CN205804084U - Steel box section cap covering type temporary construction road - Google Patents

Steel box section cap covering type temporary construction road Download PDF

Info

Publication number
CN205804084U
CN205804084U CN201620659732.6U CN201620659732U CN205804084U CN 205804084 U CN205804084 U CN 205804084U CN 201620659732 U CN201620659732 U CN 201620659732U CN 205804084 U CN205804084 U CN 205804084U
Authority
CN
China
Prior art keywords
steel
sleeve
box section
temporary construction
construction road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620659732.6U
Other languages
Chinese (zh)
Inventor
张学军
王江滨
黄伟
陈有威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QIANJIAN CO Ltd JIANGSU
Original Assignee
QIANJIAN CO Ltd JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QIANJIAN CO Ltd JIANGSU filed Critical QIANJIAN CO Ltd JIANGSU
Priority to CN201620659732.6U priority Critical patent/CN205804084U/en
Application granted granted Critical
Publication of CN205804084U publication Critical patent/CN205804084U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

Steel box section cap covering type temporary construction road, relates to technical field of road construction, particularly relates to the laying technology of job site temporary road, including the some groups of box assemblies being sequentially connected with;Often group box assembly all includes the rectangular steel plates casing of lower ending opening, I-steel, steel deduction cap, holder, the sleeve being vertically arranged and the spud pile being vertically arranged;Described I-steel and steel deduction cap are all welded on the inside top of container body of steel plate, the upper surface of steel deduction cap be plane, lower surface be the hemisphere face of indent, the top of sleeve is hemisphere and is equipped with in the hemisphere face of steel deduction cap, the bottom of sleeve is enclosed within the top of spud pile, and sleeve is connected with described I-steel by holder.This utility model is lower than to site requirements with tradition temporary construction road, and step is simple, and assembling is quick, route change, pipeline change is had stronger adaptibility to response, can have enough to meet the need use, it is ensured that green construction simultaneously.

Description

Steel box section cap covering type temporary construction road
Technical field
This utility model relates to technical field of road construction, particularly relates to the laying technology of job site temporary road.
Background technology
At present in China's building field temporary road be generally divided into element (grey) rammed earth, building waste change fill out, graded sand and stone Place mat, concreting etc., wherein with the application of cast-in-place concrete temporary construction road at most, tradition temporary construction road is to place Require height, operation is loaded down with trivial details, input artificial, material is many, relatively low to accident adaptibility to response, it is difficult to turnover use, and remove Time, produce substantial amounts of building waste, cause waste and the environmental pollution of resource.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of short construction period, site requirements The steel box section cap covering type temporary construction road that the highest, operation is succinct, quick for installation.
The purpose of this utility model is achieved in that steel box section cap covering type temporary construction road, including being sequentially connected with Some groups of box assemblies;Often group box assembly all includes the rectangular steel plates casing of lower ending opening, I-steel, steel deduction cap, consolidates The sleeve determine device, being vertically arranged and the spud pile being vertically arranged;Described I-steel and steel deduction cap are all welded on container body of steel plate Inside top, the upper surface of steel deduction cap be plane, lower surface be the hemisphere face of indent, the top of sleeve is hemisphere and joins Closing in the hemisphere face being arranged on steel deduction cap, the bottom of sleeve is enclosed within the top of spud pile, and sleeve is by holder and described work Word steel connects.
Preferably, holder includes steel firmware, screw rod, catch and steel band, and steel firmware is connected with described I-steel, Screw flight is connected in steel firmware, and catch is welded on screw rod, and one end of steel band is connected with steel firmware, the other end around It is connected with catch after crossing sleeve.
Preferably, welding male plug part on described I-steel, weld mother board on described steel firmware, mother board is inserted in Male plug part is interior and is bolted.
Preferably, being radially arranged a circle groove on described sleeve, steel band is wound in the groove of sleeve, it is simple to by steel Band positions.
Preferably, rectangular steel plates casing corresponding two I-steel, four steel deduction caps, two screw rods, four steel Firmware, four steel bands, four sleeves and four spud piles so that road is more solid and reliable.
Preferably, all being connected by adapter between two adjacent groups box assembly, adapter includes steel lath, at steel Welding steel nail on lath, the other end of steel nail is wholely set spacing round end, and two rectangular steel plates casings of joint are respectively provided with Connecting hole, the connecting hole on two rectangular steel plates casings is arranged symmetrically with, and the equal one end of each connecting hole is big, one end is little, and steel nail places In connecting hole on two rectangular steel plates casings, steel nail one end is disposed therein a rectangular steel plates casing by steel lath Inner side carries out spacing, and the inner side that the other end of steel nail is arranged on adjacent rectangle container body of steel plate by spacing round end carries out spacing.
Preferably, described adapter also includes chute, and chute is welded on the inner side of rectangular steel plates casing, described steel lath Being arranged in chute, steel nail alignment connecting hole is easy in the design of chute.
This utility model is by above design, and steel box section is that 3m*3m is square, surrounding forms by hanging steel plate under 30cm.Set Cylinder can rotate in steel deduction cap.Screw rod can rotate in steel firmware, by rotating screw rod, makes steel band shrink, with set Cylinder is fixing.Chute can allow steel lath to slide in chute, and steel nail is through the big end in the hole of two steel box section sides, logical Cross slip steel lath, make steel nail block in the small end in hole, reach to connect the purpose fixing two steel box section.
When needs carry out temporary road construction in certain job site, only these parts need to be installed at the scene, this The construction period of temporary road is short, weatherproof.
Installation steps of the present utility model:
1. site clearing, indicates the position of site of road line and prefabricated pile.
The most embedding prefabricated pile, reaches absolute altitude requirement.
3. steel box section is welded with I-steel and steel deduction cap.
4. I-steel is connected with the firmware of holder by connector.
5. sleeve is connected fixing with stake by setscrew.
6., by rotating the screw rod of holder, make steel band fasten pile protection cylinder, reach the effect fixing with stake.
7. repeat 3-6 process, complete the installation of another steel box section, then two casings are connected fixing.
This utility model is lower than to site requirements with tradition temporary construction road, and step is simple, and assembling is quick, satisfies the need Line changes, pipeline change has stronger adaptibility to response, can have enough to meet the need use, it is ensured that green construction simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of one group of box assembly.
Fig. 3 is the axonometric chart removing spud pile in Fig. 2.
Fig. 4 is screw rod, steel band, the connection diagram of steel firmware.
Fig. 5 is the partial schematic diagram of Fig. 1.
Fig. 6 is the explosive view of Fig. 5.
Detailed description of the invention
As shown in figures 1 to 6, steel box section cap covering type temporary construction road, including the some groups of box assemblies being sequentially arranged 1, two adjacent groups box assembly 1 is all connected by adapter 2.
Often group box assembly 1 all include a lower ending opening rectangular steel plates casing 4, two screw rods 6 of 3, two I-steel, Four steel deduction caps, 7, four catch 8 of 5, four steel firmwares and 9, four sleeves being vertically arranged 10 of four steel bands and four The spud pile 11 being vertically arranged.Two I-steel 4 and four steel deduction caps 5 are all welded on the inside top of container body of steel plate 3, two I-steel 4 is longitudinally arranged, and four steel deduction caps 5 are arranged in two rows, and is positioned at longitudinal two of which steel deduction cap 5 and is arranged on The side of a piece I-steel 4, is positioned at two other longitudinal steel deduction cap 5 and is arranged on the side of another root I-steel 4.Steel button The upper surface of cap 5 be plane, lower surface be the hemisphere face of indent, the top of sleeve 10 is hemisphere and is equipped with at steel In the hemisphere face of deduction cap 5, the bottom of sleeve 10 is enclosed within the top of spud pile 11 and is connected by setscrew 10.
Four steel firmwares 7 are arranged in two rows, and are positioned at longitudinal two of which steel firmware 7 and are arranged on an I-shaped The lower section of steel 4, is positioned at two other longitudinal steel firmware 7 and is arranged on the lower section of another root I-steel 4.I-steel 4 welds Connect male plug part 14, steel firmware 7 welds mother board 15, connect in mother board 15 is inserted in male plug part 14 and by bolt 16. Two screw rod 6 lateral arrangement, are positioned at horizontal two of which steel firmware 7 and are threaded on a screw rod 6, be positioned at horizontal Two other steel firmware 7 is threaded on another root screw rod 6.Two catch 8 are welded on same screw rod 6, every steel One end of matter band 9 is bolted with steel firmware 7, and the other end is connected with catch 8 after walking around sleeve 10.At each sleeve 10 On be all radially arranged a circle groove 13, each steel band 9 be wound on correspondence sleeve 10 groove 13 in.Each sleeve 10 all passes through Screw rod 6, steel firmware 7, steel band 9 connect with corresponding I-steel 4.
Adapter 2 includes steel lath 18, and steel lath 18 welds steel nail 19, and the other end of steel nail 19 is wholely set limit Circle of position head 20, two rectangular steel plates casings 3 of joint are respectively provided with connecting hole 21, the connection on two rectangular steel plates casings 3 Hole 21 is arranged symmetrically with, and each connecting hole 21 is equal, and one end is big, one end is little, and steel nail 19 is set in the company on two rectangular steel plates casings 3 Connecing in hole 21, the inner side that steel nail 19 one end is disposed therein a rectangular steel plates casing 3 by steel lath 18 carries out spacing, steel nail The inner side that the other end of 19 is arranged on adjacent rectangle container body of steel plate 3 by spacing round end 20 carries out spacing.Adapter 2 also includes chute 17, chute 17 is welded on the inner side of rectangular steel plates casing 3, and steel plate 18 is arranged in chute 17.Chute 17 can allow steel Scutum bar 18 slides in chute 17, and steel nail 19 is through the big end of the connecting hole 21 of two steel box section 3 sides, by slip steel Scutum bar 18, makes steel nail 19 block in the small end of connecting hole 21, reaches to connect the purpose fixing two steel box section 3.

Claims (7)

1. steel box section cap covering type temporary construction road, it is characterised in that: include the some groups of box assemblies being sequentially connected with;Often group Box assembly all include the rectangular steel plates casing of lower ending opening, I-steel, steel deduction cap, holder, the sleeve being vertically arranged and The spud pile being vertically arranged;Described I-steel and steel deduction cap are all welded on the inside top of container body of steel plate, steel deduction cap upper Surface be plane, lower surface be the hemisphere face of indent, the top of sleeve is hemisphere and is equipped with in the half of steel deduction cap In sphere, the bottom of sleeve is enclosed within the top of spud pile, and sleeve is connected with described I-steel by holder.
Steel box section cap covering type temporary construction road the most according to claim 1, it is characterised in that: described holder includes Steel firmware, screw rod, catch and steel band, steel firmware is connected with described I-steel, and screw flight is connected in steel firmware, Catch is welded on screw rod, and one end of steel band is connected with steel firmware, and the other end is connected with catch after walking around sleeve.
Steel box section cap covering type temporary construction road the most according to claim 2, it is characterised in that: on described I-steel Welding male plug part, welds mother board on described steel firmware, and mother board is inserted in male plug part and is bolted.
Steel box section cap covering type temporary construction road the most according to claim 3, it is characterised in that: footpath on described sleeve To arranging a circle groove, steel band is wound in the groove of sleeve.
Steel box section cap covering type temporary construction road the most according to claim 4, it is characterised in that: a rectangular steel plates case Corresponding two I-steel of body, four steel deduction caps, two screw rods, four steel firmwares, four steel bands, four sleeves and four Spud pile.
Steel box section cap covering type temporary construction road the most according to claim 5, it is characterised in that: two adjacent groups casing group All being connected by adapter between part, adapter includes steel lath, welds steel nail, the other end one of steel nail on steel lath Body arranges spacing round end, two rectangular steel plates casings of joint is respectively provided with connecting hole, the company on two rectangular steel plates casings Connecing hole to be arranged symmetrically with, the equal one end of each connecting hole is big, one end is little, and steel nail is set in the connecting hole on two rectangular steel plates casings In, the inner side that steel nail one end is disposed therein a rectangular steel plates casing by steel lath carries out spacing, the other end of steel nail by Spacing round end is arranged on the inner side of adjacent rectangle container body of steel plate and carries out spacing.
Steel box section cap covering type temporary construction road the most according to claim 6, it is characterised in that: described adapter also wraps Including chute, chute is welded on the inner side of rectangular steel plates casing, and described steel lath is arranged in chute.
CN201620659732.6U 2016-06-29 2016-06-29 Steel box section cap covering type temporary construction road Withdrawn - After Issue CN205804084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620659732.6U CN205804084U (en) 2016-06-29 2016-06-29 Steel box section cap covering type temporary construction road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620659732.6U CN205804084U (en) 2016-06-29 2016-06-29 Steel box section cap covering type temporary construction road

Publications (1)

Publication Number Publication Date
CN205804084U true CN205804084U (en) 2016-12-14

Family

ID=57511760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620659732.6U Withdrawn - After Issue CN205804084U (en) 2016-06-29 2016-06-29 Steel box section cap covering type temporary construction road

Country Status (1)

Country Link
CN (1) CN205804084U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926404A (en) * 2016-06-29 2016-09-07 江苏邗建集团有限公司 Steel box body buckle hat type temporary construction road

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926404A (en) * 2016-06-29 2016-09-07 江苏邗建集团有限公司 Steel box body buckle hat type temporary construction road
CN105926404B (en) * 2016-06-29 2017-12-08 江苏邗建集团有限公司 Steel box section cap covering type temporary construction road

Similar Documents

Publication Publication Date Title
CN103726508B (en) A kind of precast rc slab material loose tool and construction method
CN103541352A (en) Underground and overground continuous construction method for major-diameter high flat bed pile in sandy soil stratum
CN205804084U (en) Steel box section cap covering type temporary construction road
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN104993440A (en) Lightning-protection manual grounding system and construction method by utilizing structure steel bar externally-connected downlead wire
CN105926404B (en) Steel box section cap covering type temporary construction road
CN104727307B (en) For the non-uniform pile column construction method of underground
CN104196036B (en) Foundation pit supporting structure and method based on old underground outdoor wall structure
CN206495384U (en) A kind of assembled hangs platform structure
CN105332375A (en) Fixing method for base of pile driver for static-pressed pile by anchor rods
CN102619286A (en) Connecting joint of steel pipe concrete column and profile steel concrete beam
CN104278635A (en) Steering method of ground anchor type suspension bridge catwalk load bearing cable
CN203488088U (en) Steel structure of ladder compartment for pedestrian courtyard
KR101663374B1 (en) Streetlight Foundation Structure
CN204199296U (en) Foundation pit supporting structure based on old underground outdoor wall structure
CN204174946U (en) A kind of prefabricated post and post connection positioner
CN203050736U (en) Waterproof earth pressure balance rectangular jacking pipe joint for large-section motor vehicle tunnel
CN204875526U (en) Big steel pipe support constructional device of combination casing assembled
CN204252565U (en) One faces frontier defense protection unit
CN203856225U (en) Assembled type stair section safety protection handrail system
CN113339003A (en) Construction method of tunnel integrated arch sheathing trolley
CN203905027U (en) Prefabricated assembling-type inner supporting system of foundation pit support system
CN203475438U (en) Column structure and foundation pit supporting system comprising same
CN104343382B (en) Pedestrain raise solar steel design and construction method
KR102137389B1 (en) Reinforcement connection structure and method of underground box structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20161214

Effective date of abandoning: 20171208