CN205822119U - A kind of construction of hydro project automatic drain system - Google Patents
A kind of construction of hydro project automatic drain system Download PDFInfo
- Publication number
- CN205822119U CN205822119U CN201620720297.3U CN201620720297U CN205822119U CN 205822119 U CN205822119 U CN 205822119U CN 201620720297 U CN201620720297 U CN 201620720297U CN 205822119 U CN205822119 U CN 205822119U
- Authority
- CN
- China
- Prior art keywords
- pipe
- water
- water inlet
- construction
- inlet pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
This utility model relates to a kind of construction of hydro project automatic drain system, including: water pump, water inlet pipe, outlet pipe, detector, point water inlet pipe, drinking-water pipe, the joint that draws water, collector pipe, construction site, liquid level control switch, PLC control device, one end of water pump is connected with detector by outlet pipe, and the other end is connected with a point water inlet pipe by water inlet pipe;Dividing water inlet pipe to connect drinking-water pipe respectively, each drinking-water pipe is connected on the collector pipe of correspondence;Collector pipe is arranged on rises, is provided with liquid level control switch in collector pipe.This construction of hydro project automatic drain system can realize Auto-drainage in engineering, saves the engineering time, simple in construction, reduces water resource loss.
Description
Technical field
This utility model belongs to hydraulic engineering technical field, particularly relates to a kind of construction of hydro project Auto-drainage system.
Background technology
At present, in construction of hydro project, often in the local construction less than water level, such engineering ground will be because of oozing
Water or the generation hydrops that leaks, thus affect dry work, existing drainage arrangement structure is complicated, cost is bigger, drainage effect
Typically, the working time is wasted.
Summary of the invention
This utility model is to solve the drainage system structure complexity of construction of hydro project, cost present in known technology
Bigger, problem that drainage effect is general and provide a kind of simple in construction, easy to install, improve the water conservancy work of work efficiency
Journey construction Auto-drainage system.
This utility model is adopted the technical scheme that by solving technical problem present in known technology:
A kind of construction of hydro project automatic drain system, this construction of hydro project automatic drain system includes: water pump,
Water inlet pipe, outlet pipe, point water inlet pipe, drinking-water pipe, the joint that draws water, collector pipe, construction site, liquid level control switch, PLC control dress
Put;
One end of water pump is connected with outlet pipe, and the other end is connected with a point water inlet pipe by water inlet pipe;Water inlet pipe is divided to connect respectively
Connecing drinking-water pipe, the joint that draws water is arranged on collector pipe, and drinking-water pipe is connected on collector pipe by the joint that draws water;Collector pipe is arranged on
Rises, construction site, is provided with liquid level control switch in collector pipe, PLC controls device and is connected with water pump.
Further, self priming pump selected by described water pump, and water pump is provided with water inlet, outlet, and collector pipe lower end connects collection
Moisture arm, described in the branched pipe that catchments be provided with multiple, multiple branched pipes that catchment are distributed in collector pipe lower end radially.
Further, PLC control device is provided with PLC, display floater, automatic electromagnetic valve, wireless receiver, institute
State display floater, automatic electromagnetic valve, wireless receiver are all connected with PLC, described PLC be provided with controller and
A/d converter reverse connection mutually.
Further, described water inlet pipe both sides are fixedly installed multiple points of water inlet pipes, and the termination of point water inlet pipe has external screw thread
Or female thread, drinking-water pipe one end has female thread or the external screw thread that external screw thread or female thread with point water inlet pipe match.
Further, described liquid level control switch is that height is opened low stopping and controlled switch, and is provided with wireless transmitter, described wireless
Emitter is connected with wireless receiver.
This utility model has the advantage that with good effect: this construction of hydro project automatic drain system PLC controls
Being arranged in engineering of device can realize Auto-drainage, saves the engineering time, and simple in construction reduces water resource loss;Under collector pipe
Multiple branched pipes that catchment that end connects, can effectively blot the water that clean construction site is oozed out, can understand row in real time by display floater
The situation of water.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of construction of hydro project automatic drain system that this utility model embodiment provides
Figure;
In figure: 1, water pump;2, water inlet pipe;3, outlet pipe;4, water inlet pipe is divided;5, drinking-water pipe;6, draw water joint;7, catchment
Pipe;8, construction site;9, liquid level control switch;10, PLC controls device;11, catchment branched pipe.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate
Accompanying drawing describes in detail as follows:
Refer to shown in Fig. 1:
A kind of construction of hydro project automatic drain system, this construction of hydro project automatic drain system includes: water pump
1, water inlet pipe 2, outlet pipe 3, point water inlet pipe 4, drinking-water pipe 5, the joint 6 that draws water, collector pipe 7, construction site 8, liquid level control switch
9, PLC controls device 10;
One end of water pump 1 is connected with outlet pipe, and the other end is connected with a point water inlet pipe 4 by water inlet pipe;Divide water inlet pipe respectively
Connecting drinking-water pipe, the joint 6 that draws water is arranged on collector pipe, and drinking-water pipe is connected on collector pipe by the joint that draws water;Collector pipe sets
Putting rises on construction ground, be provided with liquid level control switch 9 in collector pipe, PLC controls device and is connected with water pump.
Self priming pump selected by described water pump, and water pump is provided with water inlet, outlet, and collector pipe lower end connects the branched pipe that catchments
11, described in the branched pipe 11 that catchments be provided with multiple, multiple branched pipes that catchment are distributed in collector pipe lower end radially.
PLC controls device 10 and is provided with PLC, display floater, automatic electromagnetic valve, wireless receiver, described display
Panel, automatic electromagnetic valve, wireless receiver are all connected with PLC, and described PLC is provided with controller and AD conversion
Device reverse connection mutually.
Described water inlet pipe both sides are fixedly installed multiple points of water inlet pipes, and the termination of point water inlet pipe has external screw thread or interior spiral shell
Stricture of vagina, drinking-water pipe one end has female thread or the external screw thread that external screw thread or female thread with point water inlet pipe match.
Described liquid level control switch 9 is opened low stopping for height and is controlled switch, and is provided with wireless transmitter, described wireless transmitter
It is connected with wireless receiver.
When water level reaches liquid level eminence, liquid level control switch 9 opens wireless transmitter to 1, water pump after detecting signal
Going out to open water pump order, the PLC panel of water pump 1 is opened and is drawn water, and water pump 1 draws collection by each point of water inlet pipe 4, each drinking-water pipe 5
Water in water pipe 7, discharges from outlet pipe 3;When water level reaches liquid level lower, liquid level control switch 9 opens nothing after detecting signal
Line emitter sends the order switched off the pump to water pump 1, and the PLC panel of water pump 1 controls closedown and stops pumping.Collector pipe lower end
The multiple branched pipes that catchment connected, can effectively blot the water that clean construction site is oozed out, can understand draining in real time by display floater
Situation.
The above is only to preferred embodiment of the present utility model, not this utility model is made any in form
Restriction, every according to technical spirit of the present utility model to any simple modification made for any of the above embodiments, equivalent variations with
Modify, belong in the range of technical solutions of the utility model.
Claims (5)
1. a construction of hydro project automatic drain system, it is characterised in that this construction of hydro project automatic drain system
Including: water pump, water inlet pipe, outlet pipe, point water inlet pipe, drinking-water pipe, the joint that draws water, collector pipe, construction site, Liquid level leave
Close, PLC controls device;
One end of water pump is connected with outlet pipe, and the other end is connected with a point water inlet pipe by water inlet pipe;Divide water inlet pipe to connect respectively to take out
Water pipe, the joint that draws water is arranged on collector pipe, and drinking-water pipe is connected on collector pipe by the joint that draws water;Collector pipe is arranged on construction
Rises, place, is provided with liquid level control switch in collector pipe, PLC controls device and is connected with water pump.
2. construction of hydro project automatic drain system as claimed in claim 1, it is characterised in that described water pump is selected certainly
Sucking pump, water pump is provided with water inlet, outlet, and collector pipe lower end connects the branched pipe that catchments, described in the branched pipe that catchments be provided with many
Individual, multiple branched pipes that catchment are distributed in collector pipe lower end radially.
3. construction of hydro project automatic drain system as claimed in claim 1, it is characterised in that PLC controls device and arranges
There are PLC, display floater, automatic electromagnetic valve, wireless receiver, described display floater, automatic electromagnetic valve, wireless receiver
All being connected with PLC, described PLC is provided with controller and a/d converter reverse connection mutually.
4. construction of hydro project automatic drain system as claimed in claim 1, it is characterised in that described water inlet pipe both sides
Being fixedly installed multiple points of water inlet pipes, the termination of point water inlet pipe has external screw thread or female thread, and drinking-water pipe one end has and a point water inlet
Female thread that the external screw thread of pipe or female thread match or external screw thread.
5. construction of hydro project automatic drain system as claimed in claim 1, it is characterised in that described Liquid level is opened
Guan Weigao opens low stopping and controls switch, and is provided with wireless transmitter, and described wireless transmitter is connected with wireless receiver.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620720297.3U CN205822119U (en) | 2016-07-08 | 2016-07-08 | A kind of construction of hydro project automatic drain system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620720297.3U CN205822119U (en) | 2016-07-08 | 2016-07-08 | A kind of construction of hydro project automatic drain system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205822119U true CN205822119U (en) | 2016-12-21 |
Family
ID=57564187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620720297.3U Expired - Fee Related CN205822119U (en) | 2016-07-08 | 2016-07-08 | A kind of construction of hydro project automatic drain system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205822119U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111927543A (en) * | 2020-08-28 | 2020-11-13 | 中煤第三建设集团安徽地质测量工程有限责任公司 | Water preventing and controlling equipment for coal mine geological engineering |
CN112962640A (en) * | 2021-01-23 | 2021-06-15 | 上海友海建设工程有限公司 | Waterproof drainage device for hydraulic engineering construction and use method thereof |
-
2016
- 2016-07-08 CN CN201620720297.3U patent/CN205822119U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111927543A (en) * | 2020-08-28 | 2020-11-13 | 中煤第三建设集团安徽地质测量工程有限责任公司 | Water preventing and controlling equipment for coal mine geological engineering |
CN112962640A (en) * | 2021-01-23 | 2021-06-15 | 上海友海建设工程有限公司 | Waterproof drainage device for hydraulic engineering construction and use method thereof |
CN112962640B (en) * | 2021-01-23 | 2022-04-12 | 上海友海建设工程有限公司 | Waterproof drainage device for hydraulic engineering construction and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205822119U (en) | A kind of construction of hydro project automatic drain system | |
CN103290917A (en) | Solid-liquid separation type sewage lifting device | |
CN202755380U (en) | Tee joint working well for long-distance large-pipe-diameter underground water delivery main pipe system | |
CN205776490U (en) | A kind of system for reclaiming rainwater | |
CN202926574U (en) | Power station water discharge control system | |
CN104929085A (en) | Automatic drainage system for construction of water conservancy project and manufacturing and using method thereof | |
CN204000800U (en) | The energy-saving drainage system of bulb type generator set | |
CN203769053U (en) | Multi-way valve applied to sewage pipe | |
CN211060293U (en) | Novel vertical same-stroke water system | |
CN208395947U (en) | A kind of draining of unit maintenance and seepage from powerhouse drainage system | |
CN203334417U (en) | Solid-liquid separation type sewage lifting device | |
CN208518017U (en) | Two-way water system for clean operating room in hospital | |
CN202757190U (en) | Hydraulic module specially used for ground source heat pump unit | |
CN208487417U (en) | Construction of hydro project water-proof drainage device | |
CN204551511U (en) | The exhaust of drainage of foundation pit pipeline is from pressurization system | |
CN202227398U (en) | Water supply system for very tall building | |
CN103031874B (en) | Energy-utilizing water suction system | |
CN202626997U (en) | Pressure monitor console | |
CN206815486U (en) | A kind of big water burst counter-slope tunnel three-level discharge structure | |
CN204849707U (en) | Automatic drainage system is used in hydraulic engineering construction | |
CN205688450U (en) | One is drawn water pipeline multithread charge for remittance device | |
CN201202035Y (en) | Anti-return water drainage structure of drum-type washing machine | |
CN204919577U (en) | Automatic drainage system is used in construction of absorption basin bottom plate or reinforcement construction | |
CN206562711U (en) | A kind of nuclear island novel rainwater drainage system | |
CN203930451U (en) | A kind of continuous processing line factory effluent recovery control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 Termination date: 20170708 |