CN205828716U - A kind of 500kV transformer/reactor test connection bar - Google Patents
A kind of 500kV transformer/reactor test connection bar Download PDFInfo
- Publication number
- CN205828716U CN205828716U CN201620777941.0U CN201620777941U CN205828716U CN 205828716 U CN205828716 U CN 205828716U CN 201620777941 U CN201620777941 U CN 201620777941U CN 205828716 U CN205828716 U CN 205828716U
- Authority
- CN
- China
- Prior art keywords
- rod
- transformer
- gear
- spring
- handle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 43
- 241000040710 Chela Species 0.000 claims description 21
- 238000005096 rolling process Methods 0.000 claims description 7
- 238000002474 experimental method Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 10
- 230000009194 climbing Effects 0.000 description 6
- 208000027418 Wounds and injury Diseases 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 2
- 235000011613 Pinus brutia Nutrition 0.000 description 2
- 241000018646 Pinus brutia Species 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 230000036541 health Effects 0.000 description 2
- 238000004898 kneading Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000004382 potting Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
Abstract
A kind of 500kV transformer/reactor test connection bar, this junction pole includes the body of rod, draught line and is arranged on the spring tongs of lever front end;It alleviates 500kV transformer/reactor test difficulty, can complete the wiring of test requirements document, it is ensured that the personal safety of staff, improve the efficiency of experiment.
Description
Technical field
This utility model relates to a kind of 500kV transformer/reactor test connection bar.
Background technology
At present, when carrying out 500kV transformer/reactor high-potting, wiring aspect still uses original method, i.e. tries
The personnel of testing climb up equipment casing wiring.
During wiring, testing crew needs to fasten the safety belt, and in climbing, 500kV transformer/reactor outlet casing tube goes out, will test
Instrument line is connected at 500kV transformer/reactor patch panel, and during wiring, wiring personnel are only suspended on high-altitude with seat belt,
Butted line personal security threatens.Whole wiring process hazard and the time of cost are long.
The Northeast is long for cold season, and winter is cold, when now testing on 500kV transformer/reactor, personnel's
Safety is on the hazard.
Occur in that the situation causing human life to be on the hazard due to climbing sleeve pipe at present, therefore to ensure
The safety of 500kV transformer/reactor testing crew, reduces test required time, reduces the difficulty of test, develop a product
Extremely urgent.
Summary of the invention
Utility model purpose:
This utility model provides a kind of 500kV transformer/reactor test connection bar, its objective is that solution is the most existing
Problem.
Technical scheme:
A kind of 500kV transformer/reactor test connection bar, it is characterised in that: this junction pole include the body of rod, draught line and
It is arranged on the spring tongs of lever front end;Spring tongs is to be closed by kneading power and multiple by the elastic force of torsion spring or spring
The structure that position is opened, one handle of the tail end of this spring tongs is by being threaded onto the leading section of the body of rod as fixed handle, another
Handle is provided with the annular aperture for being draught line as movable handle, the end of this movable handle, and the front end jaw of this spring tongs is
Circular arc width mouth;Draught line one end connects the annular aperture other end and is wrapped on the spool of body of rod handheld terminal after the body of rod.
The body of rod is by the most threaded long rod structure formed of the little bar of more piece.
It is provided with on the top of the body of rod for being wound around line and choosing the auxiliary stay hook of draught line.
It is provided with stable support between bottom and the body of rod of the connecting shaft of spring tongs.
The lifter rack being connected with draught line it is provided with, outside the body of rod corresponding with this lifter rack position in the body of rod
Portion is provided with pulling force gear, and the tooth of pulling force gear engages with lifter rack in putting in the body of rod, is coaxially disposed with pulling force driving gear
Having pulling force travelling gear, travelling gear is connected with the upper transfer gear being arranged on spring tongs fixed handle, with upper by chain
Travelling gear is coaxially arranged with pinion, and upper pinion passes through with the upper transfer gear being arranged at the connecting shaft of spring tongs
Upper driving chain connects, and upper transfer gear is coaxially connected with the driving gear in the connecting shaft being arranged on spring tongs, drives tooth
Wheel is with through the dimple on the advance and retreat tooth bar of spring tongs connecting shaft, and the front end of advance and retreat tooth bar puts in the opening of spring tongs
In, in the opening of spring tongs, it being additionally provided with two card chelas, one end of two card chelas is arranged on advance and retreat by movable axis
The front end of tooth bar, the other end of two card chelas is flexibly connected with two opening handles of spring tongs respectively.
Two card chelas are flexibly connected with spring tongs opening handle by roller, are provided with restriction rolling in the front end of card chela
The limit sliding chutes of wheel, is provided with the rolling slideway rolled for roller in spring tongs opening handle front end.
It is provided with the slide opening groove that the rotating shaft for roller passes, roller at the sidewall of limit sliding chutes and the sidewall of rolling slideway
Rotating shaft make the front end of card chela can move relative to opening handle and keep being connected with opening handle through slide opening groove.
It is provided with in the position that body of rod outer wall and pulling force gear mesh are answered and can move axially along the body of rod and pulling force gear can be blocked
Make what it cannot rotate fixture block.
Pulling force gear is coaxially connected with swinging handle.
Advantage and effect:
This utility model is a kind of 500kV transformer/reactor test connection bar, and this electric wire connecting junction is easy to carry about with one and operates and existing
Field uses, very useful.Staff may stand at the flat surfaces of distance equipment patch panel safety farther out, by operation
This electric wire connecting junction, the most quickly smoothly completes wiring, and wiring effect meets test requirements document.500kV transformer/reactor is alleviated with this
Test difficulty, can complete the wiring of test requirements document, it is ensured that the personal safety of staff, improves the efficiency of experiment.
Accompanying drawing explanation
Fig. 1 be structural representation of the present utility model '
Fig. 2 is another form of structural representation of the present utility model;
Fig. 3 is A portion enlarged diagram in Fig. 2;
Fig. 4 is the B position enlarged drawing in Fig. 2.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described further:
As it is shown in figure 1, the utility model proposes a kind of 500kV transformer/reactor test connection bar, this junction pole bag
Include the body of rod 1, draught line 5 and be arranged on the spring tongs 2 of the body of rod 1 front end;Spring tongs 2 is for closing by kneading power and passing through
The structure that the elastic reset of torsion spring or spring opens, handle of the tail end of this spring tongs 2 is screwed in the body of rod 1 by screw thread 3
Leading section is provided with the annular aperture for being draught line 5 as fixed handle, another handle as movable handle, the end of this movable handle
4, the front end jaw 6 of this spring tongs 2 is circular arc width mouth;After draught line 5 one end connection annular aperture 4 other end passes the body of rod 1
It is wrapped on the spool 7 of the body of rod 1 handheld terminal.
The body of rod 1 is by the most threaded long rod structure formed of the little bar of more piece.
It is provided with on the top of the body of rod 1 for being wound around line and choosing the auxiliary stay hook 8 of draught line.
It is provided with stable support 10 between bottom and the body of rod 1 of the connecting shaft 9 of spring tongs 2.
The lifter rack 11 being connected with draught line 5 it is provided with, at the bar corresponding with this lifter rack 11 position in the body of rod 1
The outside of body 1 is provided with pulling force gear 12, and the tooth of pulling force gear 12 engages with lifter rack 11, with pulling force master in putting in the body of rod 1
Moving gear 12 is coaxially arranged with pulling force travelling gear 13, and travelling gear 13 passes through chain 14 and is arranged on spring tongs 2 fixed handle
On upper transfer gear 15 connect, be coaxially arranged with upper pinion with upper transfer gear 15, upper pinion be arranged on spring forceps
Upper transfer gear at the connecting shaft of son 2 is connected by upper driving chain 16, upper transfer gear and the company being arranged on spring tongs 2
Driving gear 17 in spindle is coaxially connected, drives recessed with on the advance and retreat tooth bar 18 through spring tongs 2 connecting shaft of gear 17
Hole engagement, the front end of advance and retreat tooth bar 18 puts in the opening of spring tongs 2, is additionally provided with two in the opening of spring tongs 2
Card chela 19, one end of two card chelas 19 is arranged on the front end of advance and retreat tooth bar 18 by movable axis 20, two card chelas 19
The other end is flexibly connected with two opening handles 21 of spring tongs 2 respectively.Pulling force driving gear 12 is arranged on same with spring tongs 2
Side.
Two card chelas 19 are flexibly connected with spring tongs 2 opening handle 21 by roller 22, set in the front end of card chela 19
It is equipped with the limit sliding chutes 23 limiting roller 22, is provided with the rolling rolled for roller 22 in spring tongs 2 opening handle 21 front end sliding
Road 24.
It is provided with the slide opening that the rotating shaft for roller 22 passes at the sidewall of limit sliding chutes 23 and the sidewall of rolling slideway 24
Groove, the rotating shaft of roller 22 makes the front end of card chela 19 can move relative to opening handle 21 and keep and opening handle through slide opening groove
21 connect.
It is provided with in the position that the body of rod 1 outer wall is corresponding with pulling force gear 12 and can move axially along the body of rod 1 and pulling force can be blocked
Gear 12 makes what it cannot rotate fixture block 25.Pulling force gear is coaxially connected with swinging handle.
Wherein:
1, the body of rod is made up of the little bar of more piece, the most totally 10 joint, and wherein a joint saves, according to reality headed by being periproct, a joint
Border situation determines body of rod length.Every a length of 1m of pole, hollow, in addition to head saves, other every poles are the ending identical straight-bars of diameter.
The top of first pole is relatively thin, and end is identical with other pole diameters.Rely on threaded between each joint;
2, first joint tail diameter is 4cm, and top diameter is 2.5cm, has screw thread, is used for placing one hands of spring tongs
Handle, place suitable with spring tongs length is provided with auxiliary wire-hanging hook;
3, the anti-skidding insulation sleeve of periproct and spool;
4, spring tongs is for changing the action direction of check bar, and can alleviate first joint end needs stress simultaneously, side
Just check bar operation is the biggest but also is engaged tight object.One handle of this pliers tail end has screw thread, is used for being screwed in first pole end, another
Handle has annular aperture, and being used for is draught line, and jaw is circular arc width mouth;
5, spool spool is used for being wound around draught line, and its rotating distance is opened for the tail end controlling spring tongs
Close, it is possible to pliers folding degree is carried out electrodeless regulation and reliably fixes;
6, stable support reduces strength suffered by check bar end, simultaneously works as supporting spring tongs and is at stable
And balanced action;
7, auxiliary stay hook is used for being wound around line, take-up, alleviates p-wire gravity suffered by check bar end with this and causes
Pulling force;
8, suture introducing needle is for when connecting each joint check bar, in advance by the draught line of tail end one by one through each pole bar
Body.
Utility model works process:
1, according to on-the-spot distance, such as 4.5m, choose the little bar of more piece and can connect into corresponding length, such as 5m length,
That includes first joint, each joint and three joints of centre of periproct;
2, first with suture introducing needle, draught line is fixed at spring tongs handle after each pole body, is then passing through screw thread
Joint test bar, and connect spring tongs;
3, object will be connect to be placed in spring jaw, and be placed stable firm;
4, line is being assisted on wire-hanging hook around loose circle;
5, lift check bar, when being connect after object puts in place, rotate spool, discharge the handle of spring tongs lentamente, directly
Decontrol completely to by folder object;
6, being displaced outwardly junction pole, the coiling on auxiliary wire-hanging hook is automatically releasable;
7, check bar is put down.
Process of taking out stitches is contrary with said process.
And in the process, as in figure 2 it is shown, when draught line 5 pulls downwards, the opening of spring tongs 2 gradually bite by
Folder thing, and now, along with draught line 5 moves down, lifter rack 11 engages downwards pulling force driving gear 12 and pulling force driving cog
Wheel 13 rotation, rotates counterclockwise exactly according to shown in Fig. 2, and then pulling force travelling gear 13 drives upper driving cog by chain 14
Wheel 15 and upper pinion rotate, and upper pinion drives upper transfer gear and driving gear 17 to rotate by upper driving chain 16,
Drive gear 17 to engage advance and retreat tooth bar 18 (left side in figure) backward mobile, and then drive two card chelas 19 to help to contract
Help spring tongs 2 to be clamped by gripped object, promote fixture block 25 to make it block pulling force driving gear 12 then up and prevent it from rotating,
And when needs release gripped object, slide downward fixture block 25, away from pulling force driving gear 12, then decontrols draught line 5,
Make lifter rack 11 upwards engage pulling force driving gear 12 and pulling force travelling gear 13 rotates, and then made by chain reaction
Tooth bar 18 of must retreating moves forward (right side in figure is moved), and then two card chelas 19 are flared out, unclamp by
While clamping thing, the front end of advance and retreat tooth bar 18 also can head on gripped object and move forward, and then completes actively to unload held
The process of thing, two card chelas 19 of whole process are further ensured that the clamping degree of gripped object, meanwhile, utilize fixture block to prevent from drawing
Moving gear 12 of advocating rotates and also further increases safety, because because draught line 5 needs to receive one during operation
The pulling force of individual tension, therefore, excessive once long-time use or gripped object, easily there is the danger broken in draught line 5,
And once break and will easily cause gripped object and drop, the most easily hurt operating personnel, and during dropping
Also other equipment of easily damage construction cause any property loss, and the equipment dropped itself once to break also be a loss, and
Have employed fixture block 25 by after fixing for pulling force driving gear 12, even if the unexpected fracture of draught line 5, two card chelas 19 also can still be protected
Hold clamped condition, do not have above-mentioned potential safety hazard, considerably increase the safety of construction, and on the other hand pressed from both sides when unloading
When holding thing, advance and retreat tooth bar 18 has the active thrust promoting forward gripped object, so narrow and small at some or circuit is more
Space in will significantly facilitate unloading gripped object, and without this mechanism, then in some slightly larger spaces or
It not that very complex environment has only to trip spring pliers 2 then slight jitter spring tongs 2 and utilizes spring tongs 2 to be moved
Move to suitable position, but when the space of narrow and small or complex circuit, do not shake spring tongs 2 space or
Person shakes spring tongs 2 can exist potential safety hazard, the most thus cannot deliver to gripped object accurately specify position, and adopt
With just solving this problem after the active offloading functions of advance and retreat tooth bar 18.
Using effect
The program is tested in Shenyang electrical test class of O&M branch, and comparing result is as follows:
A, primitive operation method
1, seat belt is checked, if having breakage or aging conditions;
2, fasten the safety belt, seat belt is tied up on the body of climbing person;
3, hanging safety belt, is enclosed within seat belt on sleeve pipe to be climbed;
4, bushing is climbed, operating specification posture during climbing;Highest point employee's health is positioned at horizontal plane 8m eminence;
5, singlehanded thick clamp, buttresses seat belt and grasps sleeve pipe on the other hand, and both legs climb tight sleeve pipe;
6, setting of casing, pine seat belt, according to normalizing posture setting of casing.
During wiring, although librarian use seat belt, but its health remains unchanged high-altitude how high for unsettled 8m, exist
Dangerous.Further, owing to process of the test needs personnel to climb the most up and down, so test period is longer, one need of a wiring
Want time half a day, not only have influence on when time test efficiency, have shadow also for total power failure duration and the operation to unit below
Ring.
B, use check bar
1, determine required check bar joint number according to practical situation, splice check bar;
2, check bar end will be put in by folder testing wire clamp;
3, check bar is lifted as corresponding site;
4, check bar is regained after pine bar
Using check bar wiring, it is possible to avoid personnel to climb, operating process is simple, without dangerous, it is possible to when shortening test
Between, improve test efficiency.
This utility model in view of the situation that causes injury to personnel, life to be on the hazard due to climbing sleeve pipe occurred,
By contrasting above-mentioned wiring process, employ check bar of the present utility model and 500kV transformator is carried out test wire connection, not only
Simple to operate, it is also possible to shorten test period, improve test efficiency, simultaneously it can be avoided that personnel's climbing is positioned at the appearance set in high-altitude
Pipe, protects testing crew personal safety.It alleviates 500kV transformer/reactor test difficulty, can complete connecing of test requirements document
Line, improves the efficiency of experiment.
Claims (9)
1. a 500kV transformer/reactor test connection bar, it is characterised in that: this junction pole includes the body of rod (1), draught line
And be arranged on the spring tongs (2) of the body of rod (1) front end (5);Spring tongs (2) be by mediate power and close and by torsion spring or
The structure that the elastic reset of person's spring opens, handle of the tail end of this spring tongs (2) is screwed in the body of rod (1) by screw thread (3)
Leading section is as fixed handle, and another handle is as movable handle, and the end of this movable handle is provided with for being the ring-type of draught line (5)
Hole (4), the front end jaw (6) of this spring tongs (2) is circular arc width mouth;Draught line (5) one end connects annular aperture (4) other end
It is wrapped on the spool (7) of the body of rod (1) handheld terminal after the body of rod (1).
A kind of 500kV transformer/reactor test connection bar the most according to claim 1, it is characterised in that: the body of rod (1)
For by the most threaded long rod structure formed of the little bar of more piece.
A kind of 500kV transformer/reactor test connection bar the most according to claim 1, it is characterised in that: at the body of rod
(1) top is provided with for being wound around line and choosing the auxiliary stay hook (8) of draught line.
A kind of 500kV transformer/reactor test connection bar the most according to claim 1, it is characterised in that: spring tongs
(2) it is provided with stable support (10) between bottom and the body of rod (1) of connecting shaft (9).
5. according to a kind of 500kV transformer/reactor test connection bar described in claim 1,2,3 or 4, it is characterised in that:
The lifter rack (11) being connected with draught line (5) it is provided with, at the bar corresponding with this lifter rack (11) position in the body of rod (1)
The outside of body (1) is provided with pulling force gear (12), and the tooth of pulling force gear (12) is nibbled with lifter rack (11) in putting in the body of rod (1)
Closing, be coaxially arranged with pulling force travelling gear (13) with pulling force driving gear (12), travelling gear (13) passes through chain (14) and sets
Put the upper transfer gear (15) on spring tongs (2) fixed handle to connect, be coaxially arranged with upper secondary tooth with upper transfer gear (15)
Wheel, upper pinion is connected by upper driving chain (16) with the upper transfer gear at the connecting shaft being arranged on spring tongs (2), on
Travelling gear is coaxially connected with driving gear (17) in the connecting shaft being arranged on spring tongs (2), drives gear (17) and wears
Crossing the dimple on the advance and retreat tooth bar (18) of spring tongs (2) connecting shaft, the front end of advance and retreat tooth bar (18) puts in spring tongs
(2), in opening, in the opening of spring tongs (2), two card chelas (19), one end of two card chelas (19) it are additionally provided with
Be arranged on the front end of advance and retreat tooth bar (18) by movable axis (20), the other end of two card chelas (19) respectively with spring tongs
(2) two opening handles (21) are flexibly connected.
A kind of 500kV transformer/reactor test connection bar the most according to claim 5, it is characterised in that: two clamp
Pawl (19) is flexibly connected with spring tongs (2) opening handle (21) by roller (22), arranges limited in the front end of card chela (19)
The limit sliding chutes (23) of roller processed (22), is provided with the rolling rolled for roller (22) in spring tongs (2) opening handle (21) front end
Sliding way (24).
A kind of 500kV transformer/reactor test connection bar the most according to claim 6, it is characterised in that: in spacing cunning
The sidewall of groove (23) and the sidewall of rolling slideway (24) are provided with the slide opening groove that the rotating shaft for roller (22) passes, roller (22)
Rotating shaft make the front end of card chela (19) can be mobile relative to opening handle (21) and keep and opening handle (21) through slide opening groove
Connect.
A kind of 500kV transformer/reactor test connection bar the most according to claim 5, it is characterised in that: at the body of rod
(1) position that outer wall is corresponding with pulling force gear (12) is provided with and can move axially along the body of rod (1) and can block pulling force gear (12)
Make its fixture block that cannot rotate (25).
A kind of 500kV transformer/reactor test connection bar the most according to claim 8, it is characterised in that: pulling force gear
(12) it is coaxially connected with swinging handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620777941.0U CN205828716U (en) | 2016-07-22 | 2016-07-22 | A kind of 500kV transformer/reactor test connection bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620777941.0U CN205828716U (en) | 2016-07-22 | 2016-07-22 | A kind of 500kV transformer/reactor test connection bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205828716U true CN205828716U (en) | 2016-12-21 |
Family
ID=57560247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620777941.0U Withdrawn - After Issue CN205828716U (en) | 2016-07-22 | 2016-07-22 | A kind of 500kV transformer/reactor test connection bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205828716U (en) |
-
2016
- 2016-07-22 CN CN201620777941.0U patent/CN205828716U/en not_active Withdrawn - After Issue
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106450839A (en) | Connection rod for testing 500kV transformer/reactor | |
CN204462233U (en) | Low-voltage load test specific purpose tool | |
CN109110659A (en) | A kind of tower crane climbing personnel's anti-dropping safety device | |
CN103240727A (en) | Tool for integrally removing nests | |
CN105914657B (en) | Portable double plate circulation turnbuckle and its line tightening method of application | |
CN205828716U (en) | A kind of 500kV transformer/reactor test connection bar | |
JP2013002010A (en) | Device for manufacturing looped fiber rope and the looped fiber rope manufactured by the device | |
CN105123125A (en) | Fruit picking rod | |
CN206132818U (en) | High altitude termination that transformer test used | |
CN203367886U (en) | Miniature take-up device | |
JP2013212027A (en) | Wiring method and removing method for cable, and wiring device used for the same | |
CN202633831U (en) | Manual multifunctional wire tensioning device | |
CN201512344U (en) | Novel removing carapace | |
CN205595701U (en) | Transmission line tensioner bullwheel | |
CN209043563U (en) | A kind of PC barrels of tolerance test device that falls from high altitude | |
CN205985413U (en) | Earth connection retractable frame | |
CN205389015U (en) | Electric power wiring pincers | |
CN205319612U (en) | Power transmission sequence cleaning device | |
CN208095507U (en) | Trees orient the auxiliary rope fastening device that falls | |
CN112045091A (en) | Stay wire manufacturing device | |
CN206452060U (en) | Preformed armor rods winding tool | |
CN217543228U (en) | Device for measuring direct current of photovoltaic group string of high bracket on ground | |
CN201727576U (en) | Wire-forcing tightener | |
CN206198202U (en) | Stand up device | |
CN205182025U (en) | Climb rope ware |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161221 Effective date of abandoning: 20190621 |