the second horn 2 to clamp the tension cross arm.

所述长杆双头螺丝3的中部外侧设置有手抓环10。A hand ring 10 is provided on the outside of the middle part of the long rod double-ended screw 3 .

在电力线路施工作业时,杆下作业人员首先将横担组装好,并把该工具固定在组装好的横担上,杆上人员固定好滑轮系好吊环,杆下人员接着通过滑轮用拉绳将安装横担送上去,杆上作业人员可双手抓住两边的长杆螺丝将横担放入杆顶内,利用固定皮带悬挂横担于杆顶部,然后进行松开本工具的螺丝,同时紧固横担的螺丝,直至紧固完毕,完成施工安装后取下该工具,并解除固定皮带。一个作业人员可完成原来需要两个人共同完成的工作量,不仅提高了工作效率,还提高了施工工艺和施工质量。During the construction of power lines, the workers under the pole first assemble the cross arm, and fix the tool on the assembled cross arm, the staff on the pole fix the pulley and fasten the suspension ring, and the staff under the pole then use the pull rope through the pulley Send the installation cross arm up, the operator on the pole can grasp the long pole screws on both sides with both hands, put the cross arm into the top of the pole, hang the cross arm on the top of the pole with the fixed belt, and then loosen the screws of this tool, and tighten it at the same time Fasten the screws of the cross arm until the fastening is complete. After the construction and installation are completed, take off the tool and release the fixed belt. One operator can complete the workload that originally required two persons to complete together, which not only improves the work efficiency, but also improves the construction process and construction quality.

上面结合附图对本实用新型的实施例作了详细说明,但是本实用新型并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。The above embodiments of the utility model have been described in detail in conjunction with the accompanying drawings, but the utility model is not limited to the above-mentioned embodiments. Make various changes below.

Claims (3)

1.砼电杆耐张横担安装辅助工具,其特征在于:包括第一角担(1)、第二角担(2)和长杆双头螺丝(3),所述第一角担(1)为角钢结构,所述第二角担(2)为长条钢板结构,所述第一角担(1)和第二角担(2)平行相对设置,两个所述长杆双头螺丝(3)垂直贯穿于第一角担(1)和第二角担(2)设置,且两个所述长杆双头螺丝(3)的端部均通过第一螺母(4)固定在第一角担(1)和第二角担(2)上,所述第一角担(1)和第二角担(2)的中部均设置有两个用于挂接固定皮带的通孔(5),所述第一角担(1)的内侧两端均设置有定位板(6),所述第二角担(2)的内侧两端均设置有勾板(7)。1. Auxiliary tool for installation of concrete pole tension cross arm, characterized in that it includes the first angle shoulder (1), the second angle shoulder (2) and the long rod double-headed screw (3), the first angle arm ( 1) is an angle steel structure, the second horn (2) is a long steel plate structure, the first horn (1) and the second horn (2) are arranged in parallel and opposite each other, and the two long poles with double ends The screw (3) is set vertically through the first horn (1) and the second horn (2), and the ends of the two long rod stud screws (3) are fixed on the On the first horn (1) and the second horn (2), the middle parts of the first horn (1) and the second horn (2) are provided with two through holes for hooking and fixing the belt (5) Positioning plates (6) are provided at both inner ends of the first corner shoulder (1), and hook plates (7) are arranged at both inner ends of the second corner shoulder (2). 2.根据权利要求1所述的砼电杆耐张横担安装辅助工具,其特征在于:所述长杆双头螺丝(3)在套装有两套垫片(8)和第二螺母(9),所述垫片(8)和第二螺母(9)均位于第一角担(1)和第二角担(2)之间,所述垫片(8)和第二螺母(9)用于与第一角担(1)和第二角担(2)配合,将耐张横担夹持住。2. The auxiliary tool for installing the tension-resistant cross-arm of a concrete pole according to claim 1, characterized in that: the long rod double-ended screw (3) is equipped with two sets of gaskets (8) and second nuts (9) ), the washer (8) and the second nut (9) are located between the first horn (1) and the second horn (2), the washer (8) and the second nut (9) It is used to cooperate with the first horn (1) and the second horn (2) to clamp the tension cross arm. 3.根据权利要求1或2所述的砼电杆耐张横担安装辅助工具,其特征在于:所述长杆双头螺丝(3)的中部外侧设置有手抓环(10)。3. The auxiliary tool for installing the tension-resistant cross-arm of a concrete pole according to claim 1 or 2, characterized in that: a gripping ring (10) is provided outside the middle of the long rod double-ended screw (3).
CN201620712761.4U 2016-07-08 2016-07-08 Concrete electric pole strain cross arm mounting auxiliary Expired - Fee Related CN205857891U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620712761.4U CN205857891U (en) 2016-07-08 2016-07-08 Concrete electric pole strain cross arm mounting auxiliary

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620712761.4U CN205857891U (en) 2016-07-08 2016-07-08 Concrete electric pole strain cross arm mounting auxiliary

Publications (1)

Publication Number Publication Date
CN205857891U true CN205857891U (en) 2017-01-04

Family

ID=57645829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620712761.4U Expired - Fee Related CN205857891U (en) 2016-07-08 2016-07-08 Concrete electric pole strain cross arm mounting auxiliary

Country Status (1)

Country Link
CN (1) CN205857891U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109546559A (en) * 2018-12-19 2019-03-29 国网江苏省电力有限公司常州供电分公司 Isolator operating mechanism installation auxiliary device
CN111219300A (en) * 2019-11-01 2020-06-02 金陵科技学院 Auxiliary support device for construction of composite steel tube concrete wind power tower
CN112234559A (en) * 2020-09-28 2021-01-15 贵州电网有限责任公司 Device for reducing current grounding accident for rural power grid transformation and using method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109546559A (en) * 2018-12-19 2019-03-29 国网江苏省电力有限公司常州供电分公司 Isolator operating mechanism installation auxiliary device
CN109546559B (en) * 2018-12-19 2023-08-11 国网江苏省电力有限公司常州供电分公司 Mounting aids for isolating switch operating mechanisms
CN111219300A (en) * 2019-11-01 2020-06-02 金陵科技学院 Auxiliary support device for construction of composite steel tube concrete wind power tower
CN112234559A (en) * 2020-09-28 2021-01-15 贵州电网有限责任公司 Device for reducing current grounding accident for rural power grid transformation and using method
CN112234559B (en) * 2020-09-28 2022-03-22 贵州电网有限责任公司 Device for reducing current grounding accident for rural power grid transformation and using method

Similar Documents

Publication Publication Date Title
CN202333597U (en) Overhead-groundwire lifter
CN103715633B (en) Strain insulator single hole yoke plate replacing insulator string method
CN205857891U (en) Concrete electric pole strain cross arm mounting auxiliary
CN203998746U (en) Portable suspension installation
CN206250670U (en) It is a kind of to be easy to operation and safe replacing device for insulator
CN202178529U (en) Jack-up fixture for tower
CN205840756U (en) The multi-functional hanging ladder of distribution operation
CN203412354U (en) Cross arm clamp
CN201298699Y (en) an insulating device
CN102664377B (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN215886019U (en) A U-shaped clamp for hoisting a square pipe
CN203624808U (en) Detachable steel structure hanger
CN202633868U (en) Heavy punch piece
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN206302092U (en) Pulling tools for overhead transmission line cables
CN102672697B (en) Electric torque wrench hoisting fixture
CN204627100U (en) A kind of distribution line construction Combined anchor ear
CN203690802U (en) Tension single-hole yoke plate insulator string replacement clamping apparatus
CN204651778U (en) A kind of servicing unit changing electric transmission line isolator
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN201392998Y (en) Isolation switch inspection pole
CN203119388U (en) Multifunctional mounting rack for changing tension-resistant crossarm
CN202268651U (en) Fixing device of transmission wire lifter
CN205391498U (en) Novel safety belt fixed bolster for power maintenance
CN202007524U (en) Steel springboard locking device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104