CN205777525U - A kind of to drawing device - Google Patents

A kind of to drawing device Download PDF

Info

Publication number
CN205777525U
CN205777525U CN201620480545.1U CN201620480545U CN205777525U CN 205777525 U CN205777525 U CN 205777525U CN 201620480545 U CN201620480545 U CN 201620480545U CN 205777525 U CN205777525 U CN 205777525U
Authority
CN
China
Prior art keywords
screw rod
connector
drawing device
nut
keeper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620480545.1U
Other languages
Chinese (zh)
Inventor
俞大有
李昌州
陈定球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620480545.1U priority Critical patent/CN205777525U/en
Application granted granted Critical
Publication of CN205777525U publication Critical patent/CN205777525U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

This utility model belongs to building implement technical field, specifically disclose a kind of to drawing device, including the first screw rod, the second screw rod and connector, one end of described connector is connected with the first screw rod, the other end and the second screw rod are flexibly connected by screw thread, one end that described connector and the first screw rod connect is provided with keeper, and the face area of described keeper is less than the face area of connector, and described second screw rod is provided with nut.This utility model is in use, the end face of keeper replaces the end face of connector, and the face area of keeper is less than the face area of connector, after in-situ layer has poured, so it is effectively reduced and drawing device is spilt the area on in-situ layer metope, solve the inaesthetic technical problem of metope.

Description

A kind of to drawing device
Technical field
This utility model belongs to building implement technical field, particularly relates to a kind of to drawing device.
Background technology
At present, in the cast-in-place concrete construction of building, the most all can use Screw arbor with nut at both-ends device.Tradition Screw arbor with nut at both-ends be integral type structure, after concrete cast-in-situ, not only screw rod cannot take out, and stretches out The screw rod of wall outer side affects the dismounting of template, needs to slice off the part of exposing surface, wastes great deal of steel, And can not reuse, waste manpower financial capacity.
For solving above-mentioned technical problem, in prior art, disclose dismountable Screw arbor with nut at both-ends, such as patent CN 202483175 U disclose a kind of detachable Screw arbor with nut at both-ends, described detachable Screw arbor with nut at both-ends include inner screw, Connector, external screw rod, chevron card and clip, the two ends of wherein said inner screw are respectively by described connection One end of part and described external screw rod connects, and the other end at described external screw rod connects described chevron card and described Clip, described clip is arranged on the outside of described chevron card.Above-mentioned Screw arbor with nut at both-ends can be dismantled and can Recycling, has saved manpower financial capacity.But, owing to connector is against interior template, pouring complete form removal After, connector has one side and exposes in-situ layer, causes wall surface unsightly.
In sum, need badly exploitation a kind of dismounting after do not affect in-situ layer metope attractive in appearance to drawing device.
Utility model content
The purpose of this utility model be to provide a kind of dismounting after do not affect in-situ layer metope attractive in appearance to drawing device.
Above-mentioned purpose is to be achieved through the following technical solutions: a kind of to drawing device, including the first screw rod, second Screw rod and connector, one end of described connector is connected with the first screw rod, and the other end and the second screw rod pass through spiral shell Stricture of vagina is flexibly connected, and one end that described connector and the first screw rod connect is provided with keeper, on described second screw rod It is provided with nut.In order to ensure after casting concrete, concrete will not wrap the second screw rod, it is desirable to connects The end of part, against interior template, arranges keeper in the end of connector, in use, and keeper End face replaces the end face of connector, and the face area of keeper, less than the face area of connector, works as in-situ layer After having poured, so it is effectively reduced and drawing device is spilt the area on in-situ layer metope, solve metope Inaesthetic technical problem.Certainly, in the case of not affecting use, the face area of keeper the least more Good.During it should be noted that this utility model uses as exterior wall is cast-in-place, in the prefabrication process of wallboard, The end anchorage of described first screw rod is in wallboard;Template in arranging parallel two piece, pours mixed in the middle of it In the case of solidifying soil, described first screw rod stretches out one of interior template, and uses nut to fasten.
Further, described keeper includes that at least one is protruding.Being arranged such, projection can play position-limiting action, Making connector not expose outer surface, the most multiple points expose simultaneously, and the most protruding length can be done short as far as possible, Make to only have therebetween a small amount of laitance so that the second screw rod is easily disassembled.Described projection is preferably symmetrical arranged 2 to 3 Individual.
Further, described keeper is along the circumferentially disposed bulge loop of connector.It is arranged such, only the circle of bulge loop Ring exposes at concrete surface, and bulge loop can make it in do not have concrete to penetrate into, make the second screw rod can be light Demolition is unloaded.In the case of not affecting use, the wall of bulge loop is the thinnest, and internal diameter is the least, when So its internal diameter have to be larger than the diameter of the second screw rod.
Further, described connector and the first screw rod are flexibly connected by screw thread.It is arranged such, it is simple to regulation Connector and the relative position of the first screw rod so that connector can be adjusted its one end rear against interior template.
Further, described connector and the first screw rod connect one end and the one end being connected with the second screw rod are offered Hand of spiral contrary.When installing and using, can first regulate the relative position of the first screw rod and connector, the company of making Fitting and interior template have certain distance, described connector and one end of the first screw rod connection and connect with the second screw rod The hand of spiral that the one end connect is offered is contrary, then after the second screw rod is screwed into connector, after being screwed to termination, then Continue to twist and then can move towards the direction of the second screw rod by band follower link, until the adjacent interior template of connector. So, after in-situ layer completes to pour, owing to connector is close to interior template, therefore the second screw rod can't occur The phenomenon of concrete parcel, when removing the second screw rod, it is only necessary to it back-outed from connector.
Further, described first screw rod is provided with sealing part.The setting of sealing part can prevent water along to drawing spiral shell Bar penetrates into inside body of wall.
Further, described nut is butterfly nut.It is arranged such, manually rotates the both wings of butterfly nut Can fasten to drawing device, simplify operation.
Further, described first screw rod is provided with anchoring piece away from one end of connector.It is arranged such, can will set The one end having the first screw rod of anchoring piece is anchored in building element, increases anchor force, prevents pulling process During, the first screw rod is extracted in building element.This kind of situation is applicable to building element to be made as template Situation.
Further, described second screw rod is provided with pad.Certainly, the surface area of pad can be increased as far as possible.
Further, described pad is between described nut and connector.
Further, described second screw rod is provided with hold-doun nut.It is arranged such, when can be the second screw rod dismounting There is provided impetus, it is simple to the dismounting of the second screw rod.
Further, described hold-doun nut and the second screw rod removably connect.It is arranged such, it is simple to tearing open of nut Unload and move, also allow for transport simultaneously.Certainly, described hold-doun nut may also be butterfly nut.
Further, described hold-doun nut is fixed on described second screw rod one end away from connector.Preferably, may be used Being arranged to square by the termination of the second screw rod, the endoporus of described hold-doun nut is also configured to and the second screw end head The shapes and sizes matched.
Further, described second screw rod is arranged to square away from one end of connector.It is arranged such that Two screw rods are arranged to square toes or homalocephalus, such square toes or homalocephalus offer stress point, just away from one end of connector Dismounting in the second screw rod.
Accompanying drawing explanation
The accompanying drawing constituting a part of the present utility model is further appreciated by of the present utility model for providing, this The schematic description and description of utility model is used for explaining this utility model, is not intended that this practicality new The improper restriction of type.
Fig. 1 is the front schematic view to drawing device involved by a kind of embodiment of this utility model;
Fig. 2 is the perspective view to drawing device involved in Fig. 1;
Fig. 3 and Fig. 4 is respectively the connecting-piece structure schematic diagram involved by a kind of embodiment of this utility model;
Fig. 5 is the perspective view to drawing device involved by this utility model another embodiment;
Fig. 6 is involved in Fig. 5 drawing device to be disassembled schematic diagram;
Fig. 7 is the perspective view to drawing device involved by this utility model another embodiment;
Fig. 8 is the use view to drawing device involved by a kind of embodiment of this utility model.
In figure:
1 first screw rod 2 second screw rod 3 connector 4 nut
In 5, template 6 in-situ layer 7 wallboard 8 is protruding
9 bulge loop 10 anchoring piece 11 pad 12 hold-doun nuts
Detailed description of the invention
Being described in detail this utility model below in conjunction with the accompanying drawings, the description of this part is only exemplary reconciliation The property released, should not have any restriction effect to protection domain of the present utility model.Additionally, people in the art Feature in embodiment in presents and in different embodiment, according to the description of presents, can be carried out by member Respective combination.
This utility model embodiment is as follows, with reference to Fig. 1~4 and Fig. 8, a kind of to drawing device, including the first spiral shell Bar the 1, second screw rod 2 and connector 3, one end of described connector 3 is connected with the first screw rod 1, the other end Being flexibly connected by screw thread with the second screw rod 2, one end that described connector 3 is connected with the first screw rod 1 is provided with Keeper, described second screw rod 2 is provided with nut 4.In order to ensure after casting concrete, concrete is not The second screw rod 2 can be wrapped, it is desirable to the end of connector 3, against interior template 5, sets in the end of connector 3 Putting keeper, in use, the end face of keeper replaces the end face of connector 3, the end face of keeper Area, less than the face area of connector 3, after in-situ layer 6 has poured, is so effectively reduced drawing Device spills the area on in-situ layer 6 metope, solves the inaesthetic technical problem of metope.Certainly, not In the case of impact uses, the face area of keeper is the smaller the better.It should be noted that this utility model When using as exterior wall is cast-in-place, in the prefabrication process of wallboard 7, the end anchorage of described first screw rod 1 exists In wallboard 7;Template 5 in parallel two piece are set, in the case of its middle casting concrete, described One screw rod 1 stretches out one of interior template 5, and uses nut 4 to fasten.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 3, described keeper includes At least one projection 8.Being arranged such, protruding 8 can play position-limiting action, make connector 3 not expose simultaneously Outer surface, the most multiple points expose, and certainly the length of protruding 8 can be done short as far as possible so that it is only have a small amount of Laitance so that the second screw rod 2 is easily disassembled.Described protruding 8 are preferably symmetrical arranged 2 to 3.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 4, described keeper is edge The bulge loop 9 that connector 3 is circumferentially disposed.Being arranged such, the only annulus of bulge loop 9 exposes at concrete surface, And bulge loop 9 does not has concrete to penetrate in can making it, make the second screw rod 2 can be with easy removal.Do not affecting In the case of use, the wall of bulge loop 9 is the thinnest, and internal diameter is the least, and its internal diameter must be big certainly Diameter in the second screw rod 2.
On the basis of above-described embodiment, in another embodiment of the present invention, described connector 3 and the first screw rod 1 is flexibly connected by screw thread.It is arranged such, it is simple to the relative position of adjusting connector 3 and the first screw rod 1, After connector 3 can be adjusted, its one end is against interior template 5.
On the basis of above-described embodiment, in another embodiment of the present invention, described connector 3 and the first screw rod 1 one end connected and contrary with the hand of spiral offered of one end that the second screw rod 2 connects.When installing and using, Can will regulate the relative position of the first screw rod 1 and connector 3, make connector 3 and interior template 5 have a spacing From, one end that described connector 3 is connected with the first screw rod 1 and the one end being connected with the second screw rod 2 are offered Hand of spiral is contrary, then, after the second screw rod 2 is screwed into connector 3, after being screwed to termination, be further continued for twisting and then can Move towards the direction of the second screw rod 2 with follower link 3, until the adjacent interior template 5 of connector 3. So, after in-situ layer 6 completes to pour, owing to connector 3 is close to interior template 5, therefore the second screw rod 2 is also Do not have the phenomenon of concrete parcel, when removing the second screw rod 2, it is only necessary to it back-outed from connector 3 ?.
On the basis of above-described embodiment, in another embodiment of the present invention, described first screw rod 1 is only provided with Water part.The setting of sealing part can prevent water from penetrating into inside body of wall along Screw arbor with nut at both-ends.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 5 and 6, described nut 4 For butterfly nut 4.Being arranged such, the both wings manually rotating butterfly nut 4 can enter to drawing device Row fastening, simplifies operation.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 5 and 6, described first spiral shell Bar 1 is provided with anchoring piece 10 away from one end of connector 3.It is arranged such, the of anchoring piece 10 can be provided with One end of one screw rod 1 is anchored in building element, increases anchor force, during preventing pulling process, and will First screw rod 1 is extracted in building element.This kind of situation is applicable to the situation that building element uses as template.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 5 and 6, described second spiral shell Bar 2 is provided with pad 11.Certainly, the surface area of pad 11 can be increased as far as possible.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 5 and 6, described pad 11 Between described nut 4 and connector 3.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 5 and 6, described second spiral shell Bar 2 is provided with hold-doun nut 12.It is arranged such, can be that the second screw rod 2 provides impetus when dismantling, it is simple to The dismounting of the second screw rod 2.
On the basis of above-described embodiment, in another embodiment of the present invention, described hold-doun nut 12 and the second spiral shell Bar 2 removably connects.It is arranged such, it is simple to the dismounting of nut 4 and movement, also allows for transport simultaneously.When So, described hold-doun nut 12 may also be butterfly nut 4.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 7, described hold-doun nut 12 It is fixed on described second screw rod 2 one end away from connector 3.Preferably, the termination of the second screw rod 2 can be set Be set to square, the endoporus of described hold-doun nut 12 be also configured to the shape that matches with the second screw rod 2 termination and Size.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 2, described second screw rod 2 One end away from connector 3 is arranged to square.It is arranged such that the second screw rod 2 away from the one of connector End is arranged to square toes or homalocephalus, such square toes or homalocephalus provides stress point, it is simple to the dismounting of the second screw rod 2.
The above is only preferred implementation of the present utility model, it is noted that for the art For those of ordinary skill, on the premise of without departing from this utility model principle, it is also possible to make some improvement And retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (10)

1. one kind to drawing device, it is characterised in that include the first screw rod, the second screw rod and connector, described One end of connector is connected with the first screw rod, and the other end and the second screw rod are flexibly connected by screw thread, described company One end that fitting and the first screw rod connect is provided with keeper, and the face area of described keeper is less than connector Face area, described second screw rod is provided with nut.
The most according to claim 1 to drawing device, it is characterised in that described keeper includes at least one Individual projection.
The most according to claim 1 to drawing device, it is characterised in that described keeper is along connector Circumferentially disposed bulge loop.
4. according to described in Claims 2 or 3 to drawing device, it is characterised in that described connector and first Screw rod is flexibly connected by screw thread.
The most according to claim 4 to drawing device, it is characterised in that described first screw rod is only provided with Water part.
The most according to claim 1 to drawing device, it is characterised in that described nut is butterfly nut.
The most according to claim 5 to drawing device, it is characterised in that described first screw rod is away from connection One end of part is provided with anchoring piece.
The most according to claim 7 to drawing device, it is characterised in that described second screw rod is provided with pad Sheet.
The most according to claim 8 to drawing device, it is characterised in that described second screw rod is provided with solid Determine nut.
The most according to claim 5 to drawing device, it is characterised in that described second screw rod is away from even One end of fitting is arranged to square.
CN201620480545.1U 2016-05-24 2016-05-24 A kind of to drawing device Active CN205777525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620480545.1U CN205777525U (en) 2016-05-24 2016-05-24 A kind of to drawing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620480545.1U CN205777525U (en) 2016-05-24 2016-05-24 A kind of to drawing device

Publications (1)

Publication Number Publication Date
CN205777525U true CN205777525U (en) 2016-12-07

Family

ID=58113267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620480545.1U Active CN205777525U (en) 2016-05-24 2016-05-24 A kind of to drawing device

Country Status (1)

Country Link
CN (1) CN205777525U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441467A (en) * 2020-04-10 2020-07-24 中国十七冶集团有限公司 Basement outer wall post-cast strip pouring front-block anti-seepage component and construction method
CN112081376A (en) * 2020-07-31 2020-12-15 何其佳 Prevention of seepage water nut and split screw assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441467A (en) * 2020-04-10 2020-07-24 中国十七冶集团有限公司 Basement outer wall post-cast strip pouring front-block anti-seepage component and construction method
CN112081376A (en) * 2020-07-31 2020-12-15 何其佳 Prevention of seepage water nut and split screw assembly

Similar Documents

Publication Publication Date Title
CN205777525U (en) A kind of to drawing device
CN106639071A (en) Laminated slab type sandwich heat preservation shear wall with split bolts and installing method
CN205475352U (en) Two sleeve connection structure of straight thread of muscle are indulged to bottom plate shrink post -cast strip
CN106284307B (en) Threaded prefabricated U HPC pile piles and its making construction method
WO2017096642A1 (en) Uplift tubular pile having spreadable barbs and construction method therefor
EP2376617B1 (en) Tank wall for a tank covered by a film and outer shell for producing the tank wall
CN206753064U (en) A kind of aluminum alloy mould plate pull-tab system
CN102979086B (en) Prestressed concrete square pile and manufacturing method thereof
DE102012001109A1 (en) hybrid tower
CN207211432U (en) A kind of stifled slurry system of sleeve grouting
CN102995635B (en) Prestressed concrete square pile and manufacturing method thereof
RU87176U1 (en) PILOT SCREW REINFORCED CONCRETE
CN205777524U (en) A kind of to drawing device
CN206128641U (en) To drawing device
CN205976506U (en) To drawing device
CN209262424U (en) A kind of auxiliary blocks the fixture of swimming pool casing hole
CN203007937U (en) Prestressed concrete square pile
CN207296435U (en) A kind of multi-functional bar tied hook
CN208328999U (en) A kind of town road anti-stealing manhole cover
CN205712767U (en) A kind of grout sleeve and prefabricated component
CN205917993U (en) Grout sleeve and prefab
CN205712763U (en) A kind of grout sleeve and prefabricated component
CN203846679U (en) Tie bar of embedded sleeve of infilled wall
CN209369319U (en) The chain type concrete template of independent assortment
CN208309538U (en) A kind of novel field water channel gate hoist

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: To drawing device

Granted publication date: 20161207

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Tying device

Granted publication date: 20161207

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Tying device

Granted publication date: 20161207

License type: Common License

Record date: 20200305

EE01 Entry into force of recordation of patent licensing contract
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 3005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

CP03 Change of name, title or address
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A pair pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A pair pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A pair pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of utility model: A pair pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of utility model: A pair pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of utility model: A pair pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20210302

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Shangyi Engineering Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010464

Denomination of utility model: A pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20211011

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan fengque Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010621

Denomination of utility model: A pulling device

Granted publication date: 20161207

License type: Common License

Record date: 20211019