CN205791261U - Big specification cable-laying gear in a kind of high-rise building vertical shaft - Google Patents

Big specification cable-laying gear in a kind of high-rise building vertical shaft Download PDF

Info

Publication number
CN205791261U
CN205791261U CN201620726579.4U CN201620726579U CN205791261U CN 205791261 U CN205791261 U CN 205791261U CN 201620726579 U CN201620726579 U CN 201620726579U CN 205791261 U CN205791261 U CN 205791261U
Authority
CN
China
Prior art keywords
cable
guide wheel
fixed mount
vertical shaft
rise building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620726579.4U
Other languages
Chinese (zh)
Inventor
姜正旭
王雪文
曹妍聆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Bohai Construction Group Co Ltd
Original Assignee
Qingdao Bohai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Bohai Construction Group Co Ltd filed Critical Qingdao Bohai Construction Group Co Ltd
Priority to CN201620726579.4U priority Critical patent/CN205791261U/en
Application granted granted Critical
Publication of CN205791261U publication Critical patent/CN205791261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Big specification cable-laying gear in the utility model discloses a kind of high-rise building vertical shaft, including cable, damping retarder, cable hank, controller and roof, described damping retarder includes fixed mount and guide wheel, and fixed mount is provided with guide wheel, and guide wheel is provided with adjustable plate.Big specification cable-laying gear in this high-rise building vertical shaft, uses the design of damping retarder, makes guide wheel assume responsibility for the horizontal component of cable gravity, by the hard and soft of cable, is bent at it and acts on guide wheel with the elastic-restoring force of generation under action of gravity;So, the friction rotated by guide wheel, the friction that cable rotates on guide wheel, thus the acceleration of gravity of time payout of effectively having decayed;Adjusting intermediate trailing wheel position and can change its amount of deceleration, preferable regulating effect is: when operating personnel exerts a force downwards, and cable overcomes damping to transfer operation, and after stopping force, cable slows down until stopping under damping retarder effect.

Description

Big specification cable-laying gear in a kind of high-rise building vertical shaft
Technical field
This utility model relates to cable-laying gear applied technical field, advises greatly in specifically a kind of high-rise building vertical shaft Lattice cable-laying gear.
Background technology
Common cable lifting common method has: " manpower tractive method ", " mechanical stretch method ".The former had both been difficult to ensure that card was executed Work safety, produces again substantial amounts of labour cost;The latter, except safety factors problem, there is also work progress to cable product matter The problem of amount protection.Wire rope traction cable, along with cable rises and weight increase, stress point and upper cable stress increase, can Can cause the mechanical damage of cable cover(ing), floor is the highest, and problem is the most obvious.
Utility model content
The purpose of this utility model is big specification cable-laying gear in being to provide a kind of high-rise building vertical shaft, to solve The problem proposed in above-mentioned background technology.
For achieving the above object, the following technical scheme of this utility model offer:
Big specification cable-laying gear in a kind of high-rise building vertical shaft, including cable, damping retarder, cable hank, control Device processed and roof, described damping retarder includes fixed mount and guide wheel, fixed mount is provided with guide wheel, and guide wheel is provided with regulation Plate, the bottom of fixed mount is fixedly mounted on floor;The side of described fixed mount is fixed on suspension bracket, and suspension bracket is fixedly mounted on wall On body, it is connected by snap close is fixing between fixed mount with suspension bracket;Top and the end of described fixed mount are equipped with holding clamp, Gu Determining fixture and suspension bracket snapping, be provided with buffer board between suspension bracket and body of wall, buffer board is fixed on body of wall by dead ring;Described Fixedly mounting microphone on roof, cable hank and controller are all fixedly mounted on roof, and both are on same level line, electricity Being wound around cable on cable dish, cable passes controller;Described cable is in close contact with fixed mount upper block;Fixing peace on described floor Dress transmitter receiver, horizontal plane is provided with monitor, and microphone, transmitter receiver and monitor are all connected by wire.
As further program of the utility model: described fixed mount uses angle iron bracket to be welded into triangular structure, leads Wheel is wooden roller, and guide wheel is provided with guided wheel slot.
As further program of the utility model: the both sides of described guide wheel install rubber sheet gasket additional, and are screwed.
As further program of the utility model: the assembling spacing between described damping retarder is equal, every three layers Assemble one group of damping retarder.
As further program of the utility model: described damping retarder sets gradually three guide wheels from top to bottom, on Lower tumbler is fixed, and middle guide wheel is fixed by adjustable plate.
Compared with prior art, this utility model beneficial effect:
(1) big specification cable-laying gear in this high-rise building vertical shaft, uses the design of damping retarder, makes to lead Wheel assume responsibility for the horizontal component of cable gravity, by the hard and soft of cable, is bent at it and returns with the elasticity of generation under action of gravity Multiple power acts on guide wheel;So, the friction rotated by guide wheel, the friction that cable rotates on guide wheel, thus effectively decay The acceleration of gravity of time payout;Adjusting intermediate trailing wheel position and can change its amount of deceleration, preferable regulating effect is: work as operation When personnel exert a force downwards, cable overcomes damping to transfer operation, and after stopping force, cable slows down straight under damping retarder effect To stopping;Fixed mount uses angle iron bracket to be welded into triangular structure, Stability Analysis of Structures, serves fixation, and stability is good, Guide wheel is wooden roller, and guide wheel is provided with guided wheel slot, and when installing cable, cable snaps in roller groove, it is to avoid cable flexing;Guide wheel Both sides install rubber sheet gasket additional, and be screwed, serve cushioning effect, it is simple to the degree of tightness of regulation guide wheel;Damping is slow Assembling spacing between device is equal, assembles one group of damping retarder every three layers, plays decay acceleration of gravity, it is to avoid cable Deadweight, causes cable tensile strain to deform;Damping retarder sets gradually three guide wheels from top to bottom, and upper lower tumbler is fixed, middle Guide wheel is fixed by adjustable plate, the degree of tightness of adjustable plate scalable guide wheel, to meet the cable use of different size.
(2) big specification cable-laying gear in this high-rise building vertical shaft, uses " self-control damping retarder " to utilize cable The kinetic energy transferred from a high position, saves the numerous manpowers or power-equipment upwards lifted, provides cost savings, and economic effect is obvious;Electricity Cable transfers operation on " damping retarder ", and its speed can arbitrarily regulate control.The structural principle of this device had both utilized cable to tie Structure characteristic, does not affect its insulation system again;Lay features simple and practical process, safe and efficient.
Accompanying drawing explanation
Fig. 1 is scheme of installation of the present utility model;
Fig. 2 is damping retarder front view of the present utility model;
Fig. 3 is damping retarder side view of the present utility model.
In figure: 1-fixed mount, 2-cable, 3-damping retarder, 4-suspension bracket, 5-adjustable plate, 6-floor, 7-guide wheel, 8-lock Button, 9-holding clamp, 10-buffer board, 11-dead ring, 12-body of wall, 13-microphone, 14-cable hank, 15-brake, 16-pair Say machine, 17-monitor, 18-roof.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Refer to Fig. 1-3, in this utility model embodiment, big specification cable laying dress in a kind of high-rise building vertical shaft Putting, including cable 2, damping retarder 3, cable hank 14, controller 15 and roof 18, damping retarder 3 includes fixed mount 1 and leads Wheel 7, the assembling spacing between damping retarder 3 is equal, assembles one group of damping retarder 3 every three layers, plays decay gravity and adds Speed, it is to avoid the deadweight of cable 2, causes cable 2 stretcher strain;Being provided with guide wheel 7 on fixed mount 1, fixed mount 1 uses angle bar to prop up Frame is welded into triangular structure, Stability Analysis of Structures, serves fixation, and stability is good, and guide wheel 7 is wooden roller, on guide wheel 7 Being provided with guided wheel slot, when installing cable 2, cable 2 snaps in roller groove, it is to avoid cable 2 swings;Guide wheel 7 is provided with adjustable plate 5, Gu The bottom determining frame 1 is fixedly mounted on floor 6;The both sides of guide wheel 7 install rubber sheet gasket additional, and are screwed, and serve slow Punching effect, it is simple to the degree of tightness of regulation guide wheel 7;The side of fixed mount 1 is fixed on suspension bracket 4, and suspension bracket 4 is fixedly mounted on body of wall 12 On, it is connected by snap close 8 is fixing between fixed mount 1 with suspension bracket 4;The top of fixed mount 1 and end are equipped with holding clamp 9, Gu Determining fixture 9 and suspension bracket 4 snapping, be provided with buffer board 10 between suspension bracket 4 and body of wall 12, buffer board 10 is fixed on by dead ring 11 On body of wall 12;Fixedly mounting microphone 13 on roof 18, cable hank 14 and controller 15 are all fixedly mounted on roof, at both On same level line, cable hank 14 being wound around cable 2, cable 2 is through controller 15;Controller 15 can control the pine of cable 2 Tightly, thus controlling the decrease speed of cable 2, cable 2 is in close contact with fixed mount 1 upper block 7;Intercommunication is fixedly mounted on floor 6 Machine 16, horizontal plane is provided with monitor 17, and microphone 13, transmitter receiver 16 and monitor 17 are all connected by wire, and damping is slow Speed device 3 sets gradually three guide wheels 7 from top to bottom, and upper lower tumbler 7 is fixed, and middle guide wheel 7 is fixed by adjustable plate 5, regulation The degree of tightness of plate 5 scalable guide wheel 7, uses meeting the cable 2 of different size.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to realize this practicality in other specific forms new Type.Therefore, no matter from the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, this practicality is new The scope of type is limited by claims rather than described above, it is intended that by the containing of equivalency in claim that fall All changes in justice and scope are included in this utility model.Should not be considered as any reference in claim limiting Involved claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment May be appreciated other embodiments.

Claims (5)

1. a big specification cable-laying gear in high-rise building vertical shaft, including cable (2), damping retarder (3), cable hank (14), controller (15) and roof (18), it is characterised in that: described damping retarder (3) includes fixed mount (1) and guide wheel (7), Being provided with guide wheel (7) on fixed mount (1), guide wheel (7) is provided with adjustable plate (5), and the bottom of fixed mount (1) is fixedly mounted on floor (6) on;The side of described fixed mount (1) is fixed on suspension bracket (4), and suspension bracket (4) is fixedly mounted on body of wall (12), fixed mount (1) it is connected by snap close (8) is fixing with between suspension bracket (4);Top and the end of described fixed mount (1) are equipped with holding clamp (9), holding clamp (9) and suspension bracket (4) snapping, it is provided with buffer board (10), buffer board (10) between suspension bracket (4) and body of wall (12) It is fixed on body of wall (12) by dead ring (11);Fixedly mount microphone (13) on described roof (18), cable hank (14) with Controller (15) is all fixedly mounted on roof, and both are on same level line, and cable hank (14) is wound around cable (2), electricity Cable (2) passes controller (15);Described cable (2) is in close contact with fixed mount (1) upper block (7);Described floor (6) is upper fixing Installing transmitter receiver (16), horizontal plane is provided with monitor (17), microphone (13), transmitter receiver (16) and monitor (17) are the most logical Cross wire to connect.
Big specification cable-laying gear in a kind of high-rise building vertical shaft the most according to claim 1, it is characterised in that: institute Stating fixed mount (1) and be welded into triangular structure by angle iron bracket, guide wheel (7) is wooden roller, and guide wheel (7) is provided with guided wheel slot.
Big specification cable-laying gear in a kind of high-rise building vertical shaft the most according to claim 1, it is characterised in that: institute The both sides stating guide wheel (7) install rubber sheet gasket additional, and are screwed.
Big specification cable-laying gear in a kind of high-rise building vertical shaft the most according to claim 1, it is characterised in that: institute State the assembling spacing between damping retarder (3) equal, assemble one group of damping retarder (3) every three layers.
Big specification cable-laying gear in a kind of high-rise building vertical shaft the most according to claim 1, it is characterised in that: institute Stating damping retarder (3) and set gradually three guide wheels (7) from top to bottom, upper lower tumbler (7) is fixed, and middle guide wheel (7) passes through Adjustable plate (5) is fixed.
CN201620726579.4U 2016-07-11 2016-07-11 Big specification cable-laying gear in a kind of high-rise building vertical shaft Expired - Fee Related CN205791261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620726579.4U CN205791261U (en) 2016-07-11 2016-07-11 Big specification cable-laying gear in a kind of high-rise building vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620726579.4U CN205791261U (en) 2016-07-11 2016-07-11 Big specification cable-laying gear in a kind of high-rise building vertical shaft

Publications (1)

Publication Number Publication Date
CN205791261U true CN205791261U (en) 2016-12-07

Family

ID=58125192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620726579.4U Expired - Fee Related CN205791261U (en) 2016-07-11 2016-07-11 Big specification cable-laying gear in a kind of high-rise building vertical shaft

Country Status (1)

Country Link
CN (1) CN205791261U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108199300A (en) * 2018-01-12 2018-06-22 中建六局土木工程有限公司 A kind of high-rise building cable lifting construction method
CN109179217A (en) * 2018-10-23 2019-01-11 筑梦高科建筑有限公司 Super High vertical high voltage cable laying construction technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108199300A (en) * 2018-01-12 2018-06-22 中建六局土木工程有限公司 A kind of high-rise building cable lifting construction method
CN109179217A (en) * 2018-10-23 2019-01-11 筑梦高科建筑有限公司 Super High vertical high voltage cable laying construction technology
CN109179217B (en) * 2018-10-23 2020-04-07 广东博智林机器人有限公司 Super high-rise vertical high-voltage cable laying construction process

Similar Documents

Publication Publication Date Title
CN201703935U (en) Elastic tensioning device of speed limiter rope
CN203434532U (en) Safety auxiliary device for vertical cable laying
CN203352100U (en) Windproof stay wire cross-arm device for power transmission line
CN205791261U (en) Big specification cable-laying gear in a kind of high-rise building vertical shaft
CN202296457U (en) Cloth inspecting machine and unreeling frame of cloth inspecting machine
CN201746270U (en) Hoisting mechanism of crane
CN204096804U (en) Elevator trailing cable protective device
CN202518906U (en) Hoistway traveling cable support
CN202651702U (en) Shaft cable paying-off laying limiter
CN205294538U (en) Safety tongs aggregate unit
CN202038788U (en) Paired cable pulley for construction lifter
CN205820611U (en) A kind of limiter of speed safety tongs shift mechanism saving ele-vator shaft spaces
CN205739860U (en) A kind of speed limiter wire rope tensioner system
CN205873644U (en) Elasticity friction buffering counter weight device
CN204283185U (en) Frame self-locking solar protection devices
CN208127773U (en) Construction cable lifting device
CN203382465U (en) Auxiliary tower climbing special tool for draught fan maintenance
CN208054666U (en) A kind of villa ladder over-speed governor tensioning apparatus
CN208577308U (en) One kind prevents cable from shaking device
CN208829090U (en) A kind of elevator intelligent dynamic balancer
CN206582070U (en) A kind of trailing type flexible cage guide fills TRT
CN205675933U (en) A kind of elevator speed governor
CN207293862U (en) Novel progressive safety tongs shift mechanism
CN205484675U (en) Power transmission line insulator detects power unit of instrument
CN201738889U (en) Long-stroke belt tower type oil pumping unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20180711