CN205839048U - Blast furnace long period stablizes coal injection device - Google Patents

Blast furnace long period stablizes coal injection device Download PDF

Info

Publication number
CN205839048U
CN205839048U CN201620826769.3U CN201620826769U CN205839048U CN 205839048 U CN205839048 U CN 205839048U CN 201620826769 U CN201620826769 U CN 201620826769U CN 205839048 U CN205839048 U CN 205839048U
Authority
CN
China
Prior art keywords
coal
output pipe
blast furnace
spraying
winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620826769.3U
Other languages
Chinese (zh)
Inventor
石建龙
贾国栋
党建明
石红雷
张绍杰
边孟珍
丁忠良
常根岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Zhong Shen Cold Rolled Material Co Ltd
Original Assignee
Hebei Zhong Shen Cold Rolled Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Zhong Shen Cold Rolled Material Co Ltd filed Critical Hebei Zhong Shen Cold Rolled Material Co Ltd
Priority to CN201620826769.3U priority Critical patent/CN205839048U/en
Application granted granted Critical
Publication of CN205839048U publication Critical patent/CN205839048U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Blast Furnaces (AREA)

Abstract

Blast furnace long period stablizes coal injection device, including the spraying and blowing organ that at least two groups are in parallel, often group spraying and blowing organ is mainly by coal pulverizer, noodles making machine, Pulverized Coal Bin, winding-up tank, coal output pipe, coal fine filter, secondary air compensating pipe and compressed air bag composition, coal pulverizer outlet is connected with noodles making machine, Pulverized Coal Bin is placed in bottom noodles making machine, Pulverized Coal Bin outlet communicates with winding-up tank, the coal output pipe of winding-up tank outlet arranges two coal fine filters in parallel, one ball valve is set on coal output pipe, compressed air bag is communicated with coal output pipe by secondary air compensating pipe, a normally opened ball valve it is respectively provided with before and after each coal fine filter, secondary air compensating pipe arranges a bypass line, one mutual stylet is set between Pulverized Coal Bin and the coal output pipe of another spraying and blowing organ of one spraying and blowing organ.The injection system of this utility model is perfect existing blast furnace, it is achieved that blast furnace blowing long-period stable operation.

Description

Blast furnace long period stablizes coal injection device
Technical field
This utility model relates to operation of blast furnace stabilization technique field, is specifically related to a kind of blast furnace long period and stablizes coal powder injection dress Put.
Background technology
Furnace shell made by blast furnace steel plate, builds fireproof brick inner lining in shell.Blast-furnace body be divided into from top to bottom furnace throat, shaft, furnace bosh, Bosh, cupola well 5 part.Owing to blast furnace technology economic indicator is good, technique is simple, and volume of production is big, and labor productivity is high, Low power consumption and other advantages, therefore the ferrum of this method production accounts for the overwhelming majority of World Iron total output.Along with the maximization of blast furnace, maintenance The prolongation in cycle, in tradition coal spraying process, injection system does not affect pulverized coal injection in cannot ensureing a time between overhauls(TBO), need by Walking perfect, the time between overhauls(TBO) longer to have adapted to big blast furnace, the direct motion steady in a long-term for blast furnace creates conditions.
Utility model content
This utility model provides a kind of blast furnace long period and stablizes coal injection device, to solve the blast furnace inspection that prior art exists The problem that cycle of repairing is short.
This utility model solves its technical problem and be the technical scheme is that
A kind of blast furnace long period stablizes coal injection device, including the spraying and blowing organ that at least two groups are in parallel, and often group spraying and blowing organ master To be made up of coal pulverizer, noodles making machine, Pulverized Coal Bin, winding-up tank, coal output pipe, coal fine filter, secondary air compensating pipe and compressed air bag, Coal pulverizer outlet is connected with noodles making machine, and Pulverized Coal Bin is placed in bottom noodles making machine, and Pulverized Coal Bin outlet communicates with winding-up tank, winding-up tank outlet Coal output pipe two coal fine filters in parallel are set, coal output pipe arranges a ball valve, compressed air bag passes through secondary air compensating Pipe communicates with coal output pipe, is respectively provided with a normally opened ball valve before and after each coal fine filter, and secondary air compensating pipe arranges a bypass Pipeline, arranges a mutual stylet between Pulverized Coal Bin and the coal output pipe of another spraying and blowing organ of a spraying and blowing organ.
The beneficial effects of the utility model are:
1, coal fine filter imports and exports pipeline respectively increases a manual ball valve, and in cleaning filter, during foreign material, switch is interior at ordinary times Two, side ball valve, when two, inner side, ball valve breaks down, and can close two, outside ball valve and cut off inlet and outlet pressure, change online Inner side ball valve, thus eliminating the need and affect the situation of the coal powder injection of blast furnace because ball valve for filter damages;
2, secondary mends device pipeline increases bypass pneumatic ball valve, and the electromagnetic valve of original supervisor's operated pneumatic valve is set as electric Opening, dead electricity is closed, and bypass operated pneumatic valve electromagnetic valve is set as that dead electricity is opened, and must be electrically turn off.So when unexpected electricity occurs During gas fault, QI invigorating pipeline bypass can be opened, and persistently supplies, it is ensured that coal spraying pipeline persistently supplies, and pipeline pressure is more than blast furnace warm Wind pressure, prevents blast furnace from burning and robs fault;
3, winding-up tank outlet increase normally opened manually-operated gate, when outside, operated pneumatic valve breaks down, can hand off tank intrinsic pressure Power media, can realize operated pneumatic valve and change online, and not affect pulverized coal injection;
4, respectively at winding-up tank winding-up pipeline increase fork arm and the valve of two spraying and blowing organs, if one can be realized it is The powder process of row is broken down, and the most a series of available winding-up tank is toward the fault defeated powder of series powder cabin, it is ensured that event occurs in powder process The injection system of barrier series can keep normal coal powder injection to blast furnace, thus tries to gain time precious to one to handling failure.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
1 coal pulverizer in figure, 2 noodles making machines, 3 Pulverized Coal Bin, 4 winding-up tanks, 5 coal output pipes, 6 coal fine filters, 7 normally opened ball valves, 8 two Secondary blowdown pipe, 9 bypass lines, 10 compressed air bags, 11 mutual stylet, 12 ball valves.
Detailed description of the invention
As it can be seen, a kind of blast furnace long period stablizes coal injection device, including the spraying and blowing organ that at least two groups are in parallel, often organize spray Blow mechanism mainly by coal pulverizer 1, noodles making machine 2, Pulverized Coal Bin 3, winding-up tank 4, coal output pipe 5, coal fine filter 6, secondary air compensating pipe 8 and Compressed air bag 10 forms, and coal pulverizer 1 exports and is connected with noodles making machine 2, and Pulverized Coal Bin 3 is placed in bottom noodles making machine 2, and Pulverized Coal Bin 3 exports Communicating with winding-up tank 4, the coal output pipe 5 of winding-up tank 4 outlet arranges two coal fine filters 6 in parallel, and coal output pipe 5 arranges one Ball valve 12, compressed air bag 10 is communicated with coal output pipe 5 by secondary air compensating pipe 8, is respectively provided with one before and after each coal fine filter 6 Individual normally opened ball valve 7, secondary air compensating pipe 8 arranges a bypass line 9, the Pulverized Coal Bin 3 of a spraying and blowing organ and another machine of jetting One mutual stylet 11 is set between the coal output pipe 5 of structure.
The beneficial effects of the utility model are:
1, coal fine filter imports and exports pipeline respectively increases a manual ball valve, and in cleaning filter, during foreign material, switch is interior at ordinary times Two, side ball valve, when two, inner side, ball valve breaks down, and can close two, outside ball valve and cut off inlet and outlet pressure, change online Inner side ball valve, thus eliminating the need and affect the situation of the coal powder injection of blast furnace because ball valve for filter damages;
2, secondary mends device pipeline increases bypass pneumatic ball valve, and the electromagnetic valve of original supervisor's operated pneumatic valve is set as electric Opening, dead electricity is closed, and bypass operated pneumatic valve electromagnetic valve is set as that dead electricity is opened, and must be electrically turn off.So when unexpected electricity occurs During gas fault, QI invigorating pipeline bypass can be opened, and persistently supplies, it is ensured that coal spraying pipeline persistently supplies, and pipeline pressure is more than blast furnace warm Wind pressure, prevents blast furnace from burning and robs fault;
3, winding-up tank outlet increase normally opened manually-operated gate, when outside, operated pneumatic valve breaks down, can hand off tank intrinsic pressure Power media, can realize operated pneumatic valve and change online, and not affect pulverized coal injection;
4, respectively at winding-up tank winding-up pipeline increase fork arm and the valve of two spraying and blowing organs, if one can be realized it is The powder process of row is broken down, and the most a series of available winding-up tank is toward the fault defeated powder of series powder cabin, it is ensured that event occurs in powder process The injection system of barrier series can keep normal coal powder injection to blast furnace, thus tries to gain time precious to one to handling failure.

Claims (1)

1. blast furnace long period stablizes a coal injection device, it is characterized in that including the spraying and blowing organ that at least two groups are in parallel, often organizes winding-up Mechanism is mainly by coal pulverizer, noodles making machine, Pulverized Coal Bin, winding-up tank, coal output pipe, coal fine filter, secondary air compensating pipe and compressed air Bag composition, coal pulverizer outlet is connected with noodles making machine, and Pulverized Coal Bin is placed in bottom noodles making machine, and Pulverized Coal Bin outlet communicates with winding-up tank, spray The coal output pipe blowing tank outlet arranges two coal fine filters in parallel, and coal output pipe arranges a ball valve, and compressed air bag passes through Secondary air compensating pipe communicates with coal output pipe, is respectively provided with a normally opened ball valve before and after each coal fine filter, and secondary air compensating pipe is arranged One bypass line, arranges a mutual siphunculus between Pulverized Coal Bin and the coal output pipe of another spraying and blowing organ of a spraying and blowing organ Line.
CN201620826769.3U 2016-08-02 2016-08-02 Blast furnace long period stablizes coal injection device Active CN205839048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620826769.3U CN205839048U (en) 2016-08-02 2016-08-02 Blast furnace long period stablizes coal injection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620826769.3U CN205839048U (en) 2016-08-02 2016-08-02 Blast furnace long period stablizes coal injection device

Publications (1)

Publication Number Publication Date
CN205839048U true CN205839048U (en) 2016-12-28

Family

ID=57618010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620826769.3U Active CN205839048U (en) 2016-08-02 2016-08-02 Blast furnace long period stablizes coal injection device

Country Status (1)

Country Link
CN (1) CN205839048U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109628671A (en) * 2018-12-29 2019-04-16 云南玉溪仙福钢铁(集团)有限公司 A kind of anti-fracture coal dust recycling stocking system applied to metallurgy
CN111500805A (en) * 2020-05-09 2020-08-07 中冶华天工程技术有限公司 Novel coal injection tank for blast furnace

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109628671A (en) * 2018-12-29 2019-04-16 云南玉溪仙福钢铁(集团)有限公司 A kind of anti-fracture coal dust recycling stocking system applied to metallurgy
CN111500805A (en) * 2020-05-09 2020-08-07 中冶华天工程技术有限公司 Novel coal injection tank for blast furnace
CN111500805B (en) * 2020-05-09 2021-11-19 中冶华天工程技术有限公司 Blast furnace coal injection tank

Similar Documents

Publication Publication Date Title
CN205839048U (en) Blast furnace long period stablizes coal injection device
CN104233176B (en) Supersonic flame spraying system
CN203979595U (en) A kind of aid blowing valve for pneumatic handling of automatic opening-closing
CN101716540B (en) Method for reducing temperature in tube mill by spraying
CN110756309B (en) Nonmetal mineral spray gun breaker based on high temperature high pressure
CN203174123U (en) Coke oven gas blowing system of blast furnace
CN201961727U (en) Pneumatic block clearing device for coal dropping pipe
CN205978492U (en) Laborsavingly prevent stifled sintering machine bellows flap valve structure
CN205087579U (en) Venturi type material feeding unit
CN207608569U (en) A kind of online plugging device for replacing blast furnace bucket pressure equalizing blow off valve
CN203159642U (en) Air quantity regulation device of blast furnace
CN104949533B (en) A kind of recovery system of electric furnace zinc smelting tail gas and its control method
CN2800086Y (en) Full-automatic air pulse ash removing device for boiler
CN203877256U (en) Blockage removal device for cylindrical flat-bottom reinforced concrete bin
CN203718232U (en) Housing-provided lateral tee pipe
CN205833118U (en) A kind of device applying big packaging microsphere sodium hydroxide to produce xanthates
CN204063968U (en) The device of catalyst is supplied to smelting furnace
CN211227188U (en) Blast furnace top pressure relief valve with cut-off device
CN204198763U (en) A kind of coal jetting branch of blast furnace purges structure
CN202912995U (en) Blowdown device of shaft furnace
CN204173586U (en) The multi-level gas pusher of granular material
CN102277469A (en) Blast furnace pulverized coal direct injection device with pulverized coal conveying function and process thereof
CN110756308B (en) High-temperature high-pressure based nonmetal mineral double-spray-gun crushing device
CN202070262U (en) Low-pressure pulse bag type dust collector
CN209213893U (en) A kind of circulating fluidized bed boiler soot blower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant