CN205804084U - Steel box section cap covering type temporary construction road - Google Patents
Steel box section cap covering type temporary construction road Download PDFInfo
- Publication number
- CN205804084U CN205804084U CN201620659732.6U CN201620659732U CN205804084U CN 205804084 U CN205804084 U CN 205804084U CN 201620659732 U CN201620659732 U CN 201620659732U CN 205804084 U CN205804084 U CN 205804084U
- Authority
- CN
- China
- Prior art keywords
- steel
- sleeve
- box section
- temporary construction
- construction road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
Steel box section cap covering type temporary construction road, relates to technical field of road construction, particularly relates to the laying technology of job site temporary road, including the some groups of box assemblies being sequentially connected with;Often group box assembly all includes the rectangular steel plates casing of lower ending opening, I-steel, steel deduction cap, holder, the sleeve being vertically arranged and the spud pile being vertically arranged;Described I-steel and steel deduction cap are all welded on the inside top of container body of steel plate, the upper surface of steel deduction cap be plane, lower surface be the hemisphere face of indent, the top of sleeve is hemisphere and is equipped with in the hemisphere face of steel deduction cap, the bottom of sleeve is enclosed within the top of spud pile, and sleeve is connected with described I-steel by holder.This utility model is lower than to site requirements with tradition temporary construction road, and step is simple, and assembling is quick, route change, pipeline change is had stronger adaptibility to response, can have enough to meet the need use, it is ensured that green construction simultaneously.
Description
Technical field
This utility model relates to technical field of road construction, particularly relates to the laying technology of job site temporary road.
Background technology
At present in China's building field temporary road be generally divided into element (grey) rammed earth, building waste change fill out, graded sand and stone
Place mat, concreting etc., wherein with the application of cast-in-place concrete temporary construction road at most, tradition temporary construction road is to place
Require height, operation is loaded down with trivial details, input artificial, material is many, relatively low to accident adaptibility to response, it is difficult to turnover use, and remove
Time, produce substantial amounts of building waste, cause waste and the environmental pollution of resource.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of short construction period, site requirements
The steel box section cap covering type temporary construction road that the highest, operation is succinct, quick for installation.
The purpose of this utility model is achieved in that steel box section cap covering type temporary construction road, including being sequentially connected with
Some groups of box assemblies;Often group box assembly all includes the rectangular steel plates casing of lower ending opening, I-steel, steel deduction cap, consolidates
The sleeve determine device, being vertically arranged and the spud pile being vertically arranged;Described I-steel and steel deduction cap are all welded on container body of steel plate
Inside top, the upper surface of steel deduction cap be plane, lower surface be the hemisphere face of indent, the top of sleeve is hemisphere and joins
Closing in the hemisphere face being arranged on steel deduction cap, the bottom of sleeve is enclosed within the top of spud pile, and sleeve is by holder and described work
Word steel connects.
Preferably, holder includes steel firmware, screw rod, catch and steel band, and steel firmware is connected with described I-steel,
Screw flight is connected in steel firmware, and catch is welded on screw rod, and one end of steel band is connected with steel firmware, the other end around
It is connected with catch after crossing sleeve.
Preferably, welding male plug part on described I-steel, weld mother board on described steel firmware, mother board is inserted in
Male plug part is interior and is bolted.
Preferably, being radially arranged a circle groove on described sleeve, steel band is wound in the groove of sleeve, it is simple to by steel
Band positions.
Preferably, rectangular steel plates casing corresponding two I-steel, four steel deduction caps, two screw rods, four steel
Firmware, four steel bands, four sleeves and four spud piles so that road is more solid and reliable.
Preferably, all being connected by adapter between two adjacent groups box assembly, adapter includes steel lath, at steel
Welding steel nail on lath, the other end of steel nail is wholely set spacing round end, and two rectangular steel plates casings of joint are respectively provided with
Connecting hole, the connecting hole on two rectangular steel plates casings is arranged symmetrically with, and the equal one end of each connecting hole is big, one end is little, and steel nail places
In connecting hole on two rectangular steel plates casings, steel nail one end is disposed therein a rectangular steel plates casing by steel lath
Inner side carries out spacing, and the inner side that the other end of steel nail is arranged on adjacent rectangle container body of steel plate by spacing round end carries out spacing.
Preferably, described adapter also includes chute, and chute is welded on the inner side of rectangular steel plates casing, described steel lath
Being arranged in chute, steel nail alignment connecting hole is easy in the design of chute.
This utility model is by above design, and steel box section is that 3m*3m is square, surrounding forms by hanging steel plate under 30cm.Set
Cylinder can rotate in steel deduction cap.Screw rod can rotate in steel firmware, by rotating screw rod, makes steel band shrink, with set
Cylinder is fixing.Chute can allow steel lath to slide in chute, and steel nail is through the big end in the hole of two steel box section sides, logical
Cross slip steel lath, make steel nail block in the small end in hole, reach to connect the purpose fixing two steel box section.
When needs carry out temporary road construction in certain job site, only these parts need to be installed at the scene, this
The construction period of temporary road is short, weatherproof.
Installation steps of the present utility model:
1. site clearing, indicates the position of site of road line and prefabricated pile.
The most embedding prefabricated pile, reaches absolute altitude requirement.
3. steel box section is welded with I-steel and steel deduction cap.
4. I-steel is connected with the firmware of holder by connector.
5. sleeve is connected fixing with stake by setscrew.
6., by rotating the screw rod of holder, make steel band fasten pile protection cylinder, reach the effect fixing with stake.
7. repeat 3-6 process, complete the installation of another steel box section, then two casings are connected fixing.
This utility model is lower than to site requirements with tradition temporary construction road, and step is simple, and assembling is quick, satisfies the need
Line changes, pipeline change has stronger adaptibility to response, can have enough to meet the need use, it is ensured that green construction simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of one group of box assembly.
Fig. 3 is the axonometric chart removing spud pile in Fig. 2.
Fig. 4 is screw rod, steel band, the connection diagram of steel firmware.
Fig. 5 is the partial schematic diagram of Fig. 1.
Fig. 6 is the explosive view of Fig. 5.
Detailed description of the invention
As shown in figures 1 to 6, steel box section cap covering type temporary construction road, including the some groups of box assemblies being sequentially arranged
1, two adjacent groups box assembly 1 is all connected by adapter 2.
Often group box assembly 1 all include a lower ending opening rectangular steel plates casing 4, two screw rods 6 of 3, two I-steel,
Four steel deduction caps, 7, four catch 8 of 5, four steel firmwares and 9, four sleeves being vertically arranged 10 of four steel bands and four
The spud pile 11 being vertically arranged.Two I-steel 4 and four steel deduction caps 5 are all welded on the inside top of container body of steel plate 3, two
I-steel 4 is longitudinally arranged, and four steel deduction caps 5 are arranged in two rows, and is positioned at longitudinal two of which steel deduction cap 5 and is arranged on
The side of a piece I-steel 4, is positioned at two other longitudinal steel deduction cap 5 and is arranged on the side of another root I-steel 4.Steel button
The upper surface of cap 5 be plane, lower surface be the hemisphere face of indent, the top of sleeve 10 is hemisphere and is equipped with at steel
In the hemisphere face of deduction cap 5, the bottom of sleeve 10 is enclosed within the top of spud pile 11 and is connected by setscrew 10.
Four steel firmwares 7 are arranged in two rows, and are positioned at longitudinal two of which steel firmware 7 and are arranged on an I-shaped
The lower section of steel 4, is positioned at two other longitudinal steel firmware 7 and is arranged on the lower section of another root I-steel 4.I-steel 4 welds
Connect male plug part 14, steel firmware 7 welds mother board 15, connect in mother board 15 is inserted in male plug part 14 and by bolt 16.
Two screw rod 6 lateral arrangement, are positioned at horizontal two of which steel firmware 7 and are threaded on a screw rod 6, be positioned at horizontal
Two other steel firmware 7 is threaded on another root screw rod 6.Two catch 8 are welded on same screw rod 6, every steel
One end of matter band 9 is bolted with steel firmware 7, and the other end is connected with catch 8 after walking around sleeve 10.At each sleeve 10
On be all radially arranged a circle groove 13, each steel band 9 be wound on correspondence sleeve 10 groove 13 in.Each sleeve 10 all passes through
Screw rod 6, steel firmware 7, steel band 9 connect with corresponding I-steel 4.
Adapter 2 includes steel lath 18, and steel lath 18 welds steel nail 19, and the other end of steel nail 19 is wholely set limit
Circle of position head 20, two rectangular steel plates casings 3 of joint are respectively provided with connecting hole 21, the connection on two rectangular steel plates casings 3
Hole 21 is arranged symmetrically with, and each connecting hole 21 is equal, and one end is big, one end is little, and steel nail 19 is set in the company on two rectangular steel plates casings 3
Connecing in hole 21, the inner side that steel nail 19 one end is disposed therein a rectangular steel plates casing 3 by steel lath 18 carries out spacing, steel nail
The inner side that the other end of 19 is arranged on adjacent rectangle container body of steel plate 3 by spacing round end 20 carries out spacing.Adapter 2 also includes chute
17, chute 17 is welded on the inner side of rectangular steel plates casing 3, and steel plate 18 is arranged in chute 17.Chute 17 can allow steel
Scutum bar 18 slides in chute 17, and steel nail 19 is through the big end of the connecting hole 21 of two steel box section 3 sides, by slip steel
Scutum bar 18, makes steel nail 19 block in the small end of connecting hole 21, reaches to connect the purpose fixing two steel box section 3.
Claims (7)
1. steel box section cap covering type temporary construction road, it is characterised in that: include the some groups of box assemblies being sequentially connected with;Often group
Box assembly all include the rectangular steel plates casing of lower ending opening, I-steel, steel deduction cap, holder, the sleeve being vertically arranged and
The spud pile being vertically arranged;Described I-steel and steel deduction cap are all welded on the inside top of container body of steel plate, steel deduction cap upper
Surface be plane, lower surface be the hemisphere face of indent, the top of sleeve is hemisphere and is equipped with in the half of steel deduction cap
In sphere, the bottom of sleeve is enclosed within the top of spud pile, and sleeve is connected with described I-steel by holder.
Steel box section cap covering type temporary construction road the most according to claim 1, it is characterised in that: described holder includes
Steel firmware, screw rod, catch and steel band, steel firmware is connected with described I-steel, and screw flight is connected in steel firmware,
Catch is welded on screw rod, and one end of steel band is connected with steel firmware, and the other end is connected with catch after walking around sleeve.
Steel box section cap covering type temporary construction road the most according to claim 2, it is characterised in that: on described I-steel
Welding male plug part, welds mother board on described steel firmware, and mother board is inserted in male plug part and is bolted.
Steel box section cap covering type temporary construction road the most according to claim 3, it is characterised in that: footpath on described sleeve
To arranging a circle groove, steel band is wound in the groove of sleeve.
Steel box section cap covering type temporary construction road the most according to claim 4, it is characterised in that: a rectangular steel plates case
Corresponding two I-steel of body, four steel deduction caps, two screw rods, four steel firmwares, four steel bands, four sleeves and four
Spud pile.
Steel box section cap covering type temporary construction road the most according to claim 5, it is characterised in that: two adjacent groups casing group
All being connected by adapter between part, adapter includes steel lath, welds steel nail, the other end one of steel nail on steel lath
Body arranges spacing round end, two rectangular steel plates casings of joint is respectively provided with connecting hole, the company on two rectangular steel plates casings
Connecing hole to be arranged symmetrically with, the equal one end of each connecting hole is big, one end is little, and steel nail is set in the connecting hole on two rectangular steel plates casings
In, the inner side that steel nail one end is disposed therein a rectangular steel plates casing by steel lath carries out spacing, the other end of steel nail by
Spacing round end is arranged on the inner side of adjacent rectangle container body of steel plate and carries out spacing.
Steel box section cap covering type temporary construction road the most according to claim 6, it is characterised in that: described adapter also wraps
Including chute, chute is welded on the inner side of rectangular steel plates casing, and described steel lath is arranged in chute.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620659732.6U CN205804084U (en) | 2016-06-29 | 2016-06-29 | Steel box section cap covering type temporary construction road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620659732.6U CN205804084U (en) | 2016-06-29 | 2016-06-29 | Steel box section cap covering type temporary construction road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205804084U true CN205804084U (en) | 2016-12-14 |
Family
ID=57511760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620659732.6U Withdrawn - After Issue CN205804084U (en) | 2016-06-29 | 2016-06-29 | Steel box section cap covering type temporary construction road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205804084U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926404A (en) * | 2016-06-29 | 2016-09-07 | 江苏邗建集团有限公司 | Steel box body buckle hat type temporary construction road |
-
2016
- 2016-06-29 CN CN201620659732.6U patent/CN205804084U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926404A (en) * | 2016-06-29 | 2016-09-07 | 江苏邗建集团有限公司 | Steel box body buckle hat type temporary construction road |
CN105926404B (en) * | 2016-06-29 | 2017-12-08 | 江苏邗建集团有限公司 | Steel box section cap covering type temporary construction road |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103726508B (en) | A kind of precast rc slab material loose tool and construction method | |
CN103541352A (en) | Underground and overground continuous construction method for major-diameter high flat bed pile in sandy soil stratum | |
CN205804084U (en) | Steel box section cap covering type temporary construction road | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN104993440A (en) | Lightning-protection manual grounding system and construction method by utilizing structure steel bar externally-connected downlead wire | |
CN105926404B (en) | Steel box section cap covering type temporary construction road | |
CN104727307B (en) | For the non-uniform pile column construction method of underground | |
CN104196036B (en) | Foundation pit supporting structure and method based on old underground outdoor wall structure | |
CN206495384U (en) | A kind of assembled hangs platform structure | |
CN105332375A (en) | Fixing method for base of pile driver for static-pressed pile by anchor rods | |
CN102619286A (en) | Connecting joint of steel pipe concrete column and profile steel concrete beam | |
CN104278635A (en) | Steering method of ground anchor type suspension bridge catwalk load bearing cable | |
CN203488088U (en) | Steel structure of ladder compartment for pedestrian courtyard | |
KR101663374B1 (en) | Streetlight Foundation Structure | |
CN204199296U (en) | Foundation pit supporting structure based on old underground outdoor wall structure | |
CN204174946U (en) | A kind of prefabricated post and post connection positioner | |
CN203050736U (en) | Waterproof earth pressure balance rectangular jacking pipe joint for large-section motor vehicle tunnel | |
CN204875526U (en) | Big steel pipe support constructional device of combination casing assembled | |
CN204252565U (en) | One faces frontier defense protection unit | |
CN203856225U (en) | Assembled type stair section safety protection handrail system | |
CN113339003A (en) | Construction method of tunnel integrated arch sheathing trolley | |
CN203905027U (en) | Prefabricated assembling-type inner supporting system of foundation pit support system | |
CN203475438U (en) | Column structure and foundation pit supporting system comprising same | |
CN104343382B (en) | Pedestrain raise solar steel design and construction method | |
KR102137389B1 (en) | Reinforcement connection structure and method of underground box structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161214 Effective date of abandoning: 20171208 |