CN205844502U - A UPS power special test load box - Google Patents

A UPS power special test load box Download PDF

Info

Publication number
CN205844502U
CN205844502U CN201620496554.XU CN201620496554U CN205844502U CN 205844502 U CN205844502 U CN 205844502U CN 201620496554 U CN201620496554 U CN 201620496554U CN 205844502 U CN205844502 U CN 205844502U
Authority
CN
China
Prior art keywords
load
phase
test
ups power
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620496554.XU
Other languages
Chinese (zh)
Inventor
蒋修洋
黎志盈
李稳根
周华俊
洪志腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Fullde Electric Co Ltd
Guangdong Fullde Electronics Co Ltd
Original Assignee
Hunan Fullde Electric Co Ltd
Guangdong Fullde Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Fullde Electric Co Ltd, Guangdong Fullde Electronics Co Ltd filed Critical Hunan Fullde Electric Co Ltd
Priority to CN201620496554.XU priority Critical patent/CN205844502U/en
Application granted granted Critical
Publication of CN205844502U publication Critical patent/CN205844502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

This utility model relates to load testing technical field, especially relate to a ups power special test load box, including three rectifier bridges being connected with three phase mains R, S, T respectively, each rectifier bridge is respectively connected with power termination part, and power termination part includes resistive load part and capacitive load part;Described power termination part is connected by catalyst matrix slave computer PLC, and slave computer PLC is connected by catalyst air blast cooling blower fan;Described a ups power special test load box also includes electric parameters testing module, electric parameters testing module connects three phase mains R, S, T, described electric parameters testing module and slave computer PLC are all connected by RS485 communication interface host computer test terminal, three ups powers can be respectively simultaneously test is provided separately, test can also be provided for three-phase ups power, provide a crucial detection for exfactory inspection.

Description

A UPS Power supply special test load box
Technical field
This utility model relates to load testing technical field, especially relates to a ups power special test load box.
Background technology
Along with the test performance of ups power requires to gradually step up, requirement to ups power test equipment raises up the most accordingly, but the loading test set for ups power test is but very different, and the load box for ups power test is the most much to use pure resistance.
But the problem of prior art existence or shortcoming are as follows:
1, in current industry a lot of ups powers test equipment be all power factor be 1, it is impossible to meet 0.6-1 power factor test scope.
2, the test of part ups power loads for alternating-current measurement, it is impossible to meet the RCD(resistance-capacitance-transistor of national regulations) type non-linear test load.
3, the resistance capacitance combination being only simple in the load of part RCD controls, and does not has corresponding electric capacity protective measure, and the service life causing UPS test load is the lowest.
Summary of the invention
The technical problems to be solved in the utility model is to provide a ups power special test load box, can be respectively three ups powers simultaneously and test is provided separately, it is also possible to provide test for three-phase ups power, provides a crucial detection for exfactory inspection.
This utility model uses following technological means to realize utility model purpose.
A ups power special test load box; it includes three rectifier bridges being connected respectively with three phase mains R, S, T; each rectifier bridge is respectively connected with power termination part; power termination part includes resistive load part and capacitive load part; described resistive load part is made up of multiple load resistances connected with rectifier bridge respectively; parallel connection between each load resistance, described capacitive load part is composed in series by load capacitance and protective resistance, each load resistance capacitive load part in parallel;Described power termination part is connected by catalyst matrix slave computer PLC, and slave computer PLC is connected by catalyst air blast cooling blower fan;Described a ups power special test load box also includes electric parameters testing module, and electric parameters testing module connects three phase mains R, S, T, and described electric parameters testing module and slave computer PLC are all connected by RS485 communication interface host computer test terminal.
Further, described air blast cooling blower fan is axial flow blower.
This utility model has the beneficial effect that a ups power special test load box described in the utility model, can be respectively three ups powers simultaneously and test is provided separately, it is also possible to provide test for three-phase ups power, provides a crucial detection for exfactory inspection.
Accompanying drawing explanation
Fig. 1 is schematic block circuit diagram of the present utility model.
Fig. 2 is the rectifier bridge being connected with R in this utility model and power termination partial circuit diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in detail.
As depicted in figs. 1 and 2; a ups power special test load box; it includes three rectifier bridges being connected respectively with three phase mains R phase, S-phase, T-phase; each rectifier bridge is respectively connected with power termination part; power termination part includes resistive load part and capacitive load part; described resistive load part is made up of multiple load resistances connected with rectifier bridge respectively; parallel connection between each load resistance; described capacitive load part is composed in series by load capacitance and protective resistance, each load resistance capacitive load part in parallel;Described power termination part is connected by catalyst matrix slave computer PLC, and slave computer PLC is connected by catalyst air blast cooling blower fan;Described a ups power special test load box also includes electric parameters testing module, electric parameters testing module connects three phase mains R phase, S-phase, T-phase, and described electric parameters testing module and slave computer PLC are all connected by RS485 communication interface host computer test terminal.Further, described air blast cooling blower fan is axial flow blower, has good cooling effect.Fig. 2 is the rectifier bridge being connected with R and power termination partial circuit diagram; this circuit is by rectifier bridge VC1; load resistance R1A-R8A; load capacitance C1A-C8A; protective resistance R11A-R18A; and KM1-KM8, KM11-KM18, KM21, KM22 of composition catalyst matrix, being formed according to the annexation in Fig. 2, the rectifier bridge and the power termination part that connect with S-phase and T-phase are identical with circuit structure shown in Fig. 2.
Further, the ups power outlet side needing test is linked into described a ups power special test load box main power source importation, this main power source importation is described rectifier bridge, and by RS485 communication interface, host computer test terminal is linked into electric parameters testing module and slave computer PLC;Ups power output AC sine waveform voltage, is DC source through rectifier bridge rectification;Resistive and the capacitive of power termination part matches band capacitive power factor load, and in load testing, the load of the simulation true application scenario of ups power needs;Be given according to ups power type in host computer test terminal and need loadtype and the capacity requirement of test, then select corresponding gear and power factor in host computer test terminal;Host computer test terminal sends instruction, slave computer PLC processes, switch on and off load gear and the type of needs, load is started working, air blast cooling blower fan brings into operation, the energy in loaded work piece is taken out of heat, it is ensured that the stability of test load case work and reliability by air blast cooling pattern;The online real time operation of electric parameters testing module, the output characteristics of detection ups power, main measurement has the voltage of three-phase, voltage, frequency, power factor, active power, reactive power, harmonic wave electrical quantity, by these parameters, measure the output characteristics of ups power, provide a crucial detection for exfactory inspection.
In sum, a ups power special test load box described in the utility model is that three-phase ups power tests test load case, three ups powers can be respectively simultaneously test is provided separately, it is also possible to provide test for three-phase ups power, provide a crucial detection for exfactory inspection.
The above is only better embodiment of the present utility model, therefore all equivalence changes done according to structure, feature and the principle described in this utility model patent claim or modification, all it is included in this utility model patent claim.

Claims (2)

  1. The most a ups power special test load box; it is characterized in that: it includes three rectifier bridges being connected respectively with three phase mains R phase, S-phase, T-phase; each rectifier bridge is respectively connected with power termination part; power termination part includes resistive load part and capacitive load part; described resistive load part is made up of multiple load resistances connected with rectifier bridge respectively; parallel connection between each load resistance; described capacitive load part is composed in series by load capacitance and protective resistance, each load resistance capacitive load part in parallel;Described power termination part is connected by catalyst matrix slave computer PLC, and slave computer PLC is connected by catalyst air blast cooling blower fan;Described a ups power special test load box also includes electric parameters testing module, electric parameters testing module connects three phase mains R phase, S-phase, T-phase, and described electric parameters testing module and slave computer PLC are all connected by RS485 communication interface host computer test terminal.
  2. A ups power special test load box the most according to claim 1, it is characterised in that: described air blast cooling blower fan is axial flow blower.
CN201620496554.XU 2016-05-27 2016-05-27 A UPS power special test load box Active CN205844502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620496554.XU CN205844502U (en) 2016-05-27 2016-05-27 A UPS power special test load box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620496554.XU CN205844502U (en) 2016-05-27 2016-05-27 A UPS power special test load box

Publications (1)

Publication Number Publication Date
CN205844502U true CN205844502U (en) 2016-12-28

Family

ID=57622818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620496554.XU Active CN205844502U (en) 2016-05-27 2016-05-27 A UPS power special test load box

Country Status (1)

Country Link
CN (1) CN205844502U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105866704A (en) * 2016-05-27 2016-08-17 湖南福德电气有限公司 Special test load box for UPSs (uninterruptable power supplies)
CN109613331A (en) * 2018-12-19 2019-04-12 广东电网有限责任公司 A kind of alternating current charging stake detection load and method based on double load arrays

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105866704A (en) * 2016-05-27 2016-08-17 湖南福德电气有限公司 Special test load box for UPSs (uninterruptable power supplies)
CN109613331A (en) * 2018-12-19 2019-04-12 广东电网有限责任公司 A kind of alternating current charging stake detection load and method based on double load arrays
CN109613331B (en) * 2018-12-19 2020-11-24 广东电网有限责任公司 Load detection method and method for alternating current charging pile based on double-load array

Similar Documents

Publication Publication Date Title
CN105301520B (en) Adjustable nonlinear load configures system
CN207215903U (en) A kind of DCR of Transformer and transformer voltage ratio group tester
CN105278439A (en) Large-capacity alternating-current adjustable simulation test load control system and control method thereof
CN104569702A (en) Testing system of unified power quality controller and testing method thereof
CN105866704A (en) Special test load box for UPSs (uninterruptable power supplies)
CN205844502U (en) A UPS power special test load box
CN103454511B (en) A kind of train auxiliary power supply system detection platform of ground type
JP2014044188A (en) Harmonic measuring method and harmonic measuring apparatus
CN105388378A (en) Voltage support experiment testing platform and method with super-capacitor-based dynamic voltage restorer
CN204789943U (en) Hand over direct current motor type test detection device
Saha et al. Harmonics analysis of power electronics loads
Patidar et al. Harmonics estimation and modeling of residential and commercial loads
CN204065240U (en) A kind of dry reactor performance test circuit and device
CN103048618B (en) Test method of counter supporting unit motor
Rawa et al. Background voltage distortion and percentage of nonlinear load impacts on the harmonics produced by a group of personal computers
CN203630241U (en) All-in-one device for testing power frequency parameters and switching test line for high-voltage power transmission line
CN109490653A (en) Electromagnetic compatibility (EMC) test method of photovoltaic DC-to-AC converter
Malagon-Carvajal et al. Analytical and experimental discussion of a circuit-based model for compact fluorescent lamps in a 60 Hz power grid
CN204065770U (en) A kind of Large Copacity exchanges adjustable simulation test load control system
CN104931905A (en) High-voltage electroscope starting voltage test apparatus and test method
Rawa et al. Power quality monitoring and simulation of a personal computer based on IEEE 1459–2010
CN203870228U (en) Power module detector
CN114397517A (en) Photovoltaic inverter test system
CN209979759U (en) Frequency conversion driver feedback type on-load aging device and system
Pasaribu et al. Harmonics step filter control model in household electricity

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant