CN205803522U - A kind of 19 hole 25mm checkerwork cell diameter checker brick - Google Patents

A kind of 19 hole 25mm checkerwork cell diameter checker brick Download PDF

Info

Publication number
CN205803522U
CN205803522U CN201521036812.8U CN201521036812U CN205803522U CN 205803522 U CN205803522 U CN 205803522U CN 201521036812 U CN201521036812 U CN 201521036812U CN 205803522 U CN205803522 U CN 205803522U
Authority
CN
China
Prior art keywords
hole
brick
checker brick
manholes
brick body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521036812.8U
Other languages
Chinese (zh)
Inventor
孟玉杰
张福明
毛庆武
张建
银光宇
李欣
许云
梅丛华
胡祖瑞
杨森
曹朝真
范燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang International Engineering Technology Co Ltd
Original Assignee
Beijing Shougang International Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang International Engineering Technology Co Ltd filed Critical Beijing Shougang International Engineering Technology Co Ltd
Priority to CN201521036812.8U priority Critical patent/CN205803522U/en
Application granted granted Critical
Publication of CN205803522U publication Critical patent/CN205803522U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Supply (AREA)

Abstract

A kind of 19 hole 25mm checkerwork cell diameter checker brick, belong to air stove technical field in iron-smelting process.Checker brick include the brick body of positive hexagonal prism, 19 manholes, 12 semi-circular through hole and 6 1/3 manholes;Brick body upper surface has three the circular grooves being uniformly along the circumferential direction evenly distributed, and lower surface has corresponding round boss;When the identical brick body of polylith is stacked upon, the gap of 8~10mm is left between the rib that every two blocks of checker brick contact, the placement center that center is upper strata checker brick that every three pieces of brick body intersect, then six ribs of upper strata checker brick are distributed on three blocks of checker brick of lower floor the most two-by-two.Advantage is, overall structure is uniform, and manufacture difficulty is low.

Description

A kind of 19 hole 25mm checkerwork cell diameter checker brick
Technical field
This utility model belongs to air stove technical field in iron-smelting process, particularly to a kind of 19 hole 25mm checkerwork cell diameter lattice Sub-brick and stacking method.Particularly relate to high efficiency, low cost heat storage, it is adaptable to high-temperature thermal storage type exchanger and the storage of heat-exchanging furnace Hot cell.
Background technology
Along with the dedusting technology progress of coal gas used by Combustion of Hot Air Furnace, the pollution of checker brick in regenerator is reduced, for obtaining Obtaining bigger heating surface, the direction that the hole of checker brick radially reduces is developed.The small-aperture lattice brick series of exploitation at present is main There are 7 holes, 19 holes, 31 holes, 37 holes and 61 holes etc..The commonly used checker brick profile of air stove is positive six prisms, from aperture φ The 7 hole bricks of 42mm, to the 19 hole bricks of φ 30mm, progressively develop into the 37 hole bricks of φ 28mm, φ 22mm.Along with aperture reduces monolithic The complete hole count of brick is consequently increased, and the volume and weight of monolithic brick is consequently increased.
Although 37 hole bricks are owing to checkerwork cell diameter is little, improve heating surface (area) (HS, but owing to the volume of its monolithic brick increases so that Manufacture difficulty is high, fabrication yield is low, builds difficulty by laying bricks or stones and strengthens, not only causes checker brick price to increase, and comprcssive strength and body The physical and chemical indexs such as long-pending density are also deteriorated.
Summary of the invention
The purpose of this utility model is to provide a kind of 19 hole 25mm checkerwork cell diameter checker brick and stacking methods, solves system Make the problem that difficulty is higher.The heating surface of checker brick can be effectively ensured, reach to control whole height and the grid of air stove The purpose of brick use cost.
A kind of 19 hole 25mm checkerwork cell diameter checker brick, including 1,19 manholes of brick body 2,12 half of positive hexagonal prism Manhole 3 and 6 1/3 manholes 4.19 manholes 2 divide three ring distributions, the first ring from inside to outside from brick body 1 center For RC 1 manhole 2 of brick body 1, the second ring is the most equally distributed 6 manholes 2, and the 3rd ring is positive six Limit shape is uniformly distributed 12 manholes 2, and outer surface is semi-circular through hole 3 or 1/3 manhole 4, and brick body 1 upper surface has uniformly Three the circular grooves 6 being along the circumferential direction evenly distributed, lower surface has corresponding round boss 5.
The diameter of each through hole is identical, and pore diameter range is between 25~27mm.
The pitch of holes of each through hole is identical, and scope is between 35~45mm.
Boss 5 be shaped as round platform wide at the top and narrow at the bottom, the shape of groove 6 is all the circular conical surface wide at the top and narrow at the bottom, but in size Bigger than boss 5 2~5mm.
The stacking method of a kind of 19 hole 25mm checkerwork cell diameter checker brick, the brick body 1 with through hole identical when polylith is stacked Time together, between the rib that every two blocks of checker brick contact, leave the gap of 8~10mm, make the every two pieces of grid between parallel surface Semi-circular through hole 3 on brick constitutes 3 manholes 2, makes the diameter of all through holes in whole plane identical, and each leads to Spacing between hole is equal.Between adjacent two layers checker brick, the fissure of displacement is built by laying bricks or stones, with the crossing center of every three pieces of brick body 1 for upper strata grid The placement center of brick, then six ribs of upper strata checker brick are distributed on three blocks of checker brick of lower floor the most two-by-two, upper strata checker brick Lower surface on three boss 5 groove 6 just at lower floor's checker brick upper surface in, such stacking structure makes checker brick Between adjacent layer, mutually locking forms stable overall structure, and can to absorb self volume swollen the gap between checker brick Swollen.Checker brick checkerwork cell on whole air stove height and in plane is uniformly distributed and makes checker brick be heated evenly, and circulation is at each lattice Air-flow in hole is uniform, the effective pressure loss regulating gas, makes the unit volume heating surface of checker brick increase.
The utility model has the advantage of, overall structure is uniform, and manufacture difficulty is low, solves big the asking of pressure loss Topic, gas flowfield is uniform, improves the heating surface of checker brick, reduces the use cost of air stove heat storage, meets energy-conservation Use requirement with the high-efficient hot air furnace of environmental protection.
Accompanying drawing explanation
Fig. 1 is checker brick structure front view.Wherein, brick body 1, manhole 2, boss 5.
Fig. 2 is checker brick structure top view.Wherein, brick body 1, manhole 2, semi-circular through hole 3,1/3 manhole 4, Boss 5, groove 6.
Fig. 3 is structure sectional view at the A A of Fig. 2.Wherein, brick body 1, boss 5.
Fig. 4 is structure sectional view at the B B of Fig. 2.Wherein, boss 5, groove 6.
Fig. 5 is the stacking schematic diagram of checker brick.Wherein, combination through hole 7.
Detailed description of the invention
Fig. 1~Fig. 5 is detailed description of the invention of the present utility model
A kind of 19 hole 25mm checkerwork cell diameter checker brick, brick body 1 and 19 be distributed in brick body of positive hexagonal prism are vertical The through hole 4 of the complete circle through hole on direction 2,12 3,6 1/3 circles of semicircular through hole, manhole aperture is 25mm, Complete manhole 2 divides position three ring inside and outside checker brick center, and 12 through holes of outer shroud are parallel to positive hexagonal prism Six straight flanges, be evenly distributed according to 3, every limit through hole, the angle of center, hole and the checker brick line of centres is divided into 30 °, middle 6 through holes of ring are divided equally by every 60 ° in a circumferential direction, and innermost ring is the center that 1 manhole is positioned at brick body 1, and positive six Prism is by being distributed with 5 complete manholes 2 on two corner angle lines at center, and semicircular through hole 3 is positive six Being distributed two on each rib of prism brick body 1, the through hole 4 of 1/3 circle is positioned on six corner angle of positive hexagonal prism brick body 1, The center distance of each through hole is equal, and pitch of holes is 40mm, and all of through hole is up-small and down-big bellmouth, upper and lower aperture difference For 2mm, regular prism brick body 1 upper surface has three circular grooves 6, and lower surface has the boss 5 that corresponding three are circular, recessed Groove 6 and boss 5 are circle and occupy the area of two complete checkerwork cells, and boss 5 be shaped as round platform wide at the top and narrow at the bottom, groove The shape of 6 is all the circular conical surface wide at the top and narrow at the bottom, but 2mm bigger than boss 5 in size, it is ensured that both can lock mutually.
When checker brick are piled up when, in order to ensure the overall structure stability of heat storage, checker brick center, upper strata It is positioned at during three blocks of checker brick of lower floor intersect in the heart, when lower floor's checker brick are stacked upon, the rib that every two blocks of checker brick contact Between leave the gap of 8mm, make the semi-circular through hole on each two checker brick between parallel surface constitute 3 combination through holes 7, three The center that block checker brick corner angle are crossed to form also forms a combination through hole 7, and three boss 5 of upper strata checker brick lower surface are just It is positioned at well in the groove 6 of lower floor's checker brick upper surface, the checker brick the piled up checkerwork cell on whole heat storage cross section so formed It is evenly distributed, and the distance between each through hole is the most identical.
When being embodied as, checker brick are piled up in chamber of hot-blast stove according to said structure, upper strata checker brick and lower floor's grid Being fixed by groove 6 and boss 5 between brick, the upper and lower surface checkerwork cell of each layer of checker brick is evenly distributed, uniform when air-flow passes through Distribution, makes each checkerwork cell inner surface of heat storage be heated evenly, and it is excessive not result in heat storage local gas pressure, thus add The big effective rate of utilization of heat storage, thus improve pathogenic wind-warm, make the rate of heat exchange of air stove increase substantially, and this structure Reduce the manufacture difficulty of checker brick, decrease the cost of processing and fabricating, and control the whole height of air stove.

Claims (1)

1. hole 25mm checkerwork cell diameter checker brick, it is characterised in that include the brick body (1) of positive hexagonal prism, 19 circles Through hole (2), 12 semi-circular through hole (3) and 6 1/3 manholes (4);19 manholes (2) from brick body (1) center by interior Outwards point three ring distributions, the first ring is RC 1 manhole (2) of brick body (1), and the second ring is the most equally distributed 6 manholes (2), the 3rd ring is that regular hexagon is uniformly distributed 12 manholes (2), and outer surface is semi-circular through hole (3) Or 1/3 manhole (4), brick body (1) upper surface has three the circular grooves (6) being uniformly along the circumferential direction evenly distributed, under Corresponding round boss (5) is had on surface;
The diameter of each through hole is identical, and pore diameter range is between 25~27mm;
The pitch of holes of each through hole is identical, and scope is between 35~45mm;
Boss (5) be shaped as round platform wide at the top and narrow at the bottom, the shape of groove (6) is all the circular conical surface wide at the top and narrow at the bottom, but in size Than boss (5) big 2~5mm.
CN201521036812.8U 2015-12-14 2015-12-14 A kind of 19 hole 25mm checkerwork cell diameter checker brick Active CN205803522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521036812.8U CN205803522U (en) 2015-12-14 2015-12-14 A kind of 19 hole 25mm checkerwork cell diameter checker brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521036812.8U CN205803522U (en) 2015-12-14 2015-12-14 A kind of 19 hole 25mm checkerwork cell diameter checker brick

Publications (1)

Publication Number Publication Date
CN205803522U true CN205803522U (en) 2016-12-14

Family

ID=58143456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521036812.8U Active CN205803522U (en) 2015-12-14 2015-12-14 A kind of 19 hole 25mm checkerwork cell diameter checker brick

Country Status (1)

Country Link
CN (1) CN205803522U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115155281A (en) * 2022-07-08 2022-10-11 中钢设备有限公司 Flue gas denitration hot blast stove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115155281A (en) * 2022-07-08 2022-10-11 中钢设备有限公司 Flue gas denitration hot blast stove

Similar Documents

Publication Publication Date Title
CN102226518B (en) Large-scale circulating fluidized bed boiler
CN202039080U (en) Heat accumulating lattice brick for a blast-furnace hot blast stove
CN205803522U (en) A kind of 19 hole 25mm checkerwork cell diameter checker brick
CN104724705B (en) Chassis assembly for polycrystalline silicon reducing furnace
CN202688356U (en) Step-shaped 19-pore checker brick with central groove
CN102352420B (en) Combination checker brick with two types of different brick structures
CN205616915U (en) Hot -blast furnace is with even gas distribution brick
CN105463145A (en) Lattice brick with 19 lattices and lattice hole diameter of 25 mm and stacking method
CN203360475U (en) Lattice brick structure for heat storage room
CN201688705U (en) Porous wave-shaped honeycomb checker brick
CN203307363U (en) Seven-hole lattice brick with center groove
CN112063786A (en) Checker brick with gas channel
CN202730162U (en) 19-aperture lattice brick with annular grooves and wide piling clearance
CN110736371B (en) Heat pipe system arranged at intervals of power station boiler
CN201809372U (en) Efficient 19-hole checker brick
CN202272897U (en) Combined checker brick with two different brick type structures
CN202973906U (en) Porous lattice brick with horizontal air flues
CN203021592U (en) Combined lattice brick
JP2015010237A (en) Checker brick for air heating furnace
CN205690951U (en) Heat storage heat exchanger
CN201266020Y (en) Heat accumulation chamber by utilization of roller kiln quench zone exhaust heat
CN103114166B (en) Top combustion stove regenerative chamber arrangement structure capable of uniformly distributing flue gas
CN203964702U (en) The heat-exchanger rig of cooling tower
CN202272899U (en) 19-hole checker brick with groove in center
CN202730163U (en) 37-aperture lattice brick with annular grooves and wide piling clearance

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant