CN205829053U - A kind of arc pay off rack laid for high tension cable - Google Patents
A kind of arc pay off rack laid for high tension cable Download PDFInfo
- Publication number
- CN205829053U CN205829053U CN201620777496.8U CN201620777496U CN205829053U CN 205829053 U CN205829053 U CN 205829053U CN 201620777496 U CN201620777496 U CN 201620777496U CN 205829053 U CN205829053 U CN 205829053U
- Authority
- CN
- China
- Prior art keywords
- montant
- cross bar
- high tension
- tension cable
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Details Of Indoor Wiring (AREA)
Abstract
This utility model provides a kind of arc pay off rack laid for high tension cable, including arcwall face, horizontal stand, vertical support frame and fixed plate, described arcwall face includes the arc gusset laying respectively at left side and right side, described horizontal stand and vertical support frame are welded on outside gusset, described horizontal stand and vertical support frame form right angle inside arcwall face and support, at least one fixed plate is welded in the side supported at right angle between described horizontal stand, described fixed plate has at least one perforate, described perforate is for fixing external environment condition by expansion bolt by arc pay off rack.This utility model compact conformation, economical and practical, when high voltage cable passes through, it is possible to the arcuately smooth advance in face, bending radius and gib are effectively ensured, are conducive to improving cable laying efficiency and safety.
Description
Technical field
This utility model relates to a kind of paying-off implement technical field, and a kind of arc laid for high tension cable is put
Coil holder.
Background technology
Nowadays, increasing power engineering can use high tension cable as the carrier of power transmission.High tension cable one
As external diameter is thick, weight big, when cable through the hole of building, floor or during corner, owing to the gravity vertically transferred is very big,
Depending merely on manpower and cannot ensure the bending radius of cable, cable outer layer is easily caused damage by the sharp corners of building, uses lifting
Suspender then cannot meet cable and transfer required distance, and operation inconvenience;Meanwhile, cable two ends lay after putting in place shaping fixing before,
Cable cannot be fixed on permanent support immediately.
Utility model content
Goal of the invention of the present utility model is: for the problem of above-mentioned existence, it is provided that a kind of high tension cable that is used for lays
Arc pay off rack.
The technical solution adopted in the utility model is such that a kind of arc pay off rack laid for high tension cable, tool
Body includes that arcwall face, horizontal stand, vertical support frame and fixed plate, described arcwall face include laying respectively at the arc on left side and right side
Gusset, described horizontal stand and vertical support frame are welded on outside gusset, and described horizontal stand and vertical support frame are inside arcwall face
Formation right angle supports, and at least one fixed plate is welded in the side supported at right angle between described horizontal stand, and described fixed plate has
Having at least one perforate, described perforate is for being fixed on external environment condition by expansion bolt by arc pay off rack.
Further, described arcwall face also includes the parallel steel pipe being welded on equably between gusset of N root, outside described steel pipe
Set pvc pipe.
Further, described horizontal stand includes and the first cross bar, the second montant, the 3rd montant and the 4th montant.
Further, described first cross bar is the first right-angle side that right angle supports, and described first cross bar welds the successively
First end of two montants, the first end of the 3rd montant and the non-end positions of the 4th montant.
Further, described second montant, the 3rd montant and the 4th montant are each perpendicular to the first cross bar.
Further, described second montant, the 3rd montant and the 4th montant exceed 200mm outside arcwall face respectively, described
The raised area has wrapped up rubber peel.
Further, described vertical support frame includes the first montant, the second cross bar, the 3rd cross bar and the 4th cross bar.
Further, described first montant is the second right-angle side that right angle supports, and described first montant welds the successively
First end of two cross bars, the first end of the 3rd cross bar and the first end of the 4th cross bar, the non-end positions of described second cross bar
Weld with the first end of the 4th montant.
Further, described second cross bar, the 3rd cross bar and the 4th cross bar are each perpendicular to the first montant.
Further, described second cross bar, the 3rd cross bar and the 4th cross bar exceed 200mm outside arcwall face respectively, described
The raised area has wrapped up rubber peel.
In sum, owing to have employed technique scheme, the beneficial effects of the utility model are: arc pay off rack is not only
The gravity of high tension cable can be born, it is ensured that Cable Bending Radius and smooth pass through, it is also possible to avoid cable by hole, building
When plate or corner, rub with sharp corners, protection cable outer layer and sheath;When being also used as cable shaping simultaneously
Interim fixed support;Avoid when high tension cable is laid by hole, floor or corner and cannot ensure Cable Bending Radius
And the problem that cable is fixed temporarily;Arc pay off rack simple in construction, easily making, cost of manufacture is cheap, easy and simple to handle, improves construction
Speed.
Accompanying drawing explanation
Fig. 1 is the side structure schematic diagram of the arc pay off rack that this utility model lays for high tension cable.
Fig. 2 is the plan structure schematic diagram of the arc pay off rack that this utility model lays for high tension cable.
Labelling in figure: 1-gusset, 2-the first montant, 3-the first cross bar, 4-fixed plate, 5-perforate, 6-the second montant, 7-
Three montants, 8-the 4th montant, 9-the second cross bar, 10-the 3rd cross bar, 11-the 4th cross bar, 12-steel pipe, 13-external environment condition.
Detailed description of the invention
Below in conjunction with the accompanying drawings, this utility model is described in detail.
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing and enforcement
Example, is further elaborated to this utility model.Should be appreciated that specific embodiment described herein is only in order to explain
This utility model, is not used to limit this utility model.
As shown in Figure 1-2, a kind of arc pay off rack laid for high tension cable, specifically include arcwall face, horizontal stand,
Vertical support frame and fixed plate 4, described arcwall face includes laying respectively at the arc gusset 1 on left side and right side, described horizontal stand and
Vertical support frame is welded on outside gusset 1, and described horizontal stand and vertical support frame form right angle inside arcwall face and support, described water
At least one fixed plate 4 is welded in the side supported at right angle between flat support, and described fixed plate 4 has at least one perforate 5, institute
Stating perforate 5 for fixed plate 4 being fixed on external environment condition 13 by expansion bolt, during construction, high tension cable needs to pass through hole
Mouthful, the external environment condition 13 such as floor and corner, external environment condition 13 irregular structure and be inconvenient to place high voltage cable, employing expansion
Fixed plate 4 is fixed on hole or floor or corner by perforate 5 by bolt, and arc pay off rack is fixed, high voltage cable
It is positioned on arcwall face, makes high voltage cable have certain bending radius when laying and be fixed temporarily, it is to avoid sharply to turn
High voltage cable is caused damage by angle.
Described arcwall face also includes the parallel steel pipe 12 being welded on equably between gusset of N root, the present embodiment preferably nine
Steel pipe 12, described steel pipe 12 overcoat pvc pipe, when high voltage cable needs to drag, the pvc pipe of steel pipe 12 and appearance surface cover is permissible
Friction between high voltage cable is changed into rolling friction, it is to avoid when high voltage cable lays, scratch high line cable.
Described horizontal stand includes and the first cross bar the 3, second montant the 6, the 3rd montant 7 and the 4th montant 8;Described first is horizontal
Bar 3 is the first right-angle side that right angle supports, and described first cross bar 3 welds the first end of the second montant 6, the 3rd montant 7 successively
The first end and the non-end positions of the 4th montant 8;Described second montant the 6, the 3rd montant 7 and the 4th montant 8 are each perpendicular to
First cross bar 3;Described second montant the 6, the 3rd montant 7 and the 4th montant 8 exceed 200mm outside arcwall face, described the raised area
Wrap up rubber peel;The material that horizontal stand uses is angle steel, stabilized structure, and the part exceeded can play lever effect, anti-
Only high voltage cable landing from arcwall face.
Described vertical support frame includes the first montant the 2, second cross bar the 9, the 3rd cross bar 10 and the 4th cross bar 11;Described first erects
Bar 2 is the second right-angle side that right angle supports, and described first montant 2 welds the first end of the second cross bar 9, the 3rd cross bar 10 successively
The first end and the first end of the 4th cross bar 11, the first end weldering of the non-end positions of described second cross bar 9 and the 4th montant 8
Connect;Described second cross bar the 9, the 3rd cross bar 10 and the 4th cross bar 11 are each perpendicular to the first montant 2;Described second cross bar the 9, the 3rd is horizontal
Bar 10 and the 4th cross bar 11 exceed 200mm outside arcwall face, and described the raised area has wrapped up rubber peel;The material that vertical support frame uses
Material is angle steel, stabilized structure, and horizontal stand coordinate can be to the strongest holding power of arc pay off rack offer, the part exceeded
Lever effect can be played, prevent high voltage cable landing from arcwall face.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this
Any amendment, equivalent and the improvement etc. made within the spirit of utility model and principle, should be included in this utility model
Protection domain within.
Claims (10)
1. the arc pay off rack laid for high tension cable, it is characterised in that: include arcwall face, horizontal stand, vertically prop up
Frame and fixed plate, described arcwall face includes the arc gusset laying respectively at left side and right side, described horizontal stand and vertical support frame
Be welded on outside gusset, described horizontal stand and vertical support frame formed inside arcwall face right angle support, described horizontal stand it
Between right angle support side weld at least one fixed plate, described fixed plate has at least one perforate, and described perforate is used for
By expansion bolt, arc pay off rack is fixed in external environment condition.
2. the arc pay off rack laid for high tension cable as claimed in claim 1, it is characterised in that: described arcwall face also includes
The parallel steel pipe being welded on equably between gusset of N root, described steel pipe overcoat pvc pipe.
3. the arc pay off rack laid for high tension cable as claimed in claim 2, it is characterised in that: described horizontal stand includes
First cross bar, the second montant, the 3rd montant and the 4th montant.
4. the arc pay off rack laid for high tension cable as claimed in claim 3, it is characterised in that: described first cross bar is straight
Angle support the first right-angle side, described first cross bar welds successively the first end of the second montant, the 3rd montant the first end with
And the 4th non-end positions of montant.
5. the arc pay off rack laid for high tension cable as claimed in claim 4, it is characterised in that: described second montant, the
Three montants and the 4th montant are each perpendicular to the first cross bar.
6. the arc pay off rack laid for high tension cable as claimed in claim 5, it is characterised in that: described second montant, the
Three montants and the 4th montant exceed arcwall face 200mm respectively, and described the raised area has wrapped up rubber peel.
7. the arc pay off rack laid for high tension cable as claimed in claim 6, it is characterised in that: described vertical support frame includes
First montant, the second cross bar, the 3rd cross bar and the 4th cross bar.
8. the arc pay off rack laid for high tension cable as claimed in claim 7, it is characterised in that: described first montant is straight
Angle support the second right-angle side, described first montant welds successively the first end of the second cross bar, the 3rd cross bar the first end with
And the 4th first end of cross bar, the non-end positions of described second cross bar is welded with the first end of the 4th montant.
9. the arc pay off rack laid for high tension cable as claimed in claim 8, it is characterised in that: described second cross bar, the
Three cross bars and the 4th cross bar are each perpendicular to the first montant.
10. the arc pay off rack laid for high tension cable as claimed in claim 9, it is characterised in that: described second cross bar, the
Three cross bars and the 4th cross bar exceed 200mm outside arcwall face respectively, and described the raised area has wrapped up rubber peel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620777496.8U CN205829053U (en) | 2016-07-22 | 2016-07-22 | A kind of arc pay off rack laid for high tension cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620777496.8U CN205829053U (en) | 2016-07-22 | 2016-07-22 | A kind of arc pay off rack laid for high tension cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205829053U true CN205829053U (en) | 2016-12-21 |
Family
ID=57560346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620777496.8U Expired - Fee Related CN205829053U (en) | 2016-07-22 | 2016-07-22 | A kind of arc pay off rack laid for high tension cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205829053U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111244831A (en) * | 2020-03-20 | 2020-06-05 | 广东韶钢松山股份有限公司 | Cable arrangement method |
CN113883334A (en) * | 2021-11-19 | 2022-01-04 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | Fan-shaped hose support |
-
2016
- 2016-07-22 CN CN201620777496.8U patent/CN205829053U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111244831A (en) * | 2020-03-20 | 2020-06-05 | 广东韶钢松山股份有限公司 | Cable arrangement method |
CN113883334A (en) * | 2021-11-19 | 2022-01-04 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | Fan-shaped hose support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205829053U (en) | A kind of arc pay off rack laid for high tension cable | |
CN110589192B (en) | Low-abrasion building material conveying device | |
CN202721426U (en) | Special pay-off rack for BV and BLV cables | |
CN204369415U (en) | The auxiliary device of thin plate handling | |
JP3208039U (en) | Long tube guide support device | |
CN206466801U (en) | A kind of lift cable unreeling rack | |
CN206929490U (en) | Poling moves protection of pipe device in pipe | |
CN202612853U (en) | Bracket for pipe dragging | |
CN205149911U (en) | Workshop transfer device | |
CN203423463U (en) | Vertical cable pay-off seat | |
CN202316592U (en) | Copper wire feeding device | |
CN203428586U (en) | Film feeding mechanism used for packing machine | |
CN215160357U (en) | Safety protection device for gantry crane | |
CN202405700U (en) | Lifting mobile wire releasing device | |
CN203567787U (en) | Carrying tooling of wall hanging plates | |
CN205952682U (en) | Road roller gyro wheel delivery frock | |
CN105869878B (en) | Novel and multifunctional coiling rack | |
CN204508414U (en) | A kind of cable rack | |
CN204624982U (en) | The vertical overhead hoist of a kind of tubing | |
CN110565930A (en) | Telescopic movable operation platform for top construction of light well and construction method thereof | |
CN204264194U (en) | The wire rod labour-saving go-cart of a kind of carrying dish circle | |
CN202156826U (en) | Semi-automatic unwinding device | |
CN214866930U (en) | Steel strand fixing and penetrating device | |
CN206681391U (en) | A kind of material slipper bracket for building | |
CN210848043U (en) | Automatic feeding device of straightening machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 Termination date: 20190722 |
|
CF01 | Termination of patent right due to non-payment of annual fee |