CN205800138U - A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes - Google Patents

A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes Download PDF

Info

Publication number
CN205800138U
CN205800138U CN201620718782.7U CN201620718782U CN205800138U CN 205800138 U CN205800138 U CN 205800138U CN 201620718782 U CN201620718782 U CN 201620718782U CN 205800138 U CN205800138 U CN 205800138U
Authority
CN
China
Prior art keywords
mold body
resistance
double
double resistance
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620718782.7U
Other languages
Chinese (zh)
Inventor
傅淼
傅一淼
倪炜
鲍岳祥
许文雄
周志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huafeng New Materials Ltd By Share Ltd
Original Assignee
Zhejiang Huafeng New Materials Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huafeng New Materials Ltd By Share Ltd filed Critical Zhejiang Huafeng New Materials Ltd By Share Ltd
Priority to CN201620718782.7U priority Critical patent/CN205800138U/en
Application granted granted Critical
Publication of CN205800138U publication Critical patent/CN205800138U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

This utility model provides the particular manufacturing craft of a kind of non-digging PE-specialized double resistance to pipes, including back-up ring, inner mold body and outer mold body, wherein the double resistance to pipe clamp of PE is enclosed between inner mold body and back-up ring, described inner mold body is torus shape, it is against on the double resistance to inside pipe wall of PE, and between back-up ring and the double outer wall of resistance to pipe of PE, interface width is equal to interface width between inner mold body and the double resistance to inside pipe wall of PE;Electric heating flaggy and heat-resisting stress crack resistant interlayer it is nested with the most successively being positioned at inside outer mold body;Described outer mold body withstands the double resistance to tube edge edge of PE.The particular manufacturing craft of non-digging PE-specialized double resistance to pipes of the present utility model solves extraction flammable explosive gas in cable pipeline or piping shaft and uses the double resistance to tubing of PE, solve the problem that pipeline joint difficulty is big, achieve pipe integrated with back-up ring, alleviate deadweight, greatly facilitate transport and install, the advantage with simple in construction etc..

Description

A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes
Technical field
This utility model relates to pipe technology field, particularly relates to the particular manufacturing craft of a kind of non-digging PE-specialized double resistance to pipes.
Background technology
At present existing cable pipeline or pipeline use steel pipe mostly, generally use steel pipe to there is weight big, transport Inconvenience, installs complexity, easy-to-rust, and the length of service is short, sealing property, heat resistance difference and by stress defect easy to crack, because of This communication cable industry is in new pipeline technical standard, it is desirable to preferred material should select the double resistance to tubing of PE, and the double resistance to tubing of PE In the connection on ground, general using straight tube docking, electrical heating is welded, and it is inflammable easily to be likely to be due to some in pipeline or pipeline The reason of explosive gas etc., uses non-explosion-proof electrical heating operation not in down-hole, goes into the well after welding such as ground, and its length is the most very Difficult adaptation conditions down-hole.
Utility model content
In order to solve above-mentioned technical problem, the purpose of this utility model is to provide a kind of non-digging PE-specialized double resistance to pipes Particular manufacturing craft.
To achieve the above object, this utility model have employed following technical scheme:
The particular manufacturing craft of a kind of non-digging PE-specialized double resistance to pipes is provided, including back-up ring, inner mold body and outer mold body, Wherein the double resistance to pipe clamp of PE is enclosed between inner mold body and back-up ring, and described inner mold body is torus shape, is against the double resistance to pipe of PE On inwall, and between the back-up ring outer wall of resistance to pipe double with PE, interface width contacts equal between inner mold body resistance to inside pipe wall double with PE Face width degree;Electric heating flaggy and heat-resisting stress crack resistant interlayer it is nested with the most successively being positioned at inside outer mold body;Institute State outer mold body and withstand the double resistance to tube edge edge of PE.Wherein: heat-resisting stress crack resistant interlayer has prominent heat-resisting and stress crack resistant Functional effect.
Preferably: the cross section of described outer mold body is symmetrical L-shaped structure.
Preferably: described outer mold body extends in the double resistance to pipe of PE, and in outer mold body resistance to pipe double with PE Gap it is provided with between wall.
Compared with prior art, the beneficial effects of the utility model are:
The particular manufacturing craft of non-digging PE-specialized double resistance to pipes of the present utility model solves in cable pipeline or piping shaft to be taken out Put flammable explosive gas and use the double resistance to tubing of PE, solve the problem that pipeline joint difficulty is big, it is achieved that manage integrated with back-up ring, Alleviating deadweight, greatly facilitate transport and install, having simple in construction, flexible to operation, labor intensity is low, sealing property Good, practical and attractive generous, profitable advantage;And heat-resisting stress crack resistant interlayer has prominent heat-resisting and stress crack resistant Functional effect, it is ensured that the stability of this mould.
Simultaneously by controlling electric heating flaggy so that the double temperature stabilization of resistance to pipe of PE, i.e. realize the homogeneous heating of outer mold body, And then the double resistance to pipe of PE is heated evenly, obtains good result;Electric heating flaggy uses electromagnetic heating technique, and its efficiency is high, preheating time Short, service life is long, and heating part heat dissipates few, on production environment without impact.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
Accompanying drawing marks: inner mold body 1, the double resistance to pipe 2 of PE, back-up ring 3, outer mold body 4, electric heating flaggy 5, heat-resisting proof stress Cracking interlayer 6, gap 7.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is made a detailed explanation.
As it is shown in figure 1, this utility model provides being embodied as of the particular manufacturing craft of a kind of non-digging PE-specialized double resistance to pipes 2 Example, the particular manufacturing craft of a kind of non-digging PE-specialized double resistance to pipes 2 of this offer, including back-up ring 3, inner mold body 1 and outer mold body 4, wherein double resistance to pipe 2 chuck of PE is between inner mold body 1 and back-up ring 3, and described inner mold body 1, in torus shape, is against PE On double resistance to pipe 2 inwalls, and between double resistance to pipe 2 outer wall of back-up ring 3 and PE, interface width is equal to inner mold body 1 resistance to pipe 2 double with PE Interface width between inwall;Be positioned at inside outer mold body 4 be nested with the most successively electric heating flaggy 5 and heat-resisting resistance to should Power cracking interlayer 6;Described outer mold body 4 withstands double resistance to pipe 2 edge of PE.Wherein: heat-resisting stress crack resistant interlayer 6 has prominent The heat-resisting functional effect with stress crack resistant.
Wherein: the cross section of described outer mold body 4 is symmetrical L-shaped structure, described outer mold body 4 extends into PE pair In resistance to pipe 2, and it is provided with gap 7 between double resistance to pipe 2 inwall of outer mold body 4 and PE.
The particular manufacturing craft of non-digging PE-specialized double resistance to pipes 2 of the present utility model solves in cable pipeline or piping shaft to be taken out Put flammable explosive gas and use double resistance to pipe 2 material of PE, solve the problem that pipeline joint difficulty is big, it is achieved that pipe and back-up ring 3 one Changing, alleviate deadweight, greatly facilitate transport and install, having simple in construction, flexible to operation, labor intensity is low, seals Performance is good, practical and attractive generous, profitable advantage;And heat-resisting stress crack resistant interlayer 6 has prominent heat-resisting and proof stress The functional effect of cracking, it is ensured that the stability of this mould.Simultaneously by controlling electric heating flaggy 5 so that double resistance to pipe 2 temperature of PE is steady Fixed, i.e. realize the homogeneous heating of outer mold body 4, and then the double resistance to pipe 2 of PE is heated evenly, obtains good result;Electric heating flaggy 5 is adopted With electromagnetic heating technique, its efficiency is high, and preheating time is short, and service life is long, and heating part heat dissipates few, to production environment without Impact.
Of the present utility model ultimate principle and principal character and of the present utility model advantage have more than been shown and described.One's own profession Skilled person will appreciate that of industry, this utility model is not restricted to the described embodiments, described in above-described embodiment and description Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model is also Have various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model Claimed scope is defined by appending claims and equivalent thereof.

Claims (3)

1. the particular manufacturing craft of non-digging PE-specialized double resistance to pipes, it is characterised in that include back-up ring, inner mold body and outer mold Body, wherein the double resistance to pipe clamp of PE is enclosed between inner mold body and back-up ring, and described inner mold body is torus shape, is against PE double On resistance to inside pipe wall, and between back-up ring and the double outer wall of resistance to pipe of PE, interface width is equal between inner mold body and the double resistance to inside pipe wall of PE Interface width;Be positioned at inside outer mold body be nested with the most successively electric heating flaggy and heat-resisting stress crack resistant every Layer;Described outer mold body withstands the double resistance to tube edge edge of PE.
The particular manufacturing craft of a kind of non-digging PE-specialized double resistance to pipes the most according to claim 1, it is characterised in that described external mold The cross section of tool body is symmetrical L-shaped structure.
The particular manufacturing craft of a kind of non-digging PE-specialized double resistance to pipes the most according to claim 2, it is characterised in that described external mold Tool body extends in the double resistance to pipe of PE, and is provided with gap between outer mold body and the double resistance to inside pipe wall of PE.
CN201620718782.7U 2016-07-11 2016-07-11 A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes Expired - Fee Related CN205800138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620718782.7U CN205800138U (en) 2016-07-11 2016-07-11 A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620718782.7U CN205800138U (en) 2016-07-11 2016-07-11 A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes

Publications (1)

Publication Number Publication Date
CN205800138U true CN205800138U (en) 2016-12-14

Family

ID=58141163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620718782.7U Expired - Fee Related CN205800138U (en) 2016-07-11 2016-07-11 A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes

Country Status (1)

Country Link
CN (1) CN205800138U (en)

Similar Documents

Publication Publication Date Title
CN104373759A (en) Long-distance vacuum insulation conveying pipeline
CN203161103U (en) Prestressed vacuum heat-insulating sleeve
CN103850653B (en) The manufacture method of insulation oil sleeve pipe
CN203500757U (en) Detachable heating casing
CN205800138U (en) A kind of particular manufacturing craft of non-digging PE-specialized double resistance to pipes
CN203978312U (en) Heat insulation box cupling
CN201795230U (en) Prefabricated steel bushing steel direct-buried elbow pipe applicable to steam pipeline
CN101608723A (en) A kind of non-maintaining sleeve compensator with double sealing structure
CN202560114U (en) Efficient prestress thermal insulation pipe
CN204692874U (en) Curvedly connect the embedded electromagnetic welding double tube structure of formula and elbow connection thereof
CN106761440A (en) Aerogel heat-proof oil pipe
CN206268660U (en) Tongue and groove vacuum flange
CN204547068U (en) The hot-melting fixture of multiple tube is manufactured for metal tube plastic lining
CN103850654B (en) The manufacture method of the heat insulation tubing and casing of prestressing force
CN209817953U (en) Novel multifunctional oil pipe
CN204610935U (en) Twoly diffuse plastic valve
CN206449837U (en) Storage-type electric water heater
CN204692867U (en) Curvedly connect formula outer electromagnetic welding double tube structure and outerly curvedly connect formula joint
CN206432640U (en) A kind of HGCO hollow cables protection pipe
CN204692870U (en) Direct-type electromagnetic welding double tube structure and straight joint thereof
CN204300615U (en) A kind of long distance vacuum insulation conveyance conduit
CN207113609U (en) A kind of more enamel-covered wires pass through the sealing structure of hyperbar electric furnace cover
CN207111043U (en) Aerogel heat-proof bushing
CN205690002U (en) A kind of socket joint type channel bend insulation cladding
CN206458933U (en) Petroleum pipeline is incubated pipe collar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214