CN205822623U - Locker, solar photovoltaic roof are installed and there is its building - Google Patents
Locker, solar photovoltaic roof are installed and there is its building Download PDFInfo
- Publication number
- CN205822623U CN205822623U CN201620734658.XU CN201620734658U CN205822623U CN 205822623 U CN205822623 U CN 205822623U CN 201620734658 U CN201620734658 U CN 201620734658U CN 205822623 U CN205822623 U CN 205822623U
- Authority
- CN
- China
- Prior art keywords
- locker
- supporting part
- connecting portion
- roof
- photovoltaic cell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
This utility model provides a kind of building installed locker, solar photovoltaic roof and have it.This installation locker includes: the first locker part;Second locker part, the first end of this second locker part is the second supporting part that the first supporting part with the first locker frame matches, and the second end is the portion that is connected that the second connecting portion with the first locker part is connected;3rd locker part, the second end of the 3rd locker part and the first locker part is connected to clamp photovoltaic cell component;First supporting part and the second supporting part form splayed configuration and prop up spike, and what splayed configuration propped up that spike formed accommodates space for accommodating the waterproof connection supporting part of the joint of adjacent two metal roofing boards of waterproof roof structure.Application the technical solution of the utility model can solve in prior art for complete roofing install photovoltaic cell component can damage roof waterproof performance, and the problem that installation difficulty is big.
Description
Technical field
This utility model relates to photovoltaic building technical field, installs locker, solar photovoltaic roof in particular it relates to a kind of
And there is its building.
Background technology
At present, completing building, the metal Roof of structures architectural sets up photovoltaic cell, typically take from building
The bearing increasing photovoltaic cell support on building structure is anchor point, and such one is to destroy the original water proof structure of building, the shortest
Post fulcrum runs through metal Roof, even if taking effective waterproof measure, also cannot ensure that the waterproof measure of each fulcrum is being executed
There is breakage during work, during use, cause leakage hidden trouble, affect the use function of roofing;Two is that difficulty of construction is big,
Point passes roofing from completed building structure layer, and working place is little, the safety coefficient of personnel's construction is low, carries in work progress
The disaster hidden-trouble come is big, and especially in work progress, roof boarding is opened, and the use function built in construction period for guarantee must
Need do substantial amounts of interim measure, therefore take traditional mounting means can at the architectural photovoltaic cell of setting up of existing metal Roof
Operability is low, and coverage is big, and the development to photovoltaic building causes difficulty.
Utility model content
The purpose of this utility model is to provide a kind of building installed locker, solar photovoltaic roof and have it,
Aim to solve the problem that in prior art for complete roofing install photovoltaic cell component can damage roof waterproof performance, and installation difficulty
Big problem.
For solving above-mentioned technical problem, the technical solution of the utility model is: provide one to install locker, including: first
Locker part, the first end of this first locker part is the first supporting part, and the second end is the first connecting portion, first end and second
Mid portion between end is the second connecting portion;Second locker part, the first end of this second locker part is to support with first
The second supporting part that portion matches, the second end is the portion that is connected being connected with the second connecting portion;3rd locker part, should
The second end of the 3rd locker part and the first locker part is connected to clamp photovoltaic cell component;Wherein, the first supporting part
Forming splayed configuration with the second supporting part and prop up spike, splayed configuration props up receiving space that spike formed for accommodating waterproof roof structure
The waterproof connection supporting part of joint of adjacent two metal roofing boards, and the first supporting part and the clamping of the second supporting part waterproof
Connect supporting part.
Alternatively, the first connecting portion is in horizontally disposed clamping plate.
Alternatively, it is vertically arranged between the second connecting portion and the first connecting portion.
Alternatively, the mid portion of the first locker part is provided with spacing preiection, shape between spacing preiection and the first connecting portion
Becoming spacing occlusal crib, the second end of the second locker part to be provided with spacing termination, spacing termination is inserted in spacing occlusal crib.
Alternatively, the first connecting portion and the 3rd locker part are bolted, and the second connecting portion passes through with the portion of being connected
Bolt connects.
According to another aspect of the present utility model, it is provided that a kind of solar photovoltaic roof, including: waterproof roof structure,
The joint of adjacent two metal roofing boards of this waterproof roof structure is provided with waterproof connection supporting part;Solar photovoltaic roof is also
Including: photovoltaic cell component, this photovoltaic cell component is connected on waterproof connection supporting part by installing locker, installs locker and is
Aforesaid installation locker.
Alternatively, photovoltaic cell component includes photovoltaic silicon structure and is encapsulated in the encapsulation frame of photovoltaic silicon structure surrounding, envelope
Rim frame is by the first connecting portion and the clamping of the 3rd locker part installing locker.
Alternatively, solar photovoltaic roof includes multiple photovoltaic cell component, and between multiple photovoltaic cell components, interval sets
Put.
According to another aspect of the present utility model, it is provided that a kind of building, including construction wall be connected to building wall
The roofing on body top, this roofing is aforesaid solar photovoltaic roof.
In this utility model, the splayed configuration formed by the first supporting part and the second supporting part is propped up spike and props up with waterproof connection
Cooperation between support part, can be fastened on roofing by fall installation locker on the premise of not damaging conventional one-tenth roofing, and
By the cooperation between the first connecting portion and the 3rd locker part, photovoltaic cell component is clamped and installed on roofing, thus realize
Complete installing solar photovoltaic component on roofing.Application the technical solution of the utility model, maintains the water resistance of roofing,
Reduce the difficulty of construction installing photovoltaic cell component simultaneously, improve the safety coefficient in staff's work progress.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of solar photovoltaic roof of the present utility model;
Fig. 2 is structure for amplifying schematic diagram at the A in Fig. 1;
Fig. 3 is the partial structurtes schematic diagram of Fig. 1.
In the accompanying drawings:
10, the first locker part;11, the first supporting part;12, the first connecting portion;13, the second connecting portion;
14, spacing preiection;20, the second locker part;21, the second supporting part;22, be connected portion;
23, spacing termination;30, the 3rd locker part;100, photovoltaic cell component;
101, photovoltaic silicon structure;102, encapsulation frame;200, waterproof roof structure;
201, metal roofing board;202, waterproof connection supporting part.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing and enforcement
Example, is further elaborated to this utility model.Should be appreciated that specific embodiment described herein is only in order to explain
This utility model, is not used to limit this utility model.
It should be noted that when element is referred to as " being fixed on " or " being arranged at " another element, and it can be directly separately
On one element or be connected on this another element.When an element is referred to as " being connected to " another element, and it is permissible
It is directly to another element or is indirectly connected on this another element.
Also, it should be noted the orientation term such as left and right, upper and lower in the present embodiment, be only each other relative concept or
With the normal operating condition of product as reference, and should not be regarded as restrictive.
As shown in Figure 1 to Figure 3, the installation locker of the present embodiment includes first locker part the 10, second locker part 20 and the 3rd
Locker part 30, the first end of this first locker part 10 is the first supporting part 11, and the second end is the first connecting portion 12, the first end
Mid portion between portion and the second end is the second connecting portion 13, and the first end of this second locker part 20 is to support with first
The second supporting part 21 that portion 11 matches, the second end is the portion that is connected 22 being connected with the second connecting portion 13, and this is years old
Three locker parts 30 are connected to clamp photovoltaic cell component 100 with the second end of the first locker part 10, wherein, and first
Support part 11 and the second supporting part 21 form splayed configuration and prop up spike, and it is waterproof for accommodating that splayed configuration props up the receiving space that spike formed
The waterproof connection supporting part 202 of the joint of adjacent two metal roofing boards 201 of roof structure 200, and the first supporting part 11
Clamp with the second supporting part 21 and waterproof be connected supporting part 202.
Eight words formed by the first supporting part 11 of the first locker part 10 and the second supporting part 21 of the second locker part 20
Type props up spike and the waterproof cooperation being connected between supporting part 202, fall can install lock on the premise of not damaging conventional one-tenth roofing
Folder is fastened on roofing, and by the cooperation between the first connecting portion 12 and the 3rd locker part 30 of the first locker part 10
Photovoltaic cell component 100 is clamped and installed on roofing, thus realize complete installing solar photovoltaic component on roofing.Should
By the technical solution of the utility model, neither damage complete roofing on the premise of achieve the peace of photovoltaic cell component 100
Dress, maintains the water resistance of roofing, reduces the difficulty of construction installing photovoltaic cell component 100 simultaneously, improve staff
Safety coefficient in work progress.
As shown in Figures 2 and 3, in the present embodiment, owing to photovoltaic cell component 100 is plate-shaped member, locked by installation
Pressing from both sides the edge to the photovoltaic cell component 100 of tabular to be clamped installing, therefore, the first connecting portion 12 is in horizontally disposed folder
Tight plate, and, it is vertically arranged between the second connecting portion 13 and the first connecting portion 12.Photovoltaic cell component is made by installing locker
Leave gap between 100 and roofing, it is simple to ventilation and heat, also allow for roofing during the rainy day simultaneously and carry out draining.
During connecting the first locker part 10 and the second locker part 20, for convenience the second locker part 20 is positioned at
On first locker part 10, therefore, the mid portion of the first locker part 10 is provided with spacing preiection 14, and spacing preiection 14 and first connects
Connecing and form spacing occlusal crib between portion 12, the second end of the second locker part 20 is provided with spacing termination 23, and spacing termination 23 is inserted
Enter in spacing occlusal crib.Staff only needs just to have positioned spacing termination 23 to placing with spacing occlusal crib.Enter one
Step ground, first connecting portion 12 of the present embodiment is bolted with the 3rd locker part 30, the second connecting portion 13 be connected
Portion 22 is bolted.After first locker part 10 and the second locker part 20 have been positioned by staff, then by even
First locker part 10 is connected fixing by connecting bolt with the second locker part 20, convenient, fast, and installs accurately.
According to another aspect of the present utility model, it is provided that a kind of solar photovoltaic roof.This solar photovoltaic roof bag
Include waterproof roof structure 200 and photovoltaic cell component 100, adjacent two metal roofing boards 201 of this waterproof roof structure 200
Joint is provided with this photovoltaic cell component 100 of waterproof connection supporting part 202 and is connected to waterproof connection by aforesaid installation locker
On supporting part 202.The installation locker provided by the present embodiment has completed to be pacified by photovoltaic cell component 100 on roofing accordingly
Dress is fixing, both can not damage the water resistance having completed roofing, and can complete again photovoltaic cell component 100 conveniently and efficiently
Operation is installed, reduces installation difficulty, it is ensured that while worker safety, improve work efficiency.
As shown in Figures 2 and 3, photovoltaic cell component 100 includes photovoltaic silicon structure 101 and is encapsulated in photovoltaic silicon structure 101
The encapsulation frame 102 of surrounding, encapsulation frame 102 is clamped with the 3rd locker part 30 by the first connecting portion 12 installing locker.Due to
Photovoltaic cell component 100 is plate-shaped member, and the edge of photovoltaic silicon structure 101 is weaker, therefore, in photovoltaic silicon structure 101
Edge arrange encapsulation frame 102, the complete of photovoltaic silicon structure 101 can not only be protected, it is also possible to strengthen photovoltaic cell
The bonding strength of assembly 100.
When carrying out installing photovoltaic cell component 100 for the roofing of building, such as gymnasium, exhibition center, station
Building etc., owing to the roofing area of these buildings is relatively big, therefore, solar photovoltaic roof includes multiple photovoltaic cell
Assembly 100, between multiple photovoltaic cell components 100, interval is arranged.
According to another aspect of the present utility model, it is provided that a kind of building.This building includes construction wall and connection
At the roofing on construction wall top, roofing is aforesaid solar photovoltaic roof.
These are only preferred embodiment of the present utility model, not in order to limit this utility model, all in this practicality
Any amendment, equivalent and the improvement etc. made within novel spirit and principle, should be included in guarantor of the present utility model
Within the scope of protecting.
Claims (9)
1. an installation locker, it is characterised in that including:
First locker part (10), the first end of this first locker part (10) is the first supporting part (11), and the second end is first
Connecting portion (12), the mid portion between first end and the second end is the second connecting portion (13);
Second locker part (20), the first end of this second locker part (20) for match with described first supporting part (11) the
Two supporting parts (21), the second end is the portion that is connected (22) being connected with described second connecting portion (13);
3rd locker part (30), the 3rd locker part (30) is connected to incite somebody to action with the second end of described first locker part (10)
Photovoltaic cell component (100) clamps;
Wherein, described first supporting part (11) and described second supporting part (21) form splayed configuration and prop up spike, and described splayed configuration props up
The receiving space that spike is formed is for accommodating connecting of adjacent two metal roofing board (201) of waterproof roof structure (200)
The waterproof connection supporting part (202) at place, and described first supporting part (11) clamps described waterproof with described second supporting part (21)
Connect supporting part (202).
Locker is installed the most as claimed in claim 1, it is characterised in that described first connecting portion (12) is in horizontally disposed folder
Tight plate.
Locker is installed the most as claimed in claim 2, it is characterised in that described second connecting portion (13) and described first connecting portion
(12) it is vertically arranged between.
Locker is installed the most as claimed in claim 1, it is characterised in that the mid portion of described first locker part (10) is provided with
Spacing preiection (14), forms spacing occlusal crib between described spacing preiection (14) and described first connecting portion (12), and described second
The second end of locker part (20) is provided with spacing termination (23), and described spacing termination (23) is inserted in described spacing occlusal crib.
5. the installation locker as according to any one of Claims 1-4, it is characterised in that described first connecting portion (12) and institute
Stating the 3rd locker part (30) to be bolted, described second connecting portion (13) is with the described portion that is connected (22) by bolt even
Connect.
6. a solar photovoltaic roof, including:
Waterproof roof structure (200), the joint of adjacent two metal roofing boards (201) of this waterproof roof structure (200) sets
There is waterproof connection supporting part (202);
It is characterized in that, described solar photovoltaic roof also includes:
Photovoltaic cell component (100), this photovoltaic cell component (100) is connected to described waterproof connection supporting part by installing locker
(202), on, described installation locker is the installation locker according to any one of claim 1 to 5.
7. solar photovoltaic roof as claimed in claim 6, it is characterised in that described photovoltaic cell component (100) includes light
Lie prostrate silicon structure (101) and be encapsulated in the encapsulation frame (102) of described photovoltaic silicon structure (101) surrounding, described encapsulation frame (102)
By first connecting portion (12) of described installation locker and the 3rd locker part (30) clamping.
8. solar photovoltaic roof as claimed in claim 6, it is characterised in that described solar photovoltaic roof includes multiple institute
Stating photovoltaic cell component (100), between multiple described photovoltaic cell components (100), interval is arranged.
9. a building, including construction wall and the roofing being connected to described construction wall top, it is characterised in that described room
Face is the solar photovoltaic roof according to any one of claim 6 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620734658.XU CN205822623U (en) | 2016-07-12 | 2016-07-12 | Locker, solar photovoltaic roof are installed and there is its building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620734658.XU CN205822623U (en) | 2016-07-12 | 2016-07-12 | Locker, solar photovoltaic roof are installed and there is its building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205822623U true CN205822623U (en) | 2016-12-21 |
Family
ID=57563724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620734658.XU Expired - Fee Related CN205822623U (en) | 2016-07-12 | 2016-07-12 | Locker, solar photovoltaic roof are installed and there is its building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205822623U (en) |
-
2016
- 2016-07-12 CN CN201620734658.XU patent/CN205822623U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101324500B1 (en) | Roof type photovoltaic module equipment | |
KR200467825Y1 (en) | Roof structure with solar cell module panel | |
CN104153524B (en) | Roofing skylight is fixed and drainage arrangement | |
WO2022000985A1 (en) | Load-bearing framework having no damage to metal roof and mounting method | |
JP2013221393A (en) | Support structure for roof-fixed solar panel | |
WO2021042805A1 (en) | Photovoltaic building component and building integrating photovoltaics | |
CN106059453A (en) | Roof photovoltaic module support | |
TW202124892A (en) | Combining assembly for truss structure capable of conveniently and quickly assembling a truss structure for a solar power generation module at a lower cost | |
CN205822623U (en) | Locker, solar photovoltaic roof are installed and there is its building | |
CN204681292U (en) | Photovoltaic module fixture | |
JP6224389B2 (en) | Equipment installation materials and equipment installation roof | |
CN205822621U (en) | Locker, solar photovoltaic roof are installed and there is its building | |
KR101305109B1 (en) | Exterior insulation gang form apparatus with improved tie bolt device, and exterior insulation wall construction method using the same | |
JP4870241B1 (en) | Photovoltaic panel mounting structure | |
CN211648185U (en) | Shield tunnel externally-hung channel structure with fire-proof plate | |
CN205637262U (en) | Energy -conserving curtain system of mixing | |
CN205822622U (en) | Locker, solar photovoltaic roof are installed and there is its building | |
CN212453140U (en) | Splicing apparatus for building materials | |
CN211421647U (en) | Canopy keel structure | |
CN210780634U (en) | Component for connecting photovoltaic module and cable structure | |
CN210490785U (en) | Be applied to block structure of tile formula photovoltaic module frame attach | |
CN206004578U (en) | A kind of mounting bracket system | |
CN106487323A (en) | Photovoltaic module installation system | |
CN205657628U (en) | Solar photovoltaic joining of plates spare | |
CN109859645A (en) | A kind of hung type LED screen mounting structure and installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 Termination date: 20200712 |