CN205841417U - Locking nail for timber - Google Patents

Locking nail for timber Download PDF

Info

Publication number
CN205841417U
CN205841417U CN201620717003.1U CN201620717003U CN205841417U CN 205841417 U CN205841417 U CN 205841417U CN 201620717003 U CN201620717003 U CN 201620717003U CN 205841417 U CN205841417 U CN 205841417U
Authority
CN
China
Prior art keywords
nail
main
duct
ailhead
timber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620717003.1U
Other languages
Chinese (zh)
Inventor
姚斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yu Heart Door Industry Co Ltd
Original Assignee
Chongqing Yu Heart Door Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yu Heart Door Industry Co Ltd filed Critical Chongqing Yu Heart Door Industry Co Ltd
Priority to CN201620717003.1U priority Critical patent/CN205841417U/en
Application granted granted Critical
Publication of CN205841417U publication Critical patent/CN205841417U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

This patent belongs to fastener areas, specifically discloses the locking nail for timber, including main nail and secondary nail;Main nail includes that main ailhead and main nail rod, main ailhead and main nail rod are fixing and connects, and master nails on to be provided with and penetrated into the duct on the sidewall of main nail rod by the circle centre position of main ailhead;Duct be shaped as J-shaped, the sweep in duct is circular arc, and the diameter of secondary nail is identical with the diameter in duct, and the length of secondary nail is more than the length in duct.This patent overcomes existing wooden peg not have locked defect, it is provided that a kind of locking nail for timber with locking function.

Description

Locking nail for timber
Technical field
This utility model relates to fastener areas, is specifically related to a kind of locking nail for timber.
Background technology
In the course of processing of timber, it will usually polylith timber is fixed by screw.Screw is by rotary screw head, Screw is drilled in timber, reaches purpose fixing with timber for screw.Screw is by screw rod and the head of screw that is connected with screw rod Composition, screw rod is shaped with the screw thread of consecutive identical rotation direction, after the existence of such screw is given a shock, easily loosens, even screw The problem got loose from timber.Now it is badly in need of a kind of locking nail for timber with locking function.
Utility model content
This utility model overcomes existing wooden peg not have locked defect, it is provided that a kind of have locking function for The locking nail of timber.
The base case that this programme provides is: for the locking nail of timber, including main nail and secondary nail;Main nail includes main ailhead Connection fixing with main nail rod, main ailhead and main nail rod, main nailing on is provided with the sidewall being penetrated into main nail rod by the circle centre position of main ailhead On duct;Duct be shaped as J-shaped, the sweep in duct is circular arc, and the diameter of secondary nail is identical with the diameter in duct, pair The length of nail is more than the length in duct.
Operation principle and the advantage of this programme are: first, and main nail hammer can be entered needs by instruments such as hammers by user In fixing timber.Then putting in duct by pair nail, user is continuing with hammer, and hammering pair is followed closely, after secondary nail stress, and can edge The sweep bending in duct, owing to the length of pair nail is more than the length in duct, secondary nail can be from hole from the sidewall of main nail rod Passing in road, pair hammers in timber.
This programme, for the locking nail of timber, is completed to fix timber by main nail, is then worn from duct by pair nail Go out, allow pair follow closely the reinforcing to main nail, reach the purpose preventing main nail from loosening.Owing to pair nail is to bend, finally along duct Heading in timber, under the cooperation of main nail and secondary nail, if secondary nail does not loosens, main nail will not withdraw from timber, from And followed closely by pair, reach locked for main nail purpose in wood.
Preferred version one: based on the preferred version of scheme, secondary nail includes secondary ailhead and secondary nail rod, secondary ailhead and secondary nail Bar is fixing to be connected, and is provided with the cavity that the secondary nail rod in edge is axial in secondary nail rod.It is more flexible that cavity enables to secondary nail rod, and user exists During hammering pair nail, it is possible to more laborsaving.
Preferred version two: the preferably preferred version of: main ailhead is provided with groove, groove is positioned at main ailhead Circle centre position, groove communicates with duct, and groove shapes is identical with secondary ailhead shape.Groove can allow pair by included for secondary ailhead Ailhead flushes with main ailhead, prevents from, because secondary stud bump, causing the situation of user imprudence scratch to occur.
Preferred version three: the preferably preferred version of two: three times of a diameter of duct of main nail.Secondary nail is in duct In, when bending along duct, to main nail, mutual situation about extruding, three times of a diameter of channel diameter of main nail, energy can occur Enough avoid because main nail diameter is less, occur that the situation of main nail crimp is occurred by pair nail.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation before the locking nail embodiment of timber is installed;
Fig. 2 is this utility model sectional view after the locking nail embodiment of timber is installed.
Detailed description of the invention
Below by detailed description of the invention, this utility model is described in further detail:
Reference in Figure of description includes: timber 1, secondary nail 2, main ailhead 3, main nail rod 4, duct 5, cavity 6, recessed Groove 7.
Embodiment is the most as shown in Figure 1: for the locking nail of timber 1, including main nail and secondary nail 2;Main nail includes main nail 3 and main nail rod 4, main ailhead 3 and main nail rod 4 is fixing connects, main nail on to be provided with being penetrated into main nail rod by the circle centre position of main ailhead 3 Duct 5 on the sidewall of 4, one end, duct 5 is positioned at the circle centre position of main ailhead 3, and the other end in duct 5 is positioned at the sidewall of main nail rod 4 On;Duct 5 be shaped as J-shaped, the sweep in duct 5 is circular arc, and the diameter of secondary nail 2 is identical with the diameter in duct 5, secondary follows closely The length of 2 is more than the length in duct 5.Secondary nail 2 includes secondary nail 2 and secondary nail 2 bars, and secondary nail 2 is fixing with secondary nail 2 bars to be connected, pair It is provided with in following closely 2 bars and follows closely, along secondary, the cavity 6 that 2 bars are axial.Main ailhead 3 is provided with groove 7, and groove 7 is positioned at the circle centre position of main ailhead 3, Groove 7 communicates with duct 5, and groove 7 shape is identical with secondary nail 2 head shapes.Three times of a diameter of duct 5 of main nail.
Time specifically used, as shown in Figure 2: first, main nail hammer can be entered what needs were fixed by instruments such as hammers by user In timber 1.Then putting in duct 5 by pair nail 2, user is continuing with hammer, and hammering pair follows closely 2, after secondary nail 2 stress, and can edge The sweep duct 5 bends to the left, and owing to the length of pair nail 2 is more than the length in duct 5, secondary nail 2 can be from the side of main nail rod 4 Passing from duct 5 on wall, secondary nail 2 hammers in timber 1.Groove 7 can allow main ailhead 3 and pair follow closely by included for pair nail 2 2 flush.
Above-described is only embodiment of the present utility model, and in scheme, the known general knowledge such as concrete structure and characteristic is at this Too much describe.It should be pointed out that, for a person skilled in the art, in the premise without departing from this utility model structure Under, it is also possible to making some deformation and improvement, these also should be considered as protection domain of the present utility model, and these are all without impact The effect of this utility model enforcement and practical applicability.The protection domain that this application claims should be with the content of its claim Being as the criterion, the detailed description of the invention in description etc. records the content that may be used for explaining claim.

Claims (4)

1. for the locking nail of timber, including main nail and secondary nail;Main nail includes that main ailhead and main nail rod, main ailhead and main nail rod are solid Fixed connection, master nails on to be provided with and is penetrated into the duct on the sidewall of main nail rod by the circle centre position of main ailhead;Duct be shaped as J-shaped, The sweep in duct is circular arc, and the diameter of secondary nail is identical with the diameter in duct, and the length of secondary nail is more than the length in duct.
Locking nail for timber the most according to claim 1, it is characterised in that secondary nail includes secondary ailhead and secondary nail rod, Secondary ailhead is fixing with secondary nail rod to be connected, and is provided with the cavity that the secondary nail rod in edge is axial in secondary nail rod.
Locking nail for timber the most according to claim 2, it is characterised in that main ailhead is provided with groove, groove position In the circle centre position of main ailhead, groove communicates with duct, and groove shapes is identical with secondary ailhead shape.
Locking nail for timber the most according to claim 3, it is characterised in that three times of a diameter of duct of main nail.
CN201620717003.1U 2016-07-08 2016-07-08 Locking nail for timber Active CN205841417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620717003.1U CN205841417U (en) 2016-07-08 2016-07-08 Locking nail for timber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620717003.1U CN205841417U (en) 2016-07-08 2016-07-08 Locking nail for timber

Publications (1)

Publication Number Publication Date
CN205841417U true CN205841417U (en) 2016-12-28

Family

ID=58149968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620717003.1U Active CN205841417U (en) 2016-07-08 2016-07-08 Locking nail for timber

Country Status (1)

Country Link
CN (1) CN205841417U (en)

Similar Documents

Publication Publication Date Title
CN203081302U (en) Electric pick chisel
EP1972799A1 (en) Adjusting screw for door frames and window casings
KR101265226B1 (en) Using corn as a gap steel nail and its construction methods
KR20100081290A (en) A multi purpose wrench for a support
CN205841417U (en) Locking nail for timber
KR20140047926A (en) Set anchor bolt
CN201027748Y (en) Anti-exit nail
CN204505186U (en) Hammer
KR102350066B1 (en) Connecting tip for hitting anchor bolt
CN204299177U (en) The jig of component template
CN203125471U (en) Steel nail mounting device
US10926392B2 (en) Construction and demolition bar and method
CN201943346U (en) Template reinforcing fixture for column beam concrete member formwork
CN103213100B (en) A kind of steel nail binder
CN213744368U (en) Steel nail with multiple use functions
CN213744358U (en) High-strength cement nail
CN221052509U (en) Fixed knot of bank protection net constructs for hydraulic engineering
CN203051352U (en) Fastening recovery nail
CN215830906U (en) Double-end steel nail and double-end steel nail sleeve
CN105065409A (en) Cement screw used for buildings
CN207131695U (en) One kind isolates the anti-tear wood member nail of formula
CN110952780A (en) Manual push-pull type aluminum alloy formwork stripping device
CN203185259U (en) Electric blunt
CN103586841A (en) Hand-injury preventive nailing device
US20140264208A1 (en) Multi-Purpose Hammer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant