CN205804274U - A kind of topological training wall for the broken end river connection of main stem side - Google Patents

A kind of topological training wall for the broken end river connection of main stem side Download PDF

Info

Publication number
CN205804274U
CN205804274U CN201620741204.5U CN201620741204U CN205804274U CN 205804274 U CN205804274 U CN 205804274U CN 201620741204 U CN201620741204 U CN 201620741204U CN 205804274 U CN205804274 U CN 205804274U
Authority
CN
China
Prior art keywords
wall
river
main stem
connection
beheaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620741204.5U
Other languages
Chinese (zh)
Inventor
赵华菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou University
Original Assignee
Suzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou University filed Critical Suzhou University
Priority to CN201620741204.5U priority Critical patent/CN205804274U/en
Application granted granted Critical
Publication of CN205804274U publication Critical patent/CN205804274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of topological training wall for the broken end river connection of main stem side.At the center position of the beheaded river width of a width of B of river surface, arranging one water proof body of wall, one end of body of wall starts from away from beheaded river end B/2, and the other end is connected with the quaywall of another side of main stem;The height of body of wall is higher than the peak level in river course.This road body of wall changes the topological relation of main stem and the beheaded river of its side, so that current flow in the topological structure of a through track, plays the effect guiding current at beheaded river.This utility model achieves the connection running water in main river and beheaded river, simple and easy to do, and connects effective, and construction investment saves, and the completion time of project is short, and O&M cost is low, has popularizing application prospect.

Description

A kind of topological training wall for the broken end river connection of main stem side
Technical field
This utility model relates to a kind of topological training wall connected for the river that breaks end with main stem, is particularly well-suited to city The beheaded river connection running water of built-up areas.
Background technology
City river water environment treatment task is the heaviest, and it is that one of which is the heaviest that connection beheaded river realizes Channel Group's running water The control measures wanted.At present, beheaded river connection running water method mainly have three kinds: one to be connection of constructing a canal, beheaded river and other Construct a canal between beheaded river (or other main stems) connection;Two is pipeline communication, in beheaded river and other beheaded rivers (or other main rivers Road) between lay pipeline and build pumping plant realize connection;Three is pumping plant water filling, the water inlet of diversion pumping plant be placed in beheaded river with The upstream of main stem joint, outlet is placed in the end of beheaded river, the stagnant water state of forcibly changing beheaded river.
In prior art, a part of scheme relates to expropriation of land of removing in a large number, and enforcement difficulty is big, investment is big, and some is deposited High in O&M cost, the deficiency of the aspects such as connection weak effect.
Summary of the invention
This utility model for the connection of existing completed region of the city beheaded river administer present in problem, it is provided that a kind of easy easily OK, and connecting effective, construction investment saves, and the completion time of project is short, the parallel works of the beheaded river running water that O&M cost is low.
The technical scheme realizing this utility model purpose is to provide a kind of opening up for the broken end river connection of main stem side Flutterring training wall, described training wall is the one in armored concrete upright wall, Larsen sheet pile diaphragm wall, and training wall is arranged at river Face width is the center position of the beheaded river width of B, and one end of body of wall starts from away from beheaded river end B/2, the other end and main river The quaywall of road opposite side connects;The height of body of wall is higher than the peak level in river course.
In technical solutions of the utility model, described training wall includes main body wall and auxiliary wall, and auxiliary wall is placed in main body wall Top, main body wall is immersed in river, surfaces in the wall top of auxiliary wall.Auxiliary wall can be rigid transparent material, it is also possible to be tool There is the planting pot of water proof effect.
Principle of the present utility model is: the training wall body of wall of setting, can change opening up of the main stem beheaded river with its side Flutter relation, the topological structure of a main stem and original 4: 3 lines of beheaded river has been made into the topological structure of 2: 1 lines, from And make current flow in the topological structure of a through track, play the effect guiding current at beheaded river.
Compared with prior art, the beneficial effects of the utility model are: by arranging topology training wall together, it is achieved disconnected The connection in situ of head river, simple and easy to do, and connect effective, construction investment saves, and the completion time of project is short, and O&M cost is low, has popularization Application prospect.
Accompanying drawing explanation
River course structural representation before Fig. 1,2 main stem side broken end river connections and topology diagram;
Fig. 3,4 be respectively arrange topology training wall after, main stem side broken end river connection after river course structural representation And topology diagram;
Fig. 5 is the sectional drawing of the topological training wall that this utility model embodiment provides;
In figure, 1, main stem;2, beheaded river;3, current streamline;4, topology training wall;5, beheaded river quaywall;6, Gao Shui Position;7, low water level;8, high at the bottom of riverbed;9, reinforced concrete foundation;10, the upright body of wall of armored concrete;11, built-in connection; 12, auxiliary wall.
Detailed description of the invention
With embodiment, technical solutions of the utility model are further elaborated below in conjunction with the accompanying drawings.
Embodiment 1
The beheaded river length that this utility model is suitable for is generally no greater than 500 meters.
Seeing attached Fig. 1 and 2, they are the river course structural representation before broken end river connection and topology diagram respectively;Fig. 1 In, there is a beheaded river 2 main stem 1 side, the current streamline 3 in main stem;By the topology diagram of Fig. 2 it will be seen that one Bar main stem and beheaded river were the topological structure of 4: 3 lines originally.Owing to head is the driving force of water flowing, at main stem AB section, current flow to, from the A point that head is high, the B point that head is low;And in beheaded river CD section, there is not head difference in C, D at 2, so Define slough.Therefore, current streamline 3 occurs over just main stem AB section.
Seeing accompanying drawing 3 and 4, they are the river course structural representation after arranging topology training wall and topology diagram respectively. By Fig. 3, arranging topology training wall 4 in the center of the beheaded river 2 that river width is B, the initiating terminal of wall is from beheaded river end B/2 Place, end is connected with main stem 1 quaywall, and current streamline 3 there occurs change along training wall 4.Due to the comprehensive discharge capacity in river course Depending primarily on minimum flow area, it is optimal that topology training wall is arranged on this position effect.Can be seen by the topological structure of Fig. 4 Arriving, after arranging topology training wall, compared with the topological structure before transformation, C, D 2 cancellation, a main stem and a broken end The topological structure (Fig. 2) of original 4: 3 lines in river has made the topological structure (Fig. 4) of 2: 1 lines into.Under head drives, current are from water The A point of head height flows to the B point that head is low, and current streamline 3 occurs in the topological structure that A, B two one lines are through, thus ensures The connection running water of main river and beheaded river.
Topology training wall reduces the thickness of wall body as far as possible, to retain the flow area of beheaded river to greatest extent.Topology is led Stream wall is made up of main body wall and auxiliary wall, and main body wall is immersed in water, surfaces in the wall top of auxiliary wall, and topology training wall total height should Higher than river course maximum water level.Auxiliary wall can be colourless lucite material, thus retains the original style and features of beheaded river;Auxiliary wall also may be used Use the planting pot with water proof effect, in order to plant water loving plant, thus form brand-new beheaded river landscape water body.
Seeing accompanying drawing 5, it is the sectional drawing of the topological training wall that the present embodiment provides.At the beheaded river quaywall 5 that river width is B Centre (B/2) place arrange topology training wall, the present embodiment training wall includes the upright body of wall of armored concrete 10, armored concrete Basis 9, built-in connection 11 and the auxiliary wall of lucite 12;Reinforced concrete foundation 9 is embedded at the bottom of riverbed high by less than 8, reinforced concrete The upright body of wall 10 of soil is vertical with reinforced concrete foundation 9, and the top of the upright body of wall of armored concrete 10 arranges built-in connection 11, wall 12 auxiliary with lucite is connected.The height of the upright body of wall of armored concrete 10 is less than the low water level 7 in river course, lucite The top of auxiliary wall 12 should be higher than that the peak level 6 of river.

Claims (5)

1. the topological training wall for the broken end river connection of main stem side, it is characterised in that: described training wall is steel One in reinforced concrete upright wall, Larsen sheet pile diaphragm wall, training wall is arranged at the beheaded river of the main stem side a width of B of river surface The center position of width, one end of body of wall starts from away from beheaded river end B/2, and the other end connects with the quaywall of main stem opposite side Connect;The height of body of wall is higher than the peak level in river course.
A kind of topological training wall for the broken end river connection of main stem side the most according to claim 1, its feature exists In: described training wall includes main body wall and auxiliary wall, and auxiliary wall is placed in the top of main body wall, and main body wall is immersed in river, auxiliary wall Wall top surface.
A kind of topological training wall for the broken end river connection of main stem side the most according to claim 1, its feature exists The upright body of wall of armored concrete, reinforced concrete foundation, built-in connection and auxiliary is included in: described armored concrete upright wall Wall;Reinforced concrete foundation is embedded in below height at the bottom of riverbed, and the upright body of wall of armored concrete is vertical with reinforced concrete foundation, reinforcing bar The top of the upright body of wall of concrete arranges built-in connection, is connected with auxiliary wall.
4. according to a kind of topological training wall for the broken end river connection of main stem side described in Claims 2 or 3, its feature It is: described auxiliary wall is rigid transparent material.
5. according to a kind of topological training wall for the broken end river connection of main stem side described in Claims 2 or 3, its feature It is: described auxiliary wall is the planting pot with water proof effect.
CN201620741204.5U 2016-07-14 2016-07-14 A kind of topological training wall for the broken end river connection of main stem side Expired - Fee Related CN205804274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620741204.5U CN205804274U (en) 2016-07-14 2016-07-14 A kind of topological training wall for the broken end river connection of main stem side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620741204.5U CN205804274U (en) 2016-07-14 2016-07-14 A kind of topological training wall for the broken end river connection of main stem side

Publications (1)

Publication Number Publication Date
CN205804274U true CN205804274U (en) 2016-12-14

Family

ID=57511039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620741204.5U Expired - Fee Related CN205804274U (en) 2016-07-14 2016-07-14 A kind of topological training wall for the broken end river connection of main stem side

Country Status (1)

Country Link
CN (1) CN205804274U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020243974A1 (en) * 2019-06-06 2020-12-10 苏州大学 Method for achieving unidirectional flow of beheaded river by using tides, and device therefor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020243974A1 (en) * 2019-06-06 2020-12-10 苏州大学 Method for achieving unidirectional flow of beheaded river by using tides, and device therefor

Similar Documents

Publication Publication Date Title
CN106192872A (en) A kind of original position connection method of beheaded river
CN104480914B (en) The fish pass structure that fish pass combines with ship lock and method
CN102219304B (en) Method for ecologically improving water quality of water delivery type lake
CN107558386B (en) A method of improving City Pumping Station oblique inflow box culvert assignment of traffic uniformity
CN205804274U (en) A kind of topological training wall for the broken end river connection of main stem side
CN209523161U (en) A kind of ecology broken end creek flow-guiding structure
CN104803496A (en) Governing system for severe eutrophication of lake bay
CN207130672U (en) A kind of Novel water conservancy dykes and dams
CN208501611U (en) A kind of device for realizing beheaded river one-way flow using tide
CN108589634A (en) A kind of method and its device for realizing beheaded river one-way flow using tide
CN209260649U (en) A kind of porous ecological revetment of vertical type L-type
CN204080765U (en) A kind of farmland combined water drain hidden pipe
CN207727508U (en) A kind of topological training wall of flexibility for beheaded river running water
CN108149769B (en) A method of improving Urban Waterlogging pumping plant side unit Inlet flow pattern
CN206220172U (en) Tubular type diversion pumping plant
CN206805220U (en) A kind of farmland intellectuality irrigation management system
CN205877586U (en) Pipeline for water conservancy project
CN204924303U (en) Open channel flume
CN203346942U (en) Dredging system of excavated basin
CN209194312U (en) A kind of steel pipe type pontoon bridge
CN210127479U (en) Ecological bank protection of formula of permeating water
CN208486229U (en) A kind of combinable staged water blocking weir plate and water-retaining structure
CN101418562B (en) Adjustable intake apparatus for hydraulic power plant
CN204662629U (en) A kind of overflow well derrick
CN204625334U (en) A kind of arm of lake serious rice-nutrient governing system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20170714

CF01 Termination of patent right due to non-payment of annual fee