CN205826494U - A kind of bituminous paving rotary friction coefficient tester of simulated rainfall - Google Patents

A kind of bituminous paving rotary friction coefficient tester of simulated rainfall Download PDF

Info

Publication number
CN205826494U
CN205826494U CN201620822177.4U CN201620822177U CN205826494U CN 205826494 U CN205826494 U CN 205826494U CN 201620822177 U CN201620822177 U CN 201620822177U CN 205826494 U CN205826494 U CN 205826494U
Authority
CN
China
Prior art keywords
water
friction coefficient
bituminous paving
side form
coefficient tester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620822177.4U
Other languages
Chinese (zh)
Inventor
王慧
沈佳
彭刚
樊泽鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201620822177.4U priority Critical patent/CN205826494U/en
Application granted granted Critical
Publication of CN205826494U publication Critical patent/CN205826494U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Road Paving Structures (AREA)

Abstract

This utility model relates to the rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall.It rain case including being divided into capital equipment district and auxiliary equipment district;Capital equipment district is converged rain base plate and is divided into upper and bottom section, and bottom is divided into collection box;The right half of upper part is provided with the water distributor of band shower nozzle at top;The right half of upper part is provided with two card articles in bottom, places die trial in the middle of two card articles;The upper surface of die trial is provided with dynamic rotary type friction coefficient tester;Left half is provided with water butt in bottom, the water pump being connected in collection box by water inlet pipe bottom this water butt;Water butt is provided with water pump at top, and this water pump is connected to water distributor by aqueduct;Aqueduct is the most also disposed with threeway, effusion meter and electromagnetic valve;Threeway connects the return pipe being connected to water butt of band regulation valve;Auxiliary equipment district is provided with control chamber.This utility model simple in construction, easy and simple to handle.

Description

A kind of bituminous paving rotary friction coefficient tester of simulated rainfall
Technical field
This utility model belongs to bituminous pavement property technical field of measurement and test, it particularly relates to a kind of simulated rainfall The rotary friction coefficient tester of bituminous paving.
Background technology
Along with expanding economy, road quality classification improves constantly, and the volume of traffic increases, and speed is accelerated, and the antiskid of bituminous paving is asked Topic becomes increasingly conspicuous, and especially in the rainy day, Bitumen Pavement Anti-Skid Performance is substantially reduced, and easily makes vehicle slip out of control, cause casualties, The major accidents such as property loss.In order to verify whether Bitumen Pavement Anti-Skid Performance disclosure satisfy that use requirement, we use dynamically Rotary friction coefficient tester measures surface friction coefficient.But in test process, under the conditions of being merely able to test the non-rainy day Bituminous paving coefficient of friction, it is impossible to enough under the conditions of the reflection rainy day, different rainfall intensities, the bituminous paving of overland flow coefficient rub Wipe coefficient.
Utility model content
For solving above-mentioned technical problem, this utility model provides a kind of simple in construction, easy and simple to handle and using effect The rotary friction coefficient tester of bituminous paving of good simulated rainfall.
The rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall described in the utility model, described tester Including being divided into the rain case 1 in capital equipment district and auxiliary equipment district, capital equipment district is located at the left of rain case 1;Capital equipment district quilt The rain base plate 15 that converges is divided into upper and bottom section, and bottom is divided into collection box 17, and upper part is divided into again left half and right half;Right Part is provided with the water distributor 2 of band shower nozzle 3 at top;Right half is provided with two card articles 13 in bottom, puts in the middle of these two card articles 13 Put die trial 19;The upper surface of die trial 19 is provided with dynamic rotary type friction coefficient tester 12;Left half is provided with water butt in bottom 10, the water pump A16 being connected in collection box 17 by water inlet pipe 14 bottom this water butt 10;Water butt 10 is provided with water pump at top B11, this water pump B11 are connected to water distributor 2 by aqueduct;Aqueduct is the most also disposed with threeway 9, effusion meter 4 With electromagnetic valve 5;An only surplus outlet of threeway 9 connects the return pipe 8 of band regulation valve 7, and this return pipe 8 is connected to water butt 10;Auxiliary equipment district is provided with control chamber 24.
The rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall described in the utility model, at the bottom of described remittance rain Two card articles 13 and some " one " word vacancy section it is provided with on the right side of plate 15;Described card article 13 is in cuboid.
The rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall described in the utility model, described die trial 19 Including being trapped among the left side side form 28 of base plate 30 4 side, right side side form 29, front side form 26, rear side form 27, left side baffle plate 20, the right side Side shield 21, and four clips;The length direction of described left side side form 28 and right side side form 29 takes turns direction of travel with load Parallel;Described front side form 26 is vertical with load wheel direction of travel with the length direction of rear side form 27;Described left side side form 28 Top surface edge at be provided with left groove 22;It is provided with right groove 23 at the top surface edge of described right side side form 29; Described left side baffle plate 20 can be with socket joint in left groove 22;Described right-hand apron 21 can be used with socket joint in right groove 23 Runoff coefficient in regulation PVvalue testing surface of test piece;Four apex of described base plate 30 lower surface, symmetrical setting There are four clips, fixing for die trial and test specimen cushion cap.
The rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall described in the utility model, described die trial 19 The long 60cm in space corresponding at base plate 30, wide 60cm, high 5cm, i.e. can make the long 60cm of type, wide 60cm, the Colophonium of high 5cm Compound test specimen.
The rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall described in the utility model, described control chamber 24 are provided with display screen 33 and input keyboard 34 on panel, are being internally provided with the controller 25 that electronic circuit board connects.
The rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall described in the utility model, described electromagnetic valve 5, regulation valve 7, water pump B11 and water pump A16 all connect with controller 25.
When being simulated the bituminous paving dynamic rotary type Test of Friction of rainfall, the water in water butt 10 passes through water The effect of pump B11 flows in water distributor 2 along outlet pipe 6, and is dropped in asphalt examination by shower nozzle 3 simulation formation raindrop Part surface, rainwater from surface of test piece landing to converge rain base plate 15 surface, and along converge rain base plate 15 flow into collection box 17, collection box Water in 17 flows into water butt 10, the water in supply water butt 10 by water pump A16 and water inlet pipe 14;Threeway 9 and regulation valve 7, The synergism of effusion meter 4 and electromagnetic valve 5 can regulate rainfall intensity;By whether arrange left side baffle plate 20 He in die trial both sides Right-hand apron 21 can be with regulated flow coefficient.Under condition of raining, dynamic rotary type friction coefficient tester 12 is placed in die trial 19 and die trial 19 in bitumen mixture specimen surface, the bituminous paving dynamic rotary type coefficient of friction of simulated rainfall can be carried out Test.
Compared with prior art, the rotary friction coefficient tester of the bituminous paving of simulated rainfall described in the utility model Have the advantage that
1) the bituminous paving dynamic rotary type friction coefficient tester simple in construction of the simulated rainfall used, reasonable in design And install and use easy and simple to handle, input cost is relatively low, installs compact, takes up room less;
2) the bituminous paving dynamic rotary type friction coefficient tester parameter adjustment of the simulated rainfall used is easy, can be right The parameters such as rainfall intensity, runoff coefficient, rainfall duration are adjusted, and are provided with control chamber, control simple, can accurately control Raininess degree, runoff coefficient, rainfall duration so that the bituminous paving dynamic rotary type PVvalue testing process under condition of raining is easy In control;
3) left groove that the die trial that used both sides parallel with direction of travel are arranged and right groove, can be according to need Determine the need for fixing left side baffle plate and right-hand apron, and then may be used for controlling the runoff on bitumen mixture specimen surface Coefficient, for simulating the runoff coefficient situation of actual road surface;
4) die trial used symmetrical can arrange four clips by four apex of base plate lower surface Method, it is to avoid the level of die trial during test is slided, improves the test essence of bituminous paving dynamic rotary type measuring friction coefficient test Degree.
5) using effect is good and practical value high, good looking appearance, facilitates the bituminous paving of simulated rainfall largely Dynamic rotary type PVvalue testing, and process of the test is easily controllable, has the advantages such as test operation is convenient, control is accurate, The accuracy of the dynamic rotary type PVvalue testing result of simulated rainfall can be effectively ensured.
Accompanying drawing explanation
Fig. 1: tester schematic diagram described in the utility model;Fig. 2: remittance rain base plate schematic diagram figure;Fig. 3: die trial structure chart;Figure 4: left side baffle plate figure;Fig. 5: right-hand apron figure.1-rain case, 2-water distributor, 3-shower nozzle, 4-effusion meter, 5-electromagnetic valve, 6-water outlet Pipe, 7-regulation valve, 8-return pipe, 9-threeway, 10-water butt, 11-water pump B, 12-dynamic rotary type friction coefficient tester, On the left of 13-card article, 14-water inlet pipe, 15-remittance rain base plate, 16-water pump A, 17-collection box, 19-die trial, 20-on the right side of baffle plate, 21- Baffle plate, 22-left groove, 23-right groove, 24-control chamber, 25-controller, 26-front side form, 27-rear side form, 28- Side form, 30-base plate, display screen-33, input keyboard-34 on the right side of left side side form, 29-.
Detailed description of the invention
Below in conjunction with specific embodiment to the rotary friction of bituminous paving of simulated rainfall described in the utility model it is Number tester is described further, but protection domain of the present utility model is not limited to this.
Embodiment 1
The rotary friction coefficient tester of bituminous paving of a kind of simulated rainfall, described tester includes being divided into capital equipment The rain case 1 in district and auxiliary equipment district, capital equipment district is located at the left of rain case 1;Capital equipment district is converged rain base plate 15 and is divided into Upper and bottom section, bottom is divided into collection box 17, and upper part is divided into again left half and right half;Right half is provided with band at top The water distributor 2 of shower nozzle 3;Right half is provided with two card articles 13 in bottom, places die trial 19 in the middle of these two card articles 13;Die trial 19 Upper surface is provided with dynamic rotary type friction coefficient tester 12;Left half is provided with water butt 10 in bottom, bottom this water butt 10 The water pump A16 being connected in collection box 17 by water inlet pipe 14;Water butt 10 is provided with water pump B11, this water pump B11 at top to be passed through Aqueduct is connected to water distributor 2;Aqueduct is the most also disposed with threeway 9, effusion meter 4 and electromagnetic valve 5;Threeway 9 An only surplus outlet connects the return pipe 8 of band regulation valve 7, and this return pipe 8 is connected to water butt 10;Auxiliary equipment district is provided with control Case 24 processed.
Two card articles 13 and some " one " word vacancy section it is provided with on the right side of described remittance rain base plate 15;Described card article 13 is in rectangular Body.Described die trial 19 include being trapped among the left side side form 28 of base plate 30 4 side, right side side form 29, front side form 26, rear side form 27, Left side baffle plate 20, right-hand apron 21, and four clips;Described left side side form 28 and the length direction of right side side form 29 and lotus Carry wheel direction of travel parallel;Described front side form 26 is vertical with load wheel direction of travel with the length direction of rear side form 27;Institute State and be provided with left groove 22 at the top surface edge of left side side form 28;It is provided with at the top surface edge of described right side side form 29 Right groove 23;Described left side baffle plate 20 can be with socket joint in left groove 22;Described right-hand apron 21 can be with socket joint on right side In groove 23, for regulating the runoff coefficient of PVvalue testing surface of test piece;Four apex of described base plate 30 lower surface, It is symmetrically arranged with four clips, fixing for die trial and test specimen cushion cap.The sky that described die trial 19 is corresponding at base plate 30 Between long 60cm, wide 60cm, high 5cm, i.e. can make the long 60cm of type, wide 60cm, the bitumen mixture specimen of high 5cm.Described control Case 24 processed is provided with display screen 33 and input keyboard 34 on panel, is being internally provided with the controller that electronic circuit board connects 25.Described electromagnetic valve 5, regulation valve 7, water pump B11 and water pump A16 all connect with controller 25.It is provided with in described auxiliary equipment district Temperature sensor and heater;Described connecting shaft is provided with displacement transducer.
When being simulated the bituminous paving dynamic rotary type Test of Friction of rainfall, the water in water butt 10 passes through water The effect of pump B11 flows in water distributor 2 along outlet pipe 6, and is dropped in asphalt examination by shower nozzle 3 simulation formation raindrop Part surface, rainwater from surface of test piece landing to converge rain base plate 15 surface, and along converge rain base plate 15 flow into collection box 17, collection box Water in 17 flows into water butt 10, the water in supply water butt 10 by water pump A16 and water inlet pipe 14;Threeway 9 and regulation valve 7, The synergism of effusion meter 4 and electromagnetic valve 5 can regulate rainfall intensity;By whether arrange left side baffle plate 20 He in die trial both sides Right-hand apron 21 can be with regulated flow coefficient.Under condition of raining, dynamic rotary type friction coefficient tester 12 is placed in die trial 19 and die trial 19 in bitumen mixture specimen surface, the bituminous paving dynamic rotary type coefficient of friction of simulated rainfall can be carried out Test.

Claims (6)

1. the rotary friction coefficient tester of the bituminous paving of a simulated rainfall, it is characterised in that described tester includes point For the rain case (1) in capital equipment district and auxiliary equipment district, capital equipment district is located at the left of rain case (1);Capital equipment district is converged Rain base plate (15) is divided into upper and bottom section, and bottom is divided into collection box (17), and upper part is divided into again left half and right half; Right half is provided with the water distributor (2) of band shower nozzle (3) at top;Right half is provided with two card articles (13) in bottom, these two card articles (13) die trial (19) is placed in the middle of;The upper surface of die trial (19) is provided with dynamic rotary type friction coefficient tester (12);Left half Be provided with water butt (10) in bottom, this water butt (10) bottom is connected to the water pump A in collection box (17) by water inlet pipe (14) (16);Water butt (10) is provided with water pump B (11) at top, and this water pump B (11) is connected to water distributor (2) by aqueduct;Defeated Waterpipe is the most also disposed with threeway (9), effusion meter (4) and electromagnetic valve (5);An only surplus outlet of threeway (9) is even The return pipe (8) of tape splicing regulation valve (7), this return pipe (8) is connected to water butt (10);Auxiliary equipment district is provided with control chamber (24)。
The rotary friction coefficient tester of bituminous paving of simulated rainfall the most according to claim 1, it is characterised in that institute State remittance rain base plate (15) right side and be provided with two card articles (13) and some " one " word vacancy section;Described card article (13) is in cuboid.
The rotary friction coefficient tester of bituminous paving of simulated rainfall the most according to claim 1, it is characterised in that institute State die trial (19) to include being trapped among the left side side form (28) of base plate (30) four side, right side side form (29), front side form (26), rear side Mould (27), left side baffle plate (20), right-hand apron (21), and four clips;Described left side side form (28) and right side side form (29) length direction is parallel with load wheel direction of travel;The length direction of described front side form (26) and rear side form (27) with Load wheel direction of travel is vertical;Left groove (22) it is provided with at the top surface edge in described left side side form (28);Described right side Right groove (23) it is provided with at the top surface edge of side form (29);Described left side baffle plate (20) can be with socket joint in left groove (22) in;Described right-hand apron (21) can be used for regulating PVvalue testing surface of test piece with socket joint in right groove (23) Runoff coefficient;Four apex of described base plate (30) lower surface, are symmetrically arranged with four clips, for die trial and examination Fixing of part cushion cap.
The rotary friction coefficient tester of bituminous paving of simulated rainfall the most according to claim 3, it is characterised in that institute State die trial (19) the space long 60cm corresponding at base plate (30) place, wide 60cm, high 5cm, i.e. can make the long 60cm of type, width 60cm, the bitumen mixture specimen of high 5cm.
The rotary friction coefficient tester of bituminous paving of simulated rainfall the most according to claim 3, it is characterised in that institute State control chamber (24) on panel, be provided with display screen (33) and input keyboard (34), connect being internally provided with electronic circuit board Controller (25).
The rotary friction coefficient tester of bituminous paving of simulated rainfall the most according to claim 3, it is characterised in that institute State electromagnetic valve (5), regulation valve (7), water pump B (11) and water pump A (16) all connects with controller (25).
CN201620822177.4U 2016-08-01 2016-08-01 A kind of bituminous paving rotary friction coefficient tester of simulated rainfall Expired - Fee Related CN205826494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620822177.4U CN205826494U (en) 2016-08-01 2016-08-01 A kind of bituminous paving rotary friction coefficient tester of simulated rainfall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620822177.4U CN205826494U (en) 2016-08-01 2016-08-01 A kind of bituminous paving rotary friction coefficient tester of simulated rainfall

Publications (1)

Publication Number Publication Date
CN205826494U true CN205826494U (en) 2016-12-21

Family

ID=57556804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620822177.4U Expired - Fee Related CN205826494U (en) 2016-08-01 2016-08-01 A kind of bituminous paving rotary friction coefficient tester of simulated rainfall

Country Status (1)

Country Link
CN (1) CN205826494U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106092875A (en) * 2016-08-01 2016-11-09 山西省交通科学研究院 The rotary friction coefficient tester of bituminous paving of simulated rainfall and method of testing thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106092875A (en) * 2016-08-01 2016-11-09 山西省交通科学研究院 The rotary friction coefficient tester of bituminous paving of simulated rainfall and method of testing thereof
CN106092875B (en) * 2016-08-01 2019-01-25 山西省交通科学研究院 The rotary friction coefficient tester of the bituminous pavement of simulated rainfall and its test method

Similar Documents

Publication Publication Date Title
CN102590475B (en) Fine simulation test device and fine simulation test method for slope water erosion
Agassi et al. Methodologies for interrill soil erosion studies
Boer et al. Effects of spatially structured vegetation patterns on hillslope erosion in a semiarid Mediterranean environment: a simulation study
Armstrong et al. Variability of interrill erosion at low slopes
CN102636401B (en) Testing device and evaluating method for water stability of water-permeable bituminous mixture
CN205844153U (en) A kind of bituminous paving friction coefficient tester of simulated rainfall
CN107132137B (en) A kind of asphalt constraint test specimen wheel tracking test device and method
CN202562819U (en) Water-permeability asphalt mixture water stability testing device
Dell'Acqua et al. Indirect skid resistance measurement for porous asphalt pavement management
CN206208639U (en) The multifactor coefficient pavement test device of one kind simulation
CN205826494U (en) A kind of bituminous paving rotary friction coefficient tester of simulated rainfall
CN207623202U (en) A kind of OGFC bituminous concretes test specimen coefficient of permeability test device
CN205844085U (en) A kind of asphalt pavement rut tester of simulated rainfall
CN205643059U (en) Measurement device for cement concrete pavement top layer scour resistance ability
Wang et al. Characterization of dynamic response of asphalt pavement in dry and saturated conditions using the full-scale accelerated loading test
El-Desouky Investigating the effect of temperature variations on the measured airfield pavement skid resistance
CN105806776A (en) Device and method for testing skid resistance of asphalt mixture in damp state
CN107037199B (en) Asphalt antiskid method of evaluating performance based on gray relative
CN106093360A (en) The asphalt pavement rut tester of a kind of simulated rainfall and test method thereof
CN105297576B (en) A kind of internal car noise test pavement and its laying method, internal car noise method of testing
CN106092875A (en) The rotary friction coefficient tester of bituminous paving of simulated rainfall and method of testing thereof
CN104062159A (en) Porous asphalt mixture gap blocking experiment method
CN103712909A (en) Synchronous testing method for friction coefficient and friction noise of pavement
CN106290145B (en) A kind of the bituminous pavement friction coefficient tester and its test method of simulated rainfall
Verhaegen The influence of soil properties on the erodibility of Belgian loamy soils: a study based on rainfall simulation experiments

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161221

Termination date: 20190801