CN205805545U CN201620565436.XU CN201620565436U CN205805545U CN 205805545 U CN205805545 U CN 205805545U CN 201620565436 U CN201620565436 U CN 201620565436U CN 205805545 U CN205805545 U CN 205805545U
Authority
CN
China
Prior art keywords
pipe
snap close
steel pipe
pipe curtain
existing buildings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620565436.XU
Other languages
Chinese (zh)
Inventor
王汉霆
罗文江
杜帅锋
赵辉
李建
程伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201620565436.XU priority Critical patent/CN205805545U/en
Application granted granted Critical
Publication of CN205805545U publication Critical patent/CN205805545U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses and wear existing buildings pipe curtain construction settlement control and compensation system under one, the top soil body solving down Mining Method excavation section tunnel when wearing existing buildings sinks to controlling and a difficult problem for compensation.It is included in the termination, top wall (5) of interval people's air defense section tunnel (4) and is provided with snap close pipe curtain, snap close pipe curtain is arranged on the underface of existing shield tunnel (1), it is provided with steel pipe jacking device (8) between parados (6) after snap close pipe curtain and the right angle in interval people's air defense section tunnel that excavated, metering soil bucket it is provided with below the soil outlet of jacking device, it is provided with snap close (14) between two adjacent snap closes pipe curtain steel pipe (7), the lateral wall (2) of snap close pipe curtain steel pipe is fixedly welded with mini-valve tube (12), the pulp inlet of mini-valve tube connects and has slip casting machine (13), the tube core grouting gun head of mini-valve tube core pipe is provided in immediately below existing buildings.This utility model make use of the existing device at scene, and settlement Control compensation effect is good.

Description

Under wear existing buildings pipe curtain construction settlement control and compensation system
Technical field
The present invention relates to a kind of the sedimentation of the soil body above tunneling be controlled when using Mining Method Metro Excavation tunnel System and compensate system and method, particularly to a kind of use Mining Method Metro Excavation tunnel time excavation section closely top set It is equipped with structures, when new tunnel excavation, the pipe curtain construction settlement control that the sedimentation to existing buildings is controlled and compensates System and method.
Background technology
In Urban Metro Construction, under wear existing buildings situation get more and more.The soil body below existing buildings When being disturbed, the existing buildings in range of disturbance is owing to being affected by strength of turbulence is different, and the difference that can produce transfinites is sunk Fall, thus have influence on the safety of existing buildings.Therefore control settlement, and the sedimentation to having occurred compensates, it has also become under The problem that must solve in construction when wearing existing buildings.In the prior art, wear existing buildings under Mining Method, typically use Tunneling boring deep hole grouting method, the soil body of side is reinforced on which.When tunneling boring deep hole grouting, in order to reach deep hole grouting Effect, need bigger slip casting space, particularly during construction operation, after existing structures settle, typically The method using deep hole grouting, compensates sedimentation, and owing to being limited by construction geographical environment, deep hole grouting technique cannot be entered OK.In settlement Control, prior art also has employing pipe canopy supporting process, and this technique also has one to the soil body above pipe canopy Fixed canopy protects effect, but creeping into of pipe boron steel pipe uses band water pore-forming operating type more, and water enters the soil body below structures, on the contrary Increase the weight of the sedimentation of the soil body, if not submersible, by direct for the Large Diameter Pipeline steel pipe jacking soil body, there is again jacking difficulty.It addition, The gap of adjacent steel pipe in pipe canopy, also can induce the soil body sedimentation above it.
Summary of the invention
The invention provides and under one, wear existing buildings pipe curtain construction settlement control and compensation system and method, solve down When wearing existing buildings, the top soil body in Mining Method excavation section tunnel sinks to controlling and a difficult problem for compensation.
The present invention is to solve above technical problem by the following technical programs:
Wear existing buildings pipe curtain construction settlement control and compensation system under one, be included in the existing of setting on the ground and construct Thing, the section of wearing running tunnel under the lower section of existing buildings is provided with Mining Method tunneling, the section of wearing interval tunnel under Mining Method tunneling The left end in road is provided with the interval people's air defense section tunnel excavated, and above interval people's air defense section tunnel in the wall of termination, is provided with lock Button pipe curtain, is provided with steel pipe jacking device between parados after snap close pipe curtain and the right angle in interval people's air defense section tunnel that excavated, The auger stem of steel pipe jacking device is arranged in snap close pipe curtain steel pipe, the top, termination of auger stem and snap close pipe curtain steel pipe Distance between right output port lateral surface is 10 centimetres, is provided with metering soil bucket in the lower section of the soil outlet of steel pipe jacking device, It is provided with snap close, fixing weldering on the lateral wall of snap close pipe curtain steel pipe between snap close pipe curtain steel pipe and second snap close pipe curtain steel pipe Being connected to sleeve valve barrel grouting pipe, be provided with mini-valve tube core pipe in sleeve valve barrel grouting pipe, the tube core grouting gun head of mini-valve tube core pipe is Being arranged on immediately below existing buildings, connecting on the pulp inlet of mini-valve tube core pipe has slip casting machine.
The sleeve valve barrel grouting pressure of slip casting machine is 2 MPas.
Wear existing buildings pipe curtain construction settlement control compensation methods under one, comprise the following steps:
The first step, the lower section of existing buildings prepare excavation Mining Method tunneling under the section of wearing running tunnel left end excavation Go out interval people's air defense section tunnel;
Second step, on the lateral wall of snap close pipe curtain steel pipe, weld the box of snap close, at second snap close pipe curtain steel pipe The ZIKOU of snap close is welded, on the lateral wall end face of snap close pipe curtain steel pipe and the outside of second snap close pipe curtain steel pipe on lateral wall Sleeve valve barrel grouting pipe it is respectively welded on wall end face;In the bentonite of 1 weight portion, add the water of 9-11 weight portion, stir, Obtain bentonite slurry;
3rd step, steel pipe jacking device is arranged on behind the right angle in the interval people's air defense section tunnel excavated on parados, in district Between people's air defense section tunnel termination, top wall and steel pipe jacking device between install snap close pipe curtain steel pipe, start steel pipe jacking device, Snap close pipe curtain steel pipe is headed in the soil body below the existing buildings in upper end Tou Qiang front;
4th step, at first snap close pipe curtain steel pipe by the soil below the existing shield tunnel in wall front, termination above heading into During body, when the jacking pressure of steel pipe jacking device reaches 20 MPas, by the sleeve of welding on first snap close pipe curtain steel pipe Valve pipe Grouting Pipe is received on slip casting machine, loads the bentonite slurry that second step obtains, and noted by bentonite slurry in slip casting machine Enter in the soil body around first snap close pipe curtain steel pipe, to reduce the friction in jack-in process of first snap close pipe curtain steel pipe Resistance;First snap close pipe curtain steel pipe push into the soil body below existing shield tunnel whole during, steel pipe jacking device The top, termination of auger stem be provided in first snap close pipe curtain steel pipe, and top, the termination distance of auger stem 10 centimetres, the outer face of the right output port of first snap close pipe curtain steel pipe;In jack-in process, if the jacking pressure of steel pipe jacking device When power reaches 20 MPas again, by steel pipe jacking device, auger stem is pushed ahead, make the termination of auger stem lean out 10 centimeters outside the right output port outer face of the first snap close pipe curtain steel pipe, reach to loosen the purpose of the snap close pipe curtain steel pipe front soil body;
5th step, complete to head into the second snap close pipe curtain steel in location, side of first snap close pipe curtain steel pipe of work Pipe, makes together with the ZIKOU of second snap close pipe curtain steel pipe patches with the box of first snap close pipe curtain steel pipe, startup steel pipe top Enter equipment, second snap close pipe curtain steel pipe is pushed in the soil body below the existing shield tunnel in wall front, termination, top, Repeat the above-mentioned 4th during heading into step by step suddenly, make second snap close pipe curtain steel pipe head into smoothly and put in place;
6th step, successively follow-up snap close pipe curtain steel pipe is pushed into top wall front, termination existing shield tunnel below The soil body in, and two adjacent snap close pipe curtain steel pipes are plugged in together, form snap close pipe curtain;
7th step, when existing buildings occur sedimentation time, the tube core grouting gun head of mini-valve tube core pipe is reached existing constructing The underface of thing, loads two fluid grouting liquid in slip casting machine, by slip casting machine, the soil body immediately below structures is carried out biliquid note Slurry, makes the sedimentation of structures be compensated.
Present invention utilizes the existing device at scene, it is easy to operation, make the sedimentation occurred be compensated timely, it is ensured that Existing buildings safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 be in Fig. 1 A-A to sectional view.
Detailed description of the invention
The present invention is described in detail below in conjunction with the accompanying drawings:
Wear existing buildings pipe curtain construction settlement control and compensation system under one, be included in the existing buildings arranged on the ground 1, the section of wearing running tunnel 3 under the lower section of existing buildings 1 is provided with Mining Method tunneling, the section of wearing interval tunnel under Mining Method tunneling The left end in road 3 is provided with the interval people's air defense section tunnel 4 excavated, and above interval people's air defense section tunnel 4 in termination wall 5, arranges There is snap close pipe curtain, after snap close pipe curtain and the right angle in interval people's air defense section tunnel 4 that excavated, be provided with steel pipe jacking between parados 6 Equipment 8, the auger stem 9 of steel pipe jacking device 8 is arranged in snap close pipe curtain steel pipe 7, the top, termination of auger stem 9 and snap close Distance 10 between the right output port lateral surface of pipe curtain steel pipe 7 is 10 centimetres, arranges in the lower section of the soil outlet of steel pipe jacking device 8 There is metering soil bucket 11, between snap close pipe curtain steel pipe 7 and second snap close pipe curtain steel pipe 2, be provided with snap close 14, at snap close pipe curtain It is fixedly welded with sleeve valve barrel grouting pipe 12 on the lateral wall of steel pipe 7, sleeve valve barrel grouting pipe 12 is provided with mini-valve tube core pipe 15, The tube core grouting gun head 16 of mini-valve tube core pipe 15 is provided in immediately below existing buildings 1, mini-valve tube core pipe 15 enter slurry On mouth, connection has slip casting machine 13.
The sleeve valve barrel grouting pressure of slip casting machine 13 is 2 MPas.
Wear existing buildings pipe curtain construction settlement control compensation methods under one, comprise the following steps:
The first step, under the lower section of existing buildings 1 prepares the Mining Method tunneling of excavation, the left end of the section of wearing running tunnel 3 is opened Dig out interval people's air defense section tunnel 4;
Second step, on the lateral wall of snap close pipe curtain steel pipe 7 weld snap close 14 box, at second snap close pipe curtain steel pipe The ZIKOU of snap close 14 is welded, with second snap close pipe curtain steel pipe on the lateral wall end face of snap close pipe curtain steel pipe 7 on the lateral wall of 2 It is respectively welded sleeve valve barrel grouting pipe 12 on the lateral wall end face of 2;In the bentonite of 1 weight portion, add the water of 9-11 weight portion, Stir, obtain bentonite slurry;
3rd step, steel pipe jacking device 8 is arranged on behind the right angle in the interval people's air defense section tunnel 4 excavated on parados 6, Between termination, top wall 5 and the steel pipe jacking device 8 in interval people's air defense section tunnel 4, snap close pipe curtain steel pipe 7 is installed, starts steel pipe jacking Equipment 8, heads into snap close pipe curtain steel pipe 7 in the soil body below the existing buildings 1 in wall 5 front, termination, top;
4th step, first snap close pipe curtain steel pipe 7 by the existing shield tunnel 1 in termination wall 5 front above heading into below The soil body during, when the jacking pressure of steel pipe jacking device 8 reaches 20 MPas, will on first snap close pipe curtain steel pipe 7 weld The sleeve valve barrel grouting pipe 12 connect is received on slip casting machine 13, loads the bentonite slurry that second step obtains in slip casting machine 13, and will Bentonite slurry is injected in the soil body around first snap close pipe curtain steel pipe 7, to reduce by first snap close pipe curtain steel pipe 7 on top Frictional resistance during entering;The whole process of the soil body below existing shield tunnel 1 is pushed at first snap close pipe curtain steel pipe 7 In, the top, termination of the auger stem 9 of steel pipe jacking device 8 is provided in first snap close pipe curtain steel pipe 7, and spiral 10 centimetres, the outer face of the right output port of first snap close pipe curtain steel pipe 7 of top, the termination distance of drilling rod 9;In jack-in process, if When the jacking pressure of steel pipe jacking device 8 reaches 20 MPas again, by steel pipe jacking device 8, auger stem 9 is pushed ahead, The termination making auger stem 9 leans out 10 centimeters outside the right output port outer face of the first snap close pipe curtain steel pipe 7, reaches to loosen snap close The purpose of the pipe curtain steel pipe 7 front soil body;
5th step, complete to head into the second snap close pipe curtain in location, side of first snap close pipe curtain steel pipe 7 of work Steel pipe 2, makes together with the ZIKOU of second snap close pipe curtain steel pipe 2 patches with the box of first snap close pipe curtain steel pipe 7, to start steel Pipe jacking device 8, pushes into the soil below the existing shield tunnel 1 in wall 5 front, termination, top by second snap close pipe curtain steel pipe 2 In body, during heading into, repeat the 4th step, make second snap close pipe curtain steel pipe 2 head into smoothly and put in place;
6th step, successively follow-up snap close pipe curtain steel pipe 7 is pushed into top wall 5 front, termination existing shield tunnel 1 In the soil body of lower section, and two adjacent snap close pipe curtain steel pipes are plugged in together, form snap close pipe curtain;
7th step, when existing buildings 1 occur sedimentation time, the tube core grouting gun head 16 of mini-valve tube core pipe 15 is reached existing The underface of structures 1, loads two fluid grouting liquid, by slip casting machine 13 to the soil body immediately below structures 1 in slip casting machine 13 Carry out two fluid grouting, make the sedimentation of structures 1 be compensated.
Owing to adjacent snap close pipe curtain steel pipe is to be connected by primary and secondary snap close, snap close pipe curtain steel pipe is made to define a closing Snap close pipe curtain, serve in follow-up Mining Method digging process, play wearing down the soil body above existing shield tunnel The effect of support, has reached effective control of settling amount so that it is deformation amount controlling is in the range of Con trolling index.The every lock at pipe curtain In the work progress of button pipe curtain steel pipe 7, by injecting bentonite slurry, solve and head into pipe curtain steel pipe resistance greatly without water, existing There is the difficult problem that equipment cannot complete.Particularly during heading into, by coordinating in real time unearthed amount and the control of jacking pressure System, controls to greatest extent and affects the soil body above newly built tunnels, and strict science controls disturbance below existing shield tunnel The disturbance output of the soil body, during heading into, by the real-time fixing quantity to unearthed amount, strict science controls existing shield The disturbance output of disturbed soil below structure tunnel, complete settling amount Con trolling index to serve the effect got instant result.When When existing buildings 1 occurs sedimentation, the tube core grouting gun head 16 of mini-valve tube core pipe 15 is reached the underface of existing buildings 1, In slip casting machine 13, load two fluid grouting liquid, by slip casting machine 13, the soil body immediately below structures 1 is carried out two fluid grouting, biliquid Slip casting has the effect of slip casting uplift of soil, makes the sedimentation of structures 1 be compensated.At first snap close pipe curtain steel pipe 7 quilt It is hampered during heading into the soil body below the existing shield tunnel 1 in wall 5 front, termination, top, injects bentonite by slip casting machine 13 Serosity, plays the effect reducing resistance, when there is sedimentation, injects dual slurry by slip casting machine 13, produces the soil body of sedimentation Grand role.

Claims (2)

1. wear an existing buildings pipe curtain construction settlement control and compensation system under, be included in the existing buildings arranged on the ground (1), the lower section of existing buildings (1) is provided with the section of wearing running tunnel (3) under Mining Method tunneling, the section of wearing under Mining Method tunneling The left end of running tunnel (3) is provided with the interval people's air defense section tunnel (4) excavated, it is characterised in that in interval people's air defense section tunnel (4) in termination, top wall (5), it is provided with snap close pipe curtain, straight snap close pipe curtain and the interval people's air defense section tunnel (4) excavated Being provided with steel pipe jacking device (8) behind angle between parados (6), the auger stem (9) of steel pipe jacking device (8) is arranged on snap close pipe In curtain steel pipe (7), the distance between top, termination and the right output port lateral surface of snap close pipe curtain steel pipe (7) of auger stem (9) (10) it is 10 centimetres, is provided with metering soil bucket (11) in the lower section of the soil outlet of steel pipe jacking device (8), at snap close pipe curtain steel pipe (7) and it is provided with snap close (14) between second snap close pipe curtain steel pipe (2), fixing on the lateral wall of snap close pipe curtain steel pipe (7) It is welded with sleeve valve barrel grouting pipe (12), sleeve valve barrel grouting pipe (12) is provided with mini-valve tube core pipe (15), mini-valve tube core pipe (15) tube core grouting gun head (16) is provided in immediately below existing buildings (1), at the pulp inlet of mini-valve tube core pipe (15) Upper connection has slip casting machine (13).
Wearing existing buildings pipe curtain construction settlement control and compensation system under one the most according to claim 1, its feature exists In, the sleeve valve barrel grouting pressure of slip casting machine (13) is 2 MPas.
CN201620565436.XU 2016-06-12 2016-06-12 Under wear existing buildings pipe curtain construction settlement control and compensation system Withdrawn - After Issue CN205805545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620565436.XU CN205805545U (en) 2016-06-12 2016-06-12 Under wear existing buildings pipe curtain construction settlement control and compensation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620565436.XU CN205805545U (en) 2016-06-12 2016-06-12 Under wear existing buildings pipe curtain construction settlement control and compensation system

Publications (1)

Publication Number Publication Date
CN205805545U true CN205805545U (en) 2016-12-14

Family

ID=58142943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620565436.XU Withdrawn - After Issue CN205805545U (en) 2016-06-12 2016-06-12 Under wear existing buildings pipe curtain construction settlement control and compensation system

Country Status (1)

Country Link
CN (1) CN205805545U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909258A (en) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 Settlement control and compensation system and method for underneath pass existing building pipe-roofing construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909258A (en) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 Settlement control and compensation system and method for underneath pass existing building pipe-roofing construction
CN105909258B (en) * 2016-06-12 2018-02-06 中铁十九局集团轨道交通工程有限公司 Under wear existing buildings pipe curtain construction settlement control compensation system and method

Similar Documents

Publication Publication Date Title
CN102121395B (en) Method for integrated comprehensive management of gas in low-permeability single coal bed
CN100501124C (en) Construction method for tunnel contact passage in shield section of underground railway
CN105909259B (en) Existing shield tunnel pipe curtain construction settlement control system and method are closely worn down
CN102777189B (en) A kind of ultra-long tube curtain non-relay jacking construction device and method
CN103711492B (en) A kind of jacking-type cable sleeve channel construction method
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN105909265B (en) Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN103306687A (en) Construction method for deformation control via horizontal whirling jet grouting of long cantilever in soft-rock tunnel
CN101749024B (en) Pipe-pulling construction method of underground buried box culvert
CN104612696B (en) Overpass column hole method construction method is passed through in big cross section tunneling subway station in fine sand layer
CN107268600A (en) Grouting strengthening method, pipe jacking construction method and application
CN103603670A (en) Construction method of ultra-deep-earthed shield crossing complex formations
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN104790419A (en) Dewatering construction method applicable to tunnel in water-rich quicksand stratum
CN105696550A (en) Three axes agitating pile construction method capable of assisting in grooving of reinforced underground diaphragm wall
CN109518699A (en) Miniature steel pipe pile adds grid spray anchor deep foundation ditch combination supporting scheme system and its construction method
CN111379573B (en) Connecting system for connecting shield tunnel in middle of oil and gas pipeline
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN205805545U (en) Under wear existing buildings pipe curtain construction settlement control and compensation system
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN107575238B (en) Shield-tunneling construction super close distance grouting method and grouting device
CN203239355U (en) Jacking type cable sleeve channel structure
CN105909258B (en) Under wear existing buildings pipe curtain construction settlement control compensation system and method
CN208917850U (en) A kind of miniature steel pipe pile adds grid to spray anchor deep foundation ditch combination supporting scheme system
CN201078234Y (en) Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161214

Effective date of abandoning: 20180206

AV01 Patent right actively abandoned