CN205804803U - The high intensity indoor railing being easily installed - Google Patents

The high intensity indoor railing being easily installed Download PDF

Info

Publication number
CN205804803U
CN205804803U CN201620334934.3U CN201620334934U CN205804803U CN 205804803 U CN205804803 U CN 205804803U CN 201620334934 U CN201620334934 U CN 201620334934U CN 205804803 U CN205804803 U CN 205804803U
Authority
CN
China
Prior art keywords
compressing
compress
muscle bar
chamber
perpendicular muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620334934.3U
Other languages
Chinese (zh)
Inventor
王兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zinc Time Guardrail Co Ltd
Original Assignee
Chongqing Zinc Time Guardrail Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Zinc Time Guardrail Co Ltd filed Critical Chongqing Zinc Time Guardrail Co Ltd
Priority to CN201620334934.3U priority Critical patent/CN205804803U/en
Application granted granted Critical
Publication of CN205804803U publication Critical patent/CN205804803U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high intensity indoor railing being easily installed, including perpendicular muscle bar and face glass, it is provided with fixing journal stirrup in the bottom surface of perpendicular muscle bar and is provided with shrinkage pool in the bottom center of perpendicular muscle bar, buffering compression leg it is provided with in shrinkage pool, it is provided with buffering stage clip between buffering compression leg and shrinkage pool, it is provided with perpendicular slot in the side of perpendicular muscle bar, it is additionally provided with in the middle part of the side of perpendicular muscle bar and compresses chamber, compress chamber to be connected with perpendicular slot, it is provided with in the sidewall of perpendicular slot and compresses plate, perpendicular muscle bar is provided through perpendicular muscle bar and with compress that plate is connected compress screw rod, the side of face glass inserts from perpendicular slot and is supported by face glass under the effect compressing plate into compressing intracavity and to realize compressing of face glass fixing by compressing screw rod.Simple in construction of the present utility model, install convenient, substantially increase stability and the fastness of installation, and easy disassembly, stability in use is good, and the suitability is strong and practicality good.

Description

The high intensity indoor railing being easily installed
Technical field
This utility model belongs to railing equipment technical field, is specifically related to a kind of high intensity being easily installed Indoor railing.
Background technology
It is mostly iron montant and the glass group being connected with iron montant by screw rod at indoor railing Become, but it has certain potential safety hazard in use, and its dismounting is more inconvenient, Er Qieyou It is mostly point type in it to support, so there is also installation to wait deficiency built on the sand, so the suitability and practicality Property is restricted to a certain extent.
Summary of the invention
In order to solve above-mentioned technical problem, this utility model is to provide a kind of simple in construction, uses and stablize Property good the and high intensity indoor railing being easily installed that the suitability is strong.
The technical scheme realizing this utility model purpose is a kind of high intensity indoor railing being easily installed, Including perpendicular muscle bar and face glass, it is provided with fixing journal stirrup and at described perpendicular muscle in the bottom surface of described perpendicular muscle bar The bottom center of bar is provided with shrinkage pool, is provided with buffering compression leg in described shrinkage pool, described buffering compression leg with It is provided with buffering stage clip between described shrinkage pool, is provided with perpendicular slot in the side of described perpendicular muscle bar, described perpendicular Be additionally provided with in the middle part of the side of muscle bar and compress chamber, described in compress chamber and be connected with described perpendicular slot, described It is provided with in the sidewall of perpendicular slot and compresses plate, described perpendicular muscle bar is provided through perpendicular muscle bar and supports with described What pressing plate was connected compresses screw rod, described in compress plate and the described chamber that compresses and be symmetricly set on described perpendicular slot Both sides and described in compress plate stretch under the described effect compressing screw rod described in compress intracavity, described glass The side of glass panel inserts from perpendicular slot and supports face glass into compressing under the described effect compressing plate Intracavity and to realize compressing of face glass fixing by compressing screw rod.
The described roof compressing chamber and diapire are equipped with clamping chamber, are provided with n at described clamping intracavity Type clamps block, clamps at described N-shaped and is provided with cramping spring, described glass between block and described clamping chamber Panel is supported in the clip slot that N-shaped clamps block by the end edge up and down compressing intracavity and face glass.
The described inwall compressing chamber is equipped with rubber filler strip.
The described end face compressing plate is provided with rubber and compresses face.
This utility model has a positive effect: simple in construction of the present utility model, install convenient, adopts Coordinate with perpendicular slot and compress chamber and compress plate, can pass through after perpendicular slot inserts in the side of face glass Compress plate to coordinate and compress chamber and realize fixing the cramping of face glass, it is achieved face glass and perpendicular muscle bar Plane-plane contact, thus substantially increase stability and the fastness of installation, and easy disassembly, use Good stability, the suitability is strong and practicality good.
Accompanying drawing explanation
In order to make content of the present utility model be more likely to be clearly understood, below according to specific embodiment And combine accompanying drawing, this utility model is described in further detail, wherein:
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
(embodiment 1)
Fig. 1 shows a kind of detailed description of the invention of the present utility model, and wherein Fig. 1 is this utility model Structural representation.
See Fig. 1, a kind of high intensity indoor railing being easily installed, including perpendicular muscle bar 1 and face glass 2, It is provided with fixing journal stirrup 3 in the bottom surface of described perpendicular muscle bar 1 and is provided with in the bottom center of described perpendicular muscle bar 1 Shrinkage pool 4, is provided with buffering compression leg 5 in described shrinkage pool 4, at described buffering compression leg 5 and described shrinkage pool 4 Between be provided with buffering stage clip 6, be provided with perpendicular slot 7 in the side of described perpendicular muscle bar 1, at described perpendicular muscle bar Be additionally provided with in the middle part of the side of 1 and compress chamber 8, described in compress chamber 8 and be connected, in institute with described perpendicular slot 7 Be provided with in stating the sidewall of perpendicular slot 7 and compress plate 9, described perpendicular muscle bar 1 is provided through perpendicular muscle bar 1 and With described compress that plate 9 is connected compress screw rod 10, described in compress plate 9 and described to compress chamber 8 symmetrical Be arranged on described perpendicular slot 7 both sides and described in compress plate 9 and stretch under the described effect compressing screw rod 10 Compressing in chamber 8 described in entering, the side of described face glass 2 inserts from perpendicular slot 7 and compresses described Under the effect of plate 9, face glass 2 is supported in compressing chamber 8 and realizing glass surface by compressing screw rod 10 Compressing of plate 2 is fixing.
The described roof compressing chamber 8 and diapire are equipped with clamping chamber 11, in described clamping chamber 11 It is provided with N-shaped and clamps block 12, clamp at described N-shaped and be provided with cramping between block 12 and described clamping chamber 11 Spring 13, described face glass is supported to support into the end edge up and down compressing intracavity and face glass and is pressed from both sides into N-shaped In the clip slot of briquetting.
The described inwall compressing chamber is equipped with rubber filler strip 14.
The described end face compressing plate is provided with rubber and compresses face 15.
Simple in construction of the present utility model, install convenient, use perpendicular slot to coordinate and compress chamber and compress plate, Chamber realization can be compressed by glass surface by compressing plate cooperation after perpendicular slot inserts in the side of face glass The cramping of plate is fixed, it is achieved face glass and the plane-plane contact of perpendicular muscle bar, thus substantially increases installation Stability and fastness, and easy disassembly, stability in use is good, and the suitability is strong and practicality good.
Obviously, above-described embodiment of the present utility model is only to be made by clearly demonstrating this utility model Citing, and be not the restriction to embodiment of the present utility model.Common for art For technical staff, change or the change of other multi-form can also be made on the basis of the above description Dynamic.Here without also cannot all of embodiment be given exhaustive.And these belong to this utility model The obvious change extended out of connotation or variation still fall within protection model of the present utility model Enclose.

Claims (4)

1. the high intensity indoor railing being easily installed, including perpendicular muscle bar and face glass, described The bottom surface of perpendicular muscle bar is provided with fixing journal stirrup and is provided with shrinkage pool, described in the bottom center of described perpendicular muscle bar It is provided with buffering compression leg in shrinkage pool, between described buffering compression leg and described shrinkage pool, is provided with buffering stage clip, its It is characterised by: be provided with perpendicular slot in the side of described perpendicular muscle bar, in the middle part of the side of described perpendicular muscle bar also Be provided with and compress chamber, described in compress chamber and be connected with described perpendicular slot, set in the sidewall of described perpendicular slot Compress plate, described perpendicular muscle bar is provided through perpendicular muscle bar and with described compress that plate is connected compress Screw rod, described in compress plate with described compress chamber be symmetricly set on described perpendicular slot both sides and described in compress Plate compresses intracavity described in stretching under the described effect compressing screw rod, and the side of described face glass is from perpendicular Slot inserts and is supported by face glass under the described effect compressing plate into compressing intracavity and by compressing spiral shell It is fixing that bar realizes compressing of face glass.
The high intensity indoor railing being easily installed the most according to claim 1, it is characterised in that: The described roof compressing chamber and diapire are equipped with clamping chamber, are provided with N-shaped folder at described clamping intracavity Briquetting, clamps at described N-shaped and is provided with cramping spring, described face glass between block and described clamping chamber Supported in the clip slot that N-shaped clamps block by the end edge up and down compressing intracavity and face glass.
The high intensity indoor railing being easily installed the most according to claim 2, it is characterised in that: The described inwall compressing chamber is equipped with rubber filler strip.
The high intensity indoor railing being easily installed the most according to claim 3, it is characterised in that: The described end face compressing plate is provided with rubber and compresses face.
CN201620334934.3U 2016-04-21 2016-04-21 The high intensity indoor railing being easily installed Expired - Fee Related CN205804803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620334934.3U CN205804803U (en) 2016-04-21 2016-04-21 The high intensity indoor railing being easily installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620334934.3U CN205804803U (en) 2016-04-21 2016-04-21 The high intensity indoor railing being easily installed

Publications (1)

Publication Number Publication Date
CN205804803U true CN205804803U (en) 2016-12-14

Family

ID=58144045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620334934.3U Expired - Fee Related CN205804803U (en) 2016-04-21 2016-04-21 The high intensity indoor railing being easily installed

Country Status (1)

Country Link
CN (1) CN205804803U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503480A (en) * 2017-09-19 2017-12-22 浙江长兴科创金属制品有限公司 A kind of profiled metal railing mounting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503480A (en) * 2017-09-19 2017-12-22 浙江长兴科创金属制品有限公司 A kind of profiled metal railing mounting structure

Similar Documents

Publication Publication Date Title
CN205781772U (en) Buffer-type household electrical appliances wall hanging bearing
CN207983117U (en) A kind of LED lamp frame polishing fixed mechanism
CN205804803U (en) The high intensity indoor railing being easily installed
CN205406330U (en) Mount is connected to circuit breaker
CN205070330U (en) Multilayer cable fastening clip utensil
CN205870050U (en) Fine setting type cramping positioner
CN202462000U (en) Fixture for machining of compressor shell
CN205364621U (en) Die installation structure
CN105826878A (en) Clamping device
CN205804805U (en) Demountable assemble type guardrail
CN205447178U (en) Apron type household electrical appliances lift kits
CN204647816U (en) A kind of Novel heat isolating aluminum profile
CN206393484U (en) One kind is kept to the side position-limit mechanism
CN204706704U (en) Mechanical type socket
CN208687317U (en) A kind of fixed device of security protection camera base
CN205718725U (en) Front grid assembly detection device
CN205719569U (en) Left and right B post plaque assembly detection device
CN204366521U (en) For the clamp system of fold-line-shaped workpiece
CN205882595U (en) General type cable hanging rack
CN205805143U (en) Novel enclosure
CN207181485U (en) A kind of dynamometer instrument being easily installed
CN204062171U (en) A kind of feeder clip
CN205074581U (en) Big face jig of flexible axle bull ware
CN204184725U (en) A kind of practical steel coil support
CN207052867U (en) A kind of Novel socket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20170421