CN205857891U - Concrete electric pole strain cross arm mounting auxiliary - Google Patents
Concrete electric pole strain cross arm mounting auxiliary Download PDFInfo
- Publication number
- CN205857891U CN205857891U CN201620712761.4U CN201620712761U CN205857891U CN 205857891 U CN205857891 U CN 205857891U CN 201620712761 U CN201620712761 U CN 201620712761U CN 205857891 U CN205857891 U CN 205857891U
- Authority
- CN
- China
- Prior art keywords
- load
- jiao
- cross arm
- electric pole
- strain cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 8
- 239000010959 steel Substances 0.000 claims abstract description 8
- 238000010276 construction Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000012211 strain insulator Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The open a kind of simple in construction of this utility model, easy to use, it is possible to the shortcoming in overcoming concrete pole arm installation tool to use, meet the aid that concrete electric pole strain cross arm is installed;The technical scheme used is: concrete electric pole strain cross arm mounting auxiliary, including first jiao of load, second jiao of load and stock double-threaded screw, described first jiao of load is steel angle structure, described second jiao of load is strip-shaped steel plate structure, described first jiao of load and second jiao of load are oppositely arranged in parallel, two described stock double-threaded screws extend vertically through and arrange in first jiao of load and second jiao of load, and the end of two described stock double-threaded screws is all fixed in first jiao of load and second jiao of load by the first nut, the middle part of described first jiao of load and second jiao of load is provided with two for the through hole mounting fixing belt, the two ends, inner side of described first jiao of load are provided with location-plate, the two ends, inner side of described second jiao of load are provided with hook plate;This utility model can be widely applied to power equipment maintaining field.
Description
Technical field
This utility model concrete electric pole strain cross arm mounting auxiliary, belongs to the installation of adnexa during power line construction sets up
Technical field.
Background technology
Cross-arm is the important component part assembling electric force pole tower.In power circuit sets up, each concrete head of the mast needs
Corresponding cross-arm is installed for supporting overhead transmission line, is typically mounted at masthead 300-800mm, according to concrete electric pole model and
The difference of purposes, can be divided into single cross-arm, the resistance to cross-arm that rises.When installing cross-arm especially strain cross arm, existing installation method is general
Be assemble under bar after hang on masthead, then two people must lift and put into head, owing to cross-arm is installed with M type parallels, pad
Ferrum and cross-arm are the most all at active state, even if two people operate simultaneously, it is also difficult to the strain cross arm assembled is penetrated masthead
In, waste time and energy and two-handed work degree of danger is the biggest.
Utility model content
This utility model overcomes the deficiency that prior art exists, it is provided that a kind of simple in construction, easy to use, it is possible to gram
Take the shortcoming during concrete pole arm installation tool uses, meet the aid that concrete electric pole strain cross arm is installed.
In order to solve above-mentioned technical problem, the technical solution adopted in the utility model is: concrete electric pole strain cross arm is installed auxiliary
Assistant engineer has, and including first jiao of load, second jiao of load and stock double-threaded screw, described first jiao of load is steel angle structure, described second jiao
Load is strip-shaped steel plate structure, and described first jiao of load and second jiao of load are oppositely arranged in parallel, and two described stock double-threaded screws are vertical
Arrange through first jiao of load and second jiao of load, and the end of two described stock double-threaded screws is all fixed on by the first nut
In first jiao of load and second jiao of load, the middle part of described first jiao of load and second jiao of load is provided with two for mounting fixing belt
Through hole, the two ends, inner side of described first jiao of load are provided with location-plate, and the two ends, inner side of described second jiao of load are provided with hook
Plate.
Described stock double-threaded screw is respectively positioned on being set with two set pads and the second nut, described pad and the second nut
Between one jiao of load and second jiao of load, described pad and the second nut are for coordinating with first jiao of load and second jiao of load, and strain insulator is horizontal
Load clamps.
It is provided with hands outside the middle part of described stock double-threaded screw and grabs ring.
This utility model compared with prior art have the beneficial effect that this utility model pass through first jiao of load, second
Angle load and stock double-threaded screw and fixing belt are constituted, and first jiao of load, second jiao of load both sides wall punching have the hole wearing screw,
It is provided with the through hole for mounting fixing belt in the middle part of first jiao of load, second jiao of load, has respectively with edge in the middle part of stock double-threaded screw
The pad of card cross-arm and the second nut, have for hanging installation adnexa and the hook of tool kit in the middle part of stock double-threaded screw, Gu
Determining belt be each passed through through hole and be fixed in first jiao of load, second jiao of load, this utility model makes electric power installation personnel in high-altitude
During operation time saving and energy saving, both decreased risk, added again construction safety coefficient, a people can smoothly complete the peace of strain cross arm
Dress.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings this utility model is described further.
Fig. 1 is structural representation of the present utility model.
In figure: 1 be first jiao of load, 2 be second jiao of load, 3 be stock double-threaded screw, 4 be the first nut, 5 be through hole, 6 be
Location-plate, 7 for hook plate, 8 be pad, 9 be the second nut, 10 grab ring for hands.
Detailed description of the invention
As it is shown in figure 1, this utility model concrete electric pole strain cross arm mounting auxiliary, including 1, second jiao of load of first jiao of load
2 and stock double-threaded screw 3, described first jiao of load 1 be steel angle structure, and described second jiao to carry on a shoulder pole 2 be strip-shaped steel plate structure, described first
Angle load 1 and second jiao of load 2 are oppositely arranged in parallel, and two described stock double-threaded screws 3 extend vertically through carries on a shoulder pole 1 and second jiao in first jiao
Load 2 is arranged, and the end of two described stock double-threaded screws 3 is all fixed on first jiao of load 1 and second jiao of load by the first nut 4
On 2, the middle part of described first jiao of load 1 and second jiao of load 2 be provided with two for the through hole 5 mounting fixing belt, described the
The two ends, inner side of one jiao of load 1 are provided with location-plate 6, and the two ends, inner side of described second jiao of load 2 are provided with hook plate 7.
Described stock double-threaded screw 3 is being set with two set pad 8 and the second nuts 9, and described pad 8 and the second nut 9 are equal
Between first jiao of load 1 and second jiao of load 2, described pad 8 and the second nut 9 are for joining with first jiao of load 1 and second jiao of load 2
Close, strain cross arm is clamped.
It is provided with hands outside the middle part of described stock double-threaded screw 3 and grabs ring 10.
When power line construction operation, under bar, first cross-arm is assembled by operating personnel, and this instrument is fixed on group
On the cross-arm installed, on bar, personnel fix pulley and fasten suspension ring, and under bar, personnel then pass through pulley stay cord and will install cross-arm
Serving, on bar, operating personnel can catch the stock screw on both sides that cross-arm is put into masthead by both hands, utilizes fixing belt to hang
Cross-arm, in masthead portion, then carrying out unclamping the screw of this instrument, fastens the screw of cross-arm simultaneously, until fastening complete, completing to execute
Work takes off this instrument after installing, and releases fixing belt.One operating personnel can complete originally to need two people jointly to complete
Workload, not only increases work efficiency, also improves construction technology and construction quality.
Above in conjunction with accompanying drawing, embodiment of the present utility model is explained in detail, but on this utility model is not limited to
State embodiment, in the ken that those of ordinary skill in the art are possessed, it is also possible to without departing from this utility model objective
On the premise of various changes can be made.
Claims (3)
1. concrete electric pole strain cross arm mounting auxiliary, it is characterised in that: include first jiao of load (1), second jiao of load (2) and stock
Double-threaded screw (3), described first jiao of load (1) is steel angle structure, and described second jiao of load (2) is strip-shaped steel plate structure, described first
Angle load (1) and second jiao of load (2) are oppositely arranged in parallel, and two described stock double-threaded screws (3) extend vertically through in first jiao of load (1)
Arrange with second jiao of load (2), and the end of two described stock double-threaded screws (3) is all fixed on first by the first nut (4)
On angle load (1) and second jiao of load (2), the middle part of described first jiao of load (1) and second jiao of load (2) is provided with two for mounting
The through hole (5) of fixing belt, the two ends, inner side of described first jiao of load (1) are provided with location-plate (6), described second jiao of load (2)
Two ends, inner side be provided with hook plate (7).
Concrete electric pole strain cross arm mounting auxiliary the most according to claim 1, it is characterised in that: described stock double end spiral shell
Silk (3) is respectively positioned on first jiao of load being set with two set pads (8) and the second nut (9), described pad (8) and the second nut (9)
(1), between and the second jiao of load (2), described pad (8) and the second nut (9) are for joining with first jiao of load (1) and second jiao of load (2)
Close, strain cross arm is clamped.
Concrete electric pole strain cross arm mounting auxiliary the most according to claim 1 and 2, it is characterised in that: described stock is double
It is provided with hands outside the middle part of head screw (3) and grabs ring (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620712761.4U CN205857891U (en) | 2016-07-08 | 2016-07-08 | Concrete electric pole strain cross arm mounting auxiliary |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620712761.4U CN205857891U (en) | 2016-07-08 | 2016-07-08 | Concrete electric pole strain cross arm mounting auxiliary |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205857891U true CN205857891U (en) | 2017-01-04 |
Family
ID=57645829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620712761.4U Active CN205857891U (en) | 2016-07-08 | 2016-07-08 | Concrete electric pole strain cross arm mounting auxiliary |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205857891U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109546559A (en) * | 2018-12-19 | 2019-03-29 | 国网江苏省电力有限公司常州供电分公司 | Isolator operating mechanism installation auxiliary device |
CN111219300A (en) * | 2019-11-01 | 2020-06-02 | 金陵科技学院 | Auxiliary supporting device for constructing compound concrete-filled steel tube wind power tower |
CN112234559A (en) * | 2020-09-28 | 2021-01-15 | 贵州电网有限责任公司 | Device for reducing current grounding accident for rural power grid transformation and using method |
-
2016
- 2016-07-08 CN CN201620712761.4U patent/CN205857891U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109546559A (en) * | 2018-12-19 | 2019-03-29 | 国网江苏省电力有限公司常州供电分公司 | Isolator operating mechanism installation auxiliary device |
CN109546559B (en) * | 2018-12-19 | 2023-08-11 | 国网江苏省电力有限公司常州供电分公司 | Installation auxiliary device for isolating switch operating mechanism |
CN111219300A (en) * | 2019-11-01 | 2020-06-02 | 金陵科技学院 | Auxiliary supporting device for constructing compound concrete-filled steel tube wind power tower |
CN112234559A (en) * | 2020-09-28 | 2021-01-15 | 贵州电网有限责任公司 | Device for reducing current grounding accident for rural power grid transformation and using method |
CN112234559B (en) * | 2020-09-28 | 2022-03-22 | 贵州电网有限责任公司 | Device for reducing current grounding accident for rural power grid transformation and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205857891U (en) | Concrete electric pole strain cross arm mounting auxiliary | |
CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
CN205034944U (en) | Web hoisting accessory | |
CN204258157U (en) | Composite insulator string Special-purpose lifting device | |
CN102878352A (en) | Special accessory for nuclear power bridge frame | |
CN203504108U (en) | Jump wire suspension clamp | |
CN202812477U (en) | Snap-in type cable support frame structure | |
CN105119203A (en) | Lifting tool for comprehensive live overhaul of distribution network | |
CN201332246Y (en) | Large-tonnage conducting wire lifter | |
CN210599582U (en) | Ultra-large type energy-saving fan fixing device | |
CN203119673U (en) | Novel cable fixing structure | |
CN203529660U (en) | Installation structure for guide rail of lifting device of power transmission steel tower and power transmission steel tower | |
CN208200142U (en) | A kind of architectural electricity equipment construction device | |
CN206313378U (en) | A kind of angle steel tower bracket fixing device | |
CN206654644U (en) | One kind lifting auxiliary clamp | |
CN206637572U (en) | High-Pole Lamp bar top transmission mechanism | |
CN210693380U (en) | Suspension type bus duct | |
CN203434522U (en) | Dedicated tool for positioning and installation of cross arm | |
CN215907164U (en) | Dual-purpose keel mounting hook | |
CN204615299U (en) | The general hanging fixture of chute | |
CN208716704U (en) | A kind of cooling tower electric machine hanging apparatus | |
CN215905676U (en) | Adjustable hoisting tool for hoisting large-section H-shaped steel | |
CN202785445U (en) | Lifting device used for installing plate-type signboard | |
CN213059761U (en) | Elevator car fixing tool | |
CN203497976U (en) | High-altitude installation clamping device for large electric hoists |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |