CN2058247U - Multi-function automatic testing equipment - Google Patents
Multi-function automatic testing equipment Download PDFInfo
- Publication number
- CN2058247U CN2058247U CN 89220591 CN89220591U CN2058247U CN 2058247 U CN2058247 U CN 2058247U CN 89220591 CN89220591 CN 89220591 CN 89220591 U CN89220591 U CN 89220591U CN 2058247 U CN2058247 U CN 2058247U
- Authority
- CN
- China
- Prior art keywords
- test
- rail
- electricity consumption
- points
- multifunctional automatic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The utility model discloses a multifunctional automatic testing equipment for electric appliances. A testing table is provided with two load power rails and a meter power rail. The load power rails are provided with insulation separators according to inspection items and points of cut-off of data preset by the inspection items. Moreover, top ends of the power rails are circularly provided with a plurality of testing objects which are driven in turning. When every object moves to the points of cut-off, electric brushes arranged on the bottom of the rail instantly transmit setting values of inspection items of the points of cut-off to the individual and compare the setting values with testing values, and then results are displayed on an instrument panel. The testing objects qualified with test standards move to next points of cut-off, and the unqualified individuals activate an alarm. All tests of products can be simultaneously accomplished on certain points on the testing table. The transportations of the products are reduced, and the productivity is raises.
Description
The utility model is a kind of multifunctional automatic test system, especially refer in particular to a kind of proving installation of simplifying the electrical function check program that has, the negative section electricity consumption rail of the test board of this device is preset with multistage menopause fate and blocks track every it, test unit by gear start revolution is moved to block track, block and then set test event on the track respectively, the top is placed with treat the measured value of the test unit of electricity measurer to be compared with former established standards value, and be shown in respectively on the instrument panel, measure the quality of electric equipment products with check.
For safeguard the consumer safe in utilization with guarantee product quality, when electric product was made, manufacturer must be through a series of characteristic test, temperature when being grill pan as product, withstand voltage, insulation, heater strip power.The test of projects such as insulation power; Its traditional check program must be set the testing station in regular turn, and product is carried to next testing station again after an individual event functional test is qualified, product is after an individual event functional test is qualified, be carried to next testing station again, treat all items all check meet preassigned after, sale begins to dispatch from the factory; Because the device distribution of each Interventions Requested is not existing together, make the product must be through multiple carrying, during the waste worker and cost very high, the efficient of the control that can't improve the quality.
Because above-mentioned conventional electrical product test system is in design, the defective on the manufacturing technology can't realize multifunctional automatic test, when saving the porter, and the requirement of enhancing productivity.Historical facts or anecdotes has a kind of necessity with the multifunctional automatic test system that improves above-mentioned defective of develop and spread, and the present situation of carrying inconvenience is saved man-hour, the purpose that reduces production costs to reach when checking to improve electric product.
Both deposit defective for what improve traditional manual test board, the applicant has gathered the manufacturing experience of being engaged in this industry for many years, breaks through the restriction of conventional art level, to improve electric product test board checking function, is its purpose.
The application's fundamental purpose ties up in a kind of multifunctional automatic test system is provided, and the electric product checker can finish all tests according to the Interventions Requested of setting in fixed point on oval tester table, to reduce product carrying number of times; When product individual event test number is lower than the established standards value, the buzzer message that just gives a warning on the instrument panel.
Another purpose of the application is to provide a kind of multifunctional automatic test system, and its load can detect according to first article and need do the elasticity setting with the test truncation points and the test unit number of track.
Relevant the utility model is for achieving the above object, and technological means that is adopted and body configuration thereof, feature, purpose, content and function then by cooperating illustrating of embodiment, can obtain more detailed understanding.Shown in the existing adjoint, be described in detail as follows:
Fig. 1 is the schematic perspective view of multifunctional automatic test system of the present utility model.
Fig. 2 is the synoptic diagram of multifunctional automatic test system electricity rail of the present utility model, brush part.
Fig. 3 is the synoptic diagram of the utility model multifunctional automatic test system load electricity consumption rail truncation test.
Fig. 4 treats the synoptic diagram of electricity measurer for the test unit carrying of the utility model multifunctional automatic test system.
(5a, 5b 5c) are the wiring schematic diagram of the utility model multifunctional automatic test system test case to Fig. 5.
Fig. 6 is a test unit guidance panel synoptic diagram.
Fig. 7 is the test unit circuit diagram.
Fig. 8 is a test unit temperature test system diagram.
Fig. 9 is the temperature control block schematic diagram of test unit.
Figure 10 is a multifunctional automatic test system central machine deck plate synoptic diagram.
Figure number in all accompanying drawings is partly represented:
1: test board 11: board
12: load electricity consumption rail 121: truncation points
13: instrument electricity consumption rail 14: brush
15: central board 2: electrical equipment
3: test unit 1211,1212: segmentation truncation points
16: instrument panel 17: cable
Now consult Fig. 1 and 2, be furnished with on the oval board 11 of the utility model multifunctional automatic test system 1 load electricity consumption rail 12, with an annular instrument electricity consumption rail 13, each electric rail 12 is for being set as a plurality of truncation points 121 according to electrical equipment 2 check item numbers, 121 of each truncation points, separate (as shown in Figure 3) with the insulator insulation, and have the standard figures setting of Interventions Requested.
The outer test units 3 that are equipped with equidistant separation of load electricity consumption rail 12 are moved by body gear band action revolution, its top and carry treat that electricity measurer 2(sees Fig. 4); Test unit 3 is the box test cell, one load power source voltage input line and control supply voltage output line (the line footpath is thinner) are arranged, when test unit 3 carrying (for example) grill pans 2 by gear driven during to load electricity consumption rail 12 first truncation points 1211, track bottom brush (14) just conducts to test unit 3 with first truncation points, 1211 Interventions Requested established standards values, this established standards value is compared with the meter reading on the instrument panel 16 again, surmount the established standards value as meter reading, buzzer on the instrument panel is the message that gives a warning moment, as the warning of disqualified upon inspection, remind the reviewer to eliminate this electrical equipment; When it meets setting value, test unit 3 just advances to second truncation points 1212 and does his check, as the temperature of the former setting of present embodiment test grill pan, withstand voltage, insulation, heating power and insulation power etc., make the reviewer can carry out five setting tests (test unit moves to the 5th truncation points from first truncation points) of grill pan in fixed position, with avoid over because of the testing tool facility in different places, must treat the inconvenience of carrying continuously, thereby improve makers' production efficiency.
The number and the functional test project of the truncation points 121 of the utility model load electricity consumption rail 12, all can set different Interventions Requested according to product to be measured functional, make between test unit 3 and test board and have good insulation, its temperature test, the control function process flow diagram, with the guidance panel configuration, built-up circuit figure is shown in annex one to four, when test unit control power supply is the ON state, connect temperature sensor, after electricity is sent in load (electric finished product to be measured), begin heating, temperature rises, pilot lamp is bright to be opened, and load current is to carry through PC plate current transformer (CT), and relay is the state by OFF; When the start of electric product temperature switch (being maximum temperature usually), cut off load power source, current transformer this moment (CT) is output as zero current, relay is transmitted trigger the ON state; Another winding point of relay then is connected to temperature controller " HOLD " input end; in time keep the temperature test value; pilot lamp promptly extinguishes;, go out state bright by pilot lamp are to judge the temperature effect (overheating protection trip-point, reliability, sensitivity, degree of stability etc.) of electrical equipment finished product (as various heating electric appliances articles for use such as grill pan, electronic pot, electric iron, motor stove, electric hot water bottle, the machines of beginning to drink).
The utility model multifunctional automatic test system is made as multi-functional, it is intended to have following function converting unit, as voltage, electric current, electric power, temperature, proof voltage, insulation resistance, resistance (interior resistance or contact resistance), pressure (cooperation pneumatics), rotating speed, frequency, power factor, product electrical endurance, mechanical life etc., its every test wiring such as Fig. 5 (5a, 5b, 5c) shown in:
Wiring diagram when Fig. 5 a is proof voltage, megger test.
Wiring diagram when Fig. 5 b is an electric power to be measured.
Wiring diagram during Fig. 5 c tachometry.
Truncation points 121 numbers and the functional test project of the utility model load electricity consumption rail 12, all can be according to the functional characteristic of product to be measured, set different Interventions Requested, this test board 1 surcharge is more improved, and be generalized to the verification test of every electric, precise electronic spare.
In sum, the utility model multifunctional automatic test system is the creation of a brand-new practicality in fact, for simplifying the functions of electric appliances check, has remarkable effect.
Fig. 6 is for implementing reference diagram of the present invention to Figure 10.
Claims (4)
1, a kind of multifunctional automatic test system, it is mainly formed and comprises:
One tester table: the ovalize test board, be distributed with two the load electricity consumption rails and an instrument electricity consumption rail of concentration ellipse, electric flange of rail end also is respectively equipped with brush;
A plurality of test units: for box body examination examination unit, do gyration by the gear driven of being located under the central board in load electricity consumption tread end, the plane seat of monomer upper end also can carry treats electricity measurer or element;
It is characterized in that: described load electricity consumption rail is according to treating that the Interventions Requested of electricity measurer (element) are set as a plurality of truncation points, when making test unit be moved to truncation points by the gear start, the brush of load electricity consumption rail promptly transmits the Interventions Requested preset standard value of this truncation points to test cell, make comparisons for test reading value on the instrument panel, to according with the established standards interval, test cell is made the specification test of difference in functionality successively in each truncation points, make and treat that electricity measurer (element) implements default Interventions Requested in a fixed point and treat the carrying of electricity measurer (element) with minimizing, thereby improved production, testing efficiency.
2,, it is characterized in that separating with the insulator insulation between described each truncation points of load electricity consumption rail according to the described multifunctional automatic test system of claim 1.
3, according to the described multifunctional automatic test system of claim 1, it is characterized in that the Interventions Requested of counting and treating electricity measurer, element that block of described load electricity consumption rail, be according to treating electricity measurer, component products characteristic, do that different Interventions Requested set.
4,, it is characterized in that the centre board is provided with among the described test board respectively to check the numerical value Displaying Meter with the read test value according to the described multifunctional automatic test system of claim 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 89220591 CN2058247U (en) | 1989-12-02 | 1989-12-02 | Multi-function automatic testing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 89220591 CN2058247U (en) | 1989-12-02 | 1989-12-02 | Multi-function automatic testing equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2058247U true CN2058247U (en) | 1990-06-13 |
Family
ID=4875238
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 89220591 Withdrawn CN2058247U (en) | 1989-12-02 | 1989-12-02 | Multi-function automatic testing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2058247U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101978276A (en) * | 2008-03-21 | 2011-02-16 | 电子科学工业有限公司 | Electrical tester setup and calibration device |
-
1989
- 1989-12-02 CN CN 89220591 patent/CN2058247U/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101978276A (en) * | 2008-03-21 | 2011-02-16 | 电子科学工业有限公司 | Electrical tester setup and calibration device |
CN101978276B (en) * | 2008-03-21 | 2013-07-31 | 电子科学工业有限公司 | Electrical tester setup and calibration device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207430730U (en) | A kind of rotating disc type automatic testing equipment | |
CN203217023U (en) | Motor and transformer microcomputer integration test stand | |
CN102495292A (en) | Method and circuit for online monitoring capacity state of bus capacitor | |
CN210051836U (en) | Intelligent large-current temperature rise test system | |
CN110919144A (en) | Automatic detection device and detection method for welding power supply | |
CN104191424A (en) | Intelligent safety tool cabinet unit of high-voltage substation | |
CN2058247U (en) | Multi-function automatic testing equipment | |
CN111090256A (en) | Voltage safety interlocking control device for ionic membrane caustic soda electrolytic cell | |
CN103197245B (en) | Detecting device and detecting technology for servo motor stator | |
CN104614667B (en) | A kind of Switching Power Supply yoke plate auto testing instrument and method | |
CN104049191B (en) | Multi-station alternating-current voltage testing device | |
CN201548632U (en) | On-line monitoring device for capacitive equipment of intelligent transformer substation | |
CN106127383B (en) | Intelligent safety tool training and evaluation management system | |
CN115032530A (en) | Full-automatic mechanical performance test and accelerated aging platform for medium-voltage circuit breaker | |
CN205941823U (en) | Specified surplus switch -on breaking capacity testing arrangement | |
CN114690111A (en) | Online quality check backflow self-checking method for three-phase electric energy meter | |
CN204758790U (en) | Automatic fault diagnostic of mining ac motor | |
CN114038287A (en) | PLC virtual-real integrated practical training equipment with wiring alarm function | |
CN210533534U (en) | Weighing device for production line | |
CN210243752U (en) | Transformer test system compatible with multiple types of transformers | |
CN2442277Y (en) | Combined detector for general safety property | |
CN215219495U (en) | Specification taking-out and identifying device | |
CN216051970U (en) | IH cooking utensil electric capacity interference tester | |
CN213457137U (en) | Power adapter detection device | |
CN205691751U (en) | A kind of simulated automotive starts intelligent test instrument apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C15 | Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993) | ||
RN01 | Renewal of patent term | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |