CN205853268U - The flow passage structure of a kind of plastic mould and plastic mould - Google Patents

The flow passage structure of a kind of plastic mould and plastic mould Download PDF

Info

Publication number
CN205853268U
CN205853268U CN201620795128.6U CN201620795128U CN205853268U CN 205853268 U CN205853268 U CN 205853268U CN 201620795128 U CN201620795128 U CN 201620795128U CN 205853268 U CN205853268 U CN 205853268U
Authority
CN
China
Prior art keywords
runner
block
glue
dams
plastic mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620795128.6U
Other languages
Chinese (zh)
Inventor
丁祥波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Tinno Wireless Technology Co Ltd
Original Assignee
Shenzhen Tinno Wireless Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Tinno Wireless Technology Co Ltd filed Critical Shenzhen Tinno Wireless Technology Co Ltd
Priority to CN201620795128.6U priority Critical patent/CN205853268U/en
Application granted granted Critical
Publication of CN205853268U publication Critical patent/CN205853268U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

This utility model embodiment provides flow passage structure and the plastic mould of a kind of plastic mould.This utility model embodiment is by providing by runner body, and the flow passage structure of the plastic mould of at least one pair of block composition of damming, it is provided with on runner body into Jiao Weizhikou, what the block that respectively dams that dams in block for any pair was corresponding is arranged on the both sides into Jiao Weizhikou, and the block that respectively dams is arranged on the runner of runner body.Glue can flow in runner by entering Jiao Weizhikou, the block that dams on runner can adjust the size of the width of runner, glue can be controlled and flow to the speed of each glue-feeder so that some glue-feeder to enter glue speed fast, some glue-feeder to enter glue speed slow.Do not change the width dimensions of runner on flow passage structure, structure relatively simple convenient, cost is relatively low;Can design size and the width of the block that dams, the block that dams is adapted to the runner of the flow passage structure of all kinds of plastic mould, can dam block with standardization, be conducive to being molded production.

Description

The flow passage structure of a kind of plastic mould and plastic mould
[technical field]
This utility model relates to technique production field, particularly relates to flow passage structure and the plastic mould of a kind of plastic mould.
[background technology]
In manufacturing industry, it will usually use plastic mould to carry out injection and go to manufacture product.There is in plastic mould stream Road structure, flow passage structure has runner, can arrange one at the middle part of runner and enter Jiao Weizhikou, simultaneously can be at the two ends of runner Multiple glue-feeder is set, thus glue can flow to the inside of plastic mould by glue-feeder after entering in runner, to enter Row injection.During injection, need to control glue and flow to the speed of each glue-feeder so that some glue-feeder enter glue Speed is fast, some glue-feeder to enter glue speed slow.
In prior art, by changing the width of the runner on flow passage structure, and then change the runner flowing to glue-feeder Thickness, and then go control glue to flow to the speed of each glue-feeder.
During realizing this utility model, inventor finds that in prior art, at least there are the following problems:
After being changed by the width of the runner on flow passage structure, the width of runner the most again cannot be changed, thus for The demand of the injection moulding process of different product, for the glue admission velocity of different glue-feeders, it is desirable to provide much have difference The flow passage structure of width of flow path so that injection moulding process is complicated and relatively costly;Meanwhile, the concrete data of the width of runner, can only Experience by Producer is adjusted, it is impossible to standardization, is unfavorable for that injection produces.
[utility model content]
In view of this, this utility model embodiment provides flow passage structure and the plastic mould of a kind of plastic mould, in order to Solving in prior art after being changed by the width of the runner on flow passage structure, the width of runner the most again cannot be changed, and needs There is provided the flow passage structure much with different width of flow path so that injection moulding process is complicated and relatively costly;Flow passage structure cannot Standardization, is unfavorable for the problem that injection produces.
This utility model embodiment provides the flow passage structure of a kind of plastic mould, including:
Runner body, and at least one pair of block that dams;
It is provided with on described runner body into Jiao Weizhikou, the setting that the block that respectively dams that dams in block for any pair is corresponding Described enter Jiao Weizhikou both sides, and the block that respectively dams is arranged on the runner of described runner body.
Aspect as above and arbitrary possible implementation, it is further provided a kind of implementation, described in dam block Including the block body that dams, dam portion and pushing part;
Dam the end of block body described in being positioned in the described portion of damming, described pushing part be positioned at described in dam the top of block body Portion;
The described block body that dams is connected with the runner of described runner body, and described in the portion of damming be positioned at described runner body In runner;
Described portion of damming, for damming to the glue in the runner flowing through described runner body;
Described pushing part, for the block that dams described in movement.
Aspect as above and arbitrary possible implementation, it is further provided a kind of implementation, described in dam block Body and the runner clamping of described runner body;
Or the block body that dams described in, is cementing with the runner of described runner body;
Or the block body that dams described in, is hinged with the runner of described runner body.
Aspect as above and arbitrary possible implementation, it is further provided a kind of implementation, described pushing part Upwardly extend relative to the top of the described block body that dams.
Aspect as above and arbitrary possible implementation, it is further provided a kind of implementation, described in dam block The bottom of body is provided with at least one groove;
A groove in each groove, with the edge clamping of the runner of described runner body.
Aspect as above and arbitrary possible implementation, it is further provided a kind of implementation, described groove Length direction, parallel with the length direction of the runner of described runner body.
Aspect as above and arbitrary possible implementation, it is further provided a kind of implementation, described runner is originally The two ends of body are respectively arranged with the first glue-feeder and the second glue-feeder;
Described first glue-feeder, described second glue-feeder and the flow passage of described runner body.
A technical scheme in technique scheme has the advantages that
By providing by runner body, and the flow passage structure of the plastic mould of at least one pair of block composition of damming, runner is originally Being provided with into Jiao Weizhikou on body, what the block that respectively dams that dams in block for any pair was corresponding is arranged on two into Jiao Weizhikou Side, and the block that respectively dams is arranged on the runner of runner body.Such that it is able to can flow to by entering Jiao Weizhikou at glue The when of in runner, the size of the width of runner can be adjusted due to the block that dams on runner, flow to often such that it is able to control glue The speed of one glue-feeder so that some glue-feeder to enter glue speed fast, some glue-feeder to enter glue speed slow.Need not Change the width dimensions of runner on flow passage structure, it is provided that structure relatively simple convenient, cost is relatively low;Meanwhile, can design The size of block of damming and width, the block that dams is adapted to the runner of the flow passage structure of all kinds of plastic mould, can cut with standardization Stream block, is conducive to being molded production.
This utility model embodiment additionally provides a kind of plastic mould, described plastic mould is provided with and moulds as above The flow passage structure of sealing rubber die.
A technical scheme in technique scheme has the advantages that
By providing the flow passage structure arranging the plastic mould provided in embodiment one, embodiment two on plastic mould, The flow passage structure of plastic mould is by runner body, and at least one pair of block that dams is constituted, and runner body is provided with into glue position Mouthful, what the block that respectively dams that dams in block for any pair was corresponding is arranged on the both sides into Jiao Weizhikou, and the block that respectively dams is arranged On the runner of runner body;Dam block by the block body that dams, dam portion and pushing part is constituted, the portion of damming can flow through runner this Glue in the runner of body dams, and promotes pushing part and then can move the block that dams.Such that it is able to can pass through at glue The when of entering Jiao Weizhikou and flow in runner, the size of the width of runner can be adjusted due to the block that dams on runner, thus can Flow to the speed of each glue-feeder controlling glue so that some glue-feeder to enter glue speed fast, some glue-feeder enter glue Speed is slow.Need not change the width dimensions of the runner on flow passage structure, it is provided that relatively simple convenient, the cost of structure relatively Low;Meanwhile, can design size and the width of the block that dams, the block that dams is adapted to the stream of the flow passage structure of all kinds of plastic mould Road, can dam block with standardization, be conducive to being molded production.
[accompanying drawing explanation]
In order to be illustrated more clearly that the technical scheme of this utility model embodiment, will use required in embodiment below Accompanying drawing be briefly described, it should be apparent that, below describe in accompanying drawing be only embodiments more of the present utility model, right From the point of view of those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain according to these accompanying drawings Other accompanying drawing.
The structural representation of the flow passage structure of the plastic mould that Fig. 1 is provided by this utility model embodiment one;
The structure of the runner body in the flow passage structure of the plastic mould that Fig. 2 is provided by this utility model embodiment one is shown It is intended to;
The structural representation of the flow passage structure of the plastic mould that Fig. 3 is provided by this utility model embodiment two;
The cross-section structure of the block that dams in the flow passage structure of the plastic mould that Fig. 4 is provided by this utility model embodiment two Schematic diagram.
Reference:
1-runner body 2-dams block
3-enters glue position mouth 4-and dams block body
5-dams 6-pushing part, portion
7-the first glue-feeder 8-the second glue-feeder
[detailed description of the invention]
In order to be better understood from the technical solution of the utility model, below in conjunction with the accompanying drawings this utility model embodiment is carried out Describe in detail.
It will be appreciated that be only this utility model a part of embodiment rather than the whole enforcement of described embodiment Example.Based on the embodiment in this utility model, those of ordinary skill in the art are obtained under not making creative work premise The all other embodiments obtained, broadly fall into the scope of this utility model protection.
The term used in this utility model embodiment is only merely for describing the purpose of specific embodiment, and is not intended to Limit this utility model." a kind of " of singulative used in this utility model embodiment and appended claims, " described " and " being somebody's turn to do " is also intended to include most form, unless context clearly shows that other implications.
Should be appreciated that term "and/or" used herein is only a kind of incidence relation describing affiliated partner, represent Three kinds of relations, such as, A and/or B can be there are, can represent: individualism A, there is A and B, individualism B these three simultaneously Situation.It addition, character "/" herein, typically represent forward-backward correlation to as if the relation of a kind of "or".
Depend on linguistic context, word as used in this " if " can be construed to " ... time " or " when ... Time " or " in response to determining " or " in response to detection ".Similarly, depend on linguistic context, phrase " if it is determined that " or " if detection (condition of statement or event) " " when determining " or " in response to determining " can be construed to or " when the detection (condition of statement Or event) time " or " in response to detection (condition of statement or event) ".
Embodiment one
This utility model embodiment one provides the flow passage structure of a kind of plastic mould, refer to Fig. 1, and it is this utility model The structural representation of the flow passage structure of the plastic mould that embodiment one is provided, Fig. 2 is provided by this utility model embodiment one Plastic mould flow passage structure in the structural representation of runner body, as depicted in figs. 1 and 2, the runner of this plastic mould Structure includes: runner body 1, and at least one pair of block 2 that dams;
It is provided with on runner body 1 into glue position mouth 3, the setting that the block 2 that respectively dams in block 2 that dams for any pair is corresponding In the both sides entering glue position mouth 3, and the block 2 that respectively dams is arranged on the runner of runner body 1.
In the present embodiment, concrete, the flow passage structure of plastic mould is by runner body 1 and at least one pair of block 2 that dams Constitute.Having runner on runner body 1, the middle part of runner body 1 is provided with one and enters glue position mouth 3 simultaneously, and glue can lead to Cross and flow in runner into glue position mouth 3.
Corresponding being arranged on the both sides of glue position mouth 3 of the block 2 that respectively dams in block 2 that any pair is dammed, meanwhile, Each block 2 that dams is provided on the runner of runner body 1, and the front end of each block 2 that dams is positioned at the stream of runner body 1 In road.Further, the two ends at runner body 1 are provided with glue-feeder.
Thus glue can flow in runner by entering glue position mouth 3 when, due to block 2 meeting of damming on runner Adjust the size of the width of runner, such that it is able to control glue to flow to the speed of each glue-feeder so that some glue-feeder Enter glue speed fast, some glue-feeder to enter glue speed slow.
For example, corresponding being arranged on the both sides of glue position mouth 3 of the block 2 that a pair can be dammed, meanwhile, each The individual block 2 that dams all is provided on the runner of runner body 1;The two ends of runner body 1 are respectively provided with glue-feeder 1 and glue-feeder 2, the block 2 that dams closed on glue-feeder 1 is for the block D that dams, and the block 2 that dams closed on glue-feeder 2 is for the block D1 that dams;Promotion is dammed block D and D1, regulates the runner gap of the runner at block D place of damming, equal to the runner gap of the runner at block D1 place of damming, now Glue-feeder 1 enter glue speed, enter glue amount and glue-feeder 2 enter that glue is fast, it is the most identical to enter glue amount;Promotion is dammed block D and D1, adjusts Joint dams the runner gap of runner at block D place, more than the runner gap of the runner at block D1 place of damming, and now glue-feeder 1 Enter glue speed, enter glue amount, be all respectively greater than glue-feeder 2 enter that glue is fast, enter glue amount;Promotion is dammed block D and D1, and regulation is dammed block D The runner gap of the runner at place, less than the runner gap of runner at block D1 place of damming, now the entering glue speed, enter of glue-feeder 1 Glue amount, all be respectively smaller than glue-feeder 2 enter glue speed, enter glue amount.
The present embodiment is by providing by runner body 1, and the runner knot of the plastic mould of at least one pair of block 2 composition of damming Structure, runner body 1 is provided with into glue position mouth 3, what the block 2 that respectively dams in block 2 that dams for any pair was corresponding be arranged on into The both sides of glue position mouth 3, and the block 2 that respectively dams is arranged on the runner of runner body 1.Such that it is able to glue can pass through into Glue position mouth 3 and when flow in runner, the size of the width of runner can be adjusted due to the block 2 that dams on runner, thus can Flow to the speed of each glue-feeder controlling glue so that some glue-feeder to enter glue speed fast, some glue-feeder enter glue Speed is slow.Need not change the width dimensions of the runner on flow passage structure, it is provided that relatively simple convenient, the cost of structure relatively Low;Meanwhile, can design size and the width of the block 2 that dams, the block 2 that dams is adapted to the flow passage structure of all kinds of plastic mould Runner, can dam block 2 with standardization, be conducive to being molded production.
Embodiment two
Flow passage structure based on the plastic mould that above-described embodiment one is provided, this utility model embodiment two provides one The flow passage structure of plastic mould, refer to Fig. 3, the flow passage structure of its plastic mould provided by this utility model embodiment two Structural representation, cuing open of the block that dams in the flow passage structure of the plastic mould that Fig. 4 is provided by this utility model embodiment two Face structural representation, as shown in Figure 3 and Figure 4, the block 2 that dams includes dam block body 4, dam portion 5 and pushing part 6;
Portion 5 of damming is positioned at the end of the block body 4 that dams, and pushing part 6 is positioned at the top of the block body 4 that dams;
The block body 4 that dams is connected with the runner of runner body 1, and portion 5 of damming is positioned in the runner of runner body 1;
Dam portion 5, for the glue in the runner flowing through runner body 1 is dammed;
Pushing part 6, for the mobile block 2 that dams.
Damming the block body 4 runner clamping with runner body 1, the bottom of the block body 4 that dams is provided with at least one groove; A groove in each groove, with the edge clamping of the runner of runner body 1;Or, dam block body 4 and runner body 1 Runner is cementing;Or, the block body 4 that dams is hinged with the runner of runner body 1.
Pushing part 6 upwardly extends relative to the top of the block body 4 that dams.
The length direction of groove, parallel with the length direction of the runner of runner body 1.
The two ends of runner body 1 are respectively arranged with the first glue-feeder 7 and the second glue-feeder 8;First glue-feeder 7, second enter Glue mouth 8 and the flow passage of runner body 1.
In the present embodiment, concrete, the block 2 that dams by the block body 4 that dams, dam portion 5 and pushing part 6 is constituted, dam block 2 Can be integrated, or, each several part in block 2 that dams can be stationarily connected to together.
Portion 5 of damming is positioned at the end of the block body 4 that dams, and meanwhile, the runner of dam block body 4 and runner body 1 is carried out even Connect, and portion 5 of damming is positioned in the runner of runner body 1, thus portion 5 of damming can be to flowing through glue in the runner of runner body 1 Liquid dams.
Simultaneously can by the block body 4 runner clamping with runner body 1 of damming, or, will dam block body 4 and runner The runner of body 1 is cementing, or, the block body 4 that dams is hinged with the runner of runner body 1.Wherein, at block body 4 and the stream of damming The specific implementation of the runner clamping of road body 1 is: the bottom of the block body 4 that dams can be provided with multiple groove, groove Length direction be parallel with the length direction of the runner of runner body 1, and by a groove in each groove, with runner The edge clamping of the runner of body 1;Moving the block 2 that dams in the position of the runner of runner body 1 when, can be by different Groove carries out clamping with the edge of the runner of runner body 1.
Pushing part 6 is positioned at the top of the block body 4 that dams, and pushing part 6 upwardly extends relative to the top of the block body 4 that dams. Pushing part 6 can be rectangular convex shape, or the convex shape of ellipse, etc..Such that it is able to promote pushing part 6, and then Go to the mobile block 2 position in the runner of runner body 1 of damming.
Further, being respectively arranged with the first glue-feeder 7 and the second glue-feeder 8 at the two ends of runner body 1, first enters glue simultaneously Mouth the 7, second glue-feeder 8 and the flow passage of runner body 1.
The present embodiment is by providing by runner body 1, and the runner knot of the plastic mould of at least one pair of block 2 composition of damming Structure, runner body 1 is provided with into glue position mouth 3, what the block 2 that respectively dams in block 2 that dams for any pair was corresponding be arranged on into The both sides of glue position mouth 3, and the block 2 that respectively dams is arranged on the runner of runner body 1;Dam block 2 by the block body 4 that dams, cut Stream portion 5 and pushing part 6 are constituted, and the glue that portion 5 of damming can flow through in the runner of runner body 1 dams, and promote pushing part 6 And then the block 2 that dams can be moved.Such that it is able to glue can flow in runner by entering glue position mouth 3 when, due to The block 2 that dams on runner can adjust the size of the width of runner, such that it is able to control glue to flow to the speed of each glue-feeder, Make some glue-feeder to enter glue speed fast, some glue-feeder to enter glue speed slow.Need not change on flow passage structure The width dimensions of runner, it is provided that structure relatively simple convenient, cost is relatively low;Meanwhile, size and the width of the block 2 that dams can be designed Degree, the block 2 that dams is adapted to the runner of the flow passage structure of all kinds of plastic mould, can dam block 2 with standardization, be conducive to injection Produce.
Embodiment three
This utility model embodiment three provides a kind of plastic mould, plastic mould is provided with in above-described embodiment offer The flow passage structure of plastic mould.
In the present embodiment, concrete, moulding of offer can be provided in embodiment one, embodiment two on plastic mould The flow passage structure of sealing rubber die.
The stream of the plastic mould provided in the structure of the flow passage structure of plastic mould and principle and embodiment one, embodiment two The structure of road structure is identical with principle, and here is omitted.
The present embodiment arranges the stream of the plastic mould provided in embodiment one, embodiment two on plastic mould by providing Road structure, the flow passage structure of plastic mould by runner body, and at least one pair of dam block constitute, runner body is provided with into Jiao Weizhikou, what the block that respectively dams that dams in block for any pair was corresponding is arranged on the both sides into Jiao Weizhikou, and respectively dams Block is arranged on the runner of runner body;Dam block by the block body that dams, dam portion and pushing part is constituted, the portion of damming can flow through Glue in the runner of runner body dams, and promotes pushing part and then can move the block that dams.Such that it is able to can at glue The when of to flow in runner by entering Jiao Weizhikou, the size of the width of runner can be adjusted due to the block that dams on runner, Such that it is able to control glue to flow to the speed of each glue-feeder so that some glue-feeder to enter glue speed fast, some glue-feeder To enter glue speed slow.Need not change the width dimensions of the runner on flow passage structure, it is provided that structure relatively simple convenient, Cost is relatively low;Meanwhile, can design size and the width of the block that dams, the block that dams is adapted to the runner knot of all kinds of plastic mould The runner of structure, can dam block with standardization, be conducive to being molded production.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. done, should be included in this utility model Within the scope of protection.

Claims (8)

1. the flow passage structure of a plastic mould, it is characterised in that including:
Runner body, and at least one pair of block that dams;
Being provided with on described runner body into Jiao Weizhikou, what the block that respectively dams that dams in block for any pair was corresponding is arranged on institute State the both sides into Jiao Weizhikou, and the block that respectively dams is arranged on the runner of described runner body.
The flow passage structure of plastic mould the most according to claim 1, it is characterised in that described in dam block include damming block this Body, dam portion and pushing part;
Dam the end of block body described in being positioned in the described portion of damming, described pushing part be positioned at described in dam the top of block body;
The described block body that dams is connected with the runner of described runner body, and described in the portion of damming be positioned at the runner of described runner body In;
Described portion of damming, for damming to the glue in the runner flowing through described runner body;
Described pushing part, for the block that dams described in movement.
The flow passage structure of plastic mould the most according to claim 2, it is characterised in that described in dam block body and described stream The runner clamping of road body;
Or the block body that dams described in, is cementing with the runner of described runner body;
Or the block body that dams described in, is hinged with the runner of described runner body.
The flow passage structure of plastic mould the most according to claim 2, it is characterised in that described pushing part is relative to described section The top of stream block body upwardly extends.
The flow passage structure of plastic mould the most according to claim 2, it is characterised in that described in the dam bottom of block body set It is equipped with at least one groove;
A groove in each groove, with the edge clamping of the runner of described runner body.
The flow passage structure of plastic mould the most according to claim 5, it is characterised in that the length direction of described groove, with The length direction of the runner of described runner body is parallel.
7. according to the flow passage structure of the plastic mould described in any one of claim 1-6, it is characterised in that described runner body Two ends are respectively arranged with the first glue-feeder and the second glue-feeder;
Described first glue-feeder, described second glue-feeder and the flow passage of described runner body.
8. a plastic mould, it is characterised in that arrange on described plastic mould just like moulding described in any one of claim 1-7 The flow passage structure of sealing rubber die.
CN201620795128.6U 2016-07-27 2016-07-27 The flow passage structure of a kind of plastic mould and plastic mould Expired - Fee Related CN205853268U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620795128.6U CN205853268U (en) 2016-07-27 2016-07-27 The flow passage structure of a kind of plastic mould and plastic mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620795128.6U CN205853268U (en) 2016-07-27 2016-07-27 The flow passage structure of a kind of plastic mould and plastic mould

Publications (1)

Publication Number Publication Date
CN205853268U true CN205853268U (en) 2017-01-04

Family

ID=57649164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620795128.6U Expired - Fee Related CN205853268U (en) 2016-07-27 2016-07-27 The flow passage structure of a kind of plastic mould and plastic mould

Country Status (1)

Country Link
CN (1) CN205853268U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110355952A (en) * 2019-08-23 2019-10-22 广东博智林机器人有限公司 Hot flow path valve assembly and hot-runner device
CN111251547A (en) * 2020-01-21 2020-06-09 中亿腾模塑科技(苏州)有限公司 Intelligent flow channel adjusting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110355952A (en) * 2019-08-23 2019-10-22 广东博智林机器人有限公司 Hot flow path valve assembly and hot-runner device
CN111251547A (en) * 2020-01-21 2020-06-09 中亿腾模塑科技(苏州)有限公司 Intelligent flow channel adjusting system

Similar Documents

Publication Publication Date Title
CN205853268U (en) The flow passage structure of a kind of plastic mould and plastic mould
CN204322438U (en) A kind of pouring gate structure with buffer area
CN102166811B (en) Mold for injection molding
EP1767332A4 (en) Mold for extrusion, extrusion molding apparatus, method of manufacturing thermoplastic resin sheet, and method of manufacturing thermoplastic resin foam sheet
CN206383450U (en) A kind of die joint die venting structure
CN209007881U (en) A kind of plastic cement foot pedal injection mold of baby stroller
CN204820192U (en) Injection mold runner and mould
CN206011670U (en) A kind of new PP R granulation dies
CN204658843U (en) A kind of ox horn without mold insert clamp trace enters plastic structure
CN204354414U (en) The flat side gate of a kind of submarine on injection mold
JP2009297945A (en) Flat die and method for manufacturing sheet
CN202846822U (en) Sub-channel remodeling structure for plastic mould
CN205395023U (en) Take mould structure of sequence valve hot runner
CN207310391U (en) A kind of injection mold for preventing the double-colored area of coverage from altering color
CN202045836U (en) Exhaust structure of parting face of plastic mold
CN207535274U (en) A kind of branch pipe type flow passage structure of angle change
CN206383371U (en) A kind of connector machine-shaping plastic mould
CN209207967U (en) A kind of anti-threaded configuration of plastic mould sprue bush
CN206544289U (en) A kind of injection structure of improvement
CN202399477U (en) Central plate for semiconductor plastic packaging mould
CN206154630U (en) Latent mouthful structure of gluing of plastics pipe fittings mould
CN209550572U (en) It is a kind of for manufacturing the die casting mold insert structure of lamp for car barn door
CN205853266U (en) Hot nozzle structure and hot runner moulding system
CN210820703U (en) Valve needle, hot nozzle assembly and hot runner system
CN205705080U (en) A kind of modified form ox horn enters glue ejecting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20170727